Bid Set _ 2025_07_09_CSU_RiverCenterCT_BidSet.pdf

PDF 676 KB Posted

Attached to
CSU RiverCenter Cooling Tower Replacement
Solicitation number
PE-53000-RFQ-2026-000000048
Issued by
Muscogee County, Columbus City, Georgia

About this file

This is a bid set drawing package prepared for Columbus State University in Columbus, Georgia, for the River Center Cooling Tower Replacement project under Contract Number CSU-11-26. The project involves the replacement of existing cooling towers with new equipment and associated HVAC systems modifications on the roof of the River Center facility. The bid set, dated July 9, 2025, includes mechanical and electrical demolition and installation work, with a bid set expiration date of June 30, 2026. The project engineer is NBP Engineers, Inc., located in Macon, Georgia. The drawings specify two new cooling towers (CT-1 and CT-2) to replace existing units, modifications to condenser water piping systems, electrical disconnects and conductors, and structural steel support systems. The scope includes removing existing cooling tower equipment, basin systems, conduit penetrations, and related infrastructure while retaining specified structural elements and existing service platforms.

The bid set contains detailed mechanical and electrical schedules, including pump specifications for condenser water circulation showing 1,050 feet of head at 1,750 RPM for both existing pumps, with cooling tower manufacturers listed as Marley and Evapco. The new cooling tower units are specified as AXS Series 3000 NC models with 95 degrees Fahrenheit maximum wet bulb ambient conditions and 7 kilowatt electric basin heaters. Design conditions include outside air at 97 degrees Fahrenheit dry bulb/76 degrees Fahrenheit wet bulb and inside conditions at 75 degrees Fahrenheit and 55 percent relative humidity. All existing conduit and conductors are to be reused, with specific notation that penetrations through the roof must be sealed upon removal of equipment. The project involves coordination between mechanical and electrical systems with references to existing building infrastructure and verification requirements in the field.

View the file

Other files

File Type Posted
Notice of Award.pdf PDF
CSU RiverCenter Cooling Tower Replacement Sig.pdf PDF
NOIA.pdf PDF
DBB _ 2025_07_09_CSU River Center Cooling Tow.pdf PDF
Pre_bid Agenda.pdf PDF
Bid Invite _ 2025_07_09_CSU River Center Cool.pdf PDF
Pre_Bid Announcement.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDEX OF

DRAWINGS

PROJECT CONSULTANTS

M001

M201

SHEET NO. TITLE

NBP ENGINEERS, INC.

MACON, GEORGIA316 CORPORATE PARKWAY

NBP

ENGINEERS

CONSULTANTS

478-745-1691 www.nbpengineers.com

Contract Number CSU-1 1-26

COLUMBUS STATE UNIVERSITY

COLUMBUS, GEORGIA

ABBREVIATIONS, LEGEND, & SCHEDULES - HVAC

LARGE SCALE - PARTIAL ROOF PLAN - AREA A - DEMOLITION & NEW WORK - HVAC

BID SET 07.09.2025

RIVER CENTER COOLING TOWER REPLACEMENT

P:\25016\25016m001.dgn

DATE PLOTTED

DGN FILE

09-JUL-2025

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\25016\25016m001.dgn

AS SHOWN

07.09.2025

WSH

DCS

WSH

C O

L U

M B

U S S

T A

T E U

N

IV

E R

S

IT

Y

25016

C O

L U

M B

U S

G E

O R

G

IA

B

ID

S E

T

EXPIRES: 06.30.2026

COA#PEF000774

NBP ENGINEERS, INC.

C o n tr a c t

N u m b e r

C S

U -1 -2

R

IV

E R C

E N

T E

R C

O O

L

IN

G T

O W

E R R

E P

L A

C E

M E

N T

M001

75 F & 55% RH

18 F DB

72 F DB

97 F DB/76 WB

A COMPRESSED AIR

AAV AUTOMATIC AIR VENT

AF AIR FOIL

-AFF ABOVE FINISHED FLOOR

AV ACID VENT

AVD AUTOMATIC VOLUME DAMPER

AW ACID WASTE

-AC ABOVE CEILING

AH- AIR HANDLING UNIT

BBD BOILER BLOW DOWN

BE BOTTOM ELEVATION

BOL BOTTOM OF LINE (UNINSULATED)

