Bid Plans Part 2 _ Maint Bldg Expansion - 909CM3028 .pdf

PDF 13 MB Posted

Attached to
Z2QA--909CM3028-29: Bldg Expansion and Road Repairs, Ft Custer
Solicitation number
36C78624B0001
Issued by

About this file

This federal contract opportunity solicitation requests bids to renovate and expand a maintenance building and repair asphalt roads at Fort Custer National Cemetery. The contractor will provide all management, supervision, labor, materials, parts, and equipment necessary to renovate and expand Maintenance Building 3001 and repair and repave asphalt roads at Fort Custer National Cemetery. The work includes general conditions, general construction, structures, alterations, roads, parking, walks, grading, drainage, mechanical, electrical, telecommunications and security work, utility systems, and the necessary removal of existing structures and construction of other items in accordance with the drawings and specifications. The solicitation was issued by the Department of Veterans Affairs National Cemetery Administration under number 36C78624B0001 for the project named Z2QA--909CM3028-29: Bldg Expansion and Road Repairs, Ft Custer.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F

S P

FACP

1. PROVIDE AND INSTALL A NEW FIRE ALARM SYSTEM

THROUGHOUT THE BUILDING PER NFPA 101, NFPA 72, THE VA

FIRE PROTECTION DESIGN MANUAL AND THE NCA DESIGN

GUIDE. REFER TO SPEC SECTION 28 46 00 FIRE DETECTION

AND ALARM.

2. FIRE ALARM SYSTEM SHALL FUNCTION AS A VOICE

EVACUATION SYSTEM PER THE VA DESIGN MANUAL.

3. SMOKE OR HEAT DETECTION SHALL BE PROVIDED

THROUGHOUT THE FACILITY.

4. PROVIDE FIRE SEAL FOR INSERTS, SLEEVES AND CONDUIT

PENETRATIONS THROUGH WALLS, CEILINGS AND FLOORS AS

PER SPECIFICATIONS

5. COORDINATE FIRE ALARM SYSTEM DEVICE LOCATIONS WITH

LIGHT FIXTURES, STRUCTURAL MEMBERS, SPRINKLER HEADS

AND PIPING, HVAC EQUIPMENT AND DUCTWORK.

6. THE CONTRACTOR SHALL FURNISH AND INSTALL COMPLETE

AND SATISFACTORILY OPERATING SYSTEMS AS INDICATED ON

THE CONTRACT DOCUMENTS AND AS EVIDENTLY INTENDED.

IT IS NOTED THAT THE DRAWINGS ARE DIAGRAMMATIC AND

INDICATE GENERAL ARRANGEMENTS OF SYSTEMS AND

WORK. INTERCONNECTIONS HAVE BEEN SHOWN, AND THE

CONTRACTOR SHALL FURNISH AND INSTALL CONDUIT AND

WIRING AS REQUIRED TO ACCOMPLISH THE FUNCTIONS

INDICATED. ADDITIONALLY, FIRE ALARM SYSTEMS HAVE BEEN

SHOWN AND THE CONTRACTOR SHALL FURNISH AND INSTALL

THE REQUIRED QUANTITIES AND TYPES OF CABLES,

CONDUCTORS, RACEWAYS, REMOTE POWER SUPPLIES AND

CONNECTIONS, SHIELDING REQUIREMENTS, ETC., AS

REQUIRED BY THE SYSTEM MANUFACTURER, THE

SPECIFICATIONS, AND ANY APPLICABLE CODES. ALL WIRING

SHOWN ON RISER DIAGRAMS SHALL ALSO BE FURNISHED AND

INSTALLED REGARDLESS OF WHETHER THESE ITEMS ARE

SHOWN ON THE FLOOR PLANS.

7. THE CONTRACTOR SHALL COORDINATE THE ELECTRICAL

WORK WITH THE WORK OF ALL OTHER TRADES AND EXISTING

CONDITIONS SO AS TO AVOID CONFLICTS. RESOLVE ALL

CONFLICTS THROUGH THE A/E PRIOR TO ROUGH-IN. FAILURE

TO PROVIDE SUCH COORDINATION PRIOR TO WORK BEING

INSTALLED SHALL NOT BE CAUSE FOR ADDITIONAL

COMPENSATION TO THE CONTRACTOR, AND MAY RESULT IN

REJECTION OF THE WORK.

8. ADDITIONAL DEVICES MAY BE REQUIRED. DO NOT USE THESE

DRAWINGS FOR DEVICE COUNTS.

9. ALL MATERIALS SHALL BE NEW, SHALL BE SUITABLE FOR THE

APPLICATION INTENDED, AND SHALL BEAR LABELS OR

MARKINGS INDICATING THIRD PARTY TESTING LABORATORY

LISTINGS ACCEPTABLE TO THE AUTHORITY HAVING

JURISDICTION.

10. VERIFY LOCATIONS OF WIRING DEVICES IN FINISHED SPACES,

MILLWORK, AND CASEWORK WITH ARCHITECTURAL

DRAWINGS, DETAILS, AND ELEVATIONS, AND WITH THE

OWNER'S EQUIPMENT AND FURNITURE LAYOUTS PRIOR TO

ROUGH-IN.

11. ALL FIRE ALARM CABLES SHOULD BE INSTALLED IN METAL

RACEWAYS AND BE PAINTED RED.

12. ALL RACEWAY AND WIRING SHALL BE CONCEALED IN

FINISHED SPACES AND MAY BE EXPOSED IN UNFINISHED

SPACES SUCH AS MECHANICAL AND ELECTRICAL ROOMS. ALL

RACEWAY AND WIRING SHALL BE ROUTED EITHER

PERPENDICULAR OR PARALLEL TO THE BUILDING'S

STRUCTURAL COMPONENTS.

13. PROVIDE PULL AND JUNCTION BOXES AS REQUIRED TO MEET

CODE AND INSTALLATION REQUIREMENTS. PULL AND

JUNCTION BOXES SHALL BE CONCEALED IN FINISHED SPACES

AND LOCATIONS SHALL BE COORDINATED WITH THE WORK OF

ALL OTHER TRADES SO AS TO AVOID CONFLICTS.

14. ALL CONDUCTORS SHALL BE IDENTIFIED AT EACH JUNCTION

BOX, OUTLET BOX, CABINET, PULL BOX, ETC., WITH VINYL

SELF-ADHESIVE TAGS INDICATING PANEL AND CIRCUIT

NUMBER, CONTROL WIRE IDENTIFICATION NUMBER, OR

OTHER APPROPRIATE INFORMATION. ALL PULL AND

JUNCTION BOXES SHALL BE LABELED AS TO FUNCTION.

15. ALL EQUIPMENT SHALL BE SECURELY FASTENED BY MEANS

OF ANCHORS, RODS, HANGERS, SUPPORTS, GUIDES, SWAY

BRACES, ETC., TO MAINTAIN ALIGNMENT AND PREVENT

EQUIPMENT MOVEMENT. ALL EQUIPMENT LOCATED IN

SEISMIC ZONES SHALL BE SECURED WITH MEANS APPROVED

FOR THE SEISMIC CLASSIFICATION ENCOUNTERED.

16. ALL PENETRATIONS OF FIRE OR SMOKE RATED

CONSTRUCTION SHALL BE SEALED WITH FIRESTOPPING

MATERIALS APPROVED AND LISTED FOR THE RATING OF THE

CONSTRUCTION TO BE PENETRATED. PROVIDE

DOCUMENTATION ON ALL SUCH PENETRATION SEALING

SYSTEMS FOR VERIFICATION OF PROPER INSTALLATION.

17. ALL PENETRATIONS OF ROOFS, EXTERIOR WALLS,

FOUNDATIONS, OR OTHER WATER OR MOISTURE PROOF

CONSTRUCTION SHALL BE SEALED WITH APPROPRIATE

SEALING FITTINGS OR SEALED CONSTRUCTION TO PREVENT

THE INTRODUCTION OF MOISTURE INTO THE BUILDING.

18. WHERE EMPTY RACEWAYS ARE INSTALLED, THEY SHALL BE

LABELED AT BOTH ENDS AND FITTED WITH NYLON

PULLSTRINGS FOR FUTURE USE.

19. ELECTRICAL WORK SHALL BE PERFORMED ON DE-ENERGIZED

SYSTEMS ONLY TO PREVENT PERSONNEL INJURY AND

POTENTIAL SYSTEM FAILURE. WHERE WORK ON EXISTING

SYSTEMS WILL REQUIRE INTERRUPTION OF ELECTRICAL

SERVICE, THEN TEMPORARY PROVISIONS ACCEPTABLE TO

THE OWNER FOR TEMPORARY POWER SHALL BE UTILIZED

UNTIL THE WORK IS COMPLETE.

20. THE FIRE ALARM SYSTEM SHALL COMPLY WITH ALL RELATED

NFPA, BUILDING CODES AND LOCAL FIRE DEPARTMENT

REGULATIONS.

21. WALL MOUNTED FIRE ALARM PULL STATIONS ARE TO BE

LOCATED 46" A.F.F. AND WITHIN 5' OF THE NEAREST

ADJACENT EXIT DOOR FROM THE FLOOR OR BUILDING.

22. WALL MOUNTED FIRE ALARM NOTIFICATION APPLIANCES,

EITHER VISUAL, OR COMBINATION AUDIO/VISUAL, SHALL BE

LOCATED SUCH THAT THE ENTIRE LENS OF THE VISUAL

PORTION IS BETWEEN 80" AND 96" A.F.F. AUDIO ONLY

APPLIANCES SHALL BE LOCATED, NOT LESS THAN 90" A.F.F.

TO TOP OF APPLIANCE, OR 6" BELOW CEILING.

FIRE ALARM GENERAL NOTES

1. THE SCOPE OF WORK FOR THIS PROJECT IS TO DEMOLISH ALL

EXISTING FIRE ALARM DEVICES AND SYSTEM COMPONENTS

INCLUDING THE EXISTING FIRE ALARM CONTROL PANEL. FIRE

ALARM DEVICES SHALL BE REPLACED WITH NEW.

2. THE EXISTING FIRE ALARM SYSTEM SHALL REMAIN IN SERVICE

UNTIL THE NEW DEVICES ARE INSTALLED, TESTED AND READY

TO BE PLACED IN SERVICE.

3. THESE DRAWINGS DEPICT THE GENERAL INTENT OF THE

SCOPE OF THE DEMOLITION WORK AND NOT ALL ITEMS ARE

NECESSARILY SHOWN. THE CONTRACTOR SHALL BE

REQUIRED TO VERIFY IN THE FIELD AND DETERMINE SCOPE

OF DEMOLITION PRIOR TO WORK.

4. PHASING OF DEMOLITION SHALL FOLLOW THAT OF THE

GENERAL CONTRACTOR. COORDINATE REMOVAL OF FIRE

ALARM COMPONENTS WITH OTHER ACTIVITIES AND

REQUIREMENTS OF THE VA.

