Bid Plans Part 1 _ Maint Bldg Expansion - 909CM3028 .pdf
PDF 17 MB Posted
- Solicitation number
- 36C78624B0001
About this file
This federal contract opportunity solicits bids to renovate and expand a maintenance building and repair asphalt roads at Fort Custer National Cemetery. The Department of Veterans Affairs National Cemetery Administration is seeking a contractor to provide all management, supervision, labor, materials, parts, and equipment necessary to renovate and expand Maintenance Building 3001 and repair and repave asphalt roads. Specifically, the work includes general conditions, general construction, structures, alterations, roads, parking, walks, grading, drainage, mechanical, electrical, telecommunications and security work, as well as utility systems and the removal of existing structures to allow for new construction, in accordance with the provided drawings and specifications. Solicitation number 36C78624B0001 has been issued for this project to renovate and repair facilities at Fort Custer National Cemetery.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78624B0001.docx | DOCX document | |
| 8 - Cost Estimate Worksheet.xlsx | XLSX spreadsheet | |
| Bid Specs _ Roads Repair - 909CM3029.pdf | ||
| Bid Specs _ Maint Bldg Expansion - 909CM3028 .pdf | ||
| Bid Plans _ Roads Repair - 909CM3029.pdf | ||
| Bid Plans Part 2 _ Maint Bldg Expansion - 909CM3028 .pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
KALAMAZOO COUNTY, MICHIGAN
909CM3028
MARCH 24, 2023 Dwg. of
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
FORT CUSTER NATIONAL CEMETERY
RENOVATE & EXPAND
MAINTENANCE BUILDING 3001Leo A Daly
(202) 861-4600
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\33
-1
1 F
OR
T
CU
ST
ER
N C
BL
DG
A
ND
R
OA
DS
\E
NG
IN
\P
LA
NS
\90
9C M3
8\G
I00 1.D
W G
GORDON - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
Integrity Federal Services, Inc.
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Above Group, Inc.
(321) 345-9026
GI001
COVER SHEET
PREPARED BY
RENOVATE & EXPAND MAINTENANCE BUILDING 3001
PROJECT NUMBER: 909CM3028
BID DOCUMENTS
KALAMAZOO COUNTY, MICHIGAN
FORT CUSTER NATIONAL CEMETERY
CONSULTANTS
GORDON - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
GORDON
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
P L A N N I N G A R C H I T E C T U R E E N G I N E E R I N G I N T E R I O R S
EST. 1915
1200 NINETEENTH STREET
SUITE 220
PH. 202-861-4600
WASHINGTON, DC 20036
LEO A DALY.
DRAWING INDEX
NO. DRAWING DRAWING TITLE
1. GI001 COVER SHEET
2. GI002 GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS
CIVIL
3. VL101 EXISTING CONDITIONS AND BORING PLAN
4. GC100 CONSTRUCTION SEQUENCING PLAN
5. GC101 EROSION & SEDIMENT CONTROL PLAN
6. GC501 EROSION & SEDIMENT CONTROL NOTES & DETAILS
7. CD101 SITE DEMOLITION PLAN
8. CS101 SITE PLAN
9. CG101 GRADING PLAN
10. CT501 SITE DETAILS
11. LP101 LANDSCAPE PLAN
STRUCTURAL
12. S-001 GENERAL STRUCTURAL NOTES
13. S-002 SPECIAL INSPECTIONS
14. SB101 FOUNDATION PLAN
15. SB501 FOUNDATION DETAILS
16. SF101 ROOF FRAMING PLAN
17. SF501 FRAMING DETAILS
ARCHITECTURAL
18. GI003 MOUNTING CRITERIA
19. GI101 LIFE SAFETY PLAN
20. AD101 DEMOLITION FLOOR PLAN
21. AD102 DEMOLITION ROOF PLAN
22. AD121 DEMOLITION PLANS - FCA ITEMS
23. AE101 FLOOR PLAN
24. AE102 ROOF PLAN
25. AE111 CEILING PLAN
26. AE121 FLOOR PLANS - FCA ITEMS
27. AE201 EXTERIOR ELEVATIONS
28. AE211 INTERIOR ELEVATIONS
29. AE301 BUILDING & WALL SECTIONS
30. AE501 EXTERIOR DETAILS
31. AE502 INTERIOR DETAILS
32. AE521 EXTERIOR DETAILS - FCA ITEMS
33. AE601 SCHEDULES
INTERIORS
34. IF101 FURNITURE, EQUIPMENT & SIGNAGE PLAN
35. IN101 FINISH PLAN
36. IN501 INTERIOR FINISHES AND SIGNAGE SCHEDULES & DETAILS
FIRE PROTECTION
37. F-001 FIRE ALARM GENERAL NOTES
38. FA101 FIRE ALARM DEMOLITION PLAN
39. FA102 FIRE ALARM PLAN
PLUMBING
40. P-001 PLUMBING NOTES, SYMBOLS & ABBREVIATIONS
41. PD101 PLUMBING DEMOLITION PLAN
42. PP100 PLUMBING PLAN - UNDERGROUND
43. PP101 PLUMBING PLAN
44. PP501 PLUMBING DETAILS
MECHANICAL
45. M-001 MECHANICAL NOTES, SYMBOLS & ABBREVIATIONS
46. MD101 MECHANICAL DEMOLITION PLAN
47. MD121 MECHANICAL DEMOLITION PLAN - FCA ITEMS
48. MH101 HVAC PLAN
49. MH121 HVAC PLAN - FCA ITEMS
50. MP101 PIPING PLAN
51. MI701 MECHANICAL CONTROLS
ELECTRICAL
52. E-001 ELECTRICAL SYMBOLS & GENERAL NOTES
53. ED101 ELECTRICAL DEMOLITION PLAN
54. ED121 ELECTRICAL DEMOLITION PLANS - FCA ITEMS
55. ES101 ELECTRICAL SITE PLAN
56. ES121 ELECTRICAL SITE PLAN - FCA ITEMS
57. EL101 ELECTRICAL LIGHTING PLAN
58. EP101 ELECTRICAL POWER PLAN
59. EP121 ELECTRICAL POWER PLANS - FCA ITEMS
60. ET101 ELECTRICAL SYSTEMS PLAN
61. EE101 ELECTRICAL ONE-LINE DIAGRAM, DETAILS & SCHEDULES
62. EE102 ELECTRICAL SCHEDULES
TELECOMMUNICATIONS
63. T-001 TELECOM LEGEND, ABBREVIATIONS AND NOTES
64. T-101 LEVEL 1 PLAN - TELECOM - DEMO
65. T-102 LEVEL 1 PLAN - TELECOM - NEW WORK
66. T-501 TELECOM DETAILS
Know what's below.
