This document is a set of construction documents for a federal renovation project at First Ladies National Historic Site in Canton, Ohio. The project scope involves replacing the existing chiller cooling system at the Education Research Center building located at 205 Market Ave S.
The project includes comprehensive structural, mechanical, and electrical work. Structurally, the contractor must remove the existing concrete pad and mechanical equipment, restore soil and pavement, and provide a new concrete foundation pad with proper drainage and grading. Mechanically, the work involves demolishing the existing air-cooled condensing unit, abandoned hydronic unit heater, indoor evaporator unit, and chilled water pumps, then installing a new 60-ton packaged air-cooled chiller (Model CH-1.1 by Trane), base-mounted pumps (CWP-1.1 and CWP-2.1), a pot feeder, and associated piping, controls, and insulation. Piping materials include 4-inch chilled water supply and return lines with elastomeric insulation. Electrically, the project requires disconnecting and removing existing equipment feeders, installing new 300-amp chiller disconnect and 100-amp disconnect for the remote condenser, providing variable frequency drives (VFD) for the two 7.5 HP pumps, and connecting a barrel heater with appropriate starters and controls. The design includes provisions for temperature control integration through a Bacnet gateway, freeze protection glycol systems, and compliance with all applicable codes including the 2024 International Building Code. All contractor work must maintain accessibility standards, coordinate with existing systems to remain operational until switchover, and comply with environmental standards for refrigerant reclamation and lead paint management.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_-_Notice_to_Contractors.pdf | ||
| Attachment_-_Submittal_List.pdf | ||
| Wage_Determination_-_Stark_Co.pdf | ||
| Sol_140P6426B0007.pdf | ||
| Attachment_-_Construction_Contract_Admin.pdf | ||
| Bid_Schedule_-_Cooling_System.pdf | ||
| Bid_Schedule_-_Cooling_System.xlsx | XLSX spreadsheet | |
| Attachment_-_Limitations_on_Subcontracting_Report.xlsx | XLSX spreadsheet | |
| Specifications_-_Cooling_System.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VICINITY MAP
BL
DG
NO SCALE
SITE AERIAL
NO SCALE
BL
DG
FIRST LADIES NATIONAL HISTORIC SITE
FIRST LADIES NATIONAL HISTORIC SITE - RESEARCH CENTER
2ND ST W
TUSCARAWAS ST W
3RD ST W
4TH ST W
M
AR
KE
T
AV
E
S
C
LE
VE
LA
N D
A
VE
S W
M C
KI
N
LE
Y
AV
E
SW
W
AL
N U
T
AV
E
SE
SAXTON MCKINLEY HOUSE
TITLE OF PROJECT DRAWING NO.
PMIS/PKG NO.
SHEETFIRST LADIES NATIONAL HISTORIC SITE
80025
322010
CD DOCUMENTS
UNITED STATES
DEPARTMENT OF THE INTERIOR
NATIONAL PARK SERVICE
DENVER SERVICE CENTER REGION
MIDWEST
COUNTY
STARK
STATE
OHIO
CONSTRUCTION DOCUMENTS
NAME OF PARK
A/E FIRMS - A/E CONTRACT #
PRIME/ARCH:
STRATA ARCHITECTURE
1701 OAK STREET, SUITE 100
KANSAS CITY, MO 64106
STRUCTURAL:
IMEG
672 E. ROYALTON ROAD
BROADVIEW HEIGHTS, OH 44147
MEPF ENGINEERING:
IMEG
672 E. ROYALTON ROAD
BROADVIEW HEIGHTS, OH 44147
QUALITY DESIGN CERTIFICATION
PREPARED IN ACCORDANCE WITH DESIGN
DEVELOPMENT (TITLE I)
OR
PROJECT MANAGER DATE
VARIANCE FROM DESIGN DEVELOPMENT (TITLE I)
APPROVED BY SUPERINTENDENT ON
OR
CONSTRUCTION DRAWING NOT PRECEDED
BY DESIGN DEVELOPMENT (TITLE I)
DRAWING NO.
DATE
MARK SHEET REVISION DATE INITIAL
R
EV
IT
1/
/2
4:
:0
PM
Au to de sk
D oc s:
//N
PS
FI
LA
C hi lle r R ep la ce m en t/N
PS
FI
LA
C hi lle r R ep la ce m en t.r vt
REPLACE CHILLER COOLING SYSTEM AT EDUCATION
RESEARCH CENTER
First Ladies National Historic Site 205 Market Ave S., Canton, OH 44702
REPLACE CHILLER COOLING
SYSTEM AT EDUCATION
RESEARCH CENTER
Sheet Index
G001 COVER
G002 CONSTRUCTION BOUNDARY
ARCHITECTURAL
AD101 DEMOLITION PLANS
STRUCTURAL
S100 GROUND FLOOR PLAN
S300 TYPICAL CONCRETE DETAILS
MECHANICAL
M000 HVAC COVERSHEET
M101 ENLARGED DEMOLITION PLANS - PIPING
M201 ENLARGED PLANS - PIPING
M400 HVAC DETAILS
M600 HVAC SCHEDULES
ELECTRICAL
E000 ELECTRICAL COVERSHEET
E101 ENLARGED DEMOLITION PLAN - ELECTRICAL
E201 ENLARGED PLANS - ELECTRICAL
E500 ELECTRICAL SCHEDULES ADN ONE-LINE DIAGRAM
1 16OF
80025
HWS
H W
R
C W
R C
W S
A/ C A/
C
A/ C
A
UP
UP
DN
D N U P
T
T
T
T
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
REFER TO THE DIVISION 1 PROJECT SPECIFICATIONS AND ALL SPECIFICATIONS RELATED TO THE PROPOSED SCOPE OF WORK OUTLINED IN THESE CONSTRUCTION DOCUMENTS.
DO NOT SCALE FROM THE DRAWINGS. ALL DIMENSIONS ARE APPROXIMATE. ACTUAL FIELD VERIFIED DIMENSIONS SHALL BE OBTAINED BY THE GENERAL CONTRACTOR BEFORE SUBMITTING SHOP DRAWINGS, ORDERING MATERIALS, OR THE COMMENCEMENT OF CONSTRUCTION.
COORDINATE EXACT LOCATION AND DIMENSIONS OF CONSTRUCTION STAGING AREA (CONSTRUCTION STORAGE, FIELD OFFICE, RESTROOM FACILITIES) WITH CONTRACTING OFFICER. PROVIDE ADEQUATE SPACE FOR
SEQUENCING NEEDS.
CONTRACTOR TO PROVIDE FENCING AROUND JOB SITE AND STAGING AREA.
PUBLIC SIDEWALK, ALLEY, AND STREETS TO REMAIN CLEAR AND AVAILABLE FOR PUBLIC USE DURING CONSTRUCTION.
THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER (CO) OF ANY DISCREPANCIES THAT VARY FR0M THE CONTRACT DOCUMENTS BEFORE BEGINNING CONSTRUCTION.
LOCATIONS OF UNDERGROUND UTILITIES ARE UNKNOWN. NO EXCAVATION IS PERMITTED.
IF UTILITIES ARE TO BE TEMPORARILY INTERRUPTED, CONTACT THE CONTRACTING OFFICER (CO), PER THE SPECIFICATIONS.
THE GOVERNMENT RESERVES THE RIGHT TO REMOVE ANY ITEMS FROM THE CONSTRUCTION AREA PRIOR TO THE START OF DEMOLITION WORK BY THE CONTRACTOR AND TO RETAIN SUCH ITEMS AS THEIR
PROPERTY.
ALL DEMOLITION DEBRIS SHALL BE TAKEN TO A LICENSED LANDFILL WITH WRITTEN PROOF PROVIDED TO THE CO. PLACEMENT OF TRASH DUMPSTER FOR CONSTRUCTION DEBRIS MUST BE APPROVED BY THE CO PRIOR TO SITE OCCUPATION, AND PER THE SPECIFICATIONS. REFER TO DIVISION 1 SPECIFICATIONS.
IT IS THE INTENT OF THIS CONTRACT THAT ALL AREAS AFFECTED BY CONSTRUCTION BE A FINISHED AND COMPLETE PROJECT. CONTRACTOR SHALL PATCH, REPAIR, AND ADJUST AS REQUIRED TO ACHIEVE THIS FINISHED PROJECT. REPAIRS OR REPLACEMENTS MUST MATCH THE EXISTING MATERIAL IN PROPERTIES, TEXTURE, PROFILE, DIMENSION, FINISH, AND WHERE APPROPRIATE, SPECIES.
THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL TEMPORARY SHORING AND BRACING REQUIRED FOR THE SCHEDULED WORK.
THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL ACCESS AND EQUIPMENT TO PERFORM THE SCOPE OF WORK. ACCESS FOR EXTERIOR WORK SHOULD BE PROVIDED FROM THE EXTERIOR OF THE BUILDING.
THE BUILDING MUST BE COORDINATED WITH THE CO, PER THE SPECIFICATIONS.
THE EXISTING CONCRETE PLANTERS IN THE MECHANICAL COURTYARD TO BE PROTECTED DURING CONSTRUCTION. THE CONTRACTOR MAY MOVE THE PLANTERS DURING CONSTRUCTION, BUT THE PLANTERS ARE TO BE REINSTALLED IN THEIR ORIGINAL LOCATIONS AT THE END OF CONSTRUCTION. THE MOVING OF THE PLANTERS SHALL BE COORDINATED WITH THE CO.
FOR THE PURPOSE OF THIS PROJECT, ALL PAINT COATINGS SHOULD BE CONSIDERED LEAD-BASED PAINT. ALL CONTRACTORS PERFORMING WORK WHICH WILL DISTURB ANY PAINT COATINGS MUST HAVE RECEIVED THE 8-HOUR RRP TRAINING AND HAVE A TRAINING CERTIFICATE SIGNED BY AN APPROVED TRAINING PROVIDER. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO OBTAIN AND KEEP RECORDS OF ALL RRP TRAINING CERTIFICATES. ALL WORK MUST BE IN ACCORDANCE WITH ENVIRONMENTAL PROTECTION ADMINISTRATION STANDARDS FOR WORK WITH LEAD PAINT AND DISPOSAL OF LEAD-CONTAINING ITEMS.
SHEET GENERAL NOTES
2ND ST. SW
CO
UR
T
AV
E
SW
MA
RK
ET
A
VE
S
3RD ST. SW
4TH ST. SW
PARK - NOT OWNED BY NPS
PARKING LOT - NOT OWNED BY
NPS
EXISTING NPS STORAGE SHED
CONTRACTOR MAY USE UP TO (5)
PARKING SPOTS IN THE NORTHWEST
CORNER OF THE NPS PARKING LOT FOR
STAGING, STORAGE, AND GENERAL
CONSTRUCTION FACILITIES (INCLUDING
LARGE EQUIPMENT STORAGE AND
TEMPORARY TOILET FACILITIES)
EXISTING NPS PARKING LOT
SAXTON
HOUSE
NPS EDUCATIONAL RESEARCH
CENTER
ALLEY
NPS BUILDING WHERE
CHILLER COOLING SYSTEM
IS TO BE REPLACEDNPS MECHANICAL COURTYARD.
