Summary of Union Square Cafe Project Bid Set

This is a comprehensive bid set document prepared by Mark Cavagnero Associates, Architects, for the Union Square Cafe renovation project in San Francisco, dated February 20, 2026. The project encompasses all Division specifications for a complete buildout including plumbing, fire protection systems, mechanical work, and interior finishes. The scope includes multiple systems: automatic wet sprinkler systems with hydraulically calculated design, a single interlocked pre-action fire suppression system for the IT room, domestic water piping systems, sanitary soil/waste/vent piping, food service equipment installation, and comprehensive interior finishes including gypsum board, tiling, painting, glazing, and architectural woodwork. The specifications require bidders to submit coordinated shop drawings in Revit 2024 format, hydraulic calculations signed by California-licensed structural engineers, seismic sway bracing calculations, and as-built drawings. All work must comply with the 2022 California Building Code, California Fire Code, California Plumbing Code, NFPA standards (13, 24, 25, 72), and San Francisco Fire Marshal requirements. The contractor must obtain all necessary permits and pay associated fees, with final inspection and acceptance contingent upon San Francisco Fire Marshal and Building Inspection and Code Enforcement (BICE) approvals.

The specifications mandate that the contractor possess a minimum of five years' successful installation experience on comparable projects and maintain a current State of California C-16 contractor license held under the licensed business name for at least five years. All piping materials, valves, and plumbing fixtures must be lead-free compliant per California Assembly Bill 1953 and certified to NSF/ANSI 372 standards. The project requires a twelve-month warranty period from the date of final acceptance, with the contractor responsible for damage caused by leaks or system failures during this period. A one-year inspection agreement must be executed following system completion, including quarterly inspections and specified maintenance procedures. All submittals, including product data, shop drawings, and coordination drawings, must be provided in PDF and electronic CAD formats, with incomplete or non-compliant submittals subject to rejection without review. The contractor assumes full responsibility for coordinating all trades, resolving spatial conflicts, and managing any cost impacts resulting from field conditions, equipment substitutions, or code compliance modifications, with no additional compensation provided for such coordination efforts.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNION SQUARE CAFE

PROJECT MANUAL

Bid Set

February 20, 2026

Mark Cavagnero Associates, Architects

San Francisco, CA

AUTHOR ABBREVIATIONS

BL = Banks Landl

HRA = HRA Consulting Engineers

MA = MARSHALL ASSOCIATES

MCA = MARK CAVAGNERO ASSOCIATES

SJE = SJ Engineers

MCA Section 018115 CALGreen Requirements • •

FACILITY CONSTRUCTION SUBGROUP

MCA Section 024119 Selective Demolition • •

MCA Section 033543 Polished Concrete Floors · MCA Section 035300 Concrete Topping • •