before you dig.Call
R
CEMETERY ADDRESS:
FORT CUSTER NATIONAL CEMETERY
15501 DICKMAN RD
AUGUSTA, MI 49012
U.S. Department of Veterans Affairs
3/24/23
ARCHITECTURAL GENERAL SYMBOLS
SCALE:B2 VIEW NAME
1/8" = 1'-0"
A4
EARTH
EARTH GRAVEL
CONCRETE
METALS
BRICK
CMU
TILE
STONE
WOOD
GYPSUM
GLASS
INSULATION
REGULAR
STEEL ALUMINUM
FACE COMMON
CMU
CERAMIC
MARBLE LIMESTONE
FINISH BLOCKING
PLASTER OR GWB
LARGE SCALE SMALL SCALE
BATT OR
LOOSE
RIGID
SURFACE
DETAIL TITLE
BUILDING SECTION
WALL SECTION
EXTERIOR / INTERIOR
ELEVATION
INTERIOR MULTI-VIEW
ELEVATION
MATERIALS REFERENCE
DETAIL SECTION
AE402
C4
AE201
A1
AE305
SIM
A1
AE305
SIM
A1
AE305
SIM
AE505
C3
SIM
A3
ELEVATION NUMBER
SHEET ON WHICH
ELEVATION IS DRAWN
ELEVATION NUMBER
SHEET ON WHICH
ELEVATION IS DRAWN
S
B5
E
ACTUAL SQ. FT.
PROGRAMMED SQ. FT.
ROOM NUMBER
DOOR NUMBER
KEYNOTE
WALL TYPE
REVISION NUMBER
ELEVATION INDICATION
COLUMN GRID
IDENTIFICATION
NORTH ARROW
WINDOW NUMBER
?A1
ROOM NAME
A505B
200 SF / 150 SF
W1
1t EQUIPMENT TAG
D
NTRUE
NORTH MATCHLINE
GI002
GENERAL NOTES, SYMBOLS, AND
ABBREVIATIONS
EXISTING PROPOSED
BOUNDARY/RIGHT-OF-WAY LINE
ADJACENT BOUNDARY LINE
EASEMENT LINE
ROAD CENTERLINE
HEADER CURB
CURB & GUTTER
EDGE OF PAVEMENT
CHAIN LINK FENCE
OVERHEAD UTILITY LINE
UNDERGROUND UTILITY LINE
WATER MAIN
BUILDINGS
CONCRETE SIDEWALK
SANITARY SEWER MAIN
STORM SEWER LINE
TREES/SHRUBS
LIMITS OF GRADING
INDEX CONTOUR LINE
INTERMEDIATE CONTOUR LINE
SPOT ELEVATIONS
MISCELLANEOUS SIGNS
SITE LIGHT WITH POLE
DRIP LINE OF TREES
BOARD FENCE
SOIL BOUNDARY
HbB HgC
WIRE FENCE
EDGE OF GRAVEL
GUARDRAIL
EDGE OF CONCRETE
SANITARY SEWER CLEANOUT
SANITARY SEWER MANHOLE
STORM SEWER MANHOLE
STORM SEWER YARD INLET
STORM SEWER CATCH BASIN
STORM SEWER RIP-RAP
STORM SEWER END SECTION
FIRE HYDRANT
WATER VALVE
WATER METER
MAIL BOX
UTILITY POLE
FEATURE WALL
OVERHEAD COMMUNICATIONS LINE
UNDERGROUND COMMUNICATIONS LINE
GROUND LIGHT
UTILITY POLE GUY WIRE
SANITARY SEWER FORCE MAIN
LIMITS OF WORK
FAR FLOOR AREA RATIO
FC FACE OF CURB
FD FOUNTAIN DRAIN
FF FIRST FLOOR OR FINISHED FLOOR
FG FINISHED GRADE
FH FIRE HYDRANT
FIN FINISHED
FLR FLOOR
FN FENCE
FP FLOOD PLAIN
FOC FACE OF CURB
FOY FOYER
FP FLAG POLE OR FIRE PROTECTION
FPS FEET PER SECOND
FR FROM
FT FEET
G GAS
GAL GALLON
GDR GUARD RAIL
GEN GENERATOR
GFA GROSS FLOOR AREA
GIP GALVANIZED IRON PIPE
GL GROUND LEVEL
GOVT GOVERNMENT
GR GRADE
GR GUARD RAIL
GS GROUND SHOT
H HORIZONTAL
HC HANDICAP
HCP HANDICAPPED
HDPE HIGH DENSITY POLYETHYLENE
HDR HEADER
HDWL HEADWALL
HGL HYDRAULIC GRADE LINE
HH HAND HOLE
HLBC HOT LAID BITUMINOUS CONCRETE
HMA MOT-MIX ASPHALT
HP HIGH POINT OR HIGH PRESSURE
HR HAND RAIL
HT HEIGHT
HW HOT WATER
HWSR HOT WATER SUPPLY & RETURN
HWY HIGHWAY
HYD HYDRANT
HYDR HYDRAULIC
I RAINFALL INTENSITY
I.E. INVERT ELEVATION
ID INSIDE DIAMETER
IGC IN-GROUND CRYPT
IN INCH
INV INVERT
IP IRON PIPE
IPF IRON PIPE FOUND
IPS IRON PIPE SET
IRR IRRIGATION
IW IRRIGATION WATER
JB JUNCTION BOX
K ONE THOUSAND (KILO)
KWY KEYWAY
L LENGTH
LAT LATERAL
LF LINEAR FEET
LOC LOCATION
LONG LONGITUDE
LOS LINE OF SIGHT
LP LOW POINT OR LOW PRESSURE
LT LIGHT OR LEFT
LL LOWER LEVEL
MAINT MAINTENANCE
MAT MATERIAL
MAX MAXIMUM
MB MAIL BOX
MECH MECHANICAL
MED MEDIUM
MEMO MEMORANDUM
MEP MECHANICAL, ELECTRICAL, PLUMBING
MFG MANUFACTURING