REFERENCE SITE PLAN FOR
ADDITIONAL INFORMATION
PARKING GARAGE - NOT OWNED
BY NPS
COURT AVE SW IS A ONE-WAY
ROAD.
A
MECHANICAL LOUVER FOR
NEIGHBORING BUILDING TO REMAIN
UNBLOCKED AND PROTECTED DURING
CONSTRUCTION
PROTECT FIRE ESCAPE ABOVE
PARKING GARAGE
+/- 5' - 11" +/- 8' - 1" +/- 13' - 2" +/- 7' - 7" +/- 5' - 0"
STORAGE SHED
CHILLER PIPES
EXISTING CHILLER
9'
- 0
1/ 2"
6"
2 1
/2" 1'
- 0
9'
- 7
NO WORK
MECHANICAL
AREAWAYS
8' - 6"
0"
NEIGHBOR PARKING SPOT
TO REMAIN OPEN AND
ACCESSIBLE DURING THE
ENTIRE CONSTRUCTION
PERIOD
BOLLARD TYP.
CONCRETE CURB
ASPHALT PAVING
GRAVEL ALLEY
VEHICULAR ACCESS TO
THE EXISTING ALLEY IS
NOT AVAILABLE FROM THE
EAST.
VEHICULAR ACCESS TO THE EXISTING
ALLEY IS ONLY AVAILABLE FROM THE
WEST. AT NO TIME CAN THE ALLEY BE
BLOCKED FOR AN EXTENDED PERIOD OF
TIME. THE CONTRACTOR IS RESPONSIBLE
FOR ALL PERMITS REQUIRED FOR USE OF
PUBLIC RIGHT OF WAY.
+/- 6" DROP BETWEEN
CONCRETE CURB AND GRAVEL STAIRS DOWN TO MECHANICAL ROOM
BACK EXIT DOOR TO REMAIN ACCESSIBLE
DURING CONSTRUCTION. CONTRACTOR
TO PROVIDE WALK-OFF MATS THAT ARE
CLEANED ON WEEKLY BASIS TO ENSURE
DUST IS NOT TRACKED INTO BUILDING.
LARGE CONCRETE
PLANTER
CONSTRUCTION FENCE
LARGE CONCRETE
PLANTER
POST OFFICE DRIVER PARKS
IN ALLEY. CONTRACTOR TO
KEEP ALLEY OPEN.
FIRE ESCAPE
MECHANICAL COURTYARD - LOOKING NORTHMECHANICAL COURTYARD - LOOKING WEST TOWARDS THE ALLEY MECHANICAL COURTYARD - LOOKING EAST, NEIGHBOR'S PARKING SPOT
TO REMAIN OPEN DURING
CONSTRUCTION
VEHICULAR ACCESS TO
THE EXISTING ALLEY IS
ONLY AVAILABLE FROM THE
WEST. AT NO TIME CAN THE
ALLEY BE BLOCKED FOR
AN EXTENDED PERIOD OF
TIME. EXISTING CHILLER AND
CONCRETE PAD
EXISTING BOLLARDS (8)
LARGE CONCRETE
PLANTERS (4)
MECHANICAL AREAWAY
BELOW
LARGE CONCRETE
PLANTERS (4)
BACK EXIT DOOR TO
REMAIN ACCESSIBLE
DURING CONSTRUCTION
VEHICULAR ACCESS TO
THE EXISTING ALLEY IS
NOT AVAILABLE FROM THE
EAST.
EXIST WOOD SHED
(OWNED BY NPS)
+/- 6" DROP BETWEEN
CONCRETE CURB AND
GRAVEL
DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET
PMIS/PKG NO.
SHEET
CANTON, OHIO
322010
CA
CA, MI
CA, TF
01.27.2026
FIRST LADIES NATIONAL HISTORIC SITE
A/E FIRMS
PRIME/ARCH:
STRATA ARCHITECTURE
1701 Oak Street, Suite 100 Kansas City, MO T: 816.474.0900
DRAWING NO.
80025
1/
/2
4:
:0
PM
REPLACE CHILLER COOLING SYSTEM AT
EDUCATION RESEARCH CENTER
G002 CONSTRUCTION BOUNDARY
NOT TO SCALEG002
1 CONSTRUCTION BOUNDARY
8' 0 8' 16'
SCALE OF FEET
SCALE A
SCALEG002 1/8" = 1'-0"
2 MECHANICAL COURTYARD PLAN
A
BL
D
G
BL
D
G
NOT TO SCALEG002
3 CONSTRUCTION BOUNDARY
REBECCA GAEBLER
2118415
01/27/2026 2 16OF
A
1 2 3 4
A
HWS
H W
R
C W
R C
W S
A/ C A/
C
A/ C
A
UP
UP
DN
D N U P
T
T
T
T
A
NO WORK
8'
- 5
0'
- 8
5'
- 6
1/ 2"
0'
- 8
1/ 2"
9' - 3" 1' - 6"
AREA WELL
MECHANICAL
ROOM
AREA WELL
02.07
02.08
02.09
02.10
02.10
A
PARKING GARAGE
+/- 5' - 11" +/- 8' - 1" +/- 13' - 2" +/- 7' - 7" +/- 5' - 0"
9'
- 0
1/ 2"
6"
NO WORK
02.01 02.02
02.03
02.03
02.04
02.01
02.01
02.04
02.05
02.03
02.03
02.01
02.01
02.01
02.06
02.11
02.11
1.
2.
3.
4.
5.
6.
REFER TO THE DIVISION 1 PROJECT SPECIFICATIONS AND ALL
SPECIFICATIONS RELATED TO THE PROPOSED SCOPE OF WORK OUTLINED
IN THESE CONSTRUCTION DOCUMENTS.
DO NOT SCALE FROM THE DRAWINGS. ALL DIMENSIONS ARE APPROXIMATE.
ACTUAL FIELD VERIFIED DIMENSIONS SHALL BE OBTAINED BY THE GENERAL
CONTRACTOR BEFORE SUBMITTING SHOP DRAWINGS, ORDERING
MATERIALS, OR THE COMMENCEMENT OF CONSTRUCTION.
REFERENCE TO STRUCTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS
FOR FULL EXTENT OF REQUIRED DEMOLITION WORK.
ALL DEMOLITION DEBRIS SHALL BE TAKEN TO A LICENSED LANDFILL WITH
WRITTEN PROOF PROVIDED TO THE CO. PLACEMENT OF TRASH DUMPSTER
FOR CONSTRUCTION DEBRIS MUST BE APPROVED BY THE CO PRIOR TO
SITE OCCUPATION, AND PER THE SPECIFICATIONS. REFER TO DIVISION 1
SPECIFICATIONS.
IT IS THE INTENT OF THIS CONTRACT THAT ALL AREAS AFFECTED BY
CONSTRUCTION BE A FINISHED AND COMPLETE PROJECT. CONTRACTOR
SHALL PATCH, REPAIR, AND ADJUST AS REQUIRED TO ACHIEVE THIS
FINISHED PROJECT. REPAIRS OR REPLACEMENTS MUST MATCH THE
EXISTING MATERIAL IN PROPERTIES, TEXTURE, PROFILE, DIMENSION, FINISH,
AND WHERE APPROPRIATE, SPECIES.
FOR THE PURPOSE OF THIS PROJECT, ALL PAINT COATINGS SHOULD BE
CONSIDERED LEAD-BASED PAINT. ALL CONTRACTORS PERFORMING WORK
WHICH WILL DISTURB ANY PAINT COATINGS MUST HAVE RECEIVED THE 8-
HOUR RRP TRAINING AND HAVE A TRAINING CERTIFICATE SIGNED BY AN
APPROVED TRAINING PROVIDER. IT IS THE RESPONSIBILITY OF THE
GENERAL CONTRACTOR TO OBTAIN AND KEEP RECORDS OF ALL RRP
TRAINING CERTIFICATES. ALL WORK MUST BE IN ACCORDANCE WITH
ENVIRONMENTAL PROTECTION ADMINISTRATION STANDARDS FOR WORK
WITH LEAD PAINT AND DISPOSAL OF LEAD-CONTAINING ITEMS.
DEMOLITION PLAN SHEET NOTES
DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET
PMIS/PKG NO.
SHEET
CANTON, OHIO
322010
CA
CA, MI
CA, TF
01.27.2026
FIRST LADIES NATIONAL HISTORIC SITE
A/E FIRMS
PRIME/ARCH:
STRATA ARCHITECTURE
1701 Oak Street, Suite 100 Kansas City, MO T: 816.474.0900
DRAWING NO.
80025
1/
/2
4:
:0
PM
REPLACE CHILLER COOLING SYSTEM AT
EDUCATION RESEARCH CENTER
AD101 DEMOLITION PLANS
BL
D
G
SCALEAD101 1/4" = 1'-0"
2 LOWER LEVEL - ENLARGED MECHANICAL ROOM DEMOLITION PLAN
ASCALEAD101 1/4" = 1'-0"
1 MECHANICAL COURTYARD DEMOLITION PLAN
A
4' 0 4' 8'
SCALE OF FEET
SCALE A
KEYNOTE LEGEND
KEY VALUE KEYNOTE TEXT
02.01 CONTRACTOR TO DETERMINE WHICH BOLLARDS ARE REQUIRED TO BE
REMOVED TO SUCCESSFULLY INSTALL NEW MECHANICAL EQUIPMENT AND
MECHANICAL PAD. EXISTING BOLLARDS TO BE CAREFULLY REMOVED AND
REINSTALLED IN THE EXISTING LOCATIONS. REFERENCE MECHANICAL AND
STRUCTURAL DRAWINGS. THE CONTRACTOR IS RESPONSIBLE FOR ALL
WORK ASSOCIATED WITH REMOVING AND REINSTALLING THE BOLLARDS,
INCLUDING PATCHING ANY PAVING THAT IS DAMAGED DURING THE
REMOVAL AND REINSTALLATION.
02.02 DEMOLISH EXISTING MECHANICAL PAD AND ASSOCIATED ANCHORS.
REFERENCE MECHANICAL AND STRUCTURAL DRAWINGS. THE
CONTRACTOR IS RESPONSIBLE FOR ALL WORK ASSOCIATED WITH
REMOVING OF THE EXISTING MECHANICAL PAD AND NEW MECHANICAL PAD,
INCLUDING PATCHING ANY PAVING THAT IS DAMAGED DURING THE
REMOVAL AND INSTALLATION.
