This is a Bid Schedule and Price Schedule Worksheet for a federal construction contract issued by the U.S. Department of Interior, National Park Service, for the Cooling System Replacement project at the First Ladies National Historic Site.

The contract requires offerors to submit pricing for a single Base Bid line item on a lump-sum basis. The Base Bid encompasses the complete cooling system replacement project, which includes five major work categories: Mobilization/Demobilization, Site Preparation, Site Demolition/Removals, Installation of New Cooling System, and Site Improvements (concrete pad, bollards, asphalt work, etc.). The Price Schedule Worksheet breaks down each category into component cost elements for Materials, Labor, and Equipment. Offerors must provide total pricing for all line items and complete the overhead, profit, and bonds calculations as percentages of the subtotal. All prices must be rounded to whole dollars. The notice explicitly states that failure to submit a conforming offer with pricing for all base line items may render the proposal non-responsive. No option lines are indicated in this solicitation document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Line Item Number

(CLIN)

Contract Line Item (CLI) Title Quantity Unit of Measure Price/Unit Total Price

1 Base Bid 1 Lump Sum $ - $ -

Project Title: Cooling System Replacement

Grand Total (Base Bid)

NOTICE: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option lines (if applicable). Failure to do so may render the proposal non-responsvive. On lump-sum line items, provide the total price only. Round totals and extended prices to whole dollars.

BID SCHEDULE

US Department of Interior National Park Service Park Location: First Ladies National Historic Site

Unit Quantity Price/ Unit Subtotal

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

Construction Items

National Park Service U.S. Department of Interior

First Ladies National Historic Site

PRICE SCHEDULE WORKSHEET

BASE BID - SITE DEMOLITION/REMOVALS and all associated work/items

PROJECT: Cooling System Replacement

BASE BID - SITE IMPROVEMENTS (concrete pad/bollards/asphalt work/etc…) and all associated work/items as outlined in specifications

BASE BID - Mobilization/Demobilization

- Mob/Demob Costs

BASE BID - INSTALLATION OF NEW COOLING SYSTEM and all associated work/items

- Materials

- Equipment

- Labor

- Materials

- Labor

- Equipment

- Materials

- Labor

BASE BID - SITE PREPARATION and all associated work/items

- Equipment

- Materials

- Labor

- Equipment

SUBTOTAL

Bonds Profit

Grand Total (BASE BID)

Overhead