MGT MANAGEMENT
MH MANHOLE
MI MILE
MIN MINIMUM
MISC MISCELLANEOUS
ML MATERIALS LIST
MN MAGNETIC NORTH
MOD MODEL OR MODIFY
MON MONUMENT
MS MEDIAN STRIP
MSL MEAN SEA LEVEL
MTG MEETING
MTL MATERIAL
MULT MULTIPLE
MUNIC MUNICIPAL
N NORTH
N/F NOW OR FORMERLY
NA MOT APPLICABLE
NAT MATURAL
NATL NATIONAL
NBC NATIONAL BUILDING CODE
NBL NORTH BOUND LANE
NCA NATIONAL CEMETERY ADMINISTRATION
NE NOT EXCEEDING
NFA NET FLOOR AREA
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NRCP NON-REINFORCED CONCRETE PIPE
NTP NOT TO PROCEED
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OH OVERHANG
OHC OVERHEAD COMMUNICATIONS
OHE OVERHEAD ELECTRIC
OS OVER-SIZED
OZ OUNCE
P PERIMETER
PAR PARALLEL
PAT PATTERN
PB PULL BOX
PC POINT OF CURVATURE
PCA PORTLAND CEMENT ASSOCIATION
PCC POINT OF COMPOUND CURVE
PCEP POINT OF CURVE, EDGE OF PAVEMENT
PCT PERCENT
PCTC POINT OF CURVE, TOP OF CURB
PERF PERFORATED
PED PEDESTAL
PG PAGE
PGL POINT OF GRADE LINE
PH PROFILE HOLE
PI POINT OF INTERSECTION
PIC PUBLIC INFORMATION CENTER
A AREA OR ARC
AC ACRE
A/C AIR CONDITIONING
ADA AMERICANS WITH DISABILITIES ACT
ADMIN AMDINISTRATION
AGE ABOVE GROUND ELECTRIC
AGEC ABOVE GROUND ELECTRIC CONDUIT
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
APPROX APPROXIMATE
ARCH ARCHITECTURAL
ASPH ASPHALT
AST ABOVE-GROUND STORAGE TANK
AVE AVENUE
AWWA AMERICAN WATER WORKS ASSOCIATION
A/C AIR CONDITIONING
BC BOTTOM OF CURB
BF BASEMENT FLOOR
BFP BACKFLOW PREVENTER
BFV BUTTERFLY VALVE
BITUM BITUMINOUS
BL BASE LINE
BLDG BUILDING
BLVD BOULEVARD
BM BENCHMARK
BOE BOTTOM OF EXCAVATION
BOV BLOW OFF VALVE
BRG BEARING
BRL BUILDING RESTRICTION LINE
BV BALL VALVE
BW BOTTOM OF WALL
C COEFFICIENT OF RUNOFF
CALC CALCULATE
CB CATCH BASIN OR CHORD BEARING
CC CENTER TO CENTER
CCTV CLOSED CIRCUIT TELEVISION
CD CONSTRUCTION DOCUMENTS OR CONTRACT
DOCUMENTS
CDW CHILLED DRINKING WATER
CDWR CHILLED DRINKING WATER RETURN
CDWS CHILLED DRINKING WATER SUPPLY
CEM CEMENT OR CEMETERY
CF CONTRACTOR FURNISHED
CFS CUBIC FEET PER SECOND
CG CURB AND GUTTER
CHD CHORD
CIP CAST IRON PIPE
CJ CONTRACTION JOINT
CL CENTERLINE
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CND CONDUIT
CNR CORNER
CO CLEANOUT
COL COLUMN
COMM COMMUNICATIONS
CONC CONCRETE
COND CONDITION OR CONDENSER
CONF CONFERENCE
CONN CONNECTION
CON CONTAMINATED
CONSTR CONSTRUCTION
CONT CONTINUATION
CONTR CONTRACT OR CONTRACTOR
COR CONTRACTING OFFICER'S REPRESENTATIVE
COTG CLEANOUT TO GRADE
COV COVER OF CUT OFF VALVE
CPP CORRUGATED PLASTIC PIPE
CRN CROWN
CSB CONCRETE SPLASH BLOCK
CSI CONSTRUCTION SPECIFICATIONS INSTITUTE
CSS COMMITTAL SERVICE SHELTER
CSP CONCRETE SEWER PIPE
CT COURT
CTR CENTER OR CONTOUR
CTRL CONTROL
CTS COOLING TOWER SUPPLY
CTV CABLE TELEVISION
CV CONTROL VALVE
CW CLOCKWISE
CWP COLD WATER PIPING
D DEPTH
DAT DATUM
DB DEED BOOK OR DESIGN-BUILD
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DEPT DEPARTMENT
DESC DESCRIPTION
DET DETAIL
DI DROP INLET
DIA DIAMETER
DIFF DIFFERENCE
DIP DUCTILE IRON PIPE
DIST DISTANCE
DM DROP MANHOLE
DOC DOCUMENT
DOM DOMESTIC
DR DRIVE
DRE DECOMPOSED ROCK ELEVATION
DS DOWNSPOUT
DWG DRAWING
D/W DRIVEWAY
D DELTA
EA EACH
EBL EAST BOUND LANE
EC EDGE OF CONCRETE
EG EDGE OF GUTTER
EJ EXPANSION JOINT
ELEV ELEVATION
ELEC ELECTRICAL
ENTR ENTRANCE
EOI END OF INFORMATION