02.03 REFERENCE MECHANICAL DRAWINGS FOR DEMOLITION OF EXISTING
CONDENSING UNIT, ASSOCIATED ANCHORS, AND ASSOCIATED
ACCESSORIES (INCLUDING PLUMBING, MECHANICAL, AND ELECTRICAL
LINES).
02.04 THE EXISTING CONCRETE PLANTERS IN THE MECHANICAL COURTYARD TO
BE PROTECTED DURING CONSTRUCTION. THE CONTRACTOR MAY MOVE
THE PLANTERS DURING CONSTRUCTION, BUT THE PLANTERS ARE TO BE
REINSTALLED IN THEIR ORIGINAL LOCATIONS AT THE END OF
CONSTRUCTION. THE MOVING OF THE PLANTERS SHALL BE COORDINATED
WITH THE CONTRACTING OFFICER (CO).
02.05 CAREFULLY REMOVE AND DISPOSE OF WOODEN SHED.
02.06 REFERENCE ELECTRICAL DRAWINGS FOR DEMOLITION OF SHED LIGHTING
AND ASSOCIATED ELECTRICAL.
02.07 ELECTRICAL SWITCHBOARD 'MDP', REFERENCE ELECTRICAL DRAWINGS
FOR ANY REQUIRED DEMOLITION.
02.08 REFERENCE MECHANICAL DRAWINGS FOR DEMOLITION OF THE INDOOR
EVAPORATOR UNIT AND ASSOCIATED ACCESSORIES (INCLUDING
PLUMBING, MECHANICAL, AND ELECTRICAL LINES).
02.09 INSTALL ZIP WALL PRIOR TO STARTING CONSTRUCTION TO PROTECT
COMBUSTION BOILER FROM ANY CONSTRUCTION DUST. ZIP WALL TO
REMAIN IN PLACE THE WHOLE ENTIRE TIME CONSTRUCTION IS UNDERWAY.
REMOVE THE ZIP WALL AND ALL ASSOCIATED ANCHORS AT THE END OF
CONSTRUCTION.
02.10 MECHANICAL AREAWAY GRATE ABOVE.
02.11 MECHANICAL AREAWAY GRATE.
ASPHALT CONCRETE
REBECCA GAEBLER
2118415
01/27/2026 3 16OF
STRUCTURAL SHEET INDEX
SHEET NUMBER SHEET NAME
S001 COVER & GENERAL NOTES
S100 STRUCTURAL PLANS
S300 TYPICAL CONCRETE DETAILS
GRAND TOTAL: 3
DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET
PMIS/PKG NO.
SHEET
OF
CANTON, OHIO
322010
1.23.2026
FIRST LADIES NATIONAL HISTORIC SITE
A/E FIRMS
MEP:
IMEG
835 Grandview Ave, 3rd Floor
Columbus, OH
T: 614.443.1178
DRAWING NO.
80025
/2
/2
:4 :4
A
M
REPLACE CHILLER COOLING SYSTEM AT
EDUCATION RESEARCH CENTER
S001 COVER & GENERAL NOTES
GFM
GFM
GS
DESIGN CRITERIA
1. STRUCTURE HAS BEEN DESIGNED TO COMPLY WITH OHIO BUILDING CODE (OBC) 2024 AND
SUBSEQUENT REFERENCE STANDARDS.
2. RISK CATEGORY: II
3. MECHANICAL UNITS: THE CONTRACTOR SHALL CONFIRM THE ACTUAL MECHANICAL UNITS
PURCHASED ARE OF WEIGHT AND SIZE SUCH THAT:
1. THE UNIT WEIGHT IS LESS THAN OR EQUAL TO WEIGHT LISTED ON PLAN.
2. THE UNIT LENGTH IS LESS THAN 15 FEET. IF UNIT LENGTH IS GREATER THAN 15 FEET,
SNOW DRIFT ON ROOF SHALL BE ACCOUNTED FOR.
3. THE TOTAL SUPERIMPOSED LOAD UNDER EACH UNIT DOES NOT EXCEED THE LIVE
LOAD FOR WHICH THE FLOOR WAS DESIGNED IN THE FLOOR AREA WHERE THE UNIT IS
LOCATED AS INDICATED BY THE EQUATION BELOW:
TOTAL SUPERIMPOSED LOAD
UNDER UNIT =
TOTAL EQUIPMENT WEIGHT /
UNIT FOOTPRINT AREA =
INDICATED SERVICE LEVEL
DESIGN LIVE LOAD
TOTAL EQUIPMENT WEIGHT =
OPERATING WEIGHT OF UNIT + CONCRETE HOUSEKEEPING
PAD + INERTIA BLOCK + OTHER ANCILLARY ITEMS
ASSOCIATED WITH THE EQUIPMENT
UNIT FOOTPRINT AREA =
EFFECTIVE AREA OF UNIT OR HOUSEKEEPING PAD,
WHICHEVER IS LARGER
EFFECTIVE AREA = (LENGTH + 6 FEET) x (WIDTH + 6 FEET)
CONTRACTOR SHALL NOTIFY THE STRUCTURAL ENGINEER PRIOR TO CONSTRUCTION ON
THE LOCATION OF ANY MECHANICAL UNITS WHERE THE SUPERIMPOSED LOAD UNDER
THE UNIT EXCEEDS THE INDICATED DESIGN SIZE AND LOAD FOR THE ROOF AND/OR LIVE
LOAD FOR THE FLOOR AS INDICATED ON THE PLAN.
GENERAL
1. DURING THE CONSTRUCTION PERIOD, THE CONTRACTOR SHALL BE RESPONSIBLE FOR
THE SAFETY OF PERSONNEL AND PROPERTY ON AND AROUND THE JOBSITE. THE
CONTRACTOR SHALL PROVIDE ADEQUATE SHORING, BRACING, GUYS, ETC. IN
ACCORDANCE WITH ALL NATIONAL, STATE, AND LOCAL SAFETY ORD INANCES.
TEMPORARY BRACING, SHORING, GUYING, ETC. SHALL AVOID EXCESSIVE STRESSES AND
HOLD STRUCTURAL ELEMENTS IN PLACE DURING CONSTRUCTION. THE STRUCTURE
SHOULD NOT BE CONSIDERED STABLE UNTIL ALL STRUCTURAL ELEMENTS HAVE BEEN
CONSTRUCTED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
2. ALL DRAWINGS AND SPECIFICATIONS ARE CONSIDERED TO BE A PART OF THE CONTRACT
DOCUMENTS. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE REVIEW AND
COORDINATION OF ALL DRAWINGS PRIOR TO THE START OF CONSTRUCTION. ANY
DISCREPANCIES OR OMISSIONS SHALL BE BROUGHT TO THE ATTENTION OF THE
CONTRACTING OFFICER (CO) PRIOR TO THE START OF CONSTRUCTION SO A
CLARIFICATION CAN BE ISSUED. ANY WORK THAT DEVIATES FROM OR IS PERFORMED IN
CONFLICT WITH THE CONTRACT DOCUMENTS OR ANY CODE REQUIREMENTS SHALL BE
CORRECTED BY THE CONTRACTOR AT THEIR OWN EXPENSE AND AT NO EXPENSE TO THE
CONTRACTING OFFICERS.
3. THE CONTRACT DOCUMENTS REPRESENT THE FINISHED STRUCTURE. THEY DO NOT
INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE FOR
DETERMINING ALLOWABLE CONSTRUCTION LOADS AND FOR DETERMINING SEQUENCES
OF CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE ALL MEASURES NECESSARY TO
PROTECT THE STRUCTURE AND SAFETY OF WORKERS DURING CONSTRUCTION. SUCH
MEASURES SHALL INCLUDE, BUT NOT BE LIMITED TO: FALSEWORK, FORMWORK, STAGING,
BRACING, AND SHORING FOR LOADS DUE TO CONSTRUCTION EQUIPMENT, ETC.
OBSERVATION VISITS TO THE SITE BY THE CO SHALL NOT INCLUDE INSPECTION OR
APPROVAL OF THE ABOVE ITEMS AND DO NOT IN ANY WAY RELIEVE THE CONTRACTOR OF
THEIR RESPONSIBILITIES FOR THE ABOVE. THE CONTRACTOR SHALL TAKE ALL
NECESSARY PRECAUTIONS TO MAINTAIN AND ENSURE THE INTEGRITY OF THE
STRUCTURE AT ALL STAGES OF CONSTRUCTION.
4. ALL DIMENSIONS AND SITE CONDITIONS SHALL BE VERIFIED BY THE CONTRACTOR AT THE
JOBSITE PRIOR TO BID SUBMITTAL, START OF SHOP DRAWINGS, START OF
CONSTRUCTION, AND/OR FABRICATION OF MATERIALS. IF DISCREPANCIES ARE
ENCOUNTERED, OR CONDITIONS DEVELOP THAT ARE NOT COVERED BY THE CONTRACT
DOCUMENTS, THE CO SHALL BE NOTIFIED FOR CLARIFICATION.
5. STRUCTURAL SUBSTITUTIONS MAY BE ALLOWED WITH THE APPROVAL OF THE CO.
SUPPLIER SHALL PROVIDE SIGNED AND SEALED DESIGN CALCULATIONS OR SUITABLE
PRODUCT LITERATURE FOR THE COMPONENTS. ALL PRODUCT SUBSTITUTIONS SHALL
INCLUDE A CODE EVALUATION REPORT SPECIFIC TO THE BUILDING CODE LISTED IN THE
DESIGN CRITERIA.
6. STRUCTURAL DRAWINGS INCLUDE DESIGN REQUIREMENTS AND DIMENSIONS FOR
STRUCTURAL INTEGRITY BUT DO NOT SHOW ALL DETAIL DIMENSIONS TO FIT INTRICATE
ARCHITECTURAL AND MECHANICAL DETAILS. CONTRACTOR SHALL CONSTRUCT THE
WORK SO IT WILL CONFORM TO THE CLEARANCES REQUIRED BY ARCHITECTURAL,
MECHANICAL, AND ELECTRICAL DESIGN.
7. ALL SYMBOLS AND ABBREVIATIONS USED ON THE DRAWINGS ARE CONSIDERED TO BE
CONSTRUCTION STANDARDS. IF CLARIFICATION IS REQUIRED, THE CONTRACTOR SHALL
NOTIFY THE CO PRIOR TO PROCEEDING WITH THE WORK.
8. DO NOT SCALE DRAWINGS. PRINTED DIMENSIONS HAVE PRECEDENCE OVER SCALED
DRAWINGS AND LARGE-SCALE OVER SMALL-SCALE DRAWINGS. CONTRACTOR TO
DETERMINE FINAL DIMENSION WITH CO .