5. WHERE EXISTING JUNCTION BOX MUST REMAIN IN EXISTING

WALLS OR CEILINGS, THEY SHALL BE FITTED WITH BLANK

COVER PLATES AS REQUIRED FOR THE LEVEL OF

RENOVATION IN THE AREA.

FIRE PROTECTION DEMOLITION NOTES

DEVICES

COMBINATION OF SPEAKER/STROBE CEILING MOUNTED

MANUAL PULL STATION

STROBE ONLY CEILING MOUNTED

SYMBOL DESCRIPTION

DETECTORS

HEAT DETECTOR - RATE OF RISE

SMOKE DETECTOR - PHOTOELECTRIC

FIRE ALARM CONTROL PANEL

PANELS

STROBE ONLY WALL MOUNTED

COMBINATION OF SPEAKER/STROBE WALL MOUNTED

C

H R

FIRE ALARM SYMBOLS

FIRE ALARM

CONTROL

PANEL

CORR M100

NOTIFICATION APPLIANCES

LEVEL 1 FIRE/SMOKE

INITIATING DEVICES LEVEL 1

FIRE/SMOKE/HEAT

C

FS

LEVEL 1

= 17 = 5

= 5= 9

NOTE: REPRESENTS NUMBER OF DEVICES

ON THIS LEVEL. CONTRACTOR SHALL

VERIFY ALL NECESSARY DEVICE COUNTS

P

= 3= 1

H = 3 R

DUCT SMOKE DETECTOR

AREA SMOKE DETECTOR

DOOR RELEASE SMOKE DETECTOR

S O

U N

D G

E N

E R

A L

B U

IL

D

IN

G

A

LA

R

M

X

X

N O

T

IF

Y N

E C

E S

S A

R Y

S T

A

X

INPUT

OUTPUT

N O

T

IF

Y F

IR

E

D E

P A

R M

E N

T

IN

IT

IA

T

E S

U P

E R

V

IS

O R

Y S

IG

N

A L

T O

A

4- H

O U

R M

A N

N E

D P

O

IN

T

O

R

IM

M E

D

IA

T E

R E

S P

O N

S E

X

C

LO

S E

A S

S O

C

IA

T E

S M

O K

E

B

R R

IE

R

D O

O R

S O

N T

H

LO

O

R

X

MANUAL PULL STATION X X X X

C

LO

S E

D A

M P

E R

S O

N F

P

R O

X

IM

A T

E T

O D

E T

E C

T O

R

X

X

S H

U T

D O

W N

A

IR

H A

N D

LE

R

V E

D B

Y T

H E

D E

T E

C T

O R

X1

1. DO NOT PROVIDE DUCT DETECTORS IN DEDICATED (100%) EXHAUST FANS, THEY SHOULD CONTINUE TO RUN.

O P

E N

L O

C K

E D

E G

R E

D

O

R S

O N

F

LO

O R

O F

F

IR

IG

IN

X

X

X

FIRE ALARM MATRIX

X X X XHEAT DETECTOR

Location

Issue Date

GORDON - The LA Group Joint Venture, LLC

The LA Group 40 Long Alley Saratoga Springs, NY 12866

(518) 587-8100

Integrity Federal Services, Inc.

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

(304) 725-8456

Project Number

Drawing Number

Project Title

Checked Drawn

KALAMAZOO COUNTY, MICHIGAN

909CM3028

MARCH 24, 2023

Dwg. of

Office of Design and Construction

Service

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved: Project Director

Phase

Building Number

BID DOCUMENTS FORT CUSTER NATIONAL CEMETERY

RENOVATE & EXPAND

MAINTENANCE BUILDING 3001Leo A Daly

(202) 861-4600

F ile

P at h:

P

:\0

\0

-1

-0

\4

-0 -P

R O

D U

C T

IO

N

-W O

R K

IN

G

\4 -1

-B

IM

-C A

D \R

E V

IT

\R

E S

O U

R C

E -F

IL

E

S \C

A D

-L

IN

K S

\B D

\9

C M

_G -T

T

LB

.D W

G

Above Group, Inc.

(321) 345-9026

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

FIRE ALARM GENERAL NOTES

F-001

DLO EAG 37

SCALE: 12" = 1'-0"

F2

FIRE ALARM RISER DIAGRAM

SCALE: 1/16" = 1'-0"

F7

FIRE ALARM INPUT/OUTPUT MATRIX

24 MAR 2023

C P

1 2 3 4 5 6

B

C

FD01

FD02

FD02

FD02

FD02

FD02

FD02

FD02

FD02

FD02

FD02

FD02

FD02

FD02

FD02

FD02

Location

Issue Date

GORDON - The LA Group Joint Venture, LLC

The LA Group 40 Long Alley Saratoga Springs, NY 12866

(518) 587-8100

Integrity Federal Services, Inc.

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

(304) 725-8456

Project Number

Drawing Number

Project Title

Checked Drawn

KALAMAZOO COUNTY, MICHIGAN

909CM3028

MARCH 24, 2023

Dwg. of

Office of Design and Construction

Service

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved: Project Director

Phase

Building Number

BID DOCUMENTS FORT CUSTER NATIONAL CEMETERY

RENOVATE & EXPAND

MAINTENANCE BUILDING 3001Leo A Daly

(202) 861-4600

F ile

P at h:

P

:\0

\0

-1

-0

\4

-0 -P

R O

D U

C T

IO

N

-W O

R K

IN

G

\4 -1

-B

IM

-C A

D \R

E V

IT

\R

E S

O U

R C

E -F

IL

E

S \C

A D

-L

IN

K S

\B D

\9

C M

_G -T

T

LB

.D W

G

Above Group, Inc.

(321) 345-9026

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

FIRE ALARM DEMOLITION PLAN

FA101

DLO EAG 38

SCALE: 1/8" = 1'-0"

F2

FIRE ALARM DEMOLITION PLAN - MAINTENANCE (3001)

KEYNOTE LEGEND

FD01 DEMOLISH EXISTING FIRE ALARM CONTROL PANEL AND ALL

ASSOCIATED COMPONENTS

FD02 DEMOLISH EXISTING FIRE ALARM DETECTION AND

NOTIFICATION DEVICES, WIRING, CONDUIT, JUNCTION BOXES

AND ASSOCIATED COMPONENTS

4'

SCALE : 1/8" = 1'-0"

0 8' 16'

P

FACP

F

F

S P

S P

S P

S P

S P

S P

S P

S P

S P

S P

S P

H R

S P

S P

H R

S P

S P

S P

S P

F

FACP

S P

C

C

C

C

C

F

S P

H R

C

C

S P

F

DEVICES

COMBINATION OF SPEAKER/STROBE CEILING MOUNTED

MANUAL PULL STATION

STROBE ONLY CEILING MOUNTED

SYMBOL DESCRIPTION

DETECTORS

HEAT DETECTOR - RATE OF RISE

SMOKE DETECTOR - PHOTOELECTRIC

FIRE ALARM CONTROL PANEL

PANELS

STROBE ONLY WALL MOUNTED

COMBINATION OF SPEAKER/STROBE WALL MOUNTED

C

H R

FIRE ALARM SYMBOLS

1 2 3 4 5 6

B

C

TRAINING

M107

FAC MAINT

M102

FOREMAN

M103

MEN'S

M105

WOMEN'S

M106

BREAK

M101

STOR

M104

PARTS

M108

MAINTENANCE

BAYS

M109

OFFICE

M110A

CORRIDOR

M100

STORAGE

M113

GROUNDS SUPPLY

M112

EQUIPMENT

STORAGE

M111

WORKSHOP

M110 CORRIDOR

M110B

VEST

M099

FA01

A

Location

Issue Date

GORDON - The LA Group Joint Venture, LLC

The LA Group 40 Long Alley Saratoga Springs, NY 12866

(518) 587-8100

Integrity Federal Services, Inc.

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

(304) 725-8456

Project Number

Drawing Number

Project Title

Checked Drawn

KALAMAZOO COUNTY, MICHIGAN

909CM3028

MARCH 24, 2023

Dwg. of

Office of Design and Construction

Service

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved: Project Director

Phase

Building Number

BID DOCUMENTS FORT CUSTER NATIONAL CEMETERY

RENOVATE & EXPAND

MAINTENANCE BUILDING 3001Leo A Daly

(202) 861-4600

F ile

P at h:

P

:\0

\0

-1

-0

\4

-0 -P

R O

D U

C T

IO

N

-W O

R K

IN

G

\4 -1

-B

IM

-C A

D \R

E V

IT

\R

E S

O U

R C

E -F

IL

E

S \C

A D

-L

IN

K S

\B D

\9

C M

_G -T

T

LB

.D W

G

Above Group, Inc.

(321) 345-9026

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

FIRE ALARM PLAN

FA102

DLO EAG 39

KEYNOTE LEGEND

FA01 PROVIDE AND INSTALL NEW FIRE ALARM CONTROL PANEL.

PANEL TO INCLUDE VOICE EVACUATION CAPABILITIES.

4'

SCALE : 1/8" = 1'-0"

0 8' 16'

N

SCALE: 1/8" = 1'-0"

F1

FIRE ALARM PLAN - MAINTENANCE (3001)

SS

DSDO

SS

DSS

S

DSD

OSS

D

A

WA

WA

V

T

T

SS

OSSR

IR

MG

F

S

MFO

SFO

RFO

VFO

FFO

G

SANITARY SEWER (BELOW FLOOR)

DESCRIPTIONSYMBOL

STORM DRAIN (BELOW FLOOR)

STORM DRAIN OVERFLOW (BELOW FLOOR)

SUBSOIL DRAIN (BELOW FLOOR)

SANITARY VENT

ACID WASTE (ABOVE FLOOR)

ACID VENT

DOMESTIC COLD WATER

DOMESTIC HOT WATER

DOMESTIC HOT WATER RECIRCULATING

ACID WASTE (BELOW FLOOR)

PIPING LINES

SANITARY SEWER (ABOVE FLOOR)

STORM DRAIN (ABOVE FLOOR)

STORM DRAIN OVERFLOW (ABOVE FLOOR)

SUBSOIL DRAIN (ABOVE FLOOR)

DRINKING WATER RECIRCULATING

NATURAL GAS

FIRE LINE

SPRINKLER MAIN

IRRIGATION WATER MAIN

TEMPERED WATER

TEMPERED WATER RECIRCULATING

DRINKING WATER SUPPLY

FUEL OIL SUPPLY

FUEL OIL RETURN

FUEL OIL VENT

FUEL OIL FILL

FUEL OIL GAGE

CONTINUATION - PIPE NOT SHOWN

CONNECT TO EXISTING

DESCRIPTIONSYMBOL

KEYNOTE

GENERIC ANNOTATIONS

EQUIP ID MECHANICAL EQUIPMENT TAG

V

FE

CO

FCO

GCO

WCO

(DRAINS)