EP EDGE OF PAVEMENT
EPA ENVIRONMENTAL PROTECTION AGENCY
E&S EROSION & SEDIMENT
ES END SECTION
ESMT EASEMENT
ETO EARLY TURNOVER
EPT EXTERNAL PIPE THREAD
EQ EQUAL
EW END WALL
EXP EXPANSION
EX EXISTING
EXT EXTERIOR
PIV POST INDICATOR VALVE
PL PROPERTY LINE
POTW POTABLE WATER
PP POLYPROPYLENE (PLASTIC)
PPC PRE-PLACED CRYPT
PRC POINT OF REVERSE CURVE
PRELIM PRELIMINARY
PROP PROPOSED
PSI POUNDS PER SQUARE INCH
PSL PIPE SLEEVE
PT POINT OF TANGENCY
PV PRIVATE VAULT
PVC POLY VINYL CHLORIDE (PLASTIC PIPE)
PVI POINT OF VERTICAL INTERSECTION
PVMT PAVEMENT
PVT POINT OF VERTICAL TANGENCY
P&P PLAN AND PROFILE
Q FLOW, AMOUNT OF RUNOFF
QTR QUARTER
QTY QUANTITY
QUAD QUADRANT
QUAL QUALITY
R RISER, RADIUS
RAD RADIANS
RCP REINFORCED CONCRETE PIPE/REFLECTED
CEILING PLAN
RD ROAD, ROOF DRAIN
RDC REDUCER
RE RESIDENT ENGINEER
REP REPAIR
REQ REQUIRED
REV REVISION
RGP ROUGH GRADING PLAN
RPA RESOURCE PROTECTION AREA
RR RAILROAD
RTE ROUTE
RT RIGHT
RV RELIEF VALVE
RW RETAINING WALL
R/W RIGHT-OF-WAY
SAN SANITARY
SB SPLASH BLOCK
SBL SOUTH BOUND LANE
SCHED SCHEDULE
SD STORM DRAIN
SDMH STORM DRAIN MANHOLE
SEC SECTION
SEG SEGMENT
SEL SELECT
SEW SEWER
SF SQUARE FEET
SJ SCORED JOINT
SLV SLEEVE
SMH STEAM MANHOLE
SOV SHUT OFF VALVE
SP SITE PLAN
SPEC SPECIFICATION
SPKLR SPRINKLER
SQ SQUARE
SS SANITARY SEWER, STORM SEWER OR STEAM
SUPPLY
ST STREET
STA STATION
STD STANDARD
STE STEAM
STK STACK
STM STORM
SUPT SUPPORT
SURV SURVEY
SVC SERVICE
S/W SIDEWALK
SWG SEWAGE
Sx CROSS SLOPE
SYM SYMBOL
T TANGENT
T&M TIME AND MATERIALS
TB TEST BORE
TC TOP OF CURB
TCP TERRA COTTA PIPE, TRAFFIC CONTROL PLAN
TELE TELEPHONE
TH TEST HOLE
TNL TUNNEL
TOB TOP OF BANK
TOC TOP OF CURB
TOP TOP OF PAVEMENT
TOPO TOPOGRAPHY
TP TEST PIT, TELEPHONE POLE
TW TOP OF WALL
TYP TYPICAL
UD UNDERDRAIN
U/G UNDERGROUND
UGC UNDERGROUND COMMUNICATIONS
UGE UNDERGROUND ELECTRIC
UFC UNIFORM FIRE CODE
UL UPPER LEVEL
UON UNLESS OTHERWISE NOTED
UP UTILITY POLE
UTIL UTILITY
V VERTICAL
VA VETERANS ADMINISTRATION, VIRGINIA
VAR VARIES
VC VERTICAL CURVE
VEL VELOCITY
VERT VERTICAL
VF VERTICAL FOOT
VIC VICINITY
VID VIDEO
VIF VERIFY IN FIELD
VOL VOLUME
W WATER, WEST OR WIDE
W/ WITH
W/O WITHOUT
WBL WEST BOUND LANE
WI WROUGHT IRON
WL WATER LINE
WM WATER MAIN OR WATER METER
WO WORK ORDER
WSE WATER SURFACE ELEVATION
WT WATER TIGHT
WW WASTE WATER
X-ING CROSSING
YI YARD INLET
YR YEAR
Z SIDE SLOPES
UNDERGROUND GAS LINE
HEADSTONE FACE DIRECTION
BURIAL CRYPT PLOTS
DRIP LINE OF BRUSH
WETLANDS
GRAVESITE GRID MONUMENT
BURIAL SECTION MARKER
UTILITY BOX
FLAG SLEEVES/MISCELLANEOUS POSTS
MOUNTABLE CURB
CIVIL LEGEND ABBREVIATIONS
STORM DRAINAGE CLEANOUT
COLUMBARIUM NICHE SECTION
RETAINING WALL
DRAINAGE FLOW ARROW
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
KALAMAZOO COUNTY, MICHIGAN
909CM3028
MARCH 24, 2023 Dwg. of
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
FORT CUSTER NATIONAL CEMETERY
RENOVATE & EXPAND
MAINTENANCE BUILDING 3001Leo A Daly
(202) 861-4600
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\33
-1
1 F
OR
T
CU
ST
ER
N C
BL
DG
A
ND
R
OA
DS
\E
NG
IN
\P
LA
NS
\90
9C M3
8\G
I00 2.D
W G
GORDON - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
Integrity Federal Services, Inc.
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Above Group, Inc.