MCA Section 055000 Metal Fabrications • •

MCA Section 057000 Decorative Metal •

MCA Section 061000 Miscellaneous Rough Carpentry • •

MCA Section 064023 Interior Architectural Woodwork • •

MCA Section 066400 Plastic Paneling •

MCA Section 079200 Joint Sealants • •

MCA Section 081416 Flush Wood Doors • •

MCA Section 088000 Glazing • •

MCA Section 088733 Glazing Films •

MCA Section 092216 Non-Structural Metal Framing • •

MCA Section 092900 Gypsum Board • •

MCA Section 093000 Tiling • •

MCA Section 097210 Wood Wall Panels ·

MCA Section 099100 Painting and Coating • •

SECTION 000010 - SPECIFICATIONS TABLE OF CONTENTS

Division 00 Procurement and Contracting Requirements

GENERAL REQUIREMENTS SUBGROUP

VOLUME 1

Division 01 General Requirements

P ro g re s s C o o rd in a ti o n I s s u e /3

/2

Division 02 Existing Conditions

Division 09 Finishes

Division 04 Masonry - Not Used

Division 03 Concrete

Division 05 Metals

Division 06 Wood, Plastics, and Composites

Division 07 Thermal and Moisture Protection

Division 08 Openings

B id

S e t, /2

/2

Union Square Cafe

Bid Set

Mark Cavagnero Associates

000010 - 1

Table of Contents

MCA Section 101200 Display Case System ·

MA Section 114000 Food Service Equipment • •

MCA Section 123616 Stainless Steel Countertops • •

MCA Section 123640 Stone Countertops ·

MCA Section 123661 Solid Surface Countertops •

MCA Section 124813 Entrance Floor Mats •

SJE Section 211000 Water Based Fire Suppression System •

SJE Section 220500 Common Work Results for Plumbing • •

SJE Section 221100 Facility Water Systems • •

SJE Section 221300 Sanitary Soil Waste and Vent Systems • •

SJE Section 224000 Plumbing Fixtures • •

SJE Section 230000 Basic Materials and Methods • •

SJE Section 230529 Supports, Hangers, Anchors and Sleeves •

SJE Section 230548 Vibration Isolation and Seismic Restraints •

SJE Section 230593 Testing, Adjusting and Balancing • •

SJE Section 233100 Air Distribution Systems and Equipment •

SJE Section 233400 Air Handling Systems • •

SJE Section 238100 Split System Air Conditioning Units •

SJE Section 238119 Packaged Heating and Air Conditioning Units •

HRA Section 260501 Electrical General Provisions • •

HRA Section 260502 Equipment Connections and Coordination • •

HRA Section 260519 Low-Voltage Electrical Power Conductors and Cables • •

HRA Section 260526 Grounding System and Bonding for Electrical Systems • •

HRA Section 260533 Raceways and Boxes for Electrical Systems • •

HRA Section 260548 Vibration Isolation and Seismic Restraints • •

HRA Section 260553 Identification for Electrical Systems • •

HRA Section 260800 Commissioning of Electrical Systems • •

HRA Section 262726 Wiring Devices • •

HRA Section 262813 Fuses • •

HRA Section 262816 Enclosed Switches and Circuit Breakers • •

BL Section 265100 Interior Lighting • •

HRA Section 283100 Fire Detection and Alarm System •

BL Appendix A Lighting Fixture Schedule • •

BL Appendix B Lighting Fixture Cutsheet • •

END OF TABLE OF CONTENTS

Appendix

Division 28 Security Systems - Not Used

Division 21 Fire Protection

Division 22 Plumbing

Division 23 Mechanical

Division 26 Electrical

Division 27 Telecommunications/Audio Visual - Not Used

Division 13 Special Construction - Not Used

Division 12 Furnishings

Division 11 Equipment

Division 10 Specialties - Not Used

Union Square Cafe

Bid Set

Mark Cavagnero Associates

000010 - 2

Table of Contents

Union Square Café 018115 – 2 Bid Set CALGreen Requirements Mark Cavagnero Associates February 20, 2026

C. CALGreen Progress Reports: Concurrent with each Application for Payment, submit reports comparing actual construction and purchasing activities with CALGreen action plans for the following:

1. 5.504.3 Covering of duct openings and protection of mechanical equipment during construction. Construction Indoor Air Quality Management (IAQ) plan: During Construction.

D. CALGreen Documentation Submittals:

1. 5.504.3 Covering of duct openings and protection of mechanical equipment during construction:

a. Provide a copy of the project’s Indoor Air Quality (IAQ) Management Plan.

2. 5.504.4.1 Adhesives, Sealants, Caulks: Product Data and material safety data sheets (MSDS) for adhesives and sealants used on the project, indicating VOC content of each product used.

a. Provide a listing of each adhesive, sealant and sealant primer product used on the project. Include the manufacture’s name, product name, specific VOC data (in g/L less water) for each product, and the corresponding allowable VOC from the referenced standard.

b. Provide a listing of each aerosol adhesive product used on the project. Include the manufacture’s name, product name, specific VOC data (in g/L less water) for each product, and the corresponding allowable VOC from the referenced standard.

3. 5.504.4.3 Paints and Coatings: Product data and material safety data sheets (MSDS) for paints and coatings used on the interior of the building indicating VOC content of each product used.

a. Provide a listing of each indoor paint and coating used on the project. Include the manufacturer’s name, product name, specific VOC data (in g/L less water) for each product, and the corresponding allowable VOC from the referenced standard.

b. Provide a listing of each aerosol paint and coating used on the project. Include the manufacturer’s name, product name, specific VOC data (in g/L less water) for each product, and the corresponding allowable VOC from the referenced standard.

4. 5.504.4.5: Composite wood products. Product data for hardwood plywood, particleboard and medium density fiberboard composite wood products used on the interior or exterior of the building shall meet the requirements for formaldehyde as specified in ARB’s Air Toxics Control Measure (ATCM) for Composite Wood (17 CCR 93120 et seq.). Those materials not exempted under the ATCM must meet the specified emission limits, as shown in Table 5.504.4.5.

a. 5.504.4.5.3 Documentation. Verification of compliance with this section shall be provided as requested by the enforcing agency. Documentation shall include at least one of the following.

1) Product certifications and specifications

2) Chain of custody certifications

3) Product labeled and invoiced as meeting the Composite Wood Products regulation (see CCR, Title 17, Section 93120, et seq.)

Union Square Café 018115 – 3

4) Exterior grade products marked as meeting the PS-1 or PS-2 standards of the Engineered Wood Association, the Australian AS/NZS 2269 or European 636 3S standards.

5) Other methods acceptable to the enforcing agency

5. 5.504.5.3 Filters: Product data for filters used in the building. In mechanically ventilated buildings, provide regularly occupied areas of the building with air filtration media for outside and return air prior to occupancy that provides at least a MERV of 8.

1.5 QUALITY ASSURANCE

A. Contractor’s CALGreen Representative: Contractor’s CALGreen Representative shall oversee the environmental goals for the project, shall instruct workers concerning these goals, and shall be present on site when Work is in progress.

B. CALGreen Meetings: Schedule and conduct CALGreen meetings on a regular basis, but not less than twice a month. Meeting attendees shall include at least the following: Architect, Contractor’s Project Manager, Contractor’s CALGreen Representative, and Sub-Contractor Representatives as appropriate to stage of Work. Discuss CALGreen Certification at Pre-bid, Pre-construction, and regular job site meetings. Discuss CALGreen Certification goals and challenges at the following meetings:

1. Preconstruction Meetings

2. Progress Meetings

3. Subcontractor Meetings

4. Monthly CALGreen Meetings

C. CALGreen Training Program: Provide environmental training for workers performing Work on the Project site. Training shall include the following:

1. Overview of environmental issues related to the building industry.

2. CALGreen Building System: Requirements for this project.

D. Regulatory Requirements: Comply with applicable requirements of laws, codes, ordinances and regulations of Federal, State and Municipal authorities having jurisdiction. Obtain necessary approvals from authorities having jurisdiction.