RD-

HB-

WH-

FS

M

FHC

FVC

GATE VALVE

DESCRIPTIONSYMBOL

GLOBE VALVE

CHECK VALVE

BUTTERFLY VALVE

FLANGE

BLIND FLANGE

BALANCING VALVE

GAS COCK

PRESSURE REGULATING VALVE

SOLENOID VALVE

CAP

PIPE VALVES, FITTINGS, SENSORS AND GAGES

ECCENTRIC PLUG VALVE

BALL VALVE

STRAINER

UNION

PRESSURE GAGE

COCK (GAGE, AIRVENT, DRAIN)

PIPE ANCHOR

PIPE GUIDE

PIPE EXPANSION COMPENSATOR

VACUUM BREAKER

SAFETY RELIEF VALVE

CONTROL VALVE (2-WAY)

CONTROL VALVE (3-WAY)

THERMOMETER

SUPERVISED O S & Y VALVE

FLOW MEASURING ELEMENT

SIGHT GLASS (FLOW TYPE)

AIR ELIMINATOR

TEMPERATURE & PRESSURE RELIEF VALVE

STEAM TRAP

TEST PLUG

PIPE ELBOW UP

PIPE ELBOW DOWN

FLOOR CLEANOUT

WALL CLEANOUT

DRAINS - FLOOR - FD, TRENCH - TD, AREA -

ADROOF DRAIN OR OVERFLOW ROOF DRAIN

HOSE BIBB

GRADE CLEANOUT

PIPE TEE UP

PIPE TEE DOWN

CLEANOUT

WALL HYDRANT

FIRE DEPARTMENT CONNECTION

FIRE HOSE CABINET

FIRE VALVE CABINET

FLOW SWITCH

WATER METER

BACKFLOW PREVENTER

FLEXIBLE PIPE CONNECTION

NPC

WNPHW

SC

W

NON POTABLE COLD WATER

NON POTABLE HOT WATER

SOFT COLD WATER

SHW

ROR

SOFT HOT WATER

REVERSE OSMOSIS RETURN

ROS REVERSE OSMOSIS SUPPLY

PWS PURE WATER SUPPLY

PWR PURE WATER RETURN

PLUMBING GENERAL NOTES

1. THE CONTRACTOR SHALL FURNISH AND INSTALL COMPLETE AND SATISFACTORILY OPERATING SYSTEMS AS INDICATED IN THE CONTRACT DOCUMENTS. IT IS NOTED THAT THE DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENTS OF SYSTEMS AND WORK. THE CONTRACTOR SHALL OBTAIN EXACT LOCATION, MEASUREMENTS, LEVELS, ETC., AT THE SITE AND SHALL ADAPT THE

WORK TO THE ACTUAL CONDITIONS OF THE FIELD.

2. THE CONTRACTOR SHALL COORDINATE THE PLUMBING WITH THE WORK OF ALL OTHER TRADES, INCLUDING, BUT NOT LIMITED TO, ARCHITECTURAL, STRUCTURAL, LIGHTING, POWER, SYSTEMS, MECHANICAL, FIRE PROTECTION, AND OTHERS FOR EXISTING AND NEW WORK SO AS TO AVOID

CONFLICTS. RESOLVE ALL CONFLICTS THROUGH THE A/E PRIOR TO INSTALL. FAILURE TO PROVIDE SUCH

COORDINATION PRIOR TO WORK BEING INSTALLED SHALL NOT BE CAUSE FOR ADDITIONAL

COMPENSATION TO THE CONTRACTOR, AND MAY RESULT IN REJECTION OF WORK. IT IS THE

CONTRACTORS' RESPONSIBILITY TO COORDINATE SUBSTITUTIONS WITH OTHER TRADES.

3. THE SIZE AND LOCATION OF EQUIPMENT INSTALLED UNDER DIVISION 22-PLUMBING SHALL BE

COORDINATED WITH OTHER TRADES. CONNECTION TO EQUIPMENT SHALL BE VERIFIED WITH

MANUFACTURER'S CERTIFIED DRAWINGS. TRANSITIONS TO ALL EQUIPMENT SHALL BE VERIFIED AND

PROVIDED FOR EQUIPMENT FURNISHED.

4. ALL PIPING IS TO BE CONCEALED ABOVE CEILING (WHERE INSTALLED) OR IN NEW WALLS UNLESS SPECIFICALLY NOTED AS EXPOSED OR SURFACE MOUNTED. CONTRACTOR TO COORDINATE WITH THE GENERAL CONTRACTOR TO PAINT ALL EXPOSED PIPING TO MATCH CORRESPONDING EXPOSED AREAS.

5. ALL EQUIPMENT SHALL BE SECURELY FASTENED BY MEANS OF ANCHORS, RODS, HANGERS, SUPPORTS, GUIDES, SWAY BRACES, ETC., TO MAINTAIN ALIGNMENT AND PREVENT EQUIPMENT MOVEMENT.

6. ANY EQUIPMENT, PIPING, DUCTWORK, ETC., SHALL ONLY BE SUPPORTED FROM THE BUILDING STRUCTURE. NO EQUIPMENT SHALL BE SUPPORTS FROM OTHER PIPING, DUCTWORK, METAL ROOF

DECK, LATERAL BRACING, OR CONDUIT.

7. ALL PENETRATIONS OF FIRE OR SMOKE RATED CONSTRUCTION SHALL BE SEALED WITH FIRESTOPPING MATERIALS APPROVED AND LISTED FOR THE RATING OF THE CONSTRUCTION TO BE PENETRATED.

PROVIDE DOCUMENTATION ON ALL SUCH PENETRATION SEALING SYSTEMS FOR VERIFICATION OF

PROPER INSTALLATION.

8. ALL PENETRATIONS OF ROOFS, EXTERIOR WALLS, FOUDNATIONS, OR OTHER WATER OR MOISTURE

PROOF CONSTRUCTION SHALL BE SEALED WIT APPROPRIATE SEALING FITTINGS OR SEALED

CONSTRUCTION TO PREVENT THE INTRODUCTION OF MOISTURE INTO THE BUILDING.

9. ALL CONCRETE HOUSEKEEPING PADS FOR MECHANICAL AND PLUMBING EQUIPMENT SHALL BE SIZED

AND LOCATED BY THE MECHANICAL/PLUMBING CONTRACTOR. A MINIMUM THICKNESS OF ANY

HOUSEKEEPING PADS SHALL BE 4" AND EXTEND A MINIMUM OF 4" BEYOUND THE MECHANICAL OR PLUMBING EQUIPMENT. MECHANICAL/PLUMBING CONTRACTOR SHALL COORDINATE WITH THE GENERAL

CONTRACTOR FOR THE SIZE AND LOCATION OF HOUSEKEEPING PADS.

10. MAINTAIN CLEARANCE OF MINIMUM OF 6" BETWEEN DUCTWORK, PIPING, EQUIPMENT, ETC. AND ALL FIRE

RATED AND FIRE/SMOKE RATED PARTITIONS TO ALLOW FOR INSPECTION OF RATED WALLS.

11. ALL DASHED LINEWORK AROUND MECHANICAL AND PLUMBING EQUIPMENT INDICATES REQUIRED SERVICE CLEARANCES. ALL EQUIPMENT SHALL BE INSTALLED IN A MANNER TO MAINTAIN THE CODE AND/OR MANUFACTURER'S REQUIRED CLEARANCES. FOLLOW MANUFACTURER'S RECOMMENDATION ON

EQUIPMENT ACCESS AND MAINTENANCE WHEN NOT INDICATED ON PLANS.

12. DO NOT LOCATE VALVES, ANY EQUIPMENT WITH MOVING PARTS, OR ANY EQUIPMENT NEEDING ACCESS

OR REGULAR MAINTENANCE ABOVE INACCESSIBLE CEILINGS. WHERE LOCATIONS OF VALVES

CONTROLS OR EQUIPMENT IS UNAVOIDABLE, PROVIDE MIN. 24"X24" ACCESS PANELS.

13. COORDINATE PLUMBING, MECHANICAL, AND ELECTRICAL SUCH THAT PIPING, DUCTWORK, AND

EQUIPMENT ARE NOT LOCATED OVER ANY ELECTRICAL PANELS.

14. APPLICABLE PLUMBING CODES AND STANDARDS:

• VA PLUMBING DESIGN MANUAL, REV. JUNE 1, 2022

• INTERNATIONAL PLUMBING CODE, 2018 EDITION

• INTERNATIONAL BUILDING CODE, 2018 EDITION

Location

Issue Date

GORDON - The LA Group Joint Venture, LLC

The LA Group 40 Long Alley Saratoga Springs, NY 12866

(518) 587-8100

Integrity Federal Services, Inc.

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

(304) 725-8456

Project Number

Drawing Number

Project Title

Checked Drawn

KALAMAZOO COUNTY, MICHIGAN

909CM3028

MARCH 24, 2023

Dwg. of

Office of Design and Construction

Service

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved: Project Director

Phase

Building Number

BID DOCUMENTS FORT CUSTER NATIONAL CEMETERY

RENOVATE & EXPAND

MAINTENANCE BUILDING 3001Leo A Daly

(202) 861-4600

F ile

P at h:

P

:\0

\0

-1

-0

\4

-0 -P

R O

D U

C T

IO

N

-W O

R K

IN

G

\4 -1

-B

IM

-C A

D \R

E V

IT

\R

E S

O U

R C

E -F

IL

E

S \C

A D

-L

IN

K S

\B D

\9

C M

_G -T

T

LB

.D W

G

Above Group, Inc.

(321) 345-9026

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

PLUMBING NOTES, SYMBOLS &

ABBREVIATIONS

P-001

DES MLG 40

10.28.202203.24.2023

1 2 3 4 5 6

C

PP01

PP01

PP01

PP01

PP01

PP01

PP01

PP01

PP01

EXISTING SINK AND TRIM

TO REMAIN.

EXISTING WATER HEATER

ABOVE SINK TO REMAIN

PP03

PP04

PP01

PD01

Location

Issue Date

GORDON - The LA Group Joint Venture, LLC

The LA Group 40 Long Alley Saratoga Springs, NY 12866

(518) 587-8100

Integrity Federal Services, Inc.

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

(304) 725-8456

Project Number

Drawing Number

Project Title

Checked Drawn

KALAMAZOO COUNTY, MICHIGAN

909CM3028

MARCH 24, 2023

Dwg. of

Office of Design and Construction

Service

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved: Project Director

Phase

Building Number

BID DOCUMENTS FORT CUSTER NATIONAL CEMETERY

RENOVATE & EXPAND

MAINTENANCE BUILDING 3001Leo A Daly

(202) 861-4600

F ile

P at h:

P

:\0

\0

-1

-0

\4

-0 -P

R O

D U

C T

IO

N

-W O

R K

IN

G

\4 -1

-B

IM

-C A

D \R

E V

IT

\R

E S

O U

R C

E -F

IL

E

S \C

A D

-L

IN

K S

\B D

\9

C M

_G -T

T

LB

.D W

G

Above Group, Inc.