(321) 345-9026
T TREAD
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
TC TOP OF CURB
TE TOP ELEVATION
TEL TELEPHONE
TEMP TEMPERATURE
TERR TERRAZZO
TLT TOILET
TOPO TOPOGRAPHY
TOS TOP OF STEEL
TOW TOP OF WALL
TP TOP OF PAVEMENT
TRANS TRANSVERSE
TYP TYPICAL
U
UC UNDERCUT
UG UNDERGROUND
UH UNIT HEATER
UR URINAL
UV UNIT VENTILATOR
V
V VOLT
VAV VARIABLE AIR VOLUME
VB VINYL BASE
VC VERTICAL CURVE
VCP VITRIFIED CLAY PIPE
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VFD VARIABLE FREQUENCY DRIVE
VTR VENT THROUGH ROOF
VWC VINYL WALL COVERING
W
W WATT / WATER
W/ WITH
W/O WITHOUT
WAGD WASTE ANESTHESIA GAS DISPOSAL
WC WATER CLOSET
WD WOOD
WDW WINDOW
WH WATER HEATER / WALL HYDRANT
WP WEATHERPROOF
WPFG WATERPROOFING
WS WATER STOP
WT WEIGHT
WWF WELDED WIRE FABRIC
X
XFMR TRANSFORMER
Y
YD YARD
YH YARD HYDRANT
PHVAC PLUMBING, HEATING, VENTILATING AND AIR
CONDITIONING
PI POINT OF INTERSECTION
PIV POST INDICATOR VALVE
PKG PARKING
PL-1 PLASTIC LAMINATE
PLAS PLASTER
PLBG PLUMBING
PLF POUNDS PER LINEAR FOOT
PLYWD PLYWOOD
PNL PANEL
PR PAIR
PROJ PROJECTION
PRV PRESSURE REGULATING VALVE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT POINT OF TANGENCY
PTVC POINT OF VERTICAL CURVATURE
PVC POLYVINYL CHLORIDE
PVI POINT OF VERTICAL INTERSECTION
PVT POINT OF VERTICAL TANGENCY
Q
QT QUARRY TILE
R
R RADIUS / REGISTER
RA RETURN AIR
RB-1 RUBBER BASE
RCP REINFORCED CONCRETE PIPE
RD ROOF DRAIN
REF REFERENCE
REFL REFLECTED
REG REGISTER
REINF REINFORCED
REQD REQUIRED
REV REVERSE / REVISION
RF RETURN FAN
RGS RIGID GALVANIZED STEEL
RH ROOF HOOD / RELATIVE HUMIDITY / REHEAT
RHC REHEAT COIL
RM ROOM
RO ROUGH OPENING
ROW RIGHT OF WAY
S
S STAIR / STAIN / SURFACE / SANITARY
SA SUPPLY AIR / SOUND ATTENUATOR
SAN SANITARY
SCH SCHEDULE
SD SMOKE DAMPER / SUB DRAIN
SECT SECTION
SF SUPPLY FAN
SHT SHEET
SIM SIMILAR
SOG SLAB-ON-GRADE
SP SUMP PUMP
SPEC SPECIFICATIONS
SQ SQUARE
SS SERVICE SINK / STORM SEWER
SSO STORM SEWER OVERFLOW
SSTL STAINLESS STEEL
STA STATION
STD STANDARD
STE STANDARD TAPERED END
STIFF STIFFENER
STIR STIRRUP
STL STEEL
STOR STORAGE
STR STRUCTURAL
SUSP SUSPENDED
SW SWITCH
SWGR SWITCHGEAR
SYM SYMMETRICAL
T
L LITER
LA LABORATORY AIR
LAB LABORATORY
LAM LAMINATE
LAV LAVATORY
LBS POUNDS
LF LINEAR FEET
LIN LINEAR
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LMU LIGHTWEIGHT MASONRY UNITS
LONG LONGITUDINAL
LPM LITERS PER MINUTE
LT LIGHT
LT WT LIGHT WEIGHT
LTG LIGHTING
LV LABORATORY VACUUM
LVL LEVEL
M
M METER
M2 SQUARE METER
M3 CUBIC METER
MA MEDICAL AIR
MAINT MAINTENANCE
MAR MARBLE
MAS MASONRY
MAT MATERIAL
MAX MAXIMUM
MBH 1000 BTUH
MDO MEDIUM DENSITY OVERLAY
MECH MECHANICAL
MET METAL
MFR MANUFACTURER
MG MOTOR GENERATOR / MEDICAL GAS
MH MANHOLE
MIN MINIMUM
MLO MAIN LUGS ONLY
MM MILLIMETER
MO MASONRY OPENING
MTD MOUNTED
MTG MOUNTING
MULL MULLION
MV MEDICAL VACUUM
N
N NITROGEN
N2O NITROUS OXIDE
NEC NATIONAL ELECTRICAL CODE
NFPA NATIONAL FIRE PROTECTION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
O
O/S OFFSET
OA OUTSIDE AIR
OBD OPPOSED BLADE DAMPER
OC ON CENTER
OD OUTSIDE DIAMETER
OF OUTSIDE FACE
OPNG OPENING
OPP OPPOSITE
OX OXYGEN
OZ OUNCE
P P-1/P-2/ P-3/P-4
PAINT
PA PASCAL
PART PARTITION
PAVT PAVEMENT
PC POINT OF CURVATURE
PCF POUNDS PER CUBIC FOOT
PED PEDESTAL
PERP PERPENDICULAR
PHC PREHEAT COIL
FM FORCE MAIN / FACTORY MUTUAL
FP FIREPROOFING / FIRE PUMP
FPM FEET PER MINUTE
FR FIRE RATED
FRP FIBERGLASS REINFORCED PLASTIC
FS FLOW SWITCH
FT FEET
FTG FOOTING
FVC FIRE VALVE CABINET
G
G GAS / GRILLE
GA GAGE
GALV GALVANIZED
GB GRAB BAR
GBD GRAVITY BACKDRAFT DAMPER
GEN GENERATOR
GFRC GLASS FIBER REINFORCED CONCRETE
GI GALVANIZED IRON
GL GLASS
GLB GLASS BLOCK
GP GLAZED PAINT
GPM GALLONS PER MINUTE
GR-1 GROUT
GRV GRAVITY ROOF VENTILATOR
GWB GYPSUM WALLBOARD
GYP GYPSUM
H
HB HOSE BIBB
HC HEATING COIL
HDNR HARDENER
HDW HARDWARE
HDWD HARDWOOD
HK1E HOOK ONE END
HK2E HOOK TWO ENDS
HM HOLLOW METAL
HORIZ HORIZONTAL
HP HORSEPOWER
HPT HIGH POINT
HR HOUR
HS HIGH STRENGTH
HT HEIGHT
HTG HEATING
HTR HEATER
HVAC HEATING, VENTILATING AND AIR CONDITIONING
HW HOT WATER
HWC HOT WATER CIRCULATING
HZ HERTZ
I
IA INSTRUMENT AIR
IC INTERCOM
ID INSIDE DIAMETER
IE INVERT ELEVATION
IF INSIDE FACE
IN INCH
INSUL INSULATION
INT INTERIOR
J
JAN JANITOR
JB JUNCTION BOX
JP JOCKEY PUMP
JST JOIST
JT JOINT
K
KC MIL THOUSAND CIRCULAR MILS
KCJ KEYED CONSTRUCTION JOINT
KIT KITCHEN
KPA KILOPASCALS
KS KITCHEN SINK
KV KILOVOLT
KVA KILOVOLT AMPERE
KW KILOWATTS
L
