Amendment # 1, Wallace-Chapman Mobilization-Demobilization.docx
DOCX document 12 KB Posted
- Solicitation number
- DQ1 PHAA 2015001097 5
- Issued by
- Baca County, Denver City, Colorado
About this file
This Amendment #1 document addresses mobilization and demobilization requirements for two separate projects: Wallace and Chapman. Rather than requiring independent mobilization and demobilization efforts for each project, the amendment establishes a single, combined mobilization/demobilization approach to be executed concurrently for both projects. This unified approach is designed to enhance cost-effectiveness and schedule efficiency for all parties involved. Although each project retains individual mobilization and demobilization line items in the bid structure, these items are not priced independently from scratch, reflecting the integrated nature of the work.
The amendment clarifies that bidders should propose mobilization and demobilization strategies that treat both projects as a coordinated undertaking rather than separate endeavors. This consolidated approach allows contractors to leverage efficiencies in equipment deployment, staffing, and logistics across both the Wallace and Chapman projects, ultimately reducing overall project costs and durations while maintaining the contractual distinction between the two separate projects.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MAP_PRE BID MEETING ON SITE MEET UP LOCATION.pdf | ||
| Photo_Wallace Watkins #1.jpg | JPG image | |
| BID SCHEDULE - Wallace Bond Claim PA Project.doc | DOC document | |
| Photo_Wallace Newman #1-7.jpg | JPG image | |
| DNR POGeneralConditions.pdf | ||
| Special Provisions 1-1-09.pdf | ||
| POTerms&Conditions1-1-09.pdf | ||
| DQ_Wallace Bond Claim PA Project-1-Final (Rev).doc | DOC document | |
| Amendment #2, Wallace-Chapman Mobilization-Demobilization.docx | DOCX document | |
| BIDDER LIST OF EQUIPMENT OFFERED_WALLACE BOND CLAIM PA PROJECT.doc | DOC document | |
| WBD Hume 17-1.pdf | ||
| WBD Watkins 1A.pdf | ||
| Photo_Wallace Hume #17-1.jpg | JPG image | |
| WBD Newman 1-7.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment #1 Mobilization/Demobilization There are two different projects to be bid on – the Wallace and the Chapman.
Please treat it as a ‘singular’ mobilization/demobilization as our intention is to complete both projects essentially at the same time and to make the project more cost and time-effective for everyone. So each project does have a mob/demob line item but they are not both from scratch.