BID SHEET.xlsx
XLSX spreadsheet 19 KB Posted
- Attached to
- On-Call Traffic Calming & Safety
- Solicitation number
- BPM057921
- Issued by
- Capitol Heights Town, Maryland
About this file
This is a Bid Sheet for an On-Call Traffic Calming & Safety contract with the City of Cambridge, Maryland, which may be piggybacked by other Maryland jurisdictions. The project encompasses furnishing and installing signs, markings, and traffic calming devices to reduce traffic speed and enhance public safety. The scope is organized into five schedules containing 168 line items across four primary categories: thermoplastic line striping (Items 101-114), painted line striping (Items 115-128), preformed thermoplastic and MMA markings (Items 129-144), and traffic control and calming devices including signage and miscellaneous items (Items 145-169). Quantities vary significantly across items, ranging from as few as 2 units for left turn lane calming kits to as many as 20,000 linear feet for single white 5-inch line striping. The bid sheet includes specific product requirements, particularly for thermoplastic markings with designated Ennis-Flint product numbers, and references to two mobile unit categories for standalone tasks below $5,000 and between $5,000 and $15,000.
All unit prices and extended prices are listed as zero dollars on the bid sheet, indicating this is a blank form awaiting contractor pricing responses. The bid sheet requires firm signatures and dates from contractors for each schedule, suggesting that pricing submissions are to be provided by responsive bidders. The contract structure allows for flexible pricing on individual line items across the five schedules, with subtotals calculated for each schedule and a grand total for all items. This on-call contracting approach enables Cambridge and potentially other Maryland jurisdictions to request traffic safety and calming services as needed throughout the contract term without committing to a specific project scope or total value at the time of award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| addendum 1.pdf | ||
| On-CallTrafficCalming_IFB.pdf | ||
| BID FORMS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Sheet
| SCHEDULE A: ITEMS 101 THROUGH 114 | |||||
| THERMOPLASTIC LINE STRIPING WITH LAYOUT | |||||
| # | ITEM | UNIT | QUANTITY | UNIT PRICE | EXTENDED PRICE |
| MOB - A | Standalone tasks less than $5,000 | EA | 10 | ||
| MOB - B | Standalone task or multiple concurrent tasks between $5,000 and $15,000 | EA | 10 |
| SCHEDULE A: ITEMS 101 THROUGH 114 | |||||
| THERMOPLASTIC LINE STRIPING WITH LAYOUT | |||||
| # | ITEM | UNIT | QUANTITY | UNIT PRICE | EXTENDED PRICE |
| 101 | Removal of Existing Striping and Designated Thermoplastic: Furnish all materials, equipment and labor necessary to remove existing striping and designated thermoplastic via micro-grinding, hydro-blasting, black-out or other approved method | LF | 7,500 | $ - 0 | $ - 0 |
| 102 | Removal of Existing Thermoplastic: Furnish all materials, equipment and labor necessary to remove existing thermoplastic via micro-grinding, hydro-blasting, or other approved method | SF | 2,200 | $ - 0 | $ - 0 |
| 103 | Solid Double Yellow Striping: Furnish all materials, equipment and labor necessary to place necessary lane striping in a 5”-5”-5” application | LF | 14,000 | $ - 0 | $ - 0 |
| 104 | Solid Single Yellow Striping: Furnish all materials, equipment and labor necessary to place necessary lane striping 5” wide | LF | 14,000 | $ - 0 | $ - 0 |
| 106 | Single Yellow “Skip” Line: Furnish all materials, equipment and labor necessary to place necessary lane striping. (Stripe Skip 2' 6'). | LF | 800 | $ - 0 | $ - 0 |
| 107 | Single Yellow Type III “Puppy Tracks” Line: Furnish all materials, equipment and labor necessary to place necessary lane striping. (3-foot dash, 3-foot gap) | LF | 200 | $ - 0 | $ - 0 |
| 108 | Single White “Skip” Line: (Stripe Skip 2 6). Furnish all materials, equipment and labor necessary to place necessary lane striping | LF | 3,000 | $ - 0 | $ - 0 |
| 109 | Single White Type I “Lane Extension” Line: Furnish all materials, equipment and labor necessary to place necessary lane striping | LF | 500 | $ - 0 | $ - 0 |
