BID SCHEDULE - Wallace Bond Claim PA Project.doc

DOC document 45 KB Posted

Attached to
Wallace Bond Claim Project-3Wells, Re-entry, Plug, Abandon
Solicitation number
DQ1 PHAA 2015001097 5
Issued by
Baca County, Denver City, Colorado

About this file

This is a Contractor Bid Schedule for the Wallace Bond Claim Project Plugging and Abandonment Project (PHA A-2015-1097), a state and local contract opportunity involving oil and gas well plugging and abandonment services. The project encompasses eight primary service categories: mobilization and demobilization, plug and abandon labor, cement services, solid waste management, liquid waste management, perforation services, cement retainers, and bridge plugs. Quantities include 90 hours of plugging and abandonment labor, 171 sacks of cement, 350 barrels of liquid waste management capacity, and three sets each of perforation services, cement retainers, and bridge plugs. The document requires contractors to provide unit costs for each line item and calculate the grand total price. The bid schedule indicates that actual quantities and measurements may vary from those listed, with final payment based on quantities verified by the project manager in accordance with measurement and payment provisions in the documented quotation.

Funding for this project is provided through bond claims and/or the Oil and Gas Conservation and Environmental Response Fund. Contractors must complete and return the bid schedule with their proposals, including company information, tax identification, address, phone, and fax number, along with authorized signatures. The document specifies that quoted costs and specifications must align with standards detailed in the documented quotation accompanying this bid schedule. Contractors should note that the quantities provided are for bid comparison purposes only and do not represent guaranteed work volumes.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR

BID SCHEDULE

WALLACE BOND CLAIM PROJECT

PLUGGING AND ABANDONMENT PROJECT

PHA A- 2015-1097

The funds to plug and abandon and reclaim these wells are provided through bond claims and/or the Oil and Gas Conservation and Environmental Response Fund.

Specifications and standards for cost categories shown below are listed in the DOCUMENTED QUOTATION. The quantities and measurements set forth below are in no case exact and in some instances the exact quantities and measurements are impossible to determine until after conditions have become known during construction. The quantities shown below are for use as a basis for comparing bids only. Payment will be made only for the actual quantities verified by the PROJECT MANAGER in accordance with Section 3.0 – Measurement and Payment in the DOCUMENTED QUOTATION.

Item No.
Description
Units
Quantity
Unit Cost
Amount
3.1
Mobilization - Demobilization
Combined together
1
$
$
3.2
Plug and Abandon
Hours
90
$
$
3.3
Cement Services
Sacks
171
$
$
3.4
Solid Waste Management
Lump Sum
1
$
$
3.5
Liquid Waste Management
BBLS
350
$
$
3.6
Perforation Services
Sets
3
$
$
3.7
Cement Retainers
Sets
3
$
$
3.8
Bridge Plugs
Sets
3
$
$
GRAND TOTAL PRICE
$

DATE:

AUTHORIZED SIGNATURE:

NAME (PRINT OR TYPE):

COMPANY NAME TAX ID#

ADDRESS

PHONE #

FAX #

PAGE

RETURN THIS BID SCHEDULE WITH YOUR BID