CORR CORRIDOR
CP CEMENT PIPE
CPT CARPET
CSF CUBIC FEET PER SECOND
CT-1/CT-2/
CT-3
CERAMIC TILE
CTR CENTER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CUYD CUBIC YARD
CW COLD WATER
D
D DRAIN / DIFFUSER
DA DENTAL AIR
DBL DOUBLE
DEPR DEPRESSED
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL
DIFF DIFFUSER
DIP DUCTILE IRON PIPE
DISC DISCONNECT
DISP DISPENSER
DIST DISTRIBUTION
DK DECK
DL DEAD LOAD
DN DOWN
DO DITTO
DPR DAMPER
DR DOOR
DS DOWNSPOUT
DV DENTAL VACUUM
DWG DRAWING
DWL DOWEL
DWP DOMESTIC WATER PUMP
E
EA EACH / EXHAUST AIR
EF EACH FACE / EXHAUST FAN
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EMBED EMBEDMENT
EMD ESTIMATED MAXIMUM DEMAND
EMT ELECTRICAL METAL TUBING
EQ EQUAL
EQUIP EQUIPMENT
ET EXPANSION TANK
EVAC MEDICAL GAS EVACUATION
EW EACH WAY
EWC ELECTRICAL WATER COOLER
EWH ELECTRICAL WATER HEATER
EXH EXHAUST
EXIST EXISTING
EXP EXPOSED
EXPN EXPANSION
EXT EXTERIOR
F
F FIRE MAIN
FA FIRE ALARM
FCU FAN COIL UNIT
FD FLOOR DRAIN / FIRE DAMPER
FD / SD COMBINATION FIRE AND SMOKE DAMPER
FDC FIRE DEPARTMENT CONNECTION
FDN FOUNDATION
FDR FEEDER
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FH FIRE HYDRANT
FHC FIRE HOSE CABINET
FIN FINISH
FIX FIXTURE
FL FLOOR
A
A/C AIR CONDITIONING
AB ANCHOR BOLT / AIR BLENDER
ABS ACRYLONITRILE-BUTADIENE-STYRENE
AC ALTERNATING CURRENT / AIR COMPRESSOR
ACP ASBESTOS CEMENT PIPE
ACU AIR CONDITIONING UNIT
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
ADJ ADJACENT / ADJUSTABLE
ADR ACCESS DOOR
AFF ABOVE FINISH FLOOR
AHJ AUTHORITY HAVING JURISDICTION
AHU AIR HANDLING UNIT
AL ALUMINUM
ALT ALTERNATE
APC-1 ACOUSTICAL PANEL CEILING
APPROX APPROXIMATELY
APT APARTMENT
ARCH ARCHITECT(URAL)
ASPH ASPHALT
ATB AIR TERMINAL BOX
ATC ACOUSTICAL TILE CEILING
ATD AIR TRANSFER DUCT
ATU AIR TERMINAL UNIT
AUX AUXILIARY
AVG AVERAGE
AZ AZIMUTH
B
BB BALLED AND BURLAPPED
BD BOARD
BDD BACK DRAFT DAMPER
BE BOTTOM ELEVATION
BL BUILDING LINE
BLDG BUILDING
BLKG BLOCKING
BM BENCH MARK / BEAM
BR BARE ROOT
BRG BEARING
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C
C/C CENTER TO CENTER
CAB CABINET
CB CIRCUIT BREAKER / CATCH BASIN
CC COOLING UNIT
CE COVER ELEVATION
CEM CEMENT
CFM CUBIC FEET PER MINUTE
CG-1/CG-2 CORNER GUARD
CH CHILLER
CI CURB INLET / CAST IRON
CIP CAST IRON PIPE
CJ CONTROL JOINT OR CONTRACTION JOINT
CKT CIRCUIT
CL CENTER LINE
CLG CEILING
CLO CLOSET
CLR CLEAR
CM CENTIMETER
CMH CUBIC METER PER HOUR
CMP CORRUGATED METAL PIPE
CMT CERAMIC MOSAIC TILE
CMU CONCRETE MASONRY UNIT
CO CLEANOUT / CARBON MONOXIDE
CO2 CARBON DIOXIDE
COL COLUMN
COMB COMBINATION / COMBINE
COMP COMPRESSIBLE
CONC CONCRETE
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS / CONTINUATION
CONTR CONTRACTOR
ARCHITECTURAL ABBREVIATIONS
GENERAL NOTES:
1. THE PROPOSED SITE IMPROVEMENTS FOR 'FORT CUSTER NATIONAL CEMETERY RENOVATE & EXPAND MAINTENANCE BUILDING 3001' INCLUDES, BUT IS NOT LIMITED TO,
● RENOVATION AND EXPANSION OF MAINTENANCE BUILDING 3001.
THE PROJECT IS LOCATED IN KALAMAZOO COUNTY, MICHIGAN.
2. THE TOPOGRAPHIC CONTOUR INTERVAL IS ONE (1) FOOT. TOPOGRAPHIC INFORMATION IS BASED ON FIELD RUN TOPOGRAPHY BY MONUMENT ENGINEERING, DATED FEBRUARY 2022. THE HORIZONTAL DATUM IS REFERENCED TO US STATE PLANE COORDINATE SYSTEM, NAD83, MICHIGAN SOUTH ZONE 2113, INTERNATIONAL FEET. THE
VERTICAL DATUM IS TO BE REFERENCED TO NAVD88.
3. THE SUBJECT PROPERTY IS LOCATED ON F.E.M.A. MAP 26077C0229D DATED FEBRUARY 17, 2010. THE SCOPE OF WORK APPEARS TO LIE ENTIRELY IN ZONE (X) AREA
DETERMINED TO BE OUTSIDE OF THE 0.2% ANNUAL CHANCE FLOODPLAIN.
4. SEE THIS SHEET FOR LEGEND OF PROPOSED SYMBOLS USED ON ALL SHEETS AND SHEET 03 EXISTING CONDITIONS PLAN FOR LEGEND OF EXISTING SYMBOLS.
5. BURIAL CEREMONIES MAY BE SCHEDULED THROUGHOUT THE COURSE OF THIS PROJECT. DURING ALL CEREMONIES, ALL WORK MUST STOP, ESPECIALLY WHEN HEAVY EQUIPMENT ACTIVITY OR NOISE PRODUCING WORK IS BEING DONE. LIGHT WORK ACTIVITY CAN CONTINUE IF IT DOES NOT CREATE NOISE OR DISTRACTIONS TO THE CEREMONY. COORDINATE DAILY ACTIVITIES WITH THE CEMETERY DIRECTOR OR HIS APPROVED REPRESENTATIVE TO ACCOMMODATE SCHEDULED BURIALS.
6. DUE TO THE SENSITIVE NATURE OF THE CEMETERY SITE, CONTRACTOR SHALL MAINTAIN EACH WORK AREA IN A CLEAN AND ORDERLY APPEARANCE. TRASH AND WASTE MATERIALS SHALL BE STORED IN APPROVED CONTAINERS AND ROUTINELY DISPOSED OF OFF-SITE. CLEANUP SHALL BE REQUIRED AT THE END OF EACH DAY AND/OR MORE
FREQUENTLY AS REQUIRED.
