Bid_Schedule_-_Cooling_System.xlsx
XLSX spreadsheet 46 KB Posted
- Attached to
- Cooling System Replacement @ FILA
- Solicitation number
- 140P6426B0007
About this file
This is a Bid Schedule template document that provides pricing frameworks for federal construction projects managed by the National Park Service. The document contains three separate sample bid schedules: one for a Cooling System Replacement at First Ladies National Historic Site (FILA) in Canton, Ohio, one for a Visitors Center project at Old Faithful, and one for a Design-Build structure project in Yosemite Valley.
The FILA Cooling System Replacement bid schedule, which corresponds to the related solicitation (140P6426B0007), requires offerors to submit pricing organized into lump-sum line items covering Mobilization/Demobilization, Site Preparation (Materials, Labor, Equipment), Site Demolition/Removals (Materials, Labor, Equipment), Installation of New Cooling System (Materials, Labor, Equipment), and Site Improvements including concrete pad, bollards, and asphalt work (Materials, Labor, Equipment). The schedule requires subtotals for these components plus separate line entries for Overhead, Profit, and Bonds percentages, with a Grand Total for the Base Bid. The document emphasizes that offerors must submit pricing for all base and option line items or risk rendering the proposal non-responsive, and instructs offerors to round all totals and extended prices to whole dollars. The other two sample schedules follow similar structures but for different project types, with the DBB sample including unit-priced line items for water lines, sewer lines, and rock excavation, and the DB sample covering design and construction as separate lump-sum items with photovoltaic system options.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Schedule
BID SCHEDULE
| US Department of Interior |
| National Park Service |
| Park Location: First Ladies National Historic Site |
| Project Title: Cooling System Replacement |
NOTICE: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option lines (if applicable). Failure to do so may render the proposal non-responsvive. On lump-sum line items, provide the total price only. Round totals and extended prices to whole dollars.
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Price/Unit | Total Price |
| 1 | Base Bid | 1 | Lump Sum | $ - 0 | $ - 0 |
| 2 | |
| 3 | |
| 4 | |
| Grand Total (Base Bid) | $ - 0 |
Price Schedule Wksht
| First Ladies National Historic Site | |
| U.S. Department of Interior | |
| National Park Service |
PROJECT: Cooling System Replacement
PRICE SCHEDULE WORKSHEET
Construction Items Unit Quantity Price/ Unit Subtotal
| BASE BID - Mobilization/Demobilization | ||||
| - Mob/Demob Costs | LS | 1 | $ - 0 | $ - 0 |
| BASE BID - SITE PREPARATION and all associated work/items | ||||
| - Materials | LS | 1 | $ - 0 | $ - 0 |
| - Labor | LS | 1 | $ - 0 | $ - 0 |
| - Equipment | LS | 1 | $ - 0 | $ - 0 |
| BASE BID - SITE DEMOLITION/REMOVALS and all associated work/items | ||||
| - Materials | LS | 1 | $ - 0 | $ - 0 |
| - Labor | LS | 1 | $ - 0 | $ - 0 |
| - Equipment | LS | 1 | $ - 0 | $ - 0 |
| BASE BID - INSTALLATION OF NEW COOLING SYSTEM and all associated work/items | ||||
| - Materials | LS | 1 | $ - 0 | $ - 0 |
| - Labor | LS | 1 | $ - 0 | $ - 0 |
| - Equipment | LS | 1 | $ - 0 | $ - 0 |
| BASE BID - SITE IMPROVEMENTS (concrete pad/bollards/asphalt work/etc…) and all associated work/items as outlined in specifications | ||||
| - Materials | LS | 1 | $ - 0 | $ - 0 |
| - Labor | LS | 1 | $ - 0 | $ - 0 |
| - Equipment | LS | 1 | $ - 0 | $ - 0 |
SUBTOTAL $ - 0
| Overhead | % | $ - 0 |
| Profit | % | $ - 0 |
| Bonds | % | $ - 0 |
Grand Total (BASE BID) $ - 0
Printed: &D &T &Z&F
Design-Bid-Build (DBB) Sample
| Contract Price Schedule - Design-Bid-Build (DBB) SAMPLE | |||||
| National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18 | |||||
| Solicitation Number: | N2011080811 | ||||
| PARK - PMIS: | YELL 012345 | ||||
| (Project Management Information System) | |||||
| Developed Area: | Old Faithful | ||||
| Project Title: | Johnstonian Visitors Center | ||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | |||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | |||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | |||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | |||||
| govern. Round totals and extended prices to whole dollars. | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Total Price |
| 1 | Visitors Center | 1 | Lump Sum | $0.00 | |
| 2 | Water Line | 400 | Lineal Feet | - 0 | |
| 3 | Sanitary Sewer Line | 200 | Lineal Feet | - 0 | |
| 4 | Rock Excavation | 150 | Cubic Yards | - 0 | |
| TOTAL BASE PRICE (Contract Line Item Number 1 through 4) --------------------------------------------------------------------------------- | $0.00 | ||||
| 5 | OPTION A, Geothermal Wells | 1 | Lump Sum | - 0 | |
| 6 | OPTION B, Photovoltaic System | 1 | Lump Sum | - 0 | |
| TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 5 and 6) ------------------------------------------------------------------- | $0.00 | ||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 6) ---------------------------- | $0.00 | ||||
| All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items. |
Design-Build (DB) Sample
| Contract Price Schedule - Design-Build (DB) SAMPLE | |||||
| National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18 | |||||
| Solicitation Number: | N2011080811 | ||||
| PARK - PMIS: | YELL 012345 | ||||
| (Project Management Information System) | |||||
| Developed Area: | Yosemite Valley | ||||
| Project Title: | Design and Build a New Structure | ||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | |||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | |||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | |||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | |||||
| govern. Round totals and extended prices to whole dollars. | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Total Price |
| 1 | Design | 1 | Lump Sum | $0.00 | |
| 2 | Construction | 1 | Lump Sum | - 0 | |
| TOTAL BASE PRICE (Contract Line Item Number 1 and 2) --------------------------------------------------------------------------------------- | $0.00 | ||||
| 3 | OPTION A, Photovoltaic System | 1 | Lump Sum | - 0 | |
| TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 3) ---------------------------------------------------------------------------- | $0.00 | ||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 3) ---------------------------- | $0.00 | ||||
| All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items. |
image1.png
File details come from the government source that posted it. Updated .