This is a bid schedule for labor, materials, and other direct costs associated with an audiovisual and telecommunications infrastructure upgrade at Hanscom Air Force Base, Building 1614.

The labor component includes four CLINs covering design and installation services: RCDD Designer for minor design updates, BICSI Installer for fiber optic work including pulling, termination, and splicing, Telecommunications Technician for copper cabling and rack equipment installation, and Project Manager for quality assurance/quality control and submittal management. The materials section encompasses four CLINs for required equipment and supplies: fiber cable (single and multi-mode), twisted pair copper CAT6A plenum-rated cabling, communications closet hardware including patch panels and rack updates, and termination consumables such as connectors, labels, and faceplates. The other direct costs section includes two CLINs for testing equipment rental (Fluke/OTDR) and as-built documentation with CAD and operations and maintenance deliverables. The schedule provides line items for quantities, unit rates, and total costs across all categories, though specific pricing and hours have not been populated in this template version. The project supports upgrades to the Lundy conference auditorium to create a more professional and functional presentation and briefing space.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

BID SCHEDULE
Labor
CLINItem/RoleDescriptionQty/HoursUnit/Hr RateTotal Cost
1RCDD DesignerMinor Design UpdatesHours
2BICSI Installer 2Fiber pull, termination, splicingHours
3Telecommunications TechCopper Cabling and rack equipment installationHours
4Project ManagerQA/QC, Submittal ManagementHours
Materials
CLINItem/RoleDescriptionQty/HoursUnit/Hr RateTotal Cost
5Fiber CableSingle/Multi-mode
6Twisted Pair CopperCAT6A Plenum-rated
7Comm Closet HardwarePatch panels, rack updates
8Termination and ConsumablesConnectors, lables, Faceplates
ODC (Other Direct Costs)
CLINItem/RoleDescriptionQty/HoursUnit/Hr RateTotal Cost
9Testing EquipmentFluke Rental/OTDR
10As-Builts and DocumentationCAD and O&M Deliverables
Total =