PART 2 - PRODUCTS

2.1 POLLUTANT CONTROL

A. 5.504.4.1 Adhesives, Sealants, Caulks:

1. Adhesives, adhesive bonding primers, adhesive primers, sealants, sealant primers and caulks shall comply with local or regional air pollution control or air quality management district rules where applicable or SCAQMD Rule 1168 VOC limits, as shown in the Table below:

Architectural Applications / VOC Limit (grams / liter) Indoor carpet adhesives / 50 Carpet pad adhesives / 50

Union Square Café 018115 – 4

Outdoor carpet adhesive / 150 Wood flooring adhesive / 100 Rubber floor adhesive / 60 Subfloor adhesive / 50 Ceramic tile adhesive / 65 VCT and asphalt tile adhesive / 50 Drywall and panel adhesive / 50 Cove base adhesive / 50 Multipurpose construction adhesive / 70 Structural glazing adhesive / 100 Single-ply roof membrane adhesive / 250 Other adhesive not specifically listed / 50 Specialty Applications:

PVC welding / 510 CPVC welding / 490 ABS welding / 325 Plastic cement welding / 250 Contact adhesive / 80 Special purpose contact adhesive / 250 Structural wood member adhesive / 140 Top and trim adhesive / 250 Substrate Specific Applications:

Metal to metal / 30 Plastic foams / 50 Porous material (except wood) / 50 Wood / 30 Fiberglass / 80

2. Aerosol adhesives and smaller unit sizes of adhesives and sealant or caulking compounds (in units of product, less packaging, which do not weigh more than one pound and do not consist of more than 16 fluid ounces) shall comply with statewide VOC standards and other requirements, including prohibitions on use of certain toxic compounds, of California Code of Regulations, Title 17, commencing with Section 94507.

B. 5.504.4.3 Paints and Coatings: Architectural paints and coatings shall comply with VOC limits in Table 1 of ARB Architectural Coatings Suggested Control Measure, as shown in Table

5.504.4.3 unless more stringent local limits apply. The VOC content limit for coatings that do not meet the definitions for the specialty coatings categories listed in Table 5.504.4.3 shall be determined by classifying the coating as a Flat, Nonflat or Nonflat-High Gloss coating, based on its gloss, as defined in Subsections 4.21, 4.36 and 4.37 of the 2007 California Air Resources Board Suggested Control Measure, and the corresponding Flat, Nonflat or Nonflat-High Gloss VOC limit in Table 5.504.4.3 shall apply.

1. 5.504.4.3.1 Aerosol paints and coatings. Aerosol paints and coatings shall meet the Product-Weighted MIR Limits for ROC in Section 94522(a)(3) and other requirements, including prohibitions on use of certain toxic compounds and ozone depleting substances, in Sections 94522(c)(2) and (d)(2) of California Code of Regulations Title 17, commencing with Section 94520; and in areas under the jurisdiction of the Bay Area Air Quality Management District additionally comply with the percent VOC by weight of product limits of Regulation 8 Rule 49.

2. 5.504.4.3.2 Verification. Verification of compliance with this section shall be provided at the request of the enforcing agency. Documentation may include, but is not limited to, the following:

a. Manufacturer’s product specification.

Union Square Café 018115 – 5

b. Field verification of on-site product containers.

C. 5.504.4.5 Composite wood products. Hardwood plywood, particleboard and medium density fiberboard composite wood products used on the interior or exterior of the building shall meet the requirements for formaldehyde as specified in ARB’s Air Toxics Control Measure (ATCM) for Composite Wood (17 CCR 93120 et seq.). Those materials not exempted under the ATCM must meet the specified emission limits, as shown in Table 5.504.4.5.

1. 5.504.4.5.3 Documentation. Verification of compliance with this section shall be provided as requested by the enforcing agency. Documentation shall include at least one of the following:

a. Product certifications and specifications

b. Chain of custody certifications

c. Product labeled and invoiced as meeting the Composite Wood Products regulation

(see CCR, Title 17, Section 93120, et seq.)

d. Exterior grade products marked as meeting the PS-1 or PS-2 standards of the

Engineered Wood Association, the Australian AS/NZS 2269 or European 636 3S standards.

e. Other methods acceptable to the enforcing agency.

D. 5.504.5.3 Filters: In mechanically ventilated buildings, provide regularly occupied areas of the building with air filtration media for outside and return air that provides at least a Minimum Efficiency Reporting Value (MERV) of 13. MERV 13 filters shall be installed prior to occupancy, and recommendations for maintenance with filters of the same value shall be included in the operation and maintenance manual.

1. Exception: Existing mechanical equipment.

2. Labeling. Installed filters shall be clearly labeled by the manufacturer indicating the

MERV rating.

E. 5.507.4 Acoustical control. Employ building assemblies and components with Sound Transmission Class (STC) values determined in accordance with ASTM E 90 and ASTM E 413, or Outdoor-Indoor Sound Transmission Class (OITC) determined in accordance with ASTM E 1332, using either the prescriptive or performance method in Section 5.507.4.1 or 5.507.4.2.

1. Exception: Buildings with few or no occupants or where occupants are not likely to be affected by exterior noise, as determined by the enforcement authority, such as factories, stadiums, storage, enclosed parking structures and utility buildings.

2. Exception (DSA-SS): For public schools and community colleges, the requirements of this section and all subsections apply only to new construction.

3. 5.507.4.1 Exterior noise transmission, prescriptive method. Wall and roof-ceiling assemblies exposed to the noise source making up the building or addition envelope or altered envelope shall meet a composite STC rating of at least 50 or a composite OITC rating of no less than 40, with exterior windows of a minimum STC of 40 or OITC of 30 in the following locations:

a. Within the 65 CNEL noise contour of an airport.

1) Exceptions:

a) Ldn or CNEL for military airports shall be determined by the facility Air

Installation Compatible Land Use Zone (AICUZ) plan.

b) Ldn or CNEL for other airports and heliports for which a land use plan has not been developed shall be determined the local general plan.

b. Within the 65 CNEL or Ldn noise contour of a freeway or expressway, railroad, industrial source or fixed-guideway source as determined by the Noise Element of the General Plan.

c. 5.507.4.1.1 Noise exposure where noise contours are not readily available.