9. TYPICAL DETAILS SHALL APPLY TO SITUATIONS OCCURRING ON THE PROJECT THAT ARE
THE SAME OR SIMILAR TO THOSE SPECIFICALLY REFERENCED. WHERE NO DETAILS ARE
GIVEN, CONSTRUCTION SHALL BE AS SHOWN FOR SIMILAR WORK.
10. COORDINATE FLOOR FINISH INCLUDING, BUT NOT LIMITED TO THE "FLATNESS" AND
"LEVELNESS" REQUIREMENTS, WITH THE FLOOR FINISH CONTRACTOR. PROVIDE
UNDERLAYMENT / TOPPING WHERE REQUIRED TO PROVIDE A SURFACE ACCEPTABLE FOR
INSTALLATION OF FLOOR FINISHES. SEE ARCHITECTURAL DRAWINGS AND
SPECIFICATIONS FOR ADDITIONAL INFORMATION AND REQUIREMENTS.
11. ESTABLISH AND VERIFY ALL OPENINGS AND INSERTS FOR MECHANICAL, ELECTRICAL, AND
PLUMBING WITH APPROPRIATE TRADE CONTRACTORS. OPENING SIZES AND LOCATIONS
SHOWN FOR DUCTS, PIPE, INSERTS, AND OTHER PENETRATIONS WHEN SHOWN ARE FOR
GENERAL INFORMATION ONLY AND SHALL BE VERIFIED PRIOR TO FORMING.
12. THE EXACT WEIGHTS, DIMENSIONS, AND LOCATIONS OF ALL MECHANICAL UNITS AND
ELECTRICAL GEAR SUPPORTED ON STRUCTURAL FRAMING SHALL BE DETERMINED AND
COORDINATED BY THE CONTRACTOR PRIOR TO DETAILING THE STRUCTURAL FRAMING
SUPPORTING THOSE UNITS. IF THE UNIT WEIGHTS ARE GREATER THAN THE WEIGHTS
SHOWN ON THE STRUCTURAL DRAWINGS, THE CO SHALL BE NOTIFIED PRIOR TO
DETAILING THE STRUCTURE. UNIT WEIGHTS, DIMENSIONS, AND LOCATIONS SHOWN ON
THE STRUCTURAL DRAWINGS ARE APPROXIMATE ONLY AND SHALL NOT BE USED FOR
DETAILING THE STRUCTURE.
13. PROVIDE TEMPORARY BLOCKOUTS AND TEMPORARY OPENINGS IN THE STRUCTURE AS
REQUIRED TO PERMIT INSTALLATION OF ALL WORK. BLOCKOUTS AND TEMPORARY
OPENINGS SHALL BE LOCATED, CONFIGURED, DETAILED, AND INFILLED IN A MANNER THAT
ALTERS NEITHER THE STRENGTH OF THE STRUCTURAL FRAMING NOR THE STRENGTH OF
CONNECTIONS. INFILL ALL BLOCKOUTS AND TEMPORARY OPENINGS USING THE
MATERIALS SPECIFIED FOR THE FRAMING AT THE LOCATIONS WHERE THE BLOCKOUTS
AND OPENINGS OCCUR. SUBMIT DRAWINGS INDICATING THE LOCATIONS, DIMENSIONS,
AND DETAILS OF ALL PROPOSED BLOCKOUTS AND OPENINGS AND DETAILS INDICATING
THE MANNER IN WHICH THE BLOCKOUTS AND OPENINGS WILL BE INFILLED.
14. BEFORE SUBMITTING A PROPOSAL FOR THIS WORK, CONTRACTOR SHALL VISIT THE
PREMISES AND BECOME FULLY ACQUAINTED WITH FIELD CONDITIONS, TEMPORARY
CONSTRUCTION REQUIRED, QUANTITIES AND TYPE OF EQUIPMENT, ETC. THE PROPOSAL
SHALL INCLUDE ALL SUMS REQUIRED TO DO THE WORK.
SUBMITTALS
1. SUBMITTALS ARE:
1. CONCRETE MIX DESIGNS
2. MATERIAL PRODUCT DATA FOR STRUCTURAL MATERIALS
3. CONCRETE AND MASONRY REINFORCING
4. STEEL FABRICATION AND MISCELLANEOUS METALS
2. SUBMITTALS SHALL BE REVIEWED AND COORDINATED PRIOR TO SUBMITTING TO THE CO .
EACH SHOP DRAWING SUBMITTED SHALL BE STAMPED INDICATING REVIEW BY THE
CONSTRUCTION MANAGER/GENERAL CONTRACTOR AND REVIEW BY THE CO SHALL NOT
BEGIN UNTIL THIS IS COMPLETE. WORK SHALL NOT BEGIN WITHOUT REVIEW BY THE
DESIGN PROFESSIONALS.
3. SUBMITTALS SHALL BE REVIEWED BY T HE DESIGN PROFESSIONALS FOR GENERAL
CONFORMANCE WITH DESIGN CONCEPT ONLY. NOTATIONS MADE BY THE DESIGN
PROFESSIONALS ON THE SHOP DRAWINGS DO NOT RELIEVE THE CONTRACTOR FROM
COMPLYING WITH THE REQUIREMENTS OF THE DRA WINGS.
4. FOR ADDITIONAL INFORMATION ON REQUIRED SUBMITTALS, SEE INDIVIDUAL MATERIAL
SECTIONS.
EXISTING CONDITIONS / DEMOLITION
1. EXISTING CONDITIONS:
1. EXISTING STRUCTURAL INFORMATION SHOWN WAS OBTAINED FROM EXISTING
DRAWINGS DATED 9/24/2001 BY GAEDE SERNE ARCHITECTS INC. .
2. ALL INFORMATION SHOWN ON THE DRAWINGS RELATIVE TO EXISTING CONDITIONS IS
GIVEN AS THE BEST PRESENT KNOWLEDGE. CONTRACTOR TO VERIFY EXISTING
INFORMATION, DIMENSIONS, AND SIZES AS REQUIRED TO COMPLETE THEIR WORK.
WHERE ACTUAL CONDITIONS CONFLICT WITH THE DRAWINGS, THEY SHALL BE
REPORTED TO THE CO SO CLARIFICATION MAY BE MADE. MODIFICATION OF
CONSTRUCTION DETAILS SHALL NOT BE MADE WITHOUT WRITTEN APPROVAL OF THE
CO .
2. ALL DEMOLITION SHALL BE CARRIED OUT IN SUCH A WAY TO PREVENT DAMAGE TO
EXISTING ELEMENTS WHICH ARE TO REMAIN.
3. ALL ELEMENTS WHICH ARE TO REMAIN AND WHICH ARE DAMAGED DURING DEMOLITION
WORK SHALL BE REPLACED AT NO ADDED COST. CONTRACTOR SHALL PROVIDE AND BE
RESPONSIBLE FOR THE PROTECTION AND REPAIR OF ADJACENT EXISTING SURFACES AND
AREAS WHICH MAY BE DAMAGED AS A RESULT OF NEW WORK.
4. CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS AND CONDITIONS OF EXISTING
STRUCTURE AND SITES THAT ARE AFFECTED BY NEW WORK BEFORE PROCEEDING WITH
FABRICATION AND CONSTRUCTION.
5. ALL CONSTRUCTION IS NEW UNLESS IDENTIFIED AS EXISTING, "(E)". THE CONTRACTOR
SHALL VERIFY ALL EXISTING BUILDING INFORMATION AND SHALL NOTIFY THE CO OF ANY
DISCREPANCIES PRIOR TO FABRICATION OF ANY STRUCTURAL COMPONENT. NEW SLABS
ARE TO BE AT THE SAME ELEVATIONS AS ADJACENT EXISTING SLABS UON. FOUNDATION
ELEVATIONS OR COLUMN LENGTHS SHALL BE ADJUSTED WITH THE APPROVAL OF THE CO
TO ACHIEVE MATCHING SLAB ELEVATIONS.
6. REINFORCING STEEL IN EXISTING CONCRETE SHALL BE LOCATED PRIOR TO INSTALLATION
OF NEW OPENINGS OR CORING OF HOLES IN THE CONCRETE. REINFORCING STEEL MAY
NOT BE CUT WITHOUT APPROVAL FROM THE CO.
EARTHWORK
1. FOUNDATION DESIGN IS IN ACCORDANCE WITH THE BUILDING CODE ALLOWABLE BEARING
PRESSURES. NO NEW GEOTECHNICAL REPORT HAS BEEN PROVIDED BY THE CO FOR THIS
PROJECT.
2. A GEOTECHNICAL ENGINEER SHALL BE EMPLOYED TO VERIFY THAT THE PRESUMED
ALLOWABLE BEARING PRESSURE WILL BE ACHIEVED PRIOR TO CONSTRUCTION. THAT
ENGINEER SHALL DEVELOP AND ENSURE IMPLEMENTATION OF A SITE SUBGRADE
PREPARATION PROGRAM AS REQUIRED TO ACHIEVE THE PRESUMED SOIL BEARING
PRESSURE. FOOTING AND SLAB-ON-GRADE SUBGRADE PREPARATION SHALL BE IN
COMPLIANCE WITH THE APPLICABLE REQUIREMENTS OF THE AUTHORITIES HAVING
JURISDICTION.
3. ANY TESTS, INSPECTIONS, FIELD OBSERVATIONS, OR APPROVAL FROM THE
GEOTECHNICAL ENGINEER SHALL BE PERFORMED PRIOR TO PLACEMENT OF CONCRETE.
ALTERATIONS TO SITE PREPARATION OR GRADING SHALL BE REPORTED TO THE
GEOTECHNICAL ENGINEER PRIOR TO CONSTRUCTION.
4. PROPERTY LINE LOCATIONS INDICATED ON FOUNDATION PLANS ARE APPROXIMATE. SEE
ARCHITECTURAL AND/OR SITE DRAWINGS FOR LOCATION OF THE STRUCTURE ON THE
SITE.
5. ALL EXCAVATIONS SHALL BE PROPERLY AND SAFELY BACKFILLED. DO NOT PLACE
BACKFILL BEHIND RETAINING / BASEMENT WALLS BEFORE CONCRETE HAS ATTAINED
SPECIFIED COMPRESSIVE STRENGTH. CONTRACTOR SHALL BRACE OR PROTECT ALL
WALLS BELOW GRADE FROM LATERAL LOADS UNTIL SUPPORTING FLOORS ARE
COMPLETELY IN PLACE AND HAVE ATTAINED 7-DAY STRENGTH MINIMUM. BACKFILLING IS
NOT PERMITTED FOR FOUNDATION WALLS UNTIL SUPPORTED SLAB TOP AND BOTTOM
ARE IN PLACE OR THE WALL IS ADEQUATELY BRACED TO RESIST LATERAL LOADS.