(321) 345-9026

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

PLUMBING DEMOLITION PLAN

PD101

DES MLG 41

4'

SCALE : 1/8" = 1'-0"

0 8' 16'

N

SCALE: 1/8" = 1'-0"

F2

PLUMBING DEMOLITION PLAN - MAINTENANCE (3001)

KEYNOTE LEGEND

PD01 DEMOLISH EXISTING WATER HEATER AND SUPPORT.

PP01 REMOVE EXISTING PLUMBING FIXTURE AND ALL ASSOCIATED

PIPING. CAP EXISTING PIPES BACK AT MAIN.

PP03 EXISTING SANITARY SEWER TO BE DEMOLISHED AS

REQUIRED TO FACILITATE NEW WORK. PIPE LEFT TO BE

ABANDONED SHALL BE FILLED WITH GROUT.

PP04 DEMOLISH FLOOR SLAB AS NECESSARY FOR NEW SANITARY

SEWER PIPING. REFER TO ARCHITECTURAL PLANS AND

PP100.

SCALE: 1/8" = 1'-0"

F8

PLUMBING DEMOLITION PLAN - RESTROOMS (1501)

C

EXISTING

2" SS

EXISTING

2" SS

(E) 4" SS

EXISTING 4" SS

EXISTING 4" SS

2" SS UP

TO P-401

2" SS UP

TO P-202

4" SS UP

TO P-102

4" SS UP TO P-101

2" SS UP

TO P-401

4" SS UP TO P-101

2" SS UP

TO P-604

(E) 4" SANITARY SEWER EXIT

PP02

2" SS

2" SS UP

TO P-512

PP02

EXISTING 4" VTR

EXISTING C.O.

A

PP05

Location

Issue Date

GORDON - The LA Group Joint Venture, LLC

The LA Group 40 Long Alley Saratoga Springs, NY 12866

(518) 587-8100

Integrity Federal Services, Inc.

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

(304) 725-8456

Project Number

Drawing Number

Project Title

Checked Drawn

KALAMAZOO COUNTY, MICHIGAN

909CM3028

MARCH 24, 2023

Dwg. of

Office of Design and Construction

Service

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved: Project Director

Phase

Building Number

BID DOCUMENTS FORT CUSTER NATIONAL CEMETERY

RENOVATE & EXPAND

MAINTENANCE BUILDING 3001Leo A Daly

(202) 861-4600

F ile

P at h:

P

:\0

\0

-1

-0

\4

-0 -P

R O

D U

C T

IO

N

-W O

R K

IN

G

\4 -1

-B

IM

-C A

D \R

E V

IT

\R

E S

O U

R C

E -F

IL

E

S \C

A D

-L

IN

K S

\B D

\9

C M

_G -T

T

LB

.D W

G

Above Group, Inc.

(321) 345-9026

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

PLUMBING PLAN - UNDERGROUND

PP100

DES MLG 42

4'

SCALE : 1/8" = 1'-0"

0 8' 16'

N

SCALE: 1/8" = 1'-0"

F2

PLUMBING PLAN - UNDERGROUND - MAINTENANCE (3001)

KEYNOTE LEGEND

PP02 PIPING LOCATIONS AND RUNS TO BE FIELD VERIFIED. ADJUST

ACCORDINGLY TO FIELD POSITION. SITE PHOTOS INDICATE

ADDITIONAL LINES NOT SHOWN ON EXISTING DRAWINGS.

REQUEST FURTHER INFORMATION FROM DESIGN ENGINEER

AS REQUIRED.

PP05 INSTALL DOUBLE CLEANOUT NEAR POINT OF EXITING

BUILDING IF THERE IS NOT ONE FOUND DURING SITE

ASSESSMENT.

C

P-202

P-202

P-202

P-101

P-102

P-101

P-401

P-401PARTS

M108

MAINTENANCE

BAYS

M109

WOMEN'S

M106

MEN'S

M105

FOREMAN

M103

FAC MAINT

M102

VEST

M099

BREAK

M101

STOR

M104

CORRIDOR

M100

TRAINING

M107

P-604

PP02

2" CW

CONNECT TO EXISTING

MINIMUM 2" CW

P-512

2" VTR

1 1/4" HWC

1" HW

3/4" CW

2" CW

1 1/4" HWC

3/4" HW

3/4" CW

2" V

1" CW

EXISTING SINK

EXISTING WATER

HEATER

P-1

ET-1

REFER TO DETAIL B1 FOR

WATER HEATER + PUMP

COORDINATION

A

P-802

P-803

FD-1

ENSURE NO PIPING

CROSSES ABOVE

ELECTRICAL EQPT

P-401

3/4" HW

1 1/4" HWC

1 1/4" HW

1 1/2" CW

CONNECT TO EXISTING 2" CW

ES

P-401

P-202

P-101

P-101

P-202

P-101

P-401

P-604

P-202

P-401

EWH

FD-1

P-1

P-512

1" CW

2" CW

3/4" CW

1 1/4" HWC

3/4" CW

1/2" CW

1 1/4" HW

1 1/4" HWC

2" CW

1" CW

1 1/4" HWC

3/4" HW

ES

P-401

P-202

P-101

P-101

P-202

P-101

P-401

P-512

P-604

P-202

P-401

4" SS

2" SS

4" SS

4" V

2" SS

1 1/2" SS

2" SS

2" V

4" SS

3" SS

VTR

VTR

PP06

Location

Issue Date

GORDON - The LA Group Joint Venture, LLC

The LA Group 40 Long Alley Saratoga Springs, NY 12866

(518) 587-8100

Integrity Federal Services, Inc.

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

(304) 725-8456

Project Number

Drawing Number

Project Title

Checked Drawn

KALAMAZOO COUNTY, MICHIGAN

909CM3028

MARCH 24, 2023

Dwg. of

Office of Design and Construction

Service

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved: Project Director

Phase

Building Number

BID DOCUMENTS FORT CUSTER NATIONAL CEMETERY

RENOVATE & EXPAND

MAINTENANCE BUILDING 3001Leo A Daly

(202) 861-4600

F ile

P at h:

P

:\0

\0

-1

-0

\4

-0 -P

R O

D U

C T

IO

N

-W O

R K

IN

G

\4 -1

-B

IM

-C A

D \R

E V

IT

\R

E S

O U

R C

E -F

IL

E

S \C

A D

-L

IN

K S

\B D

\9

C M

_G -T

T

LB

.D W

G

Above Group, Inc.

(321) 345-9026

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

PLUMBING PLAN

PP101

DES MLG 43

4'

SCALE : 1/8" = 1'-0"

0 8' 16'

N

SCALE: 1/8" = 1'-0"

F2

PLUMBING PLAN - MAINTENANCE (3001)

KEYNOTE LEGEND

PP02 PIPING LOCATIONS AND RUNS TO BE FIELD VERIFIED. ADJUST

ACCORDINGLY TO FIELD POSITION. SITE PHOTOS INDICATE

ADDITIONAL LINES NOT SHOWN ON EXISTING DRAWINGS.

REQUEST FURTHER INFORMATION FROM DESIGN ENGINEER

AS REQUIRED.

PP06 REPLACE DEMOED SHELF AND WATER HEATER WITH LIKE

RATING AND CAPACITY. COORDINATE SIMILAR LOAD WITH

ELECTRICAL.

DOMESTIC FIXTURE SCHEDULE

ID DESCRIPTION MANUFACTURER MODEL

MATERIAL

DESCRIPTION FINISH

TRIM FLOW FIXTURE FLUSH FIXTURE

WASTE

ROUGH-IN

PIPE SIZE

INDIRECT

WASTE

PIPE SIZE

VENT

PIPE

SIZE

COLD

WATER

ROUGH-IN

PIPE SIZE

HOT WATER

ROUGH-IN

PIPE SIZE SPECIFICATIONMANUFACTURER MODEL TYPE

MOTION SENSOR

CONTROL WATER FLOW

TIMER

DURATION

(SEC)

COLD

WATER

TEMP.

HOT

WATER

TEMP.

MAX. MIXED

WATER

TEMP.

VOL. PER

FLUSH

MIN. VOL.

PER FLUSH

P-101 WATER CLOSET - WALL

MOUNTED - ADA

AMERICAN

STANDARD

AFWALL MILLENNIUM

2257.101

WHITE VITREOUS

CHINA

WHITE SLOAN ROYAL 111

ESS

ELECTRONIC Yes 40 °F 40 °F 1.28 gal 1.28 gal 4” --- 2” 1” ELONGATED WALL HUNG WATER CLOSET, 1-1/2” TOP SPUD, WITH CHURCH 295SSCT ELONGATED OPEN FRONT

SEAT. HARD WIRED ELECTRONIC POWERED SENSOR ACTIVATED FLUSHOMETER.

P-102 WATER CLOSET - WALL HUNG AMERICAN

STANDARD

AFWALL MILLENNIUM

2257.101

WHITE VITREOUS

CHINA

WHITE SLOAN ROYAL 111

ESS

ELECTRONIC Yes 40 °F 40 °F 1.28 gal 1.28 gal 4” --- 2” 1” ELONGATED WALL HUNG WATER CLOSET, 1-1/2” TOP SPUD, WITH CHURCH 295SSCT ELONGATED OPEN FRONT

SEAT. HARD WIRED ELECTRONIC POWERED SENSOR ACTIVATED FLUSHOMETER.

P-202 URINAL - ADA AMERICAN

STANDARD

WASHBROOK .125

GPF 6590.001

WHITE VITREOUS

CHINA

WHITE SLOAN ROYAL 186

ESS

ELECTRONIC Yes 40 °F 40 °F 0.125 gal 0.125 gal 2” --- 1-1/2” 3/4” WALL HUNG URINAL WITH WASHOUT ACTION, TOP SPUD, SIZE 18” WITH INTEGRAL EXTENDED SHIELDS SUPPORTED BY THROUGH GOING BOLTS AND C.P. NUTS. HARD WIRED ELECTRONIC POWERED SENSOR

ACTIVATED FLUSHOMETER. INSTALL AT ADA COMPLIANT HEIGHT.

P-401 LAVATORY - COUNTER - ADA INTEGRAL BOWL N/A SOLID SURFACE SEE ARCH CHICAGO FAUCET

CO

E80-A11A-41A

BCP

ELECTRONIC Yes 0.50 GPM 12 40 °F 120 °F 105 °F 1-1/2” --- 1-1/2” 1/2” 1/2” COUNTERTOP LAVATORY,INTEGRAL BOWL, SINGLE FAUCET HOLE. DECK-MOUNTED FAUCET WITH SENSOR, HARD WIRED ELECTRONIC POWER WITH VANDAL RESISTANT SPRAY, EXTERNAL ASSE 1070 COMPLIANT THERMOSTATIC MIXING VALVE, GRID DRAIN, LOOSE KEY ANGLE STOPS AND SUPPLIES. MOUNT AT ADA COMPLIANT HEIGHT. INSULATE WATER AND WASTE TO MEET ADA REQUIREMENTS USING ADA INSULATION KIT.