Buildings exposed to a noise level of 65 dB Leq-1-1hr during any hour of operation shall have building, addition or alteration exterior wall and roof-ceiling assemblies

Union Square Café 018115 – 6 exposed to the noise source meeting a composite STC rating of at least 45 (or OITC 35), with exterior windows of a minimum STC of 40 (or OITC of 30).

4. 5.507.4.2 Performance method. For building located as defined in Section 5.507.4.1 or 5.507.4.1.1, wall and roof-ceiling assemblies exposed to the noise source making up the building or addition envelope or altered envelope shall be constructed to provide an interior noise environment attributable to exterior sources that does not exceed an hourly equivalent noise level (Leq-1Hr) or 50 dBA in occupied areas during any hour of operation.

a. 5.507.4.2.1 Site features: Exterior features such as sound walls or earth berms may be utilized as appropriate to the building, addition or alteration project to mitigate sound migration to the interior.

b. 5.507.4.2.2 Documentation of compliance. An acoustical analysis documenting complying interior sound levels shall be prepared by personnel approved by the Architect or Engineer of Record.

5. 5.507.4.3 Interior sound transmission. Wall and floor-ceiling assemblies separating tenant spaces and tenant spaces and public places shall have an STC of at least 40.

F. 5.508.1.1 Chlorofluorocarbons (CFCs). Install HVAC, refrigeration and fire suppression equipment that does not contain CFCs.

G. 5.508.1.2 Halons. Install HVAC, refrigeration and fire suppression equipment that do not contain Halons.

PART 3 - EXECUTION

3.1 FIELD EXECUTION OF CALGREEN REQUIREMENTS

A. The Contractor is responsible for ensuring proper field execution of all CALGreen credits, and submittal requirements; communication with sub-contractors of all requirements; and submission of all documentation in a timely manner.

B. Contractor shall notify Owner and Architect immediately of failure to meet any stated CALGreen pre-requisite or credit requirement.

3.2 PROTECTION

A. Protect stored on-site and installed absorptive materials from moisture damage. Where absorptive materials not intended for wet applications are exposed to moisture, immediately remove from site and dispose of properly.

B. Protect installed materials using methods that do not support growth of molds and mildews.

1. Immediately remove from site and properly dispose of materials showing signs of mold and signs of mildew, including materials with moisture stains.

END OF SECTION

Union Square Café 024119 – 1 Bid Set SELECTIVE DEMOLITION

SECTION 024119

SELECTIVE DEMOLITION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Demolition and removal of selected portions of building or structure.

B. Related Requirements:

1. Div 01 Section for Construction Waste Management and Disposal.

1.3 DEFINITIONS

A. Remove: Detach items from existing construction and dispose of them off-site unless indicated to be salvaged or reinstalled.

B. Existing to Remain: Leave existing items that are not to be removed and that are not otherwise indicated to be salvaged or reinstalled.

C. Dismantle: To remove by disassembling or detaching an item from a surface, using gentle methods and equipment to prevent damage to the item and surfaces; disposing of items unless indicated to be salvaged or reinstalled.

1.4 MATERIALS OWNERSHIP

A. Unless otherwise indicated, demolition waste becomes property of Contractor.

1.5 PREINSTALLATION MEETINGS

A. Predemolition Conference: Conduct conference at Project site.

1. Inspect and discuss condition of construction to be selectively demolished.

2. Review structural load limitations of existing structure.

Union Square Café 024119 – 2

3. Review and finalize selective demolition schedule and verify availability of materials, demolition personnel, equipment, and facilities needed to make progress and avoid delays.

4. Review requirements of work performed by other trades that rely on substrates exposed by selective demolition operations.

5. Review areas where existing construction is to remain and requires protection.

1.6 INFORMATIONAL SUBMITTALS

A. Qualification Data: For refrigerant recovery technician.

B. Engineering Survey: Submit engineering survey of condition of building.

C. Proposed Protection Measures: Submit report, including Drawings, that indicates the measures proposed for protecting individuals and property, for environmental protection, for dust control and, for noise control. Indicate proposed locations and construction of barriers.

D. Schedule of Selective Demolition Activities: Indicate the following:

1. Detailed sequence of selective demolition and removal work, with starting and ending dates for each activity. Ensure Owner's on-site operations are uninterrupted.

2. Interruption of utility services. Indicate how long utility services will be interrupted.

3. Coordination for shutoff, capping, and continuation of utility services.

4. Coordination of Owner's continuing occupancy of portions of existing building and of

Owner's partial occupancy of completed Work.

E. Predemolition Photographs or Video: Show existing conditions of adjoining construction, including finish surfaces, that might be misconstrued as damage caused by demolition operations. Submit before Work begins.

F. Statement of Refrigerant Recovery: Signed by refrigerant recovery technician responsible for recovering refrigerant, stating that all refrigerant that was present was recovered and that recovery was performed according to EPA regulations. Include name and address of technician and date refrigerant was recovered.

G. Warranties: Documentation indicating that existing warranties are still in effect after completion of selective demolition.

1.7 QUALITY ASSURANCE

A. Refrigerant Recovery Technician Qualifications: Certified by an EPA-approved certification program.

1.8 FIELD CONDITIONS

A. Owner will occupy portions of building immediately adjacent to selective demolition area.

Conduct selective demolition so Owner's operations will not be disrupted.

B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.

Union Square Café 024119 – 3

C. Notify Architect of discrepancies between existing conditions and Drawings before proceeding with selective demolition.

D. Storage or sale of removed items or materials on-site is not permitted.

E. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.

1. Maintain fire-protection facilities in service during selective demolition operations.

1.9 WARRANTY

A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during selective demolition, by methods and with materials and using approved contractors so as not to void existing warranties.

B. Notify warrantor on completion of selective demolition, and obtain documentation verifying that existing system has been inspected and warranty remains in effect. Submit documentation at Project closeout.