6. CONTRACTOR SHALL PROVIDE DE-WATERING OF EXCAVATIONS FROM SURFACE WATER,
GROUNDWATER, OR SEEPAGE. DETAILS OF GROUNDWATER INFORMATION SHALL BE
OBTAINED FROM THE GEOTECHNICAL REPORT. IF GROUNDWATER IS ENCOUNTERED
DURING EXCAVATION, PROCEDURES SHALL BE IMPLEMENTED AS RECOMMENDED BY THE
GEOTECHNICAL ENGINEER.
7. PROVIDE SHORING WHERE THERE IS INSUFFICIENT SPACE FOR STABLE-SLOPED
EMBANKMENTS.
8. CONTRACTOR SHALL INVESTIGATE SITE DURING CLEARING AND EARTHWORK
OPERATIONS FOR FILL MATERIAL OR BURIED STRUCTURES SUCH AS CESSPOOLS,
CISTERNS, AND FOUNDATIONS. IF ANY SUCH MATERIAL OR STRUCTURES ARE FOUND, CO
SHALL BE NOTIFIED IMMEDIATELY.
9. ANY REQUIRED IMPORT FILL SHALL HAVE A LOW POTENTIAL FOR EXPANSION AND SHALL
BE APPROVED BY THE GEOTECHNICAL ENGINEER PRIOR TO IMPORTING.
10. UTILITY LINES SHALL NOT BE PLACED THROUGH OR BELOW FOUNDATIONS WITHOUT THE
STRUCTURAL ENGINEER'S APPROVAL. BELOW GRADE UTILITY OR PIPE ELEVATIONS,
WHERE SHOWN, ARE INDICATED FOR REFERENCE ONLY. REQUIRED ELEVATIONS SHALL
BE DETERMINED BY OTHERS AND COORDINATED WITH THE FOUNDATIONS.
11. WHERE GRADE ELEVATIONS ARE APPROXIMATELY EQUAL ON BOTH SIDES OF WALLS,
BACKFILL SHALL BE PLACED SO THAT IT IS NOT UNBALANCED BY MORE THAN 2 FEET ON
EITHER SIDE.
12. ALL REQUIRED BACKFILL AND UTILITY TRENCH BACKFILL WITHIN THE BUILDING AREA
SHALL BE COMPACTED TO 95% COMPACTION OR IN ACCORDANCE WITH THE CO
STANDARDS AND SPECIFICATIONS.
CAST-IN-PLACE CONCRETE
1. ALL CONCRETE WORK SHALL CONFORM TO THE REQUIREMENTS OF ACI 318, BUILDING
CODE REQUIREMENTS FOR STRUCTURAL CONCRETE, AND ACI 301, SPECIFICATIONS FOR
STRUCTURAL CONCRETE UON.
2. CONCRETE MATERIALS SHALL CONFORM TO:
PORTLAND LIMESTONE CEMENT ASTM C595, TYPE IL
FLY ASH ASTM C618, TYPE C OR F
SLAG CEMENT ASTM C989
FINE AND COARSE AGGREGATE ASTM C33
LIGHTWEIGHT AGGREGATE ASTM C330
WATER POTABLE
AIR-ENTRAINING ADMIXTURE ASTM C260
WATER REDUCING ADMIXTURE ASTM C494
3. CONCRETE STRENGTHS SHALL CONFORM TO:
COMPONENT f'c AT 28 DAYS 1 (PSI) MAX PERMITTED W/C EXPOSURE CLASS
SHALLOW
FOUNDATIONS
4500 0.45 F2
EXTERIOR/PARKING
SLAB-ON-GRADE
5000 0.40 F3
1 IF ALTERNATE VALUES ARE INDICATED ON PLANS OR DETAILS FOR SPECIFIC
CONDITIONS. THEY SHALL BE USED IN LIEU OF THOSE LISTED IN THE TABLE.
4. AIR ENTRAINMENT:
NOMINAL MAXIMUM
AGGREGATE SIZE
REQUIRED AIR CONTENT PER EXPOSURE CATEGORY
F1 F2
3/8" 6% 7.5%
1/2" 5.5% 7%
3/4" 5% 6%
1" 4.5% 6%
1. CONCRETE IN THESE LOCATIONS SHALL BE AIR ENTRAINED WITH THE APPROPRIATE
PERCENTAGE AIR CONTENT LISTED IN THE TABLE ABOVE AS APPLICABLE FOR THE
INDICATED EXPOSURE CLASS AND NOMINAL MAXIMUM AGGREGATE SIZE IN THE
CONCRETE MIX. THE REQUIRED AIR CONTENT VALUE MAY BE REDUCED BY 1% FOR
ALL CONCRETE WITH COMPRESSIVE STRENGTH GREATER THAN 5000 PSI. THE
PERMITTED TOLERANCE ON THE REQUIRED AIR CONTENT IS ±1.5%.
2. ALL LIGHTWEIGHT CONCRETE SHALL HAVE 4-7% AIR ENTRAINMENT.
3. AIR ENTRAINMENT SHALL CONFORM TO UL RATING REQUIREMENTS FOR FIRE
RESISTANCE.
5. REQUIRED NOMINAL MAXIMUM COARSE AGGREGATE SIZE:
CONCRETE ELEMENT
REQUIRED NOMINAL MAXIMUM COARSE
AGGREGATE SIZE*
ALL CONCRETE UON 1"
VOIDED FILIGREE SLABS 3/4"
TOPPING SLABS LESS THAN 3" THICK 3/8"
* SMALLER NOMINAL MAXIMUM COARSE AGGREGATE SIZE SHALL BE USED WHERE
REQUIRED PER ACI 318.
6. COMBINED AGGREGATE GRADING FOR STRUCTURAL SLABS: 8-22% BY WEIGHT OF
AGGREGATE SHALL BE RETAINED ON EACH SIEVE BELOW THE MAXIMUM AGGREGATE SIZE
SIEVE AND ABOVE THE #100 SIEVE.
7. "ROUGH JOINTS" ARE JOINTS ROUGHENED TO AN AMPLITUDE OF 1/4" AND FREE AND
CLEAN OF LAITANCE. PROVIDE ROUGH JOINTS AT ALL CONSTRUCTION JOINTS UON.
8. JOINTS ABUTTING EXISTING CONCRETE CONSTRUCTION SHALL BE ROUGH JOINTS UON.
9. PROJECTING CORNERS OF BEAMS, WALLS, COLUMNS, ETC. SHALL BE FORMED WITH A 3/4"
CHAMFER UON ON ARCHITECTURAL DRAWINGS.
10. AFTER CONCRETE IS PLACED, IN NO CASE SHALL THE SUPERIMPOSED CONSTRUCTION
LOADS BE GREATER THAN SPECIFIED DESIGN LIVE LOADS UNLESS THE WORK IS SHORED.
11. NOTIFY THE CO 48 HOURS MINIMUM PRIOR TO ALL POURS.
12. CONTRACTOR SHALL SURVEY ALL CONCRETE WORK WITHIN 48 HOURS OF PLACING
CONCRETE TO ENSURE PLACEMENT IS IN ACCORDANCE WITH PROJECT REQUIREMENTS.
13. CONCRETE FILL THICKNESS SHOWN ON FRAMING PLANS AND DETAIL SHEETS IS MINIMUM
THICKNESS. PROVIDE ALLOWANCES FOR ADDITIONAL CONCRETE FILL REQUIRED TO
COMPENSATE FOR BEAM OR DECK DEFLECTIONS AND TO MAINTAIN SURFACE
TOLERANCES SPECIFIED.
14. CORING OF CONCRETE IS NOT PERMITTED UNLESS APPROVED BY THE CO. SUBMIT
LOCATIONS OF PROPOSED CONCRETE CORES.
15. REINFORCING STEEL SHALL NOT BE DAMAGED WHEN DRILLING CONCRETE.
16. ADHERE TO ACI 305R AND ACI 306R FOR HOT AND COLD WEATHER CONCRETE
CONSTRUCTION.
17. DRYPACK AND GROUT SHALL HAVE A MINIMUM 28-DAY STRENGTH OF 7000 PSI.
18. THE PROPOSED MATERIALS AND MIX DESIGN SHALL BE FULLY DOCUMENTED AND
REVIEWED BY THE TESTING AND INSPECTION AGENCY. RESPONSIBILITY FOR OBTAINING
THE REQUIRED DESIGN STRENGTH IS THE CONTRACTOR'S. SUBMIT TEST DATA ON EACH
PROPOSED MIX FOR REVIEW IN ACCORDANCE WITH THE APPLICABLE CODE. MIX DESIGNS
SUBMITTED WITHOUT THE REQUIRED TEST DATA WILL BE RETURNED WITHOUT REVIEW.
19. SEE ARCHITECTURAL DRAWINGS FOR DIMENSIONS, LOCATIONS, AND DETAILS OF ALL
ARCHITECTURAL FEATURES IN THE CONCRETE. SEE ARCHITECTURAL DRAWINGS AND
PROJECT SPECIFICATIONS FOR REQUIREMENTS FOR ALL CONCRETE FINISHES.
LINTELS
1. PROVIDE LINTELS OVER ALL OPENINGS AND RECESSES IN MASONRY CONSTRUCTION.
LINTELS ARE NOT REQUIRED OVER OPENINGS 12" OR LESS IN WIDTH THAT ARE AT LEAST 1
COURSE BELOW THE BOND BEAM AT THE TOP OF WALL.
2. PENETRATIONS NOT IDENTIFIED ON THE DOCUMENTS ARE TO BE TREATED IN A MANNER
SIMILAR TO THE IDENTIFIED LOCATIONS.
3. ALL LINTELS SHALL HAVE A MINIMUM OF 8" END BEARING AND DO NOT REQUIRE BEARING
PLATES UON.
4.
5.
ALL STEEL LINTELS IN EXTERIOR WALL CONSTRUCTION SHALL BE HOT-DIP GALVANIZED
UON.
AT STEEL WIDE FLANGE LINTELS WITH SPANS LONGER THAN 16”, PROVIDE GROUTED
TIE/SOAP BLOCKS TO STEEL BEAM WEB WITH WELDED METAL TIES AT 16”.
POST-INSTALLED ANCHORS
1. BASIS OF DESIGN ANCHORS: SEE PROJECT SPECIFICATIONS
2. ALTERNATIVE ANCHORS MAY BE USED IF APPROVED IN WRITING BY THE CO. THE
CONTRACTOR SHALL SUBMIT CALCULATIONS SIGNED AND SEALED BY AN ENGINEER
LICENSED IN THE PROJECT’S JURISDICTION VERIFYING PROPOSED ALTERNATIVE
ANCHORS WILL PROVIDE THE SAME OR GREATER LOAD-CARRYING CAPACITY AS THE
SPECIFIED ANCHORS. THE CONTRACTOR SHALL SUBMIT EVALUATION REPORTS. EACH
ANCHOR CONFIGURATION SHALL BE EVALUATED AND COMPARED TO THE SPECIFIED
ANCHOR.