P-512 DOUBLE BOWL SINK - DROP IN ELKAY LRAD331965PD STAINLESS STEEL STAINLESS

STEEL

AMERICAN

STANDARD

2302E2805 MANUAL No 1.00 GPM 240 40 °F 120 °F 105 °F --- 2” --- 1/2” 1/2” TWO COMPARTMENT DROP IN 18 GAUGE SINK. GOOSENECK FAUCET WITH SINGLE LEVER SIDE VALVE, GRID STRAINER, P-TRAP, TAILPIECES, SUPPLIES AND LOOSE KEY STOPS. INSULATE WATER AND WASTE TO MEET ADA

REQUIREMENTS.

P-604 WATER COOLER - DUAL HEIGHT ELKAY LZSTL8WSLK GALVANIZED STEEL LIGHT GRAY

GRANITE

No 0.13 GPM 15 40 °F 40 °F 1-1/2” --- 1-1/2” 1/2” TWO LEVEL WALL HUNG WATER COOLER WITH BOTTLE FILLING STATION. THE UNIT SHALL BE COMPLETE WITH CABINET, MOUNTING FRAME, SELF CLOSING EASY TOUCH SIDE AND FRONT PUSHBAR CONTROLS, FLEXIGUARD SAFETY BUBBLER, REFRIGERATING SYSTEM, AIR COOLED, 120 VOLT, 60 CYCLE, SINGLE PHASE POWER

CONNECTION, FULLY AUTOMATIC, COMPLETE AND READY TO OPERATE.

P-802 HOSE BIBB CHICAGO FAUCET CHICAGO FAUCET

CO

952-CP MANUAL No 2.50 GPM 0 40 °F 40 °F 1/2” INTERIOR HOSE BIBB WITH VACUUM BREAKER, 3/4" HOSE THREAD OUTLET, LOCK SHIELD CAP, AND REMOVABLE

"TEE" HANDLE. PROVIDE SHUTOFF VALVE IN COLD WATER SUPPLY AHEAD OF HOSE BIBB.

P-803 HOSE BIBB WITH SPRAY CHICAGO FAUCET CHICAGO FAUCET

CO

809-777-21KC

P

MANUAL No 1.50 GPM 0 40 °F 40 °F 1/2” INTERIOR HOSE BIBB WITH VACUUM BREAKER, 1/2" TAPERED OUTLET, LOCK SHIELD CAP, AND REMOVABLE CROSS HANDLE. 53" WHITE VINYL HOSE, SPRAY NOZZLE FULL FLOW SELF CLOSING SPAY VALVE. PROVIDE

SHUTOFF VALVE IN COLD WATER SUPPLY AHEAD OF HOSE BIBB.

SCALE: NTS

D8

DIAGRAM - DOMESTIC RISER

SCALE: NTS

F8

DIAGRAM - SANITARY RISER

EXPANSION TANK SCHEDULE - PLUMBING

EQPM ID LOCATION SERVES

SIZE INCH

CAPACITY

GALLONS

TANK DATA

MANUFACTURER MODELDIA. HEIGHT

ACCEPTANCE

FACTOR

FILL TEMP.

(°F)

MAX. TEMP.

(°F)

ET-1 M108 BUILDING 8" 1'-1" 2.0 0.45 110 200 AMTROL ST-5

ET-2 RR CLOSET RR 8" 1'-1" 2.0 0.45 110 200 AMTROL ST-5

PLUMBING PUMP SCHEDULE

EQPM ID LOCATION SERVES TYPE FLOW (GPM)

TOTAL HEAD

FT WG

SUCTION DIA

(IN)

DISCHARGE

DIA (IN)

IMPELLER

DIA (IN) RPM

ELECTRICAL DATA

MANUFACTURER MODEL NOTESHP VOL PH HZ

P-1 M108 RECIRCULATION 3-SPEED 1 9.87 1/2" 1/2" 3" 1750 .114 120 1 60 GRUNDFOS UPS 32-40 F B 1

1. INCLUDE AQUA-STAT FOR PUMP CONTROL.

FLOOR DRAIN SCHEDULE

TAG DESCRIPTION MANUFACTURER MODEL QTY

MATERIAL DESCRIPTION PRIMER

CONNECTIO

N

WASTE VENT PRIMER

SPECIFICATIONDRAIN BODY STRAINER

PIPE

SIZE

PIPE

SIZE

PIPE

SIZE

FD-1 FLOOR DRAIN WATTS FD-100-A 1 EPOXY

COATED CAST

IRON

NICKEL

BRONZE

No 4” 2” --- EPOXY COATED CAST IRON FLOOR DRAIN WITH ANCHOR FLANGE, REVERSIBLE

CLAMPING COLLAR WITH PRIMARY & SECONDARY WEEPHOLES, ADJUSTABLE

ROUND HEEL PROOF NICKEL BRONZE STRAINER, AND NO HUB OUTLET.

SCALE: 1/8" = 1'-0"

F6

PLUMBING PLAN - RESTROOMS (1501)

ELECTRIC WATER HEATER SCHEDULE

EQPM ID LOCATION SERVES

HEATING

OUTPUT

(KW)

TANK

STORAGE

CAPACITY

RECOVERY

EXPANSION

TANK TYPE

ELECTRICAL DATA

MANUFACTU

RER MODEL

WATER FLOW

(GPM) EWT (°F) LWT (°F)

TEMPERATU

RE RISE (°F) VOL PH HZ

EWH-1 RR CLOSET RR HOT

WATER

2.5 17.0 3 50 140 90 DIAPHRAGM 120 1 60 LOCHINVAR JRCO20FS

1-1/2"

SINK

10 MICRON FILTER

1-1/2"

WASTE PIPING

WITHIN WALL.

2"

DRAIN BOX

1-1/2" COLD WATER

SINK TRAP

HOT WATER

WATER SUPPLY & DRAIN

HOSE WITHIN WALL. SEE

EQUIPMENT

INFORMATION FOR PIPE

SIZES.

COUNTER

FLOOR

ICE MAKER

FROM HW SOURCE

TO FINAL FIXTURE (OR

FIXTURE GROUP) ON

BRANCH

TO CIRCULATING PUMPBALL VALVE

CIRCULATION CONTROL VALVE CHECK VALVE

D

STRAINER

HWC

CW

HW CIRCULATING PUMP CHECK VALVE (TYP.)

SHUT-OFF VALVE (TYP.)

HW

THERMOMETER (TYP.)

TEMPERATURE AND

PRESSURE RELIEF

VALVE

TO SINK BELOW

DRAIN VALVE WITH

HOSE THREADS

UNION

(TYP.)

5 GALLON

DIAPHRAGM

TYPE

EXPANSION

TANK

A

GENERAL:

1. SYSTEM CONSISTS OF A CIRCULATING PUMP AND AQUASTAT.

PUMP UNIT CONTROL:

1. PUMP SHALL ONLY BE OPERABLE DURING OCCUPIED HOURS AS DETERMINED BY

THE BUILDING TIME CLOCK (ADJ).

2. DURING OCCUPIED HOURS THE PUMP SHALL BE CONTROLLED BY THE SYSTEM'S

AQUASTAT.

SEQUENCE OF OPERATION - DOMESTIC HOT WATER CIRCULATING PUMP

DOMESTIC

WATER

SUCTION

DOMESTIC WATER

DISCHARGE

M

IT

CW UNION (TYP.)

SHUT-OFF VALVE

(TYP.)

HW

THERMOMETER

TEMPERATURE AND

PRESSURE RELIEF

VALVE

TO FLOOR DRAIN

DRAIN VALVE

WITH HOSE

THREADS

? GALLON

DIAPHRAGM

TYPE

EXPANSION

TANK

EDITING NOTE:

DELETE EXPANSION TANK IF THERE

ARE NO CHECK VALVES, PRV'S OR

BACKFLOW PREVENTERS IN CW

UPSTREAM.

D

Location

Issue Date

GORDON - The LA Group Joint Venture, LLC

The LA Group 40 Long Alley Saratoga Springs, NY 12866

(518) 587-8100

Integrity Federal Services, Inc.

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

(304) 725-8456

Project Number

Drawing Number

Project Title

Checked Drawn

KALAMAZOO COUNTY, MICHIGAN

909CM3028

MARCH 24, 2023

Dwg. of

Office of Design and Construction

Service

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved: Project Director

Phase

Building Number

BID DOCUMENTS FORT CUSTER NATIONAL CEMETERY

RENOVATE & EXPAND

MAINTENANCE BUILDING 3001Leo A Daly

(202) 861-4600

F ile

P at h:

P

:\0

\0

-1

-0

\4

-0 -P

R O

D U

C T

IO

N

-W O

R K

IN

G

\4 -1

-B

IM

-C A

D \R

E V

IT

\R

E S

O U

R C

E -F

IL

E

S \C

A D

-L

IN

K S

\B D

\9

C M

_G -T

T

LB

.D W

G

Above Group, Inc.

(321) 345-9026

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

PLUMBING DETAILS

PP501

DES MLG 44

SCALE:NONEB3

COUNTERTOP ICE MAKER DETAIL

SCALE:NONEB5

DOMESTIC HOT WATER CIRCULATING CONTROL

SCALE:NONE

B1

ELECTRIC DOMESTIC WATER HEATER W/PUMP

SCALE:NONE

C1

DOMESTIC HOT WATER CIRCULATING PUMP (DHWCP-1) CONTROLS DIAGRAM

SCALE:NONE

B7

ELECTRIC DOMESTIC WATER HEATER

V

H

S

P

FE

FCO

GCO

WCO

(DRAINS)

RD-

HB-

WH-

FS

M

FHC

FVC

CHWS

CHWR

HWS

HWR

CWS

CWR

CD

LPS

MPS

HPS

PC

RS

RL

LPC

MPC

HPC

RD

CF

GHS

GHR

HPWS

HPWR

HTWS

HTWR

HCS

HCR

T

GATE VALVE

DESCRIPTIONSYMBOL

GLOBE VALVE

CHECK VALVE

BUTTERFLY VALVE

FLANGE

BLIND FLANGE

BALANCING VALVE

GAS COCK

PRESSURE REGULATING VALVE

SOLENOID VALVE

CAP

PIPE VALVES, FITTINGS, SENSORS AND GAGES

ECCENTRIC PLUG VALVE

BALL VALVE

STRAINER

UNION

PRESSURE GAGE

COCK (GAGE, AIRVENT, DRAIN)

PIPE ANCHOR

PIPE GUIDE

PIPE EXPANSION COMPENSATOR

VACUUM BREAKER

SAFETY RELIEF VALVE

CONTROL VALVE (2-WAY)

CONTROL VALVE (3-WAY)

THERMOMETER

SUPERVISED O S & Y VALVE

THERMOSTAT

FLOW MEASURING ELEMENT

SIGHT GLASS (FLOW TYPE)