1.10 COORDINATION

A. Arrange selective demolition schedule so as not to interfere with Owner's operations.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.

B. Standards: Comply with ASSE A10.6 and NFPA 241.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify that utilities have been disconnected and capped before starting selective demolition operations.

B. Review Project Record Documents of existing construction or other existing condition and hazardous material information provided by Owner. Owner does not guarantee that existing conditions are same as those indicated in Project Record Documents.

Union Square Café 024119 – 4

C. Perform an engineering survey of condition of building to determine whether removing any element might result in structural deficiency or unplanned collapse of any portion of structure or adjacent structures during selective building demolition operations.

1. Perform surveys as the Work progresses to detect hazards resulting from selective demolition activities.

D. Survey of Existing Conditions: Record existing conditions by use of preconstruction photographs or video.

3.2 PREPARATION

A. Refrigerant: Before starting demolition, remove refrigerant from mechanical equipment according to 40 CFR 82 and regulations of authorities having jurisdiction.

3.3 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS

A. Existing Services/Systems to Remain: Maintain services/systems indicated to remain and protect them against damage.

B. Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, disconnect, and seal or cap off utility services and mechanical/electrical systems serving areas to be selectively demolished.

1. Arrange to shut off utilities with utility companies.

2. If services/systems are required to be removed, relocated, or abandoned, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of building.

3. Disconnect, demolish, and remove fire-suppression systems, plumbing, and HVAC systems, equipment, and components indicated on Drawings to be removed.

a. Piping to Be Removed: Remove portion of piping indicated to be removed and cap or plug remaining piping with same or compatible piping material.

b. Piping to Be Abandoned in Place: Drain piping and cap or plug piping with same or compatible piping material and leave in place.

c. Equipment to Be Removed: Disconnect and cap services and remove equipment.

d. Equipment to Be Removed and Reinstalled: Disconnect and cap services and remove, clean, and store equipment; when appropriate, reinstall, reconnect, and make equipment operational.

e. Equipment to Be Removed and Salvaged: Disconnect and cap services and remove equipment and deliver to Owner.

3.4 PROTECTION

A. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.

1. Provide protection to ensure safe passage of people around selective demolition area and to and from occupied portions of building.

2. Protect walls, ceilings, floors, and other existing finish work that are to remain or that are exposed during selective demolition operations.

Union Square Café 024119 – 5

3. Cover and protect furniture, furnishings, and equipment that have not been removed.

4. Comply with requirements for temporary enclosures, dust control, heating, and cooling specified in Division 01.

B. Temporary Shoring: Design, provide, and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.

1. Strengthen or add new supports when required during progress of selective demolition.

C. Remove temporary barricades and protections where hazards no longer exist.

3.5 SELECTIVE DEMOLITION, GENERAL

A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:

1. Proceed with selective demolition systematically, from higher to lower level. Complete selective demolition operations above each floor or tier before disturbing supporting members on the next lower level.

2. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction.

Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping. Temporarily cover openings to remain.

3. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.

4. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable fire-suppression devices during flame-cutting operations.

5. Maintain adequate ventilation when using cutting torches.

6. Remove decayed, vermin-infested, or otherwise dangerous or unsuitable materials and promptly dispose of off-site.

7. Remove structural framing members and lower to ground by method suitable to avoid free fall and to prevent ground impact or dust generation.

8. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.

9. Dispose of demolished items and materials promptly. Comply with requirements in Div 01

Section for Construction Waste Management and Disposal.

B. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.

C. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by Architect, items may be removed to a suitable, protected storage location during selective demolition and cleaned and reinstalled in their original locations after selective demolition operations are complete.

Union Square Café 024119 – 6

3.6 DISPOSAL OF DEMOLISHED MATERIALS

A. Remove demolition waste materials from Project site and dispose of them in an EPA-approved construction and demolition waste landfill acceptable to authorities having jurisdiction. and recycle or dispose of them according to Div 01 Section for Construction Waste Management and Disposal.

1. Do not allow demolished materials to accumulate on-site.

2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.

3. Remove debris from elevated portions of building by chute, hoist, or other device that will convey debris to grade level in a controlled descent.

4. Comply with requirements specified in Div 01 Section for Construction Waste

Management and Disposal.

B. Burning: Do not burn demolished materials.

3.7 CLEANING

A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.

Union Square Cafe 035300 – 1 Bid Set CONCRETE TOPPING

SECTION 035300

CONCRETE TOPPING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Normal weight concrete topping.

B. Related Requirements:

1. Section 093000 ”Tiling.”

1.3 PREINSTALLATION MEETINGS

A. Preinstallation Conference: Conduct conference at Project site.

1.4 ACTION SUBMITTALS

A. Product Data: For each type of product.

1.5 INFORMATIONAL SUBMITTALS

A. Product Test Reports: For each concrete floor topping, for tests performed by manufacturer and witnessed by a qualified testing agency.

B. Field quality-control test reports.

1.6 QUALITY ASSURANCE

A. Testing Agency Qualifications: An independent agency qualified according to ASTM C1077 and ASTM E329 for testing indicated.

B. Mockups: Place concrete floor topping mockups to demonstrate typical joints, surface finish, bonding, texture, tolerances, and standard of workmanship.

1. Build mockups approximately 100 sq. ft. in the location indicated or, if not indicated, as directed by Architect.

2. If Architect determines that mockups do not meet requirements, demolish and remove them from the site and cast others until mockups are approved.

Union Square Cafe 035300 – 2

3. Approved mockups may become part of the completed Work if undisturbed at time of Substantial Completion.

1.7 DELIVERY, STORAGE, AND HANDLING

A. Deliver materials in original packages and containers, with seals unbroken, bearing manufacturer's labels indicating brand name and directions for storage, mixing with other components, and application.