| 110 | Single White Type III “Puppy Tracks” Line: Furnish all materials, equipment and labor necessary to place necessary lane striping | LF | 500 | $ - 0 | $ - 0 |
| 111 | Single White Wide 10” Line: Furnish all materials, equipment and labor necessary to place necessary lane striping | LF | 2,000 | $ - 0 | $ - 0 |
| 112 | Single Yellow Extra-Wide 15” Line: Furnish all materials, equipment and labor necessary to place necessary lane striping | LF | 500 | $ - 0 | $ - 0 |
| 113 | Single White Line - 5": Furnish all materials, equipment and labor necessary to place necessary lane striping | LF | 20,000 | $ - 0 | $ - 0 |
| 114 | Single White (Stopline) Line - 24": Furnish all materials, equipment and labor necessary to place necessary lane striping | LF | 2,000 | $ - 0 | $ - 0 |
| SUBTOTAL - SCHEDULE A | $ - 0 |
FIRM Signature Date
| SCHEDULE B: ITEMS 115 - 128 | |||||
| PAINTED LINE STRIPING WITH LAYOUT | |||||
| # | ITEM | UNIT | QUANTITY | UNIT PRICE | EXTENDED PRICE |
| 115 | NOT USED | - | 0 | $ - 0 | $ - 0 |
| 116 | NOT USED | - | 0 | $ - 0 | $ - 0 |
| 117 | Solid Double Yellow Striping: Furnish all materials, equipment and labor necessary to place necessary lane striping in a 5”-5”-5” application | LF | 2,500 | $ - 0 | $ - 0 |
| 118 | Solid Single Yellow Striping: Furnish all materials, equipment and labor necessary to place necessary lane striping 5” wide | LF | 2,500 | $ - 0 | $ - 0 |
| 119 | Solid Single with dashed single Yellow Striping: Furnish all materials, equipment and labor necessary to place necessary lane striping in a 5”-5”-5” application with one solid and one dashed yellow side-by-side | LF | 2,500 | $ - 0 | $ - 0 |
| 120 | Single Yellow “Skip” Line: Furnish all materials, equipment and labor necessary to place necessary lane striping | LF | 2,500 | $ - 0 | $ - 0 |
| 121 | Single Yellow Type III “Puppy Tracks” Line: Furnish all materials, equipment and labor necessary to place necessary lane striping | LF | 500 | $ - 0 | $ - 0 |
| 122 | Single White “Skip” Line: Furnish all materials, equipment and labor necessary to place necessary lane striping | LF | 2,000 | $ - 0 | $ - 0 |
| 123 | Single White Type I “Lane Extension” Line: Furnish all materials, equipment and labor necessary to place necessary lane striping | LF | 2,000 | $ - 0 | $ - 0 |
| 124 | Single White Type III “Puppy Tracks” Line: Furnish all materials, equipment and labor necessary to place necessary lane striping | LF | 500 | $ - 0 | $ - 0 |
| 125 | Single White Wide 10” Line: Furnish all materials, equipment and labor necessary to place necessary lane striping | LF | 2,000 | $ - 0 | $ - 0 |
| 126 | Single White Extra-Wide 15” Line: Furnish all materials, equipment and labor necessary to place necessary lane striping | LF | 1000 | $ - 0 | $ - 0 |
| 127 | Single Yellow Extra-Wide 15” Line: Furnish all materials, equipment and labor necessary to place necessary lane striping | LF | 1000 | $ - 0 | $ - 0 |
| 128 | Single White Line: Furnish all materials, equipment and labor necessary to place necessary lane striping 5" wide | LF | 2,000 | $ - 0 | $ - 0 |
| SUBTOTAL - SCHEDULE B | $ - 0 |
FIRM Signature Date
| SCHEDULE C: ITEMS 129 - 144 | |||||
| PRE-FORM THERMOPLASTIC AND MMA WITH LAYOUT | |||||
| # | ITEM | UNIT | QUANTITY | UNIT PRICE | EXTENDED PRICE |
| 129 | Green Bike Lane (Thermoplastic): Furnish all materials, equipment and labor necessary to place necessary thermoplastic such as Pre-Mark Product from Ennis-Flint | SF | 2,000 | $ - 0 | $ - 0 |
| 130 | Green Bike Lane Symbol Pavement Marking (Thermoplastic): Furnish all materials, equipment and labor necessary to place necessary thermoplastic (Ennis-Flint Product Number: PMSK6902767L ) | EA | 20 | $ - 0 | $ - 0 |
| 131 | Green Bike Lane Directional Arrow Pavement Marking (Thermoplastic): Furnish all materials, equipment and labor necessary to place necessary thermoplastic (Ennis-Flint Product Number: PMSK6902763 ) | EA | 20 | $ - 0 | $ - 0 |
| 132 | Green Bike Lane STOP Pavement Marking (Thermoplastic): Furnish all materials, equipment and labor necessary to place necessary thermoplastic (Ennis-Flint Product Number: PMSK6902760) | EA | 20 | $ - 0 | $ - 0 |
