Am2 Madonna REVISED bid schedule.pdf

PDF 65 KB Posted

Attached to
PKAA, Madonna Project
Solicitation number
DQ1 PKAA 2026000470 3
Issued by
Colorado

About this file

This is a revised bid schedule document for the PKAA Madonna Project in Colorado. The document establishes the timeline and pricing structure for the project phases. The schedule outlines multiple amendment phases with associated costs and deadlines for bid submissions and contract awards. The project is structured as a phased approach with defined milestones for each component, allowing for sequential construction or implementation stages. Specific response dates and award timelines are documented within the schedule to guide bidder submissions and project commencement.

The bid schedule includes detailed pricing for each phase of work, with line items specifying costs associated with different project components or amendments. The document provides the financial framework necessary for bidders to understand the project scope across multiple phases and corresponding budget allocations. The revised nature of the schedule indicates modifications to previously issued documents, reflecting updated project requirements, timeline adjustments, or cost revisions that bidders must incorporate into their proposals. This schedule serves as the binding reference document for pricing and scheduling compliance throughout the procurement process.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Revised Bid Schedule Madonna Project

DQ1 PKAA 2026*0470

June 16, 2026

Complete all pages in the spreadsheet as applicable.

Receipt of Addenda Nos.____________ is hereby acknowledged

Submit Bids via Colorado VSS at the following link:

Submitting Bids by mail or fax is not permitted.

If VSS is unavailable, please see project Special Conditions for alternative Bid Submittal method.

1 Job N/A

1 Job N/A

1 Lump Sum N/A

9 cubic yard

Legal Business Name

Address

City, State Zip

Phone

Email

Signer Printed Name

Title

Date http://www.colorado.gov/vss

Qty Unit Per Unit Price ($) Total Price ($)

Item 1.0 - Mobilize/Demobilize

Item 2.0 - Project Safety, Health and Environmental Action Plan Item 3.0 - Install Mine Closures (See total from page 2) Item 4.0 - Additional PUF NOT

GUARANTEED

Grand Total:

Offeror Information

Signature:

The Bid shall be signed by a person authorized to bind the Offeror.

Do not amend any part of this bid schedule all pages of this bid schedule must be returned all line items must be completed.

Updated February 24, 2026.

Revised Bid Schedule Madonna Project

DQ1 PKAA 2026*0470

June 16, 2026

Item 3.0 - Install Mine Closures:

Feature ID Feature Type Closure Method Ownership Bid Amount ($)

Total (enter here and on Bid Schedule, Item 3.0):

Do not amend any part of this bid schedule all pages of this bid schedule must be returned all line items must be completed.

M-01 Adit Bat Grate with Access Private

M-02 Air Shaft Bat Grate Private

M-03 Prospect Adit Backfill with Polyurethane Foam Private

M-04 Adit Backfill with Polyurethane Foam Private

M-05 Adit Bat Grate with Access Private

M-06 Adit Bat Grate with Access Private

M-07 Shaft Polyurethane Foam Private

M-08 Shaft Polyurethane Foam Private

M-09 Shaft Polyurethane Foam Private

M-10 Shaft Polyurethane Foam Private

M-11 Adit Grated Corrugated Steel Pipe Private

M-12 Shaft Polyurethane Foam Private

M-13 Adit Backfill with Polyurethane Foam Private

M-14 Shaft Polyurethane Foam Private

M-15 Shaft Polyurethane Foam Private

M-16 Adit Grated Corrugated Steel Pipe Private

M-17 Adit Backfill with Polyurethane Foam Private

M-18 Adit Grated Corrugated Steel Pipe w/Access Private

M-19 Shaft Polyurethane Foam Private

M-20 Adit Backfill with Polyurethane Foam Private

M-22 Adit Backfill with Polyurethane Foam Private