B. Store materials to comply with manufacturer's written instructions to prevent deterioration from moisture or other detrimental effects.

1.8 PROJECT CONDITIONS

A. Environmental Limitations: Comply with manufacturer's written instructions for substrate temperature and moisture content, ambient temperature and humidity, ventilation, and other conditions affecting concrete floor topping performance.

1. Place concrete floor topping only when ambient temperature and temperature of base slabs are between 50 and 86 deg F.

B. Close areas to traffic during topping application and, after application, for time period recommended in writing by manufacturer.

PART 2 - PRODUCTS

2.1 MATERIALS

A. Semirigid Joint Filler: Two-component, semirigid, 100 percent solids epoxy resin with a Type A Shore durometer hardness of 80 according to ASTM D2240.

B. Joint-Filler Strips: ASTM D1751, asphalt-saturated cellulosic fiber or ASTM D1752, cork or self-expanding cork.

C. Portland Cement: ASTM C150/C150M, Type I, II or V.

D. Sand: ASTM C404, fine aggregate passing No. 16 sieve.

E. Water: Potable.

F. Acrylic-Bonding Agent: ASTM C1059/C1059M, Type II, non-redispersible, acrylic emulsion or styrene butadiene.

G. Epoxy Adhesive: ASTM C881/C881M, Type V, two-component epoxy resin, capable of humid curing and bonding to damp surfaces, of class and grade to suit requirements.

H. Power-Actuated Fasteners: Fastener systems with an evaluation report based on ICC-ES

AC70.

Union Square Cafe 035300 – 3

I. Sealer for Colored Concrete: Clear, penetrating, water-based, low-luster sealer recommended by pigment manufacturer that is compatible with colored concrete components and will not adversely affect concrete color or slip resistance. Coordinate with structural engineer.

2.2 CURING MATERIALS

A. Evaporation Retarder: Waterborne, monomolecular film forming; manufactured for application to fresh concrete.

B. Absorptive Cover: AASHTO M 182, Class 2, burlap cloth made from jute or kenaf, weighing approximately 9 oz./sq. yd. when dry.

C. Moisture-Retaining Cover: ASTM C171, polyethylene film or white burlap-polyethylene sheet.

D. Water: Potable.

E. Clear, Waterborne, Membrane-Forming Curing Compound: ASTM C309, Type 1, Class B, 25 percent solids content, minimum.

2.3 MIXING

A. Bonding Slurry: Mix materials to a thick paint consistency.

B. Floor Topping: Mix concrete floor topping materials and water in appropriate drum-type batch machine mixer or truck mixer according to manufacturer's written instructions.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates, with Installer present, for conditions affecting performance of the Work.

B. Verify that base slabs are visibly dry and free of moisture. Test for capillary moisture by the plastic sheet method according to ASTM D4263.

C. Proceed with application only after unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. Prepare substrates and install the work, including components and accessories in accordance with reference standards, except where more stringent requirements are shown or specified.

Examine the areas to receive the Work and remedy detrimental conditions.

B. Install joint-filler strips where topping abuts vertical surfaces, such as column pedestals, foundation walls, grade beams, and other locations, as indicated.

1. Extend joint-filler strips full width and depth of joint, terminating flush with topping surface unless otherwise indicated.

2. Terminate full-width, joint-filler strips 1/2 inch below topping surface where joint sealants, specified in Section 079200 "Joint Sealants," are indicated.

Union Square Cafe 035300 – 4

3. Install joint-filler strips in lengths as long as practicable. Where more than one length is required, lace or clip sections together.

C. Install power-actuated fasteners according to written directions of floor topping manufacturer at perimeter of areas that are to receive floor topping, including both edges of locations where joints will be formed in floor topping.

3.3 FLOOR TOPPING APPLICATION

A. Begin floor topping application in presence of manufacturer's technical representative.

B. Monolithic Floor Topping: After textured-float finish is applied to fresh concrete of base slabs specified in Section 03 30 00 "Cast-in-Place Concrete," place concrete floor topping while concrete is still plastic.

C. Place concrete floor topping continuously in a single layer, tamping and consolidating to achieve tight contact with bonding surface. Do not permit cold joints or seams to develop within pour strip.

1. Screed surface with a straightedge and strike off to correct elevations.

2. Slope surfaces uniformly where indicated.

3. Begin initial floating, using bull floats to form a uniform and open-textured surface plane free of humps or hollows.

D. Finishing: Consolidate surface with power-driven floats as soon as concrete floor topping can support equipment and operator. Restraighten, cut down high spots, and fill low spots. Repeat float passes and restraightening until concrete floor topping surface has a uniform, smooth, granular texture.

1. Hard Trowel Finish: After floating surface, apply first trowel finish and consolidate concrete floor topping by power-driven trowel without allowing blisters to develop.

Continue troweling passes and restraighten until surface is smooth and uniform in texture.

a. Finish surfaces to specified overall values of flatness, F(F) 25; and of levelness, F(L) 20; with minimum local values of flatness, F(F) 17; and of levelness, F(L) 15, and notify independent testing agency to permit measurement within 24 hours according to ASTM E1155 for a randomly trafficked floor surface.

b. Finish and measure surface, so gap at any point between surface and an unleveled freestanding 10-foot-long straightedge, resting on two high spots and placed anywhere on the surface, does not exceed 1/4 inch.

E. Construction Joints: Construct joints true to line with faces perpendicular to surface plane of concrete floor topping, at locations indicated or as approved by Architect.

1. Coat face of construction joint with epoxy adhesive at locations where concrete floor topping is placed against hardened or partially hardened concrete floor topping.