7. AFFECT OF WORK ON PUBLIC ACCESS SHALL BE MINIMIZED AND SHALL BE COORDINATED WITH THE CEMETERY DIRECTOR. ANY ALTERED PUBLIC TRAFFIC ROUTES SHALL BE WELL DEFINED WITH PROFESSIONALLY MADE SIGNAGE AND/OR OTHER APPROVED CONVENTIONAL METHODS. CONTRACTOR SHALL PROVIDE TWO SIGNS SIMILAR TO THE CEMETERY'S "PARDON OUR APPEARANCE" SIGNS. SIZE TO BE A MINIMUM OF 4'X5' HIGH MOUNTED ON TWO 4"X4" POSTS, PLACED IN A LOCATION AS DETERMINED BY THE CEMETERY DIRECTOR. TEXT SIZE SHALL BE MAXIMUM SIZE PROPORTIONAL TO WIDTH/HEIGHT OF SIGN. TEXT WILL BE PROVIDED BY CEMETERY DIRECTOR.
8. THERE SHALL BE AT ALL TIMES WHEN WORK IS BEING DONE, A COMPETENT PERSON WHO IS APPRISED OF THE CONDITION AND PROGRESS OF ALL AREAS OF WORK ON SITE.
THIS PERSON SHALL BE ABLE TO SPEAK FOR AND ACT IN THE BEHALF OF THE CONTRACTOR. THEY SHALL BE AWARE AND KNOWLEDGEABLE OF ALL THE SAFETY CONCERNS ON THE JOB SITE. THEY SHALL BE EMPOWERED TO IMMEDIATELY AND EFFECTIVELY MITIGATE THE ACTIONS OF ANY WORKMAN ON SITE.
CONSTRUCTION NOTES:
1. THE CONTRACTOR IS RESPONSIBLE FOR REVIEWING THE PLANS PRIOR TO CONSTRUCTION AND NOTIFYING THE U.S. DEPARTMENT OF VETERANS AFFAIRS OF ANY
CIRCUMSTANCES FOUND WITHIN THESE PLANS IN NEED OF VERIFICATION SO THAT APPROPRIATE REVISIONS CAN BE MADE, IF WARRANTED.
2. DEVELOPMENT OF THE SITE INCLUDING CONSTRUCTION AND MATERIALS SHALL BE IN CONFORMANCE WITH THE U.S. DEPARTMENT OF VETERANS AFFAIRS REQUIREMENTS
AND LOCAL/STATE CONSTRUCTION STANDARDS AND SPECIFICATIONS, WHERE APPLICABLE.
3. EROSION AND SEDIMENT CONTROL DEVICES ARE TO BE IN PLACE PRIOR TO ANY CONSTRUCTION. REFER TO EROSION AND SEDIMENT CONTROL PLAN FOR PHASING AND
DETAILS.
4. ALL LAND ON OR OFF-SITE WHICH IS DISTURBED BY CONSTRUCTION AND WHICH IS NOT BUILT UPON OR SURFACED SHALL BE ADEQUATELY STABILIZED TO CONTROL EROSION
AND SEDIMENTATION.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING THE U.S. DEPARTMENT OF VETERANS AFFAIRS OF ANY CHANGES OR CONDITIONS ATTACHED TO PERMITS
REQUIRED FOR CONSTRUCTION.
6. THE CONTRACTOR SHALL PROVIDE ADEQUATE MEANS OF CLEANING TRUCKS AND/OR EQUIPMENT OF MUD AND DEBRIS, PRIOR TO ENTERING PAVED AREAS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CLEAN STREETS OF MUD AND/OR LAYING DUST AND TO TAKE ALL APPROPRIATE MEASURES NECESSARY TO ENSURE THAT STREETS ARE
KEPT IN A CLEAN AND DUST FREE CONDITION AT ALL TIMES.
7. THE CONTRACTOR SHALL VISIT THE SITE AND SHALL VERIFY EXISTING CONDITIONS PRIOR TO STARTING CONSTRUCTION ACTIVITIES.
8. THE CONTRACTOR SHALL CLEAR THE SITE OF ALL TREES, BUILDINGS, FOUNDATIONS, ETC. WITHIN THE LIMITS OF CONSTRUCTION AND SHALL BE RESPONSIBLE FOR COORDINATING ANY DISCONNECTION AND/OR ABANDONMENT OF EXISTING UTILITIES AND STRUCTURES. IF NECESSARY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND ABANDONING ALL EXISTING WELLS AND/OR SEPTIC DRAIN FIELDS AND COORDINATING THEIR ABANDONMENT WITH THE HEALTH DEPARTMENT.
9. CONTRACTOR SHALL CONTACT MISS DIG SYSTEM, INC. AT 1-800-482-7171 A MINIMUM OF THREE (3) FULL BUSINESS DAYS PRIOR TO ANY EXCAVATION WITHIN AREAS SERVED BY UNDERGROUND UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING THE PRESENCE OF ANY UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION.
10. GORDON - THE LA GROUP JOINT VENTURE DOES NOT CERTIFY TO THE LOCATION OF OR THE EXISTENCE OF ANY EXISTING UNDERGROUND UTILITIES. ANY UNDERGROUND UTILITIES SHOWN HEREON ARE BASED UPON AVAILABLE RECORDS AND DISCUSSION WITH THE OWNER. THIS DOES NOT CONSTITUTE A GUARANTEE OF THEIR ACTUAL LOCATIONS OR THAT THEY HAVE ALL BEEN SHOWN. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DIGGING OF TEST HOLES PRIOR TO BEGINNING ANY CONSTRUCTION.
THESE TEST HOLES WILL BE MADE TO VERIFY ALL CROSSINGS BETWEEN NEW AND EXISTING FACILITIES AND AT CRITICAL GRADE CHANGES. IF CONDITIONS ARE FOUND IN THE FIELD, WHICH ARE MATERIALLY DIFFERENT FROM THE PLANS, THE CONTRACTOR SHALL NOTIFY GORDON - THE LA GROUP JOINT VENTURE SO THAT APPROPRIATE REVISIONS
IF WARRANTED CAN BE MADE TO THE PLANS.