AIR ELIMINATOR

TEMPERATURE & PRESSURE RELIEF VALVE

STEAM TRAP

TEST PLUG

HUMIDISTAT

TEMPERATURE, HUMIDITY, OR CO2 SENSOR

PRESSURE SENSOR

PIPE ELBOW UP

PIPE ELBOW DOWN

FLOOR CLEANOUT

WALL CLEANOUT

CONTINUATION - PIPE NOT SHOWN

DRAINS - FLOOR - FD, TRENCH - TD, AREA -

ADROOF DRAIN OR OVERFLOW ROOF DRAIN

HOSE BIBB

GRADE CLEANOUT

PIPE TEE UP

PIPE TEE DOWN

WALL HYDRANT

FIRE DEPARTMENT CONNECTION

FIRE HOSE CABINET

FIRE VALVE CABINET

FLOW SWITCH

WATER METER

BACKFLOW PREVENTER

CONNECT TO EXISTING

CHILLED WATER SUPPLY (COOLING)

DESCRIPTIONSYMBOL

CHILLED WATER RETURN (COOLING)

HEATING WATER SUPPLY

HEATING WATER RETURN

MEDIUM PRESSURE STEAM (15-50 PSIG)

LOW PRESSURE CONDENSATE

MEDIUM PRESSURE CONDENSATE

HIGH PRESSURE CONDENSATE

PUMP CONDENSATE

REFRIGERANT SUCTION

HIGH PRESSURE STEAM (50-200 PSIG)

HVAC PIPING

CONDENSER WATER SUPPLY

CONDENSER WATER RETURN

CONDENSATE DRAIN

LOW PRESSURE STEAM (0-5 PSIG)

GLYCOL HEATING SUPPLY

HEAT PUMP WATER SUPPLY

HEAT PUMP WATER RETURN

HIGH TEMP WATER SUPPLY (HEATING)

HIGH TEMP WATER RETURN (HEATING)

HOT OR CHILLED WATER SUPPLY

GLYCOL HEATING RETURN

REFRIGERANT LIQUID

REFRIGERANT HOT GAS DISCHARGE

CHEMICAL FEED

HOT OR CHILLED WATER RETURN

ROUND FACE SUPPLY DIFFUSER

DESCRIPTIONSYMBOL

SQUARE FACE RETURN GRILLE

HVAC SYMBOLS

M

SQUARE FACE SUPPLY DIFFUSER

SQUARE FACE EXHAUST GRILLE

ROUND OR SPIRAL DUCTWORK

FLAT OVAL DUCT - FIRST NUMBER IS SIDE

SHOWNRECTANGULAR DUCTWORK

12 Ø

12/6 Ɵ

12x6

SUPPLY DUCT UP OR DOWN

RETURN / OUTSIDE AIR DUCT UP OR DOWN

EXHAUST DUCT UP OR DOWN

MANUAL VOLUME DAMPER

MOTORIZED DAMPER

ROUND DUCT TAP WITH MANUAL VOLUME

DAMPER

DESCRIPTIONSYMBOL

KEYNOTE

GENERIC ANNOTATIONS

EQUIP ID MECHANICAL EQUIPMENT TAG

#ØD1

ROUND NECK

DIFFUSER/GRILLE TAG

NECK DIAMETER, ID

AIRFLOW (CFM)

#x#G1

SQUARE NECK

DIFFUSER/GRILLE TAG

NECK SIZE, ID

AIRFLOW (CFM)

LINEAR SLOT DIFFUSER

FLEXIBLE PIPE CONNECTION

FLEXIBLE DUCT

FIRE DAMPER

SMOKE DAMPER

COMBINATION FIRE & SMOKE DAMPER

CONICAL TAKE-OFF

RECTANGULAR TAKE-OFF

MITERED ELBOW WITH TURNING VANES

RADIUSED ELBOW

EMERGENCY BOILER SHUTDOWN SWITCH

AIRFLOW MEASURING STATION

CO CLEANOUT

MECHANICAL DEMOLITION NOTES

1. ALL LINEWORK SHOWN BOLD, DASHED, OR HATCHED ON DEMOLITION DRAWINGS ARE TO BE REMOVED UNLESS

NOTED OTHERWISE.

2. ALL EXISTING MECHANICAL EQUIPMENT, DUCTWORK, PIPING, AND ACCESSORIES SHOWN HALFTONE ARE EXISTING

AND TO REMAIN.

3. NOT ALL EXISTING MECHANICAL EQUIPMENT, DUCTWORK, PIPING, AND ACCESSORIES ARE SHOWN FOR CLARITY.

THE SIZES AND LOCATIONS OF EXISTING EQUIPMENT, PIPING, AND DUCTWORK ARE SHOWN ACCORDING TO RECORD INFORMATION. CONTRACTOR SHALL MAKE APPROPRIATE PRE-BID SITE INSPECTIONS IN ORDER TO ASCERTAIN EXISTING CONDITIONS AND SHALL INCLUDE IN BID THE COST OF ALL WORK RESULTING FROM EXISTING

CONDITIONS. REFER ALL QUESTIONS TO THE A/E PRIOR TO BID FOR CLARIFICATION.

4. ALL UNDERGROUND UTILITIES ARE SHOWN IN APPROXIMATE LOCATIONS ONLY. CONTRACTOR SHALL DETERMINE

EXACT LOCATION OF ALL EXISTING UTILITIES PRIOR TO START OF WORK.

5. THE OWNER SHALL HAVE SALVAGE RIGHTS TO ANY ITEMS THAT ARE TO BE DEMOLISHED. EXISTING AHUs, FAN COIL UNITS, CHILLERS, PUMPS, EXHAUST FANS, AND VAV BOXES SHALL REMAIN PROPERTY OF THE OWNER AND SHALL ONLY BE DISPOSED IF DESIRED BY THE OWNER. ALL SHEET METAL AND PIPING WILL BE DISPOSED BY THE

GENERAL CONTRACTOR.

6. DEMOLITION WORK THAT WILL INTERRUPT HVAC OR PLUMBING CONTINUITY TO OTHER AREAS OF THE FACILITY THAT ARE TO REMAIN IN OPERATION, SHALL BE COORDINATED WITH THE OWNER TO ACCOMMODATE THE OWNER'S

NEEDS AS REQUIRED.

7. IF HAZARDOUS MATERIALS (I.E. ASBESTOS, PCB's, ETC.) ARE ENCOUNTERED AT ANY TIME DURING CONSTRUCTION

IN THE WORK AREA, STOP WORK IMMEDIATELY AND CONTACT THE ARCHITECT OR THE OWNER.

8. ANY BRANCH DUCTWORK OR PIPING SHOWN TO BE DEMOLISHED SHALL BE REMOVED BACK TO THE MAIN AND

CAPPED UNLESS OTHERWISE NOTED.

9. COORDINATE WITH MECHANICAL AND ELECTRICAL CONTRACTOR ALL THE EQUIPMENT TO BE REMOVED. REPORT ANY DISCREPANCIES BETWEEN PLANS AND ACTUAL FIELD CONDITIONS TO ARCHITECT PRIOR TO THE

COMMENCEMENT OF DEMOLITION WORK.

10. DEMOLISHED MATERIALS MUST BE PROPERLY CLEANED AND PLACED IN AN AIRTIGHT CONTAINER BEFORE

REMOVAL FROM THE AREA THROUGH ALL OCCUPIED SPACES.

11. OPENINGS IN WALLS, FLOORS, AND CEILINGS REMAINING FROM DUCT AND PIPE REMOVAL SHALL BE FILLED AND SEALED TO MATCH EXISTING WALL CONSTRUCTION AND MAINTAIN EXISTING WALL SMOKE AND FIRE RATING.

12. DEMOLITION SHALL BE PERFORMED IN SUCH A MANNER THAT WILL NOT DAMAGE ADJOINING SURFACES OR

EQUIPMENT INDICATED TO REMAIN.

13. CONTRACTOR SHALL GIVE THE OWNER NOTICE PRIOR TO ANY INTERRUPTION OF HVAC & PLUMBING SERVICES AS

SPECIFIED.

14. ANY AREAS DISRUPTED BY DEMOLITION THAT DOES NOT HAVE NEW WORK SHALL BE REPAIRED/PATCHED TO

MATCH EXISTING CONDITIONS AND FINISHES.

15. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING MATERIALS, EQUIPMENT, APPLIANCES AND DEVICES THAT ARE TO BE REUSED SHALL BE RECONDITIONED, TESTED AND PLACED IN GOOD AND PROPER WORKING CONDITION AND APPROVED. ANY DISCREPANCIES MUST BE BROUGHT TO THE ATTENTION OF THE ARCHITECT PRIOR TO BID.

16. RELOCATE EXISTING SYSTEMS (E.G. DUCT, PIPING, CONDUIT, CABLE TRAYS) OBSTRUCTING THE NEW

CONSTRUCTION.

MECHANICAL GENERAL NOTES

1. THE CONTRACTOR SHALL FURNISH AND INSTALL COMPLETE AND SATISFACTORILY OPERATING SYSTEMS AS INDICATED ON THE CONTRACT DOCUMENTS. IT IS NOTED THAT THE DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENTS OF SYSTEMS AND WORK. THE CONTRACTOR SHALL OBTAIN EXACT LOCATION, MEASUREMENTS LEVELS, ETC AT THE SITE AND SHALL ADAPT THE WORK TO THE ACTUAL CONDITIONS OF THE FIELD.

2. THE CONTRACTOR SHALL COORDINATE THE MECHANICAL WORK WITH THE WORK OF ALL OTHER TRADES INCLUDING, BUT NOT LIMITED TO, ARCHITECTURAL, STRUCTURAL, LIGHTING, POWER, SYSTEMS, PLUMBING, FIRE PROTECTION AND OTHERS FOR EXISTING AND NEW WORK SO AS TO AVOID CONFLICTS. RESOLVE ALL CONFLICTS THROUGH THE A/E PRIOR TO INSTALL. FAILURE TO PROVIDE SUCH COORDINATION PRIOR TO WORK BEING INSTALLED SHALL NOT BE CAUSE FOR ADDITIONAL COMPENSATION TO THE CONTRACTOR, AND MAY RESULT IN REJECTION OF THE WORK. IT IS

THE CONTRACTORS' RESPONSIBILITY TO COORDINATE SUBSTITUTIONS WITH OTHER TRADES.

3. THE SIZE AND LOCATION OF EQUIPMENT INSTALLED UNDER DIVISION 23 MECHANICAL SHALL BE COORDINATED WITH OTHER TRADES. CONNECTION TO EQUIPMENT SHALL BE VERIFIED WITH MANUFACTURER'S CERTIFIED DRAWINGS.

TRANSITIONS TO ALL EQUIPMENT SHALL BE VERIFIED AND PROVIDED FOR EQUIPMENT FURNISHED.