BOD BOTTOM OF DUCT

BP- BOOSTER PUMP

BTUH BRITISH THERMAL UNIT PER HOUR

-BF BELOW FLOOR

BFP BACK FLOW PREVENTOR

C CONDUIT

CC COOLING COIL

CHR CHILLED WATER RETURN

CHS CHILLED WATER SUPPLY

CR CONDENSER WATER RETURN

CS CONDENSER WATER SUPPLY

CW DOMESTIC COLD WATER

CAB CABINET FAN

CF CENTRIFICAL FAN

CFM CUBIC FEET PER MINUTE

CFP CHEMICAL FEED PUMP

CFT CHEMICAL FEED TANK

CH CABINET HEATER

CHR CHILLER

CL CENTER LINE

CO CLEANOUT

CP CHILLER PUMP

CPHB CHROME PLATED HOSE BIBB

CT COOLING TOWER

CU COPPER

CV- CONVECTOR

Cv VALVE COEFFICIENT

D DRAIN

DDC DIRECT DIGITAL CONTROL

DHW DOMESTIC HOT WATER

DN DOWN

DP DIFFERENTIAL PRESSURE

DS DOWN SPOUT

DSO DOWN SPOUT OVER FLOW

DX DIRECT EXCHANGE

EAD EXHAUST AIR DAMPER

EAT ENTERING AIR TEMPERATURE

EDB ENTERING DRY BULB

EWB ENTERING WET BULB

ESP END SUCTION PUMP

ESP EXTERNAL STATIC PRESSURE

ELL ELBOW

ET EXPANSION TANK

EQT EQUIPMENT TRAP SET

EWT ENTERING WATER TEMPERATURE

EX EXPANSION TANK LINE

EXT EXTERNAL

FOB FLAT ON BOTTOM

FOT FLAT ON TOP

F&BP FACE & BYPASS

FC FAN COIL UNIT

BPD BYPASS DAMPER

EAL EXHAUST AIR LOUVER

ECH ELECTRIC CABINET HEATER

ABBREVIATIONS

FD FLOOR DRAIN

FF FOULING FACTOR

FF- FLY FAN

FF FINISHED FLOOR

FF FINAL FILTER

FFM FIRE FLOW METER

FLEX FLEXIBLE

FM FIRE MAIN

FMS FLOW METER STATION

FOF FUEL OIL FLOW

FOR FUEL OIL RETURN

FOV FUEL OIL VENT

FOP FUEL OIL PUMP

FP FIRE PUMP

FP- FAN POWERED

FPM FEET PER MINUTE

FPS FEET PER SECOND

FRT FLOW RATE TRANSMITTER

FT FEET

G LOW PRESSURE GAS

GA GAUGE

GPM GALLONS PER MINUTE

GT GREASE TRAP

GTH GRAND TOTAL HEAT

H HEIGHT

HC HEATING COIL

HB HOSE BIBB

HBT HORIZONTAL BLOW THROUGH

HD HUB DRAIN

HDT HORIZONTAL DRAW THROUGH

HP HORSEPOWER/HIGH PRESSURE

HPA HIGH PRESSURE AIR

HPG HIGH PRESSURE GAS

HPS HIGH PRESSURE STEAM

HPWS HEAT PUMP WATER SUPPLY

HPWR HEAT PUMP WATER RETURN

HSC HORIZONTAL SPLIT CASE

HWG HOT WATER GENERATOR

HWR HEATING WATER RETURN

HWS HEATING WATER SUPPLY

ILC IN-LINE CENTRIFICAL

IT INTERVAL TIMER

IN INCHES

INV INVERT

JB JUNCTION BOX

L LENGTH

LR LONG RADIUS

LAT LEAVING AIR TEMPERATURE

LCP LOCAL CONTROL PANEL

LDB LEAVING DRY BULB

LN LIQUID NITROGEN

LWB LEAVING WET BULB

LWT LEAVING WATER TEMPERATURE

LPS LOW PRESSURE STEAM

MAV MANUAL AIR VENT

MVD MANUAL VOLUME DAMPER

MAX MAXIMUM

MBH ONE THOUSAND BTUH PER HOUR

MCC MOTOR CONTROL CENTER

MIN MINIMUM

MH MAN HOLE

MP SUMP (MUD) PUMP

MPS MEDIUM PRESSURE STEAM

MPR MEDIUM PRESSURE RETURN

MTS MEDIUM TEMPERATURE SUPPLY

MTR MEDIUM TEMPERATURE RETURN

MUA MAKE-UP AIR

MUW MAKE-UP WATER

MZ MULTIZONE

NC NORMALLY CLOSED

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NTS NOT TO SCALE

OA OUTSIDE AIR

OAD OUTSIDE AIR DAMPER

ODT OUTDOOR TEMPERATURE

PC PUMP CONDENSATE

PD PRESSURE DROP

PRV PRESSURE REDUCING VALVE

PWF PROPELLER WALL FAN

R REFRIGERANT

RA RETURN AIR

RAD RETURN AIR DAMPER

RAS RELIEF AIR SUPPLY

RP RECIRCULATING PUMP

RHG REFRIGERANT HOT GAS

RL REFRIGERANT LIQUID

RS REFRIGERANT SUCTION