F. Contraction Joints: Form weakened-plane contraction joints with power saws equipped with shatterproof abrasive or diamond-rimmed blades. Cut 1/8-inch-wide joints into concrete floor topping when cutting action will not tear, abrade, or otherwise damage surface and before random contraction cracks develop. Saw-cut joints shall be completed within the first six (6) to eighteen (18) hours after concrete placement, and never delayed more than twenty-four (24) hours.

1. Form joints in concrete floor topping over contraction joints in base slabs unless otherwise indicated.

2. Construct contraction joints for a combined depth equal to topping thickness and not less than one-fourth of base-slab thickness.

Union Square Cafe 035300 – 5

3. Construct contraction joints for a depth equal to one-half of concrete floor topping thickness, but not less than 1/2 inch deep.

3.4 PROTECTING AND CURING

A. General: Protect freshly placed concrete floor topping from premature drying and excessive cold or hot temperatures.

B. Evaporation Retarder: Apply evaporation retarder to concrete floor topping surfaces in hot, dry, or windy conditions before and during finishing operations. Apply according to manufacturer's written instructions after placing, screeding, and bull floating or darbying floor topping, but before float finishing.

C. Begin curing immediately after finishing concrete floor topping. Cure by one or a combination of the following methods, according to concrete floor topping manufacturer's written instructions:

1. Moisture Curing: Keep surfaces continuously moist for not less than 7 days with continuous water-fog spray or absorptive cover, water saturated and kept continuously wet. Cover topping surfaces and edges with 12-inch lap over adjacent absorptive covers.

2. Curing Compound: Apply uniformly in two coats in continuous operations by power spray or roller according to manufacturer's written instructions. Recoat areas subjected to heavy rainfall within three hours after initial application. Maintain continuity of coating and repair damage during curing period.

a. Coordinate curing compound compatibility with flooring products.

3.5 JOINT FILLING

A. Prepare and clean contraction joints and install semirigid joint filler, according to manufacturer's written instructions, once topping has fully cured.

B. Remove dirt, debris, saw cuttings, curing compounds, and sealers from joints; leave contact faces of joints clean and dry.

C. Install semirigid joint filler full depth of contraction joints. Overfill joint and trim semirigid joint filler flush with top of joint after hardening.

3.6 REPAIR

A. Defective Topping: Repair and patch defective concrete floor topping areas, including areas that have not bonded to concrete substrate.

3.7 FIELD QUALITY CONTROL

A. Testing Agency: Owner will engage a qualified independent testing and inspecting agency to perform field tests and inspections and prepare test reports.

B. Testing Services: Testing and inspecting of completed applications of concrete floor toppings shall take place in successive stages, in areas of extent and using methods as follows:

1. Sample Sets: At point of placement, a set of three molded-cube samples shall be taken from the topping mix for the first 1000 sq. ft., plus one set of samples for each

Union Square Cafe 035300 – 6 subsequent 5000 sq. ft. of topping, or fraction thereof, but not less than six samples for each day's placement. Samples shall be tested according to ASTM C109/C109M for compliance with compressive-strength requirements.

2. Concrete floor topping shall be tested for delamination by dragging a steel chain over the surface.

3. Concrete floor topping shall be tested for compliance with surface flatness and levelness tolerances.

C. Remove and replace applications of concrete floor topping where test results indicate that it does not comply with specified requirements.

D. Additional testing and inspecting, at Contractor's expense, will be performed to determine compliance of replaced or additional work with specified requirements.

Union Square Cafe 055000 – 1 Bid Set METAL FABRICATIONS

SECTION 055000

METAL FABRICATIONS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Steel framing and supports for countertops.

2. Steel framing and supports for applications where framing and supports are not specified in other Sections.

B. Related Requirements:

1. Section 057000 “Decorative Metal.”

2. Section 079200 “Joint Sealants.”

3. Section 092900 “Gypsum Board.”

4. Section 123661 “Solid Surface Countertops.”

1.3 COORDINATION

A. Coordinate installation of metal fabrications that are anchored to or that receive other work.

1.4 ACTION SUBMITTALS

A. Product Data: For the following:

1. Fasteners.

B. Shop Drawings: Show fabrication and installation details. Include plans, elevations, sections, and details of metal fabrications and their connections. Show anchorage and accessory items.

Provide Shop Drawings for the following:

1. Steel framing and supports for countertops.

C. Welding certificates.

1.5 QUALITY ASSURANCE

A. Welding Qualifications: Qualify procedures and personnel according to the following:

Union Square Cafe 055000 – 2

1. AWS D1.1/D1.1M, “Structural Welding Code – Steel.”

2. AWS D1.2/D1.2M, “Structural Welding Code – Aluminum.”

3. AWS D1.6/D1.6M, “Structural Welding Code – Stainless Steel."

1.6 FIELD CONDITIONS

A. Field Measurements: Verify actual locations of walls and other construction contiguous with metal fabrications by field measurements before fabrication.

PART 2 - PRODUCTS

2.1 METALS

A. Metal Surfaces, General: Provide materials with smooth, flat surfaces unless otherwise indicated. For metal fabrications exposed to view in the completed Work, provide materials without seam marks, roller marks, rolled trade names, or blemishes.

B. Steel Plates, Shapes, and Bars: ASTM A36.

C. Stainless Steel Sheet, Strip, and Plate: ASTM A240 or ASTM A666, Type 316L.

D. Stainless Steel Bars and Shapes: ASTM A276, Type 316L.

E. Steel Tubing: ASTM A500, cold-formed steel tubing.

F. Steel Pipe: ASTM A53, Standard Weight (Schedule 40) unless otherwise indicated.

G. Aluminum Plate and Sheet: ASTM B209, Alloy 6061-T6.

H. Aluminum Extrusions: ASTM B221, Alloy 6063-T6.

2.2 FASTENERS

A. General: Unless otherwise indicated, provide Type 316 stainless-steel fasteners for exterior use and zinc-plated fasteners with coating complying with ASTM B633 or ASTM F1941, Class Fe/Zn 5, at exterior walls. Select fasteners for type, grade, and class required.