4. ALL PIPING AND DUCT IS TO BE CONCEALED ABOVE CEILING OR IN NEW WALLS UNLESS SPECIFICALLY NOTED AS EXPOSED OR SURFACE MOUNTED. CONTRACTOR TO COORDINATE WITH THE GENERAL CONTRACTOR TO PAINT ALL

EXPOSED PIPING TO MATCH CORRESPONDING EXPOSED AREAS.

5. ALL EQUIPMENT SHALL BE SECURELY FASTENED BY MEANS OF ANCHORS, RODS, HANGERS, SUPPORTS, GUIDES, SWAY

BRACES, ETC., TO MAINTAIN ALIGNMENT AND PREVENT EQUIPMENT MOVEMENT.

6. ANY EQUIPMENT, PIPING, DUCTWORK, ETC. SHALL ONLY BE SUPPORTED FROM THE BUILDING STRUCTURE. NO EQUIPMENT SHALL BE SUPPORTED FROM OTHER PIPING, DUCTWORK, METAL ROOF DECK, LATERAL BRACING, OR

CONDUIT.

7. ALL PENETRATIONS OF ROOFS, EXTERIOR WALLS, FOUNDATIONS, OR OTHER WATER OR MOISTURE PROOF CONSTRUCTION SHALL BE SEALED WITH APPROPRIATE SEALING FITTINGS OR SEALED CONSTRUCTION TO PREVENT

THE INTRODUCTION OF MOISTURE INTO THE BUILDING.

8. ALL CONCRETE HOUSEKEEPING PADS FOR MECHANICAL AND PLUMBING EQUIPMENT SHALL BE SIZED AND LOCATED BY THE MECHANICAL CONTRACTOR. A MINIMUM THICKNESS OF ANY HOUSEKEEPING PADS SHALL BE 4" AND EXTEND A MINIMUM OF 4" BEYOND THE MECHANICAL OR PLUMBING EQUIPMENT. MECHANICAL CONTRACTOR SHALL COORDINATE

WITH THE GENERAL CONTRACTOR FOR THE SIZE AND LOCATION OF HOUSEKEEPING PADS.

9. ALL DUCTWORK AND PIPING IS SHOWN SCHEMATICALLY. PROVIDE ALL TRANSITIONS, ELBOWS, FITTINGS, ETC., TO ALLOW SMOOTH FLOWS. ALL SPLIT DUCT FITTINGS SHALL TRANSITION TO FULL SIZE OF THE SUM OF BOTH BRANCHES

UPSTREAM OF SPLIT.

10. MAINTAIN CLEARANCE OF A MINIMUM OF 6" BETWEEN DUCTWORK, PIPING, EQUIPMENT, ETC.

11. ALL DASHED LINEWORK AROUND MECHANICAL AND PLUMBING EQUIPMENT INDICATES REQUIRED SERVICE

CLEARANCES. ALL EQUIPMENT SHALL BE INSTALLED IN A MANNER TO MAINTAIN THE CODE OR MANUFACTURER'S REQUIRED CLEARANCES. FOLLOW MANUFACTURER'S RECOMMENDATIONS ON EQUIPMENT ACCESS AND MAINTENANCE

WHEN NOT INDICATED ON PLANS.

12. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR COORDINATING WORK WITH THE TEST AND BALANCE FIRM. PRIOR TO TESTING AND BALANCING, THE CONTRACTOR SHALL START-UP, PRE-BALANCE, AND REPLACE ALL AIR FILTERS FOR EVERY AHU BEING TESTED. ALL DISCREPANCIES, DRIVE CHANGES, ETC. REPORTED BY ARCHITECT OR TEST AND BALANCE FIRM SHALL BE CORRECTED BY CONTRACTOR WITHIN SPECIFIED NUMBER OF CALENDAR DAYS AT NO ADDITIONAL COST. TESTING AND BALANCING SHALL BE COMPLETED PRIOR TO SUBSTANTIAL COMPLETION.

13. DO NOT LOCATE VALVES, DAMPERS, ACTUATORS, CONTROL COMPONENTS, ANY EQUIPMENT WITH MOVING PARTS OR ANY EQUIPMENT NEEDING ACCESS OR REGULAR MAINTENANCE ABOVE INACCESSIBLE CEILINGS. WHERE LOCATIONS OF VALVES CONTROLS OR EQUIPMENT IS UNAVOIDABLE, PROVIDE MIN. 24"X24" ACCESS PANELS.

14. COORDINATE MECHANICAL AND ELECTRICAL SUCH THAT PIPING, DUCTWORK AND EQUIPMENT ARE NOT LOCATED OVER ANY ELECTRICAL PANELS. DO NOT INSTALL EXTERNAL PIPING AND DUCTWORK THROUGH ELEVATOR EQUIPMENT

ROOMS.

15. THERMOSTATS AND TEMPERATURE SENSORS SHALL BE MOUNTED 46" ABOVE FINISHED FLOOR. COORDINATE THEIR LOCATIONS WITH FURNITURE/EQUIPMENT LAYOUTS, WINDOWS, ELECTRICAL SWITCHES, AND DOOR SWING AREAS.

16. APPLICABLE HVAC CODES AND STANDARDS:

- VA HVAC DESIGN MANUAL, REV. MARCH 1, 2022

- VA PLUMBING DESIGN MANUAL, REV. JUNE 1, 2022

- ASHRAE HANDBOOKS AND STANDARDS, LATEST EDITIONS

- SMACNA HVAC DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE - LATEST EDITION

- AHRI STANDARD 340/360, LATEST EDITION

DUCTWORK:

1. OFFSETS IN DUCTS AND PIPING (INCLUDING DIVIDING DUCTS) AND TRANSITIONS AROUND OBSTRUCTIONS SHALL BE

PROVIDED AT NO ADDITIONAL COST.

2. ALL SUPPLY AIR INLET DUCTWORK TO VAV BOXES SHALL BE (1) SIZE GREATER AND AN EVEN DIAMETER THAN VAV BOX

INLET SIZE UNLESS OTHERWISE NOTED.

3. ALL SUPPLY, RETURN, AND EXHAUST BRANCH DUCTWORK TO DIFFUSERS, REGISTERS, AND GRILLES SHALL BE THE

SAME SIZE AS THE NECK SIZE UNLESS OTHERWISE NOTED.

4. FLEXIBLE DUCTWORK SHALL BE FULLY EXTENDED NOT TO EXCEED 5'-0" IN LENGTH.

5. DO NOT PROVIDE MANUAL VOLUME DAMPERS IN MEDIUM PRESSURE DUCT (UPSTREAM OF ATUs) EXCEPT WHERE

SPECIFICALLY SHOWN.

6. ALL VOLUME DAMPERS INSTALLED ABOVE GYPSUM BOARD CEILING SHALL HAVE A REMOTELY OPERATED DAMPER OR

DAMPER IN DUCT SHALL BE ACCESSIBLE THROUGH ACCESS DOOR. THE DAMPER LOCATION TO BE ACCURATELY

LOCATED AND LABELED ON THE AS-BUILT DRAWINGS AT THE COMPLETION OF THE PROJECT.

7. ALL EQUIPMENT, DUCTWORK, ETC., SHALL BE SUPPORTED AS DETAILED AND/OR SPECIFIED. PROVIDE ADDITIONAL SUPPORTS AS REQUIRED TO PROVIDE A VIBRATION-FREE, RIGID INSTALLATION. SUPPORT ALL OBJECTS FROM

STRUCTURE.

8. ALL DUCTWORK SHALL BE CONSTRUCTED AND INSTALLED IN ACCORDANCE WITH NFPA 90A AND 90B. DUCT SIZES SHOWN ARE MINIMUM INSIDE DIMENSIONS. BEFORE FABRICATION, VERIFY AND COORDINATE ALL DIMENSIONS IN FIELD.

DUCT SIZES AND ALL OPENINGS THROUGH BUILDING CONSTRUCTION SHALL SUIT EQUIPMENT FURNISHED.

9. ACCESS PANELS IN DUCTWORK AND CEILINGS SHALL BE PROVIDED WHERE REQUIRED FOR OPERATION, BALANCING, AND MAINTENANCE OF ALL MECHANICAL EQUIPMENT.

10. PROVIDE FLEXIBLE DUCT CONNECTIONS ON ALL DUCTS CONNECTING TO EACH FAN AND FAN COIL UNIT.

11. DIFFUSER NECKS SHALL MATCH SIZES OF FLEX DUCTS TO BE CONNECTED. FLEXIBLE DUCTWORK SHALL BE FULLY

EXTENDED NOT TO EXCEED 5'-0" IN LENGTH.

12. COORDINATE DIFFUSER, GRILLE, AND REGISTER LOCATIONS WITH ARCHITECTURAL REFLECTED CEILING PLANS AND

EQUIPMENT OF ALL TRADES.

13. ALL VISIBLE SURFACES BEHIND THE GRILLES, REGISTERS AND DIFFUSERS SHALL BE PAINTED FLAT BLACK.

14. PROVIDE FIRE DAMPERS AT EACH FIRE RATED WALL, FLOOR, AND CEILING PENETRATION OF ALL AIR SUPPLY, RETURN, EXHAUST AND VENTILATION DUCTS. IF NOT SHOWN ON THE DOCUMENTS THIS MUST BE BROUGHT TO THE ATTENTION

OF THE ENGINEER PRIOR TO BID.

15. PROVIDE A REMOVABLE 3/4" X 3/4" MINIMUM MESH SCREEN AT ALL INTAKE LOUVERS, NO INSECT SCREENS.

16. ALL TRANSFER DUCTS ARE ACOUSTICALLY LINED TURNED-UP ELBOWS ABOVE THE CEILING, SEE DETAILS FOR

FURTHER CLARIFICATION.

PIPING:

1. ALL REFRIGERANT PIPING QUANTITY AND SIZES SHALL BE PROVIDED PER MANUFACTURER'S RECOMMENDATIONS.

2. CONDENSATE DRAINS FROM ALL MECHANICAL EQUIPMENT SHALL BE COORDINATED FOR PROPER DRAINAGE TO SUIT

EQUIPMENT FURNISHED. FOLLOW MANUFACTURER'S RECOMMENDATIONS. ALL CONDENSATE DRAIN LINES SHALL BE INSULATED AND INSTALLED WITH A 'P' TRAP AT THE UNIT WITH A MINIMUM DEPTH OF 2" OR PER MANUFACTURER'S INSTRUCTIONS, WHICHEVER IS GREATER. ALL 90° ELBOWS SHALL BE INSTALLED WITH A CLEANOUT.

3. UNLESS OTHERWISE NOTED, ALL EQUIPMENT AND VALVE DRAINS SHALL BE INDEPENDENTLY PIPED FULL SIZE TO THE

NEAREST INDIRECT CONNECTION.

CONTROLS:

1. CONTROL DEVICE MOTORS (DAMPERS, ETC.) SHALL BE 24VAC TYPE WITH ALL ELECTRICAL POWER REQUIREMENTS

CLEARLY NOTED ON THE CONSTRUCTION DRAWINGS.