RD ROOF DRAIN

RV RELIEF VALVE

SR SHORT RADIUS

OAL OUTSIDE AIR LOUVER

SAN SANITARY SEWER

SC SILL COCK

SCD SMOKE DAMPER

SD STORM DRAIN

SD SMOKE DETECTOR

SF SQUARE FEET

SDO STORM DRAIN OVERFLOW

SHC SENSIBLE HEAT CAPACITY

SP STAND PIPE

SP SUMP PUMP

SPS STATIC PRESSURE SENSOR

STA STATION

TR TEMPERED WATER RETURN

UG UNDERGROUND

VAC VACUUM PIPING

VDT VERTICAL DRAW THROUGH

VTR VENT THROUGH ROOF

WB WET BULB

O2 OXYGEN

?F DEGREES FAHRENHEIT

?C DEGREES CENTIGRADE

WM WATER METER

WL WATER LINE

WH WATER HEATER

WG WATER GAUGE

W WIDTH

W WASTE

VT VERTICAL TURBINE

VFD VARIABLE FREQUENCY DRIVE

VB VACUUM BREAKER

VAV VARIABLE AIR VOLUME

V VENT

UC UNDERCUT (DOOR - 3/4")

V- VALVE

TOS TOP OF STRUCTURE

TB THRUST BLOCK

T TEMPERED WATER

STR STRAINER

SP STATIC PRESSURE

SP SPRINKLER PIPE

SG SPECIALTY GAS

EUH ELECTRIC UNIT HEATER

RECIRCULATING

DHR DOMESTIC HOT WATER

TRANSMITTER

DPT DIFFERENTIAL PRESSURE

PER MINUTE

SCIM STANDARD CUBIC INCHES

TEMPERATURE

SST SATURATED SUCTION

(UNINSULATED)

TE TOP ELEVATION

(TOWER) PUMP

TP CONDENSER WATER

FSD FIRE/SMOKE DAMPER

EA EXHAUST AIR

MA MIXED AIR

AE ADJUSTABLE AIR EXTRACTOR

RAO RETURN AIR OPENING

AD AREA DRAIN/ACCESS DOOR

CHS CHR

HWS HWR

CR

D

SPF

HTWS HTWR

DTS DTR

CHILLED WATER SUPPLY CHILLED WATER RETURN

HEATING WATER SUPPLY HEATING WATER RETURN

CONDENSER WATER SUPPLY CONDENSER WATER RETURN

CONDENSATE DRAIN

FIRE PROTECTION MAIN STANDPIPE

HIGH TEMP. SUPPLY HIGH TEMP. RETURN

DUAL TEMP. SUPPLY DUAL TEMP. RETURN

R REFRIGERANT PIPING

RL REFRIGERANT LIQUID

CS

RS REFRIGERANT SUCTION

RG REFRIGERANT HOT GAS

HIGH PRESSURE STEAM

CR CONDENSATE RETURN (LP)

PC PUMPED CONDENSATE

50#

SOLENOID VALVE RELIEF VALVE

NEEDLE VALVE

OS&Y GATE VALVE . GAS COCK

AUTOMATIC AIR VENTAAV

GAUGE WITH COCK

BOILER DRAIN PIPE TEST PLUG

FLEX. PIPE CONN. BACKFLOW PREVENTER

MANUAL AIR VENT

STRAINER

ELBOW UP ELBOW DOWN

BRANCH OUT BOTTOM BRANCH OUT TOP

TEE OUT BOTTOM TEE OUT TOP

SCREWED UNION FLANGED UNION

PIPE CAP BLIND FLANGE

PIPE SLEEVE

CONCENTRIC REDUCER

PIPE ANCHOR

HVAC LEGEND

SCREWED & FLANGED

SCREWED & FLANGED

2-WAY CONTROL VALVE

ECCENTRIC REDUCER

GAUGE COCK

VALVE IN VALVE BOX

HPS

THERMOMETER IN WELL

SEPARABLE SOCKET WELL

LPS

PLUG VALVE

ƒ" HOSE END

GATE VALVE WITH

CONTROL VALVE

3-WAY MIXING

SCREWED & FLANGED

GLOBE VALVE

SCREWED & FLANGED

CHECK VALVE

SCREWED & FLANGED

BALANCE VALVE

PLAN VIEW

CONTROL VALVE

(15 PSIG. MAX)

LOW PRESSURE STEAM

(PRESSURE INDICATED)

STEAM

SUMMER WINTER

DESIGN CONDITIONS

OUTSIDE

INSIDE

DETAILS - HVAC

SCHEDULES, &

LEGEND,

ABBREVIATIONS,

MARK GPM

EWT

F

LWT

F

REMARKS

MARK SERVICE TYPE GPM

DYNAMIC

P-1 CONDENSER WATER

CONDENSER WATERP-3

DOUBLE SUCTION

DOUBLE SUCTION

CT-1

CT-2

95 851200 20 ELEC BASIN HEAT 7KW

ELEC BASIN HEAT 7KW

25.0

25.0

EXISTING PUMP SCHEDULE

FT. H O

RPM HP

COOLING TOWER SCHEDULE

MANUFACTURERS

MARLEYEVAPCO BACHP

MOTOR

MAX

WB F

AMBIENT

(PSIG)

PRESS.