3. CRACKED CONCRETE IS ASSUMED FOR ALL ANCHORAGE DESIGN CONDITIONS UNLESS IT
CAN BE DEMONSTRATED THROUGH ENGINEERING ANALYSIS THAT THE CONCRETE
REMAINS UNCRACKED DURING THE GOVERNING ULTIMATE LOAD STATE.
4. POST-INSTALLED ANCHORS SHALL BE INSTALLED IN ACCORDANCE WITH THE
MANUFACTURER’S PRINTED INSTALLATION INSTRUCTIONS.
5. THE CONTRACTOR SHALL ARRANGE FOR AN ANCHOR MANUFACTURER’S
REPRESENTATIVE TO PROVIDE ONSITE INSTALLATION TRAINING FOR EACH SPECIFIED
ANCHOR TYPE. THE CO SHALL RECEIVE DOCUMENTATION VERIFYING ALL OF THE
CONTRACTOR’S PERSONNEL WHO INSTALL ANCHORS HAVE BEEN TRAINED PRIOR TO
COMMENCEMENT OF INSTALLING ANCHORS.
6. INSTALLATION OF ADHESIVE ANCHORS SHALL BE PERFORMED BY PERSONNEL CERTIFIED
BY AN APPROVED CERTIFICATION PROGRAM. CERTIFICATION SHALL INCLUDE WRITTEN
AND PERFORMANCE TESTS IN ACCORDANCE WITH THE ACI/CRSI ADHESIVE ANCHOR
INSTALLER CERTIFICATION PROGRAM OR EQUIVALENT. THE ACCEPTABILITY OF
CERTIFICATIONS OTHER THAN THE ACI/CRSI ADHESIVE INSTALLER CERTIFICATION WILL BE
DETERMINED BY THE CO.
7. CONCRETE SHALL HAVE ACHIEVED DESIGN STRENGTH PRIOR TO INSTALLING POST-
INSTALLED ANCHORS. ADHESIVE ANCHORS SHALL BE INSTALLED IN CONCRETE THAT HAS
CURED FOR A MINIMUM OF 21 DAYS.
8. ANCHOR CAPACITY IS DEPENDENT UPON SPACING BETWEEN ANCHORS AND PROXIMITY
OF ANCHORS TO EDGES OF CONCRETE OR MASONRY. INSTALL ANCHORS IN
ACCORDANCE WITH SPACING AND EDGE CLEARANCES INDICATED ON THE DRAWINGS.
9. POST-INSTALLED ANCHORS AND DOWELS SHALL BE INSTALLED IN A MANNER THAT DOES
NOT DAMAGE REINFORCING STEEL, CONDUIT OR OTHER EMBEDDED ITEMS. REINFORCING
STEEL SHALL BE LOCATED BY NON-DESTRUCTIVE MEANS PRIOR TO DRILLING HOLES.
PLATES AND BRACKETS THROUGH WHICH ANCHORS WILL BE INSTALLED SHALL NOT BE
FABRICATED UNTIL AFTER REINFORCING STEEL IS LOCATED AND ANCHOR LOCATIONS
ARE ADJUSTED. CONTRACTOR SHALL NOTIFY CO TO OBTAIN ALTERNATIVE ANCHOR
LAYOUT WHERE ANCHORS MUST BE RELOCATED TO AVOID INTERFERENCE WITH
REINFORCING STEEL.
10. ADHESIVE ANCHORING SYSTEMS ARE PERMITTED TO BE USED FOR INSTALLATION OF
REINFORCING STEEL INTO EXISTING CONCRETE ONLY WHERE SPECIFICALLY INDICATED IN
THE CONTRACT DOCUMENTS OR WITH APPROVAL FROM THE STRUCTURAL ENGINEER.
LOCATIONS WHERE REINFORCING STEEL WAS INCORRECTLY PLACED OR MISSED SHALL
BE SUBMITTED TO THE ENGINEER FOR REVIEW.
11. WHERE POST-INSTALLED MECHANICAL ANCHOR EMBEDMENT DEPTHS ARE SPECIFIED,
THOSE DEPTHS ARE THE REQUIRED MINIMUM NOMINAL EMBEDMENT DEPTHS. WHERE
MECHANICAL ANCHOR EMBEDMENT DEPTHS ARE NOT INDICATED, THE ANCHORS SHALL
BE INSTALLED TO THE MAXIMUM EMBEDMENT DEPTH NOTED IN THE MANUFACTURER’S
PRODUCT TECHNICAL GUIDE.
12. ADHESIVE ANCHORS SHALL BE INSTALLED WITH A MINIMUM 6” EMBEDMENT DEPTH UON.
01.27.2026 4 16OF
E
FOUNDATION PLAN KEYNOTES:
1. REMOVE EXISTING CONCRETE PAD. REFER TO
ARCHITECTURAL FOR DEMOLITION EXTENTS
OF BOLLARDS.
2. SECURE EQUIPMENT WITH 5/8" EPOXY
ANCHORS WITH 3-3/4" MIN. EMBEDMENT.
REFER TO EQUIPMENT FOR ANCHOR
LOCATIONS.
3. RESTORE SOIL BASE, PAVEMENT, AND GRADE
AROUND NEW EQUIPMENT PAD AND
BOLLARDS WHERE DEMOLISHED. SLOPE
PAVEMENT TO MATCH EXISTING.
4. CORE HOLES INTO EXISTING ELEVATED SLAB.
REFER TO MECHANICAL AND ELECTRICAL FOR
CORE SIZES AND LOCATIONS. REFER TO
5. INFILL EXISTING SLAB CORES/OPENINGS.
REFER TO MECHANICAL AND ELECTRICAL FOR
OPENINGS TO BE INFILLED. REFER TO
INDICATES NOTE USED TO DESCRIBE
ADDITIONAL INFORMATION ABOUT
WORK REQUIRED, SPECIFIC TO THE
SHEET AND/OR DETAIL
SYMBOL LEGEND:
7/S300.
6/S300.
GENERAL SHEET NOTES:
1. ELEVATIONS ARE BASED ON THE FIRST FLOOR
ELEVATION OF (0'-0").
2. SEE GENERAL NOTES SECTIONS FOR ADDITIONAL
INFORMATION.
3. CONTRACTOR VERIFY ALL EXISTING DIMENSIONS AND
CONDITIONS IN THE FIELD.
4. DESIGNATIONS:
SOG-1: 6" SLAB-ON-GRADE WITH 6x6 W2.9xW2.9
W.W.F. PLACED AT 2" FROM THE TOP OF
SLAB PLACED ON MIN. 4" COMPACTED
GRANULAR FILL ON PREPARED SUB-GRADE
S300
S300
LINTELS AS REQUIRED FOR
SERIES OF OPENINGS/CORES IN
CMU WALL, TYP. REFER TO
ELECTRICAL FOR OPENING
SIZES AND LOCATIONS.
THICKENED EDGE, TYP.
REFER TO ARCH FOR
BOLLARD LAYOUT
SOG-1
S300
S300
(E) W8x31
(E) W8x31
(E) W8x31
(E) W8x31
(E) W8x31
(E) W8x31
DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET
PMIS/PKG NO.
SHEET
OF
CANTON, OHIO
322010
1.23.2026
FIRST LADIES NATIONAL HISTORIC SITE
A/E FIRMS
MEP:
IMEG
835 Grandview Ave, 3rd Floor
Columbus, OH
T: 614.443.1178
DRAWING NO.
80025
/2
/2
:4 :4
A
M
REPLACE CHILLER COOLING SYSTEM AT
EDUCATION RESEARCH CENTER
S100 STRUCTURAL PLANS
GFM
GFM
GS
SCALES100 1/4" = 1'-0"
2 STRUCTURAL LOWER LEVEL PLAN
B L D
G
1/4"=1'-0"
4' 0 4' 8' A
SCALES100 1/4" = 1'-0"
1 STRUCTURAL COURTYARD PLAN
AA
01.27.2026 5 16OF
BL
D
G
E A
1/2"
1/2" BACKER ROD &
SEALANT - SEE SPECS
#4
(2)#4
1'-0"
#4@12"
4'-0"
PAVEMENT/ GRADE TO
BE RESTORED AS
NEEDED AND SLOPED
TO MATCH EXISTING
P A
V E
M E
N T
/G R
A D
E
M
IN
B
E L
O W
JOINTS SHALL BE INSTALLED
IMMEDIATELY UPON COMPLETION
OF FINISHING OPERATIONS
CONSTRUCTION JOINT CONTRACTION JOINT ISOLATION
JOINT
S E
E P
L A
N T
H
IC
K N
E S
S 't
INTERRUPT
REINF AT JOINT
KEY
3/4"
ENGINEERED FILL
1/4" WIDE HAND-TOOLED
OR SAW-CUT JOINT
't' /4
ISOLATION MATERIAL
/3
't
6"⌀ STD PIPE
FILL w/ 3000 PSI
CONCRETE AND
PAINT "TRAFFIC
YELLOW"
(4)#4 TIES
NOTES:
1. ALL STEEL AND BOLTS SHALL BE HOT-DIP GALVANIZED.
2. SEE ARCH DWGS AND PARKING DWGS FOR BOLLARD LOCATIONS.
3. THIS DETAIL SHALL BE USED ONLY WITHIN THE BUILDING.
(4)#4 VERT
4000 PSI
CONCRETE1'-6"
" 3
PAVEMENT, BASE, AND
GRADE TO BE
RESTORED AS
NEEDED AND SLOPED
TO MATCH EXISTING
FULLY GROUT ONE
COURSE ABOVE LINTEL.
REMOVE AND REPLACE (E)
CMU AS REQD FOR NEW
LINTEL INSTALLATION
2L4x4x5/16, LINTEL TO
EXTEND MIN 1'-0" PAST
PIPE SERIES, TYP.
(E) WALL, SHORE UNTIL
NEW LINTEL IS INSTALLED
SERIES OF PIPES
THROUGH (E) CMU
WALL, REFER TO
ELECTRICAL FOR
LOCATIONS, TYP.
