Bid Sheet Template Restrooms.xlsx
XLSX spreadsheet 59 KB Posted
- Attached to
- N3203422 Minot Probation Office
- Solicitation number
- 47PD5326R0024
- Issued by
- Not on record
About this file
This is a Bid Sheet Template for a tenant improvement project at the Bruce M. Van Sickle Federal Building & Courthouse in Minot, North Dakota. The template is designed for the Probation Office remodel (Project ND0014, Contract N3203422) and provides the required pricing format for GSA R8 Construction IDIQ proposals. The spreadsheet is structured to capture costs across multiple construction divisions organized by the 2016 CSI Masterformat, including General Requirements, Existing Conditions, Thermal and Moisture Protection, Openings, Finishes, Furnishings, Fire Sprinkler, Plumbing, HVAC, Controls, Electrical, and Communications.
Contractors must complete the template by providing materials, equipment, and labor costs for each line item, with subtotals calculated for each division. The format requires contractors to include General Conditions, Overhead, Profit, and Bond percentages to arrive at a total construction cost. Key work scope elements specific to the restroom remodel include plumbing updates for Women's and Men's restrooms with ADA compliance, electrical and HVAC modifications, flooring and wall finishes, door and frame replacements, and restroom cubicles. This pricing template is the only format accepted by GSA for proposals under this construction IDIQ contract vehicle. The solicitation is set aside for small businesses in North Dakota, and contractors are responsible for ensuring complete accuracy of their proposals.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N3203422 - Amendment 4 - 20260723.pdf | ||
| N3203422 - Amendment 3 Cover - 20260721.pdf | ||
| N3203422 - Amendment 2 Package - 20260602.pdf | ||
| N3203422 - Amendment 1 Package - 20260522.pdf | ||
| SF24-23a.pdf | ||
| Bid Sheet Template Tenant Improvement.xlsx | XLSX spreadsheet | |
| Bid Sheet Template Abatement.xlsx | XLSX spreadsheet | |
| GSA527-21a.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tenant Improvement
| PROJECT TITLE: | ND0014, N3203422, Probation Remodel, Minot |
| Bidsheet | Tenant Improvements |
| PROJECT SOLICITATION #: |
Contractor Name: Date:
| Division | Materials | Equipment | Labor | Subtotal | Comments | |||||||||||
| # | Description | Unit | Quantity | Cost/Unit | Total | Unit | Quantity | Cost/Unit | Total | Unit | Quantity | Cost/Unit | Total | Subtotal | Comments | |
| 01 | GENERAL REQUIREMENTS | |||||||||||||||
| Project Manager | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Superintendent | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Design Allowance | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Subtotal | $ - 0 |
| 02 | EXISTING CONDITIONS | ||
| Selective Demolition | $ - 0 | $ - 0 | |
| $ - 0 | |||
| $ - 0 | |||
| Subtotal | $ - 0 |
| 07 | Thermal and Moisture Protection | ||||
| Sound Batt Insulation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Subtotal | $ - 0 |
| 08 | Openings | ||||
| Door Demoliton | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Door Frames | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Doors | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Subtotal | $ - 0 |
| 09 | Finishes | ||||
| Carpet Tile and Cove Base Removal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Wall Demolition | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| New Wall Construction | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Flooring | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Painting | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Ceiling | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Subtotal | $ - 0 |
| 12 | Furnishings | ||||
| Restroom Cubicles | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Subtotal | $ - 0 |
| 21 | Fire Sprinkler | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Subtotal | $ - 0 |
| 22 | Plumbing | ||||
| Women's Restroom | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Men's RR ADA Updates | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Subtotal | $ - 0 |
| 23 | HVAC | ||||
| Supply and Return Diffusers | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Exhaust | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Subtotal | $ - 0 |
| 25 | Controls | ||||
| Thermostats and electronic controls. | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Subtotal | $ - 0 |
| 26 | Electrical | ||||
| Lighting | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Power Distribution | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Subtotal | $ - 0 |
| 27 | Communications | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Subtotal | $ - 0 |
| Construction Total | $ - 0 | |||
| General Conditions | % | $ - 0 | $ - 0 | |
| Overhead | % | $ - 0 | $ - 0 | |
| Profit | % | $ - 0 | $ - 0 | |
| Bond | % | $ - 0 | $ - 0 | |
| TOTAL CONSTRUCTION COST | $ - 0 |
Date Authorized Negotiator Signature
| NOTES | |
| 1 | Each Comment, if any, should have a note number and be explained in the notes section |
| 2 | Spreadsheet may be expanded as necessary for 2016 CSI Masterformat Divisions and/or additional line items |
| (Division can be listed as $0.00 if unused) | |
| 3 | Offeror is responsible for accuracy of the proposal in its entirety in this spreadsheet. |
| 4 | This Price Proposal Format will be the only format accepted by GSA. |
GENERAL SERVICES ADMINISTRATION R8 CONSTRUCTION IDIQ PROPOSAL BID FORMAT
Page &P of image1.png
File details come from the government source that posted it. Updated .