Bid Schedule - Madonna.pdf

PDF 59 KB Posted

Attached to
PKAA, Madonna Project
Solicitation number
DQ1 PKAA 2026000470 3
Issued by
Colorado

About this file

Bid Schedule Summary – Madonna Project

This is a Bid Schedule document for the Madonna Project (DQ1 PKAA 2026*0470) issued by the State of Colorado. The project focuses on mine closure and reclamation work, with bidders required to submit proposals through the Colorado VSS (Vendor Self-Service) online portal. The scope of work includes four primary line items: Item 1.0 (Mobilize/Demobilize), Item 2.0 (Project Safety, Health and Environmental Action Plan), Item 3.0 (Install Mine Closures), and Item 4.0 (Additional PUF - Not Guaranteed). The project involves closure of 20 mine features (M-01 through M-22, excluding M-21) using methods including bat grates with access, polyurethane foam backfill, and grated corrugated steel pipe installations. All features are classified as privately owned property. The bid schedule was last updated February 24, 2026, with a bid submission deadline of May 6, 2026. All pages of the bid schedule must be completed and returned; partial submissions or amendments to the schedule are not permitted.

Pricing shall be submitted as lump sum amounts for each line item, with Item 3.0 requiring individual bid amounts for each of the 20 mine closure features. The total project cost will be calculated by summing Items 1.0, 2.0, and 3.0, with Item 4.0 noted as not guaranteed and contingent on project conditions. Bids must be signed by an authorized representative of the offeror and submitted electronically via the Colorado VSS portal; mail and fax submissions are prohibited unless VSS is unavailable, in which case alternative submittal methods are outlined in the project Special Conditions.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Schedule Madonna Project

DQ1 PKAA 2026*0470

May 6, 2026

Complete all pages in the spreadsheet as applicable.

Submit Bids via Colorado VSS at the following link:

Submitting Bids by mail or fax is not permitted.

If VSS is unavailable, please see project Special Conditions for alternative Bid Submittal method.

1 Job N/A

1 Job N/A

1 Lump Sum N/A

9 cubic yard

Legal Business Name

Address

City, State Zip

Phone

Email

Signer Printed Name

Title

Date http://www.colorado.gov/vss

Item Description Qty Unit Per Unit Price ($) Total Price ($)

Item 1.0 - Mobilize/Demobilize

Item 3.0 - Install Mine Closures (See total from page 2) Item 4.0 - Additional PUF NOT

GUARANTEED

Grand Total $:

Offeror Information

Signature:

The Bid shall be signed by a person authorized to bind the Offeror.

Do not amend any part of this bid schedule all pages of this bid schedule must be returned all line items must be completed.

Updated February 24, 2026.

Item 2.0 - Project Safety, Health and Environmental Action Plan

Bid Schedule Madonna Project

DQ1 PKAA 2026*0470

Item 3.0 - Install Mine Closures:

Feature ID Feature Type Closure Method Ownership Bid Amount ($)

Total $ (enter here and on Bid Schedule, Item 3.0):

Do not amend any part of this bid schedule all pages of this bid schedule must be returned all line items must be completed.

M-01 Adit Bat Grate with Access Private

M-02 Air Shaft Bat Grate Private

M-03 Prospect Adit Backfill with Polyurethane Foam Private

M-04 Adit Backfill with Polyurethane Foam Private

M-05 Adit Bat Grate with Access Private

M-06 Adit Bat Grate with Access Private

M-07 Shaft Polyurethane Foam Private

M-08 Shaft Polyurethane Foam Private

M-09 Shaft Polyurethane Foam Private

M-10 Shaft Polyurethane Foam Private

M-11 Adit Grated Corrugated Steel Pipe Private

M-12 Shaft Polyurethane Foam Private

M-13 Adit Backfill with Polyurethane Foam Private

M-14 Shaft Polyurethane Foam Private

M-15 Shaft Polyurethane Foam Private

M-16 Adit Grated Corrugated Steel Pipe Private

M-17 Adit Backfill with Polyurethane Foam Private

M-18 Adit Grated Corrugated Steel Pipe w/Access Private

M-19 Shaft Polyurethane Foam Private

M-20 Adit Backfill with Polyurethane Foam Private

M-22 Adit Backfill with Polyurethane Foam Private

File details come from the government source that posted it. Updated .