S L E
E V
E
EFFECTIVE OPENING
EA END
1'-6" TYP
d dO P
E N
IN
G
E F
F E
C T
IV
E d
M
IN
d
MULTIPLE SLEEVES < 8"⌀
INSTALL REINF PER PLAN
BETWEEN OPENINGS WHERE
DIM BETWEEN > 6". WHERE
DIM BETWEEN OPENINGS
< 6", PROVIDE (1)#4 T&B
EFFECTIVE OPENING
d2 d1O P
E N
IN
G
E F
F E
C T
IV
E
MULTIPLE SLEEVES > 8"⌀
NOTES:
1. DETAIL IS APPLICABLE WHERE MULTIPLE SLEEVES ARE SPACED CLOSER THAN 4 x d.
2. PROVIDE REINF AROUND EFFECTIVE OPENINGS PER THE "REINFORCING AT SLAB OPENING" DETAIL.
NEW LIGHTWEIGHT
SLAB ON DECK INFILL
#4 EPOXY (SET-XP)
WITH 4" EMBED IN
MID-HEIGHT OF
SLAB LOW FLUTE (E) SLAB
L7x4x3/8 (LLH) WITH
3/8"Ø HILTI KWIK BOLT
w/ 2 1/2" EMBED AT
EVERY FLUTE. EXTEND
2 FLUTES BEYOND
EDGE OF OPENING
#4@8"
EACH WAY
CHIP TO PROVIDE
ROUGH SURFACE TO
1/4" AMPLITUDE, TYP
1 1/2
(E) STEEL BEAM
PL1/2, EXTEND 1'-6"
BEYOND EDGE OF
OPENING
PL1/2@1'-6" AND AT
EACH END
1/4
/2
PJP
2'-6" MAX
3" 2" 1"
E Q
E Q
DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET
PMIS/PKG NO.
SHEET
OF
CANTON, OHIO
322010
1.23.2026
FIRST LADIES NATIONAL HISTORIC SITE
A/E FIRMS
MEP:
IMEG
835 Grandview Ave, 3rd Floor
Columbus, OH
T: 614.443.1178
DRAWING NO.
80025
/2
/2
:4 :4
A
M
REPLACE CHILLER COOLING SYSTEM AT
EDUCATION RESEARCH CENTER
S300 TYPICAL CONCRETE
DETAILS
GFM
GFM
GS
SCALES300 3/4" = 1'-0"
SAWCUT JOINT
w/ SEALANT
SCALES300 3/4" = 1'-0"
SLAB-ON-GRADE TURNDOWN
AT TRANSITION TO PAVEMENT
SCALES300 3/4" = 1'-0"
3 SLAB ON GRADE CONSTRUCTION
SCALES300 3/4" = 1'-0"
5 STANDARD IN-GROUND BOLLARD
3/4"=1'-0"
2' 0 2' A
SCALES300 3/4" = 1'-0"
DOUBLE ANGLE
LINTEL IN EXISTING WALL
A
AA A A
SCALES300 3/4" = 1'-0"
REINFORCING
AT MULTIPLE SLAB OPENINGS
SCALES300 3/4" = 1'-0"
7 EXISTING SLAB INFILL
A A
01.27.2026 6 16OF
1. ROUTE DRAIN LINES FROM EQUIPMENT TO NEAREST FLOOR DRAIN.
PIPING GENERAL NOTES:
1. AFTER CONSTRUCTION ACTIVITIES ARE COMPLETE, TESTING, ADJUSTING (TAB) AND
BALANCING CONTRACTOR SHALL BALANCE PUMPS AND CHILLERS.
2. TAB CONTRACTOR SHALL COMPILE AND SUBMIT COPIES OF THE FINAL POST-
CONSTRUCTION TAB REPORT AS REQUIRED BY SECTION 23 05 93.
3. THE FINAL POST CONSTRUCTION REPORT SHALL INCLUDE ALL ITEMS REQUIRED IN THE
SPECIFICATIONS.
TAB POST-CONSTRUCTION NOTES:
MECHANICAL GENERAL NOTES:
THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL.
1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE
DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.
DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC.,
AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE
INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING
CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.
2. CATALOG AND MODEL NUMBERS SHALL NOT BE CONSIDERED COMPLETE, BUT ARE GIVEN
AS AN AID TO THE CONTRACTOR AND TO INDICATE THE QUALITY REQUIRED. THE
CONTRACTOR IS RESPONSIBLE FOR THE COMPLETE DESCRIPTION OF MATERIAL
SCHEDULED ON THESE DRAWINGS AND IN THE SPECIFICATIONS BEFORE ORDERING. THE
DESCRIPTION OF THE MATERIAL AND SCHEDULED PERFORMANCE TAKES PRECEDENCE
OVER THE MODEL NUMBER. THE FIRST MANUFACTURER SCHEDULED IS THE BASIS OF
DESIGN.
3. DETERMINATION OF QUANTITIES OF MATERIAL AND EQUIPMENT REQUIRED SHALL BE MADE
BY THE CONTRACTOR FROM THE DOCUMENTS. WHERE MATERIAL AND/OR QUANTITY
DISCREPANCIES ARISE BETWEEN DRAWINGS, SCHEDULES AND/OR SPECIFICATIONS, THE
HIGHER QUALITY/ GREATER NUMBER SHALL GOVERN.
4. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES. PHYSICALLY
REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.
5. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE
CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO
VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO
VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES
OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING
WITH FABRICATION OR EQUIPMENT ORDERS.
6. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE
REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER
ACCESS.
7. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO
COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR
EXPENSE TO THE GOVERNMENT
8. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL
CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF
DESIGN.
9. GENERAL CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO
WALLS, FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES
DAMAGE IS RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE
RATING, AND FINISH.
10. SEAL ALL FLOOR AND WALL, PENETRATIONS AIRTIGHT WHERE CONDUITS, PIPING, AND
DUCTS PENETRATE. PENETRATIONS THROUGH EXTERIOR WALLS SHALL BE SEALED
AIRTIGHT WITH WATERPROOFING MATERIALS RECOMMENDED BY MANUFACTURER FOR
OUTDOOR USE.
11. CAULK ALL PIPE AND DUCT PENETRATIONS OF FULL HEIGHT NON-FIRE RATED WALL,
PARTITION, FLOOR, AND ROOF ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE
TRANSMISSION FROM ONE ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS
WITHIN ROOMS.
12. WHERE PIPES AND DUCTS ARE SHOWN TO PENETRATE FLOORS, PROVIDE SLEEVED
OPENINGS WITH THE TOP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE WITH ALL
RELEVANT SPEC SECTIONS. SEAL SLEEVE PERIMETER TO BE WATERTIGHT.
13. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY AMONG DIFFERENT
MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND
REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,
PIPING, DUCTWORK, ETC.
14. DO NOT BLOCK TUBE PULL OR EQUIPMENT SERVICE CLEARANCES.
15. MAINTAIN A MINIMUM WORKING CLEARANCE OF 3’-6” IN FRONT OF ALL ELECTRICAL
EQUIPMENT REQUIRING MAINTENANCE, INSPECTION, AND TESTING INCLUDING BUT NOT
LIMITED TO PANELS, DISTRIBUTION PANELS, SWITCHBOARDS, MOTOR CONTROL CENTERS,
TRANSFORMERS, EQUIPMENT DISCONNECTS AND STARTERS.
16. MAINTAIN THE DEDICATED ELECTRICAL EQUIPMENT SPACE DEFINED BY THE WIDTH / DEPTH
OF ELECTRICAL EQUIPMENT MEASURED FROM THE FLOOR TO A HEIGHT 6’-0” ABOVE THE
EQUIPMENT OR THE STRUCTURAL CEILING, WHICHEVER IS LOWER. SYSTEMS FOREIGN TO
THE ELECTRICAL DISTRIBUTION SYSTEM ARE NOT ALLOWED IN THE DEDICATED
ELECTRICAL SPACE INCLUDING: DUCTWORK, PIPING, ETC.
17. PROVIDE CONCRETE EQUIPMENT PAD FOR ALL FLOOR MOUNTED EQUIPMENT. PAD SHALL
EXTEND MINIMUM 6” BEYOND ALL SIDES OF EQUIPMENT EXCEPT WHERE PAD EXTENSION
WOULD INTERFERE WITH WORKING SPACE AT EQUIPMENT CONTROL PANELS AND
ELECTRICAL PANELS.
MECHANICAL RENOVATION NOTES:
THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL.
1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD
SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND
REPORT ANY CONFLICTS BEFORE PROCEEDING.
2. NOT ALL EXISTING DUCTWORK AND PIPING IS SHOWN. VERIFY EXISTING CONDITIONS
BEFORE STARTING WORK. NOTIFY CONTRACTING OFFICER OF ANY CONFLICTS WITH NEW
WORK.
3. FIELD VERIFY THE AVAILABLE CLEARANCES FOR DUCTWORK AND PIPING BEFORE
FABRICATION. RISES AND DROPS MAY BE NECESSARY BECAUSE OF EXISTING FIELD
CONDITIONS.
4. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR CUTTING, REMOVAL AND PATCHING OF
ROOFS, WALLS, AND FLOORS ASSOCIATED WITH WORK BY ALL CONTRACTORS.
CONTRACTORS SHALL NOTIFY THE GC OF AFFECTED AREAS PRIOR TO BIDDING.
5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF
CEILINGS, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL
CONTRACTORS. NOTIFY THE GENERAL CONTRACTOR OF AFFECTED AREAS PRIOR TO
BIDDING.
6. WHERE EXISTING MECHANICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITH
NEW EQUIPMENT, PIPING, OR DUCTWORK TO BE INSTALLED, EACH CONTRACTOR SHALL
EITHER ARRANGE NEW EQUIPMENT, PIPING, OR DUCTWORK IN SUCH A FASHION THAT IT
DOES NOT CONFLICT WITH EXISTING SYSTEMS, OR REWORK EXISTING MECHANICAL
SYSTEMS TO ALLOW FOR INSTALLATION OF NEW EQUIPMENT, PIPING, OR DUCTWORK.
7. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN SERVICE DURING
CONSTRUCTION. MAINTAIN ACCESS TO EXISTING MECHANICAL INSTALLATIONS THAT
REMAIN ACTIVE.
8. OBTAIN PERMISSION FROM CONTRACTING OFFICER BEFORE SHUTTING DOWN ANY SYSTEM
FOR ANY REASON. MAINTAIN SERVICE TO ALL COMPONENTS THAT ARE TO REMAIN UNTIL
NEW SYSTEMS ARE INSTALLED.
9. MAINTAIN EXISTING SYSTEM IN SERVICE UNTIL NEW SYSTEM IS COMPLETE AND READY FOR
TIE IN AND SWITCHOVER. DRAIN SYSTEM ONLY TO MAKE SWITCHOVERS AND
CONNECTIONS. OBTAIN PERMISSION FROM CONTRACTING OFFICER BEFORE PARTIALLY OR
COMPLETELY DRAINING SYSTEM. MAKE CHANGEOVER TO NEW SYSTEMS WITH MINIMUM
OUTAGE.
10. DISCONNECT AND REMOVE MECHANICAL DEVICES AND EQUIPMENT SERVING EQUIPMENT
THAT HAS BEEN REMOVED.