INLET

80 5 AXS SERIES 3000 NC

95 851200 2080 5 AXS SERIES 3000 NC

P:\25016\25016m201.dgn

DATE PLOTTED

DGN FILE

09-JUL-2025

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\25016\25016m201.dgn

AS SHOWN

07.09.2025

WSH

DCS

WSH

C O

L U

M B

U S S

T A

T E U

N

IV

E R

S

IT

Y

25016

KEY PLAN

NOT TO SCALE

A

C O

L U

M B

U S

G E

O R

G

IA

NIC

NIC

AREA OF WORK

B

ID

S E

T

EXPIRES: 06.30.2026

COA#PEF000774

NBP ENGINEERS, INC.

C o n tr a c t

N u m b e r

C S

U -1 -2

R

IV

E R C

E N

T E

R C

O O

L

IN

G T

O W

E R R

E P

L A

C E

M E

N T

30/30 DN

24/24 DN

F-4

RG-4

EF-1

24/24 DN

18/18 DN

EF-2

54/36 DN

RH-3

TERMINATED 3' ABOVE ROOF

10"{ GOOSENECK

10"CHS

10"CHR

SCALE:

= 1'-0

4 0 2 4 8

SCALE:

= 1'-0

4 0 2 4 8 M201

N N

PARTIAL ROOF PLAN - AREA A - DEMOLITION - HVAC

LARGE SCALE -

PARTIAL ROOF PLAN - AREA A - NEW WORK - HVAC

LARGE SCALE -

30/30 DN

24/24 DN

F-4

RG-4

EF-1

24/24 DN

18/18 DN

EF-2

54/36 DN

RH-3

TERMINATED 3' ABOVE ROOF

10"{ GOOSENECK

TO EXISTING ISOLATION VALVE IN VERTICAL

REMOVE CONDENSER WATER PIPING BACK

TO EXISTING ISOLATION VALVE

REMOVE CONDENSER WATER PIPING BACK

STRUCTURE STEEL SUPPORT TO REMAIN

REMOVE EXISTING COOLING TOWERS, EXISTING

TO NEW TOWER THROUGH NEW DISCONNECT.

TO SERVING PANEL (MCC2D). RECONNECT EXISTING CONDUCTORS

SAME SIZE. REUSE ALL EXISTING CONDUIT AND CONDUCTORS BACK

TOWER AND REPLACE WITH NEW HEAVY DUTY DISCONNECT THE

REMOVE EXISTING 60/3/3R NON FUSED DISCONNECT FOR COOLING

SEAL ALL REMOVED CONDUIT PENETRATIONS THROUGH THE ROOF.

BREAKER TO THE OFF POSITION AND LABEL AS SPARE WITH THE DATE.

BASIN SWEEP BACK TO SERVING PANEL MP2D (FIELD VERIFY). TURN

REMOVE ALL CONDUIT, DISCONNECTS AND CONDUCTORS FOR THE

E1

E2

ELECTRICAL NOTES:(THIS SHEET ONLY)

E1

E1

E2

E2

10"CHS

10"CHR

WATER PIPING ON ROOF

ON EXISTING CONDENSER

PIPING INSULATION

REMOVE EXISTING

EXISTING TO REMAIN

DEMOLITION

NEW WORK

POINT OF CONNECTION

LINE LEGEND

8"

8"

8"

8"

8"

8"

ISOLATION VALVE IN VERTICAL

WATER PIPING AT EXISTING

CONNECT NEW CONDENSER

NEW

CT-2

NEW

CT-1

ACCEPT NEW COOLING TOWER

STEEL SUPPORT SYSTEM TO

MODIFY EXISTING STRUCTURAL

NEW WORK - HVAC

DEMOLITION &

AREA A -

PARTIAL ROOF PLAN -

LARGE SCALE -

SYSTEM AND CORRESPONDING PUMP AND SAND FILTER

TOWER TO REMAIN. REMOVE EXISTING TOWER BASIN SWEEP

EXISTING SERVICE PLATFORMS ON EITHER SIDE OF COOLING

25016aCov
25016m001
References
tb, 25016tb.dgn
25016m201
References
tb, 25016tb.dgn
afp1, 25016aXRoof.dgn
afp2, 25016aXRoof.dgn
existing, 25016m201.dgn

File details come from the government source that posted it. Updated .