Location

Issue Date

GORDON - The LA Group Joint Venture, LLC

The LA Group 40 Long Alley Saratoga Springs, NY 12866

(518) 587-8100

Integrity Federal Services, Inc.

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

(304) 725-8456

Project Number

Drawing Number

Project Title

Checked Drawn

KALAMAZOO COUNTY, MICHIGAN

909CM3028

MARCH 24, 2023

Dwg. of

Office of Design and Construction

Service

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved: Project Director

Phase

Building Number

BID DOCUMENTS FORT CUSTER NATIONAL CEMETERY

RENOVATE & EXPAND

MAINTENANCE BUILDING 3001Leo A Daly

(202) 861-4600

F ile

P at h:

P

:\0

\0

-1

-0

\4

-0 -P

R O

D U

C T

IO

N

-W O

R K

IN

G

\4 -1

-B

IM

-C A

D \R

E V

IT

\R

E S

O U

R C

E -F

IL

E

S \C

A D

-L

IN

K S

\B D

\9

C M

_G -T

T

LB

.D W

G

Above Group, Inc.

(321) 345-9026

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

MECHANICAL NOTES, SYMBOLS &

ABBREVIATIONS

M-001

DES MLG 45

C

(E) UNIT

HEATER

(E) UNIT

HEATER

(E) UNIT

HEATER

(E) UNIT

HEATER

(E) UNIT

HEATER

(E)

DUCTLESS

SPLIT

(E)

DUCTLESS

SPLIT

(E)

CONDENSING

UNIT

(E)

CONDENSING

UNIT

(E) UNIT

HEATER

(E) UNIT

HEATER

(E) UNIT

HEATER

(E) UNIT

HEATER

(ETR)

EXHAUST

FAN

(ETR)

EXHAUST

FAN

(ETR)

EXHAUST

FAN

(ETR)

EXHAUST

FAN

(ETR)

EXHAUST

FAN

(E) UNIT

HEATER

MD01

(ETR)

EXHAUST

FAN

MD02

MD02

MD02

MD02

MD02

Location

Issue Date

GORDON - The LA Group Joint Venture, LLC

The LA Group 40 Long Alley Saratoga Springs, NY 12866

(518) 587-8100

Integrity Federal Services, Inc.

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

(304) 725-8456

Project Number

Drawing Number

Project Title

Checked Drawn

KALAMAZOO COUNTY, MICHIGAN

909CM3028

MARCH 24, 2023

Dwg. of

Office of Design and Construction

Service

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved: Project Director

Phase

Building Number

BID DOCUMENTS FORT CUSTER NATIONAL CEMETERY

RENOVATE & EXPAND

MAINTENANCE BUILDING 3001Leo A Daly

(202) 861-4600

F ile

P at h:

P

:\0

\0

-1

-0

\4

-0 -P

R O

D U

C T

IO

N

-W O

R K

IN

G

\4 -1

-B

IM

-C A

D \R

E V

IT

\R

E S

O U

R C

E -F

IL

E

S \C

A D

-L

IN

K S

\B D

\9

C M

_G -T

T

LB

.D W

G

Above Group, Inc.

(321) 345-9026

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

MECHANICAL DEMOLITION PLAN

MD101

DES MLG 46

SCALE: 1/8" = 1'-0"

F2

MECHANICAL DEMOLITION PLAN - MAINTENANCE (3001)

KEYNOTE LEGEND

MD01 ALL MECHANICAL ITEMS SHOWN IN HATCHED AREA ON

DEMOLITION PLANS SHALL BE DEMOLISHED AND REMOVED IN

THEIR ENTIRETY UNLESS OTHERWISE NOTED. SEE DRAWINGS

OF OTHER TRADES FOR EXTENT OF DEMOLITION WORK.

MECHANICAL ITEMS SHALL INCLUDE DUCTWORK SYSTEMS, AIR

CONDITIONING UNITS, EXHAUST FANS, INSULATION,

SUPPORTS, HOUSEKEEPING PADS, AND ASSOCIATED

CONTROLS WIRING AND DEVICES, ETC.. REFER ALL QUESTIONS

OF APPLICABILITY TO THE A/E PRIOR TO BID FOR

CLARIFICATION; OTHERWISE, FIELD DECISIONS BY THE A/E

SHALL BE BINDING.

MD02 EXISTING-TO-REMAIN (ETR) EQUIPMENT TO REMAIN. REPAIR

AND CLEAN AS NECESSARY TO BRING TO A LIKE NEW

CONDITION.

4'

SCALE : 1/8" = 1'-0"

0 8' 16'

MD03

HP-2

HP-3

HP-1

ECU-1

EFC-1

MD03

CU-1

CU-2

CU-3

MD03

EF-1D

Location

Issue Date

GORDON - The LA Group Joint Venture, LLC

The LA Group 40 Long Alley Saratoga Springs, NY 12866

(518) 587-8100

Integrity Federal Services, Inc.

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

(304) 725-8456

Project Number

Drawing Number

Project Title

Checked Drawn

KALAMAZOO COUNTY, MICHIGAN

909CM3028

MARCH 24, 2023

Dwg. of

Office of Design and Construction

Service

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved: Project Director

Phase

Building Number

BID DOCUMENTS FORT CUSTER NATIONAL CEMETERY

RENOVATE & EXPAND

MAINTENANCE BUILDING 3001Leo A Daly

(202) 861-4600

F ile

P at h:

P

:\0

\0

-1

-0

\4

-0 -P

R O

D U

C T

IO

N

-W O

R K

IN

G

\4 -1

-B

IM

-C A

D \R

E V

IT

\R

E S

O U

R C

E -F

IL

E

S \C

A D

-L

IN

K S

\B D

\9

C M

_G -T

T

LB

.D W

G

Above Group, Inc.

(321) 345-9026

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

MECHANICAL DEMOLITION PLANS -

FCA ITEMS

MD121

DES MLG 47

SCALE: 1/8" = 1'-0"

C5

MECHANICAL DEMOLITION PLAN - ADMINISTRATION (1001)

KEYNOTE LEGEND

MD03 EXISTING EQUIPMENT TO BE DEMOLISHED.

SCALE: 1/8" = 1'-0"

F5

MECHANICAL DEMOLITION PLAN - RESTROOMS (1501)

M M

B

C

ERV-1

AHU-1

AHU-2

EUH-1

EUH-2

EUH-3

EUH-4

EUH-5

HP-1 HP-2

WU-1

EQUIPMENT

STORAGE

M111

WORKSHOP

M110

GROUNDS SUPPLY

M112

STORAGE

M113

OFFICE

M110A

CORRIDOR

M110B

MAINTENANCE

BAYS

M109

PARTS

M108

TRAINING

M107

MEN'S

M105

FOREMAN

M103

FAC MAINT

M102

VEST

M099

BREAK

M101

STOR

M104WOMEN'S

M106

30"x30" EXHAUST LOUVER.

COORDINATE LOCATION AND

FINISH PER ARCHITECT'S DRAWINGS.

24"x24" EXHAUST LOUVER.

COORDINATE LOCATION AND

FINISH PER ARCHITECT'S DRAWINGS.

T

AHU-2

T

AHU-1

DH-1

DH-2

12x12 OA

12x12 EA x1

E

A

8x8 EA x1

O

A x1

R

A

12x12 RA

18x12 SA 12x12 SA x1

S

A

8x8R1

10ØD1

10ØD1

10ØD1

8x8R1

8ØD1

8ØD1

8ØD1

8ØD1

8ØD1

14x14R1

8ØD1

10ØD1

8x8G1

10x10G1

8x8G1

10ØD1

8x8R1

2'-0"

MM02

MM02

8ØD1

EUH-6

A

MOUNT AT 7'

12x12 OA

12x12 EA 12x12 EA

12x12 SA

Location

Issue Date

GORDON - The LA Group Joint Venture, LLC

The LA Group 40 Long Alley Saratoga Springs, NY 12866

(518) 587-8100

Integrity Federal Services, Inc.

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

(304) 725-8456

Project Number

Drawing Number

Project Title

Checked Drawn

KALAMAZOO COUNTY, MICHIGAN

909CM3028

MARCH 24, 2023

Dwg. of

Office of Design and Construction

Service

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved: Project Director

Phase

Building Number

BID DOCUMENTS FORT CUSTER NATIONAL CEMETERY

RENOVATE & EXPAND

MAINTENANCE BUILDING 3001Leo A Daly

(202) 861-4600

F ile

P at h:

P

:\0

\0

-1

-0

\4

-0 -P

R O

D U

C T

IO

N

-W O

R K

IN

G

\4 -1

-B

IM

-C A

D \R

E V

IT

\R

E S

O U

R C

E -F

IL

E

S \C

A D

-L

IN

K S

\B D

\9

C M

_G -T

T

LB

.D W

G

Above Group, Inc.

(321) 345-9026

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

HVAC PLAN

MH101

DES MLG 48

SCALE: 1/8" = 1'-0"

F2

HVAC PLAN - MAINTENANCE (3001)

4'

SCALE : 1/8" = 1'-0"

0 8' 16'

N

SPLIT SYSTEM OUTDOOR HEAT PUMP UNIT SCHEDULE - MAINTENANCE BLDG

EQPM ID LOCATION SERVES

REFRIGERA

NT TYPE

COOLING HEATING

CAPACITY

(MBH)

COMPRESSOR ELECTRICAL DATA

MANUFACTURE

R MODEL NOTESCAP. MBH

AMB. TEMP

(°F) NO. TYPE RLA EA FLA VOL PH HZ

COND. FAN

MCANO. HP

HP-1 EXTERIOR AHU-1 R-410A 34.4 95 32 1 SCROLL 4 0.6 208 3 60 1 1/4 5.4 CARRIER 25HCE436AP06

HP-2 EXTERIOR AHU-2 R-410A 34.4 95 32 1 SCROLL 4 0.6 208 3 60 1 1/4 5.4 CARRIER 25HCE436AP06

ELECTRIC UNIT HEATER SCHEDULE

EQPM ID LOCATION TYPE FLOW (CFM)

HEATING DATA ELECTRICAL DATA

MANUFACTURER MODEL NOTESEAT (°F) KW VOLTAGE PHASE Hz

EUH-1 M109 INDUSTRIAL

HUNG

500 60 10.0 480 3 60 BERKO HUH-1048M 1, 2

EUH-2 M109 INDUSTRIAL

HUNG

500 60 10.0 480 3 60 BERKO HUH-1048M 1, 2

EUH-3 M110 INDUSTRIAL

HUNG

500 60 10.0 480 3 60 BERKO HUH-1048M 1, 2

EUH-4 M110 INDUSTRIAL

HUNG

500 60 10.0 480 3 60 BERKO HUH-1048M 1, 2

EUH-5 M113 INDUSTRIAL

HUNG

500 60 10.0 480 3 60 BERKO HUH-1048M 1, 2

EUH-6 VESTIBULE WALL

MOUNTED

300 60 4.0 208 3…

This is the start of the file's text. The full file is on GovTribe.