11. PROPERLY RECLAIM AND DISPOSE OF ALL REFRIGERANT IN REMOVED EQUIPMENT/
REFRIGERANT PIPING. RECLAIMED REFRIGERANT SHALL HAVE DOCUMENTATION AS
REQUIRED BY THE AUTHORITY HAVING JURISDICTION (AHJ).
PLAN OR DETAIL NUMBER
PLAN OR DETAIL NAME
PLAN OR DETAIL SCALE
DETAIL REFERRED TO BY SECTION CUT
SHEET DETAIL IS LOCATED ON
NAME
2 VIEW NAME
1/8" = 1'-0"
M101
SIMSIM
INDICATES SIMILAR DETAIL REFERENCED
IN MULTIPLE LOCATIONS
LEVEL NAME
10'-0" HEIGHT ABOVE
PROJECT 0'-0"
1 KEYNOTE: INDICATES NOTE USED TO
DESCRIBE ADDITIONAL INFORMATION
ABOUT WORK REQUIRED, SPECIFIC
TO THE SHEET AND/OR DETAIL
VIEW KEY
LINE TYPE AND TAG KEY:
NEW WORK BY THIS CONTRACTOR (WIDE LINE)
EXISTING TO REMAIN OR WORK BY OTHERS (NARROW LINE)
HALFTONING DOES NOT MODIFY SCOPE.
'TAG'-E TAGS WITH DASH 'E' INDICATES THE REFERENCED OBJECT IS EXISTING
TAG-1 UNDERLINED TAG INDICATES OBJECT IS IN-SCOPE. IF NEW, ADDITIONAL
INFORMATION IS AVAILABLE IN A SCHEDULE, MATERIAL LIST, OR SYMBOL LIST
INDICATES AN EXISTING SYSTEM'S POINT OF CONNECTION/REMOVAL
T101
NEW
EXISTING TO BE REMOVED (SHORT DASHED PATTERN)
NEW UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)
EXISTING
EXISTING TO BE REMOVED BY OTHERS (SHORT DASHED PATTERN)
EXISTING UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)
M000
SHEET DETAIL IS LOCATED ON
FIRE AND SMOKE SEPARATIONS ARE NOT SHOWN ON THESE DOCUMENTS. CONTRACTOR SHALL
REVIEW THE ARCHITECTURAL PLANS AND DETERMINE THE LOCATIONS OF ALL FIRE AND SMOKE
PARTITIONS, BARRIERS, AND WALLS. THIS INCLUDES FLOOR RATINGS. PRICING SHALL INCLUDE ALL MATERIALS AND LABOR REQUIRED TO MAINTAIN THE RATINGS OF ALL RATED SEPARATIONS, WHETHER SHOWN ON THE ENGINEERING PLANS OR NOT.
FIRE / SMOKE BARRIER DESIGNATIONS
BUILDING CODE: 2024 INTERNATIONAL BUILDING CODE
FIRE PROTECTION CODE: 2024 INTERNATIONAL FIRE CODE
PLUMBING CODE: 2024 INTERNATIONAL PLUMBING CODE
MECHANICAL CODE: 2024 INTERNATIONAL MECHANICAL CODE
ELECTRICAL CODE: NFPA 70 (NEC) 2023 EDITION
FIRE ALARM CODE: NFPA 101 2012 EDITION
LIFE SAFETY CODE: NFPA 101 2012 EDITION
ENERGY CONSERVATION CODE: 2024 INTERNATIONAL ENERGY CONSERVATION CODE
OTHER CODES: NFPA 90, NFPA 72, ASHRAE 90.1, ABAAS,
NPS REF. MANUAL 58
APPLICABLE CODES
CONTRACTOR SHALL COMPLY WITH APPLICABLE CODES AND LOCAL AMENDMENTS
INCLUDING, BUT NOT LIMITED TO, THE FOLLOWING:
PLUMBING CONTRACTORP.C.
GENERAL CONTRACTORG.C.
MECHANICAL CONTRACTORM.C.
VENTILATION CONTRACTORV.C.
ELECTRICAL CONTRACTORE.C.
CONTRACTOR ABBREVIATION KEY
ABBR: DESCRIPTION:
HVAC ABBREVIATION KEY
ABBR: DESCRIPTION:
DIFFERENTIAL PRESSURE GAUGE (RANGE)DPG (0-2")
DIFFERENTIAL PRESSURE SWITCHDPS
AD ACCESS DOOR
ABOVE FINISHED FLOORAFF
NOT IN CONTRACTNIC
CFSD CONTROL/FIRE/SMOKE DAMPER
FD FIRE DAMPER
FOB FLAT ON BOTTOM
FOT FLAT ON TOP
FSD FIRE/SMOKE DAMPER
SD SMOKE DAMPER
TRANSFER DUCTTD
UC-1 DOOR UNDERCUT BY OTHERS (1" TYPICAL)
TERMINAL AIR BOXTAB
TYPICALTYP
UON UNLESS OTHERWISE NOTED
NORMALLY CLOSEDN.C.
NORMALLY OPENN.O.
PRESSURE SWITCHPS
MIXING VALVEMV
ELECTRICAL TO PNEUMATIC VALVEEP
CO CLEANOUT
C COMMON
SCCR SHORT CIRCUIT CURRENT RATING
DN DOWN
FMCS FACILITY MANAGEMENT AND CONTROL SYSTEM
TEMPERATURE SENSOR WITH WELL
T
THERMOMETER WITH WELL (DIAL TYPE)T
THERMOMETER WITH WELL (FILLED TYPE)
CONTROL VALVE (TWO-WAY)
PITCH PIPE IN DIRECTION
DIELECTRIC CONNECTION
UNION/FLANGE
BALANCING VALVE (NUMBER INDICATES GPM)
PIPE CAP
PIPE DOWN
PIPE UP OR UP/DOWN
DIRECTION OF FLOW IN PIPE
SHUTOFF VALVE NORMALLY OPEN
SHUTOFF VALVE NORMALLY CLOSED
THROTTLING VALVE
AUTOMATIC BALANCING VALVE
MIXING VALVE
CONTROL VALVE (THREE-WAY)
SOLENOID VALVE
CHECK VALVE
SAFETY/RELIEF VALVE
PRESSURE REDUCING VALVE (LIQUID/GAS)
VACUUM BREAKER
"WYE" - STRAINER
"WYE" - STRAINER W/SHUTOFF VALVE AND HOSE CONNECTION WITH CAP
BASKET STRAINER
FLEXIBLE CONNECTION
PRESSURE/TEMPERATURE TEST PLUG
REDUCER - REFERENCE SPECIFICATION
FOR CONCENTRIC/ECCENTRIC AND FOT/FOB
SUCTION DIFFUSER WITH SUPPORT FOOT
AUTOMATIC AIR VENT
MANUAL AIR VENT
DRAIN VALVE WITH HOSE CONNECTION AND CAP
CHILLED WATER RETURNCWR
CHILLED WATER SUPPLYCWS
GLYCOL WATER RETURNGWR
GLYCOL WATER SUPPLYGWS
REFRIGERANT HOT GASHG
HEATING WATER RETURNHWR
HEATING WATER SUPPLYHWS
REFRIGERANT LIQUIDLIQ
REFRIGERANT SUCTIONSUC
SAFETY RELIEF VENTSV
DRAINDPP
METERM
PUMP
STATIC SWITCH
PRESSURE GAUGE (FURNISHED WITH BALL VALVE)P
PRESSURE SENSOR (FURNISHED WITH BALL VALVE)P
FLOW METER
FM
FLOW SWITCH
F
FS FLOW SENSOR
HVAC SYMBOL LIST
SYMBOL: DESCRIPTION:
NOT ALL SYMBOLS MAY APPLY.
SP
REFRIGERANTREF
SAFETY RELIEF VALVE
W/ DRIP PAN ELBOW
DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET
PMIS/PKG NO.
SHEET
OF
CANTON, OHIO
322010
01.23.2026
FIRST LADIES NATIONAL HISTORIC SITE
A/E FIRMS
MEP:
IMEG
835 Grandview Ave, 3rd Floor
Columbus, OH
T: 614.443.1178
DRAWING NO.
80025
/2
/2
:5
:3
A
M
REPLACE CHILLER COOLING SYSTEM AT
EDUCATION RESEARCH CENTER
M000 HVAC COVERSHEET
BB
LD
SH
HVAC SHEET INDEX
M000 HVAC COVERSHEET
M101 ENLARGED DEMOLITION PLANS - PIPING
M201 ENLARGED PLANS - PIPING
M400 HVAC DETAILS
M401 HVAC DETAILS
M600 HVAC SCHEDULES & CONTROLS
GRAND TOTAL: 6
SYMBOL LIST - PIPING SYSTEMS
SYMBOL DESCRIPTION
CWR CHILLED WATER RETURN
CWS CHILLED WATER SUPPLY
DPP DRAIN - PIPING
HG REFRIGERANT HOT GAS
HWR HEATING WATER RETURN
HWS HEATING WATER SUPPLY
LCS LOW PRESSURE CLEAN STEAM
LIQ REFRIGERANT LIQUID
MU MAKE-UP WATER
GI
R
S
S
R P
F E
O
E E
T
L
I G
S
NA
O N
R E
E
D
I
R
S
E N
E
HT
A T
S
E OF
DOUGLAS SMITH
E-73967
O
OI
01.27.2026 7 16OF
D N
CH-1
UH-E
ET-2-E
CWP-1
CWP-2
HG
HG
LIQ
LIQ
A
"C
W R
"C
W S
1 1/4"HWS
1 1/4"HWR
MU
ACC-1
HG
HG
LIQ
LIQ
A
DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET
PMIS/PKG NO.
SHEET
OF
CANTON, OHIO
322010
01.23.2026
FIRST LADIES NATIONAL HISTORIC SITE
A/E FIRMS
MEP:
IMEG
835 Grandview Ave, 3rd Floor
Columbus, OH
T: 614.443.1178
DRAWING NO.
80025
/2
/2
:5
:3
A
M
REPLACE CHILLER COOLING SYSTEM AT
EDUCATION RESEARCH CENTER
M101 ENLARGED DEMOLITION
PLANS - PIPING
BB
LD
SH
SCALEM101 1/4" = 1'-0"
2 LOWER LEVEL DEMOLITION PLAN - PIPING
A
KEYNOTES:
1. REMOVE AIR COOLED CONDENSING UNIT INCLUDING ALL
ASSOCIATED ANCHORS, PIPING, AND CONTROLS.
2. REMOVE ABANDONED HYDRONIC UNIT HEATER AND ALL
ASSOCIATED PIPING, CONTROLS, SUPPORTS, AND HANGERS. CAP
PIPING AT NEAREST…