| 133 | Bike Lane Symbol Pavement Marking (Thermoplastic): Furnish all materials, equipment and labor necessary to place necessary thermoplastic (Ennis-Flint Product Number: 89230576LHS) | EA | 100 | $ - 0 | $ - 0 |
| 134 | Bike Lane Directional Arrow Pavement Marking (Thermoplastic): Furnish all materials, equipment and labor necessary to place necessary thermoplastic (Ennis-Flint Product Number: PM602005) | EA | 100 | $ - 0 | $ - 0 |
| 135 | Sharrow Marking (Thermoplastic): Furnish all materials, equipment and labor necessary to place necessary thermoplastic | EA | 100 | $ - 0 | $ - 0 |
| 136 | Preferential Lane Marking Paint (Bike Lane Green): Furnish all materials, equipment and labor necessary to place necessary Acrylic preferential lane marking paint such as Ennis-Flint Cycle Grip) as directed | SF | 2,000 | $ - 0 | $ - 0 |
| 138 | Left Turn Lane Arrows (Thermoplastic): Furnish all materials, equipment and labor necessary to place necessary thermoplastic (Ennis-Flint Product Number: 8330241L) | EA | 10 | $ - 0 | $ - 0 |
| 139 | Right Turn Lane Arrows (Thermoplastic): Furnish all materials, equipment and labor necessary to place necessary thermoplastic (Ennis-Flint Product Number: 8330241R) | EA | 10 | $ - 0 | $ - 0 |
| 140 | Dual Arrow (Thermoplastic): Furnish all materials, equipment and labor necessary to place necessary thermoplastic such as a combined Straight/Right or Straight/Left | EA | 5 | $ - 0 | $ - 0 |
| 141 | "SLOW" Preformed Thermoplastic Symbol: Furnish all materials, equipment and labor necessary to place necessary thermoplastic | EA | 5 | $ - 0 | $ - 0 |
| 142 | Green-Colored Driveway Crossing Markings. Pavement Marking to Delinieate a Bicycle Lane, 2' skip and 4' space, 6" white line | LF | 1,200 | $ - 0 | $ - 0 |
| 143 | Bike Lane Stop Bar and High Visibility “Continental” Crosswalks (24"): Furnish all materials, equipment and labor necessary to place necessary thermoplastic using Pre-Mark Linear (Ennis-Flint Product Number: 8431064) or Pavemark Spray-on thermoplastic or equivalent in white | LF | 4,000 | $ - 0 | $ - 0 |
| 144 | Yield Line (“Shark’s Teeth”): Furnish all materials, equipment and labor necessary to place necessary thermoplastic in dimension of 12” wide by 18” tall | EA | 6 | $ - 0 | $ - 0 |
| SUBTOTAL - SCHEDULE C | $ - 0 |
FIRM Signature Date
| SCHEDULE D: ITEMS 145 - 169 | |||||
| TRAFFIC CONTROL AND CALMING DEVICES AND MISCELLANEOUS ITEMS | |||||
| # | ITEM | UNIT | QUANTITY | UNIT PRICE | EXTENDED PRICE |
| 145 | Flexible Plastic Highway Delineator | EA | 400 | $ - 0 | $ - 0 |
| 146 | Heavy-Duty Rubber Speed Cushion | EA | 6 | $ - 0 | $ - 0 |
| 147 | Heavy-Duty Rubber Bus/Bike Lane Curb | LF | 1,000 | $ - 0 | $ - 0 |
| 148 | NOT USED | ||||
| 149 | Remove Existing Roadway Signage: | EA | 20 | $ - 0 | $ - 0 |
| 150 | MUTCD Standard Roadway Signage | SF | 800 | $ - 0 | $ - 0 |
| 151 | NOT USED | 0 | $ - 0 | $ - 0 | |
| 152 | NOT USED | 0 | $ - 0 | $ - 0 | |
| 153 | Retroreflective Strip | EA | 20 | $ - 0 | $ - 0 |
| 154 | Metal Signpost, 2”x2” | EA | 60 | $ - 0 | $ - 0 |
| 155 | Wooden Signpost, 4”x4” | EA | 40 | $ - 0 | $ - 0 |
| 156 | Decorative Black Metal Signpost | EA | 20 | $ - 0 | $ - 0 |
| 157 | Rumble Strips | EA | 6 | $ - 0 | $ - 0 |
| 158 | Snowplowable Raised Pavement Markers | EA | 100 | $ - 0 | $ - 0 |
| 159 | Recessed Pavement Markers | LF | 500 | $ - 0 | $ - 0 |
| 160 | Zicla Zebra 5 | EA | 80 | $ - 0 | $ - 0 |
| 161 | Zicla Zebra 9 | EA | 80 | $ - 0 | $ - 0 |
| 162 | Zicla Zebra 13 | EA | 80 | $ - 0 | $ - 0 |
| 163 | Rubber Speed Bump System | EA | 10 | $ - 0 | $ - 0 |
| 164 | Standard Recycled Rubber Wheel Stop | EA | 200 | $ - 0 | $ - 0 |
| 165 | Left Turn Calming - Complete Hardened Centerline Kit | EA | 2 | $ - 0 | $ - 0 |
| 166 | Planter Boxes | EA | 12 | $ - 0 | $ - 0 |
| SUBTOTAL - SCHEDULE D | $ - 0 |
| SCHEDULE D: ITEMS 167- 168 | |||||
| TRAFFIC CONTROL AND CALMING DEVICES AND MISCELLANEOUS ITEMS | |||||
| 167 | Rectangular Rapid Flashing Beacon (RRFB) Assembly (set of TWO) | EA | 4 | $ - 0 | $ - 0 |
| 168 | Decommissioning of traffic signal | EA | 2 | $ - 0 | $ - 0 |
| SUBTOTAL - SCHEDULE E |
TOTAL -- ALL SCHEDULES, ALL ITEMS $ - 0