1. Provide stainless steel fasteners for fastening aluminum.

2. Provide stainless-steel fasteners for fastening stainless steel.

B. Steel Bolts and Nuts: Regular hexagon-head bolts, ASTM A307, Grade A; with hex nuts, ASTM A563; and, where indicated, flat washers.

C. High-Strength Bolts, Nuts, and Washers: ASTM F3125/F3125M,Grade A325, Type 3, heavy-hex steel structural bolts; ASTM A563, Grade DH3, heavy-hex carbon-steel nuts; and where indicated, flat washers.

D. Stainless-Steel Bolts and Nuts: Regular hexagon-head annealed stainless-steel bolts, ASTM F593; with hex nuts, ASTM F594; and, where indicated, flat washers; Alloy Group 1.

Union Square Cafe 055000 – 3

E. Anchor Bolts: ASTM F1554, Grade 36, of dimensions indicated; with nuts, ASTM A563; and, where indicated, flat washers.

F. Anchors, General: Capable of sustaining, without failure, a load equal to six times the load imposed when installed in unit masonry and four times the load imposed when installed in concrete, as determined by testing in accordance with ASTM E488/E488M, conducted by a qualified independent testing agency.

G. Post-Installed Anchors: Torque-controlled expansion anchors or chemical anchors.

1. Material for Interior Locations: Carbon-steel components zinc plated to comply with ASTM B633 or ASTM F1941/F1941M, Class Fe/Zn 5, unless otherwise indicated.

2. Material Where Stainless Steel Is Indicated: Alloy Group 1 stainless steel bolts, ASTM F593, and nuts, ASTM F594.

2.3 FABRICATION, GENERAL

A. Shop Assembly: Preassemble items in the shop to greatest extent possible. Disassemble units only as necessary for shipping and handling limitations. Use connections that maintain structural value of joined pieces. Clearly mark units for reassembly and coordinated installation.

B. Cut, drill, and punch metals cleanly and accurately. Remove burrs and ease edges to a radius of approximately 1/32 inch unless otherwise indicated. Remove sharp or rough areas on exposed surfaces.

C. Form bent-metal corners to smallest radius possible without causing grain separation or otherwise impairing work.

D. Form exposed work with accurate angles and surfaces and straight edges.

E. Weld corners and seams continuously to comply with the following:

1. Use materials and methods that minimize distortion and develop strength and corrosion resistance of base metals.

2. Obtain fusion without undercut or overlap.

3. Remove welding flux immediately.

4. At exposed connections, finish exposed welds and surfaces smooth and blended so no roughness shows after finishing and contour of welded surface matches that of adjacent surface.

F. Form exposed connections with hairline joints, flush and smooth, using concealed fasteners or welds where possible. Where exposed fasteners are required, use Phillips flat-head (countersunk) fasteners unless otherwise indicated. Locate joints where least conspicuous.

G. Fabricate seams and other connections that are exposed to weather in a manner to exclude water. Provide weep holes where water may accumulate.

H. Cut, reinforce, drill, and tap metal fabrications as indicated to receive finish hardware, screws, and similar items.

I. Provide for anchorage of type indicated; coordinate with supporting structure. Space anchoring devices to secure metal fabrications rigidly in place and to support indicated loads.

Union Square Cafe 055000 – 4

2.4 MISCELLANEOUS FRAMING AND SUPPORTS

A. General: Provide steel framing and supports not specified in other Sections as needed to complete the Work.

B. Fabricate units from steel shapes, plates, and bars of welded construction unless otherwise indicated. Fabricate to sizes, shapes, and profiles indicated and as necessary to receive adjacent construction.

1. Furnish inserts for units installed after concrete is placed.

2.5 FINISHES, GENERAL

A. Finish metal fabrications after assembly.

B. Finish exposed surfaces to remove tool and die marks and stretch lines, and to blend into surrounding surface.

PART 3 - EXECUTION

3.1 INSTALLATION, GENERAL

A. Cutting, Fitting, and Placement: Perform cutting, drilling, and fitting required for installing metal fabrications. Set metal fabrications accurately in location, alignment, and elevation; with edges and surfaces level, plumb, true, and free of rack; and measured from established lines and levels.

B. Fit exposed connections accurately together to form hairline joints. Weld connections that are not to be left as exposed joints but cannot be shop welded because of shipping size limitations.

C. Field Welding: Comply with the following requirements:

1. Use materials and methods that minimize distortion and develop strength and corrosion resistance of base metals.

2. Obtain fusion without undercut or overlap.

3. Remove welding flux immediately.

4. At exposed connections, finish exposed welds and surfaces smooth and blended so no roughness shows after finishing and contour of welded surface matches that of adjacent surface

D. Fastening to In-Place Construction: Provide anchorage devices and fasteners where metal fabrications are required to be fastened to in-place construction. Provide threaded fasteners for use with concrete and masonry inserts, toggle bolts, through bolts, lag screws, wood screws, and other connectors.

Union Square Cafe 055000 – 5

3.2 INSTALLING METAL FABRICATIONS

A. General: Install framing and supports to comply with requirements of items being supported, including manufacturers' written instructions and requirements indicated on Shop Drawings.

Union Square Cafe 057000 – 1 Bid Set DECORATIVE METAL

SECTION 057000

DECORATIVE METAL

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Steel panels at modesty screen, window sill, countertop, backsplash, and door…