11. GORDON - THE LA GROUP JOINT VENTURE DOES NOT CERTIFY TO THE SUB-SURFACE CONDITIONS OF THE SITE OR THE LOCATION OF UNDERLYING ROCK. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DIGGING OF TEST HOLES TO VERIFY SUB-SURFACE CONDITIONS PRIOR TO BEGINNING ANY CONSTRUCTION.
12. ALL TESTS, STUDIES, ETC., REQUIRED DURING CONSTRUCTION WILL BE CARRIED OUT BY A THIRD PARTY ENGINEERING FIRM AND PAID FOR BY THE CONTRACTOR.
13. ALL PROPOSED ELEVATIONS AS SHOWN HEREIN ARE FINISHED GRADE UNLESS OTHERWISE NOTED.
14. MAINTAIN A MINIMUM VERTICAL CLEARANCE OF ONE (1) FOOT SIX (6) INCHES BETWEEN CROSSING OF ALL UTILITY LINES UNLESS OTHERWISE NOTED.
15. EARTHWORK SHALL BE COMPACTED IN ACCORDANCE WITH SPECIFICATION 31 20 11.
16. THE CONTRACTOR, AND/OR SURVEYOR SHALL BE RESPONSIBLE FOR NOTIFYING THE U.S. DEPARTMENT OF VETERANS AFFAIRS OF ANY CONDITIONS FOUND IN THE FIELD PRIOR TO STAKEOUT THAT VARY FROM THE APPROVED PLANS OR THAT MAKE CONSTRUCTABILITY IMPOSSIBLE SO THAT APPROPRIATE REVISIONS CAN BE MADE PRIOR TO STAKEOUT AND/OR CONSTRUCTION. ANY OBSERVATIONS REGARDING APPARENT INCONSISTENCIES IN THE PLANS SHALL BE BROUGHT TO THE U.S. DEPARTMENT OF
VETERANS AFFAIRS ATTENTION FOR VERIFICATION PRIOR TO STAKEOUT.
17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INITIATING, MAINTAINING AND SUPERVISING ALL SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE PERFORMANCE OF ITS WORK AND THE WORK OF ITS SUBCONTRACTORS. GORDON - THE LA GROUP JOINT VENTURE SHALL NOT HAVE CONTROL OVER, CHARGE OF, OR RESPONSIBILITY FOR THE CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES OR FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION
WITH THE WORK.
ECT-1 ENTRANCE CARPET TILE
LK-1 LOCKER
RS-1 ROLLER SHADES
SSM-1 SOLID SURFACING MATERIAL
TS-1/TS-2
/TS-3
TRANSITION STRIP
MAINTENANCE FACILITY (BLDG. #3001)
C O
VE
R
ED
S
TO
R
AG
E
STORAGE
FIRE HYDRANT
GAS
GAL
DIESEL
FUEL
GAL
FLAMMABLE
STORAGE
PUMP
HOUSE
POND
CHAIN-LINK FENCE
CHAIN-LINK FENCE
C H
AI
N
-L
IN
K
FE
N C
E
ASPHALT
PAVEMENT
ASPHALT
PAVEMENT
ASPHALT
PAVEMENT
C H
AIN
-LIN
K FEN
C
E
DOUBLE-LEAF
GATE
DOUBLE-LEAF
GATE
DOUBLE-LEAF
GATE
CONCRETE
PAVEMENT
CONCRETE
PAVEMENT
JAM
ES B EADS
DRIVE
SANITARY SEWER
(APPROX.)
ELEC./TELEPHONE
LINES (APPROX.)
ELEC./TELEPHONE
LINES (APPROX.)
ELEC. LINES
(APPROX.) ELEC. LINES
(APPROX.)
SANITARY SEW
ER
(APPROX.)
SANITARY TILE
ABSORPTION FIELD
(APPROX.)
W
ATER LINE (APPROX.)
W
ATER LINE (APPROX.)
W
ATER LINE (APPROX.)
W
ATER LINE (APPROX.)
W
ATER LINE (APPROX.)
ELEC. LINES (APPROX.)
SOIL BORING LEGEND:
APPROXIMATE BORING LOCATION
VL101
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
KALAMAZOO COUNTY, MICHIGAN
909CM3028
MARCH 24, 2023 Dwg. of
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
FORT CUSTER NATIONAL CEMETERY
RENOVATE & EXPAND
MAINTENANCE BUILDING 3001Leo A Daly
(202) 861-4600
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\33
-1
1 F
OR
T
CU
ST
ER
N C
BL
DG
A
ND
R
OA
DS
\E
NG
IN
\P
LA
NS
\90
9C M3
8\V
L1
.D W
G
GORDON - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
Integrity Federal Services, Inc.
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Above Group, Inc.
(321) 345-9026
GRAPHICAL SCALE: 1" = 20'
20 10 0 20 40 60
KEY MAP
(NOT TO SCALE)
EXISTING CONDITIONS AND BORING
PLAN
STRUCTURE SCHEDULE
UTILITY NOTES
1. ALL UTILITIES SHOWN ARE BASED ON ABOVE GROUND EVIDENCE AT TIME OF SURVEY UNLESS
NOTED OTHERWISE.
2. THE LOCATIONS AND ELEVATIONS OF EXISTING UNDERGROUND UTILITIES AS SHOWN ON THIS
DRAWING ARE ONLY APPROXIMATE. NO GUARANTEE IS EITHER EXPRESSED OR IMPLIED AS TO
THE COMPLETENESS OR ACCURACY THEREOF. THE CONTRACTOR SHALL BE EXCLUSIVELY
RESPONSIBLE FOR DETERMINING THE EXACT UTILITY LOCATIONS AND ELEVATIONS PRIOR TO
THE START OF CONSTRUCTION.
BENCHMARK NOTE
1. BENCHMARK A: RAILROAD SPIKE IN 18" TREE, 373'± SE OF CENTERLINE RIVER ROAD & 139'±
EAST OF MAINTENANCE YARD. ELEV = 831.07. DATUM:NAVD88
EXISTING LEGEND
LOCATION MAP
CP SET IRON ROD
CP SET IRON ROD
CP SET IRON ROD
SET MONUMENT
SET MONUMENT
BM A
852.67
828.46
830.31
851.99
832.21
831.07
305736.0950
308502.9650
308491.5510
305714.5699
308881.6003
308715.1480
12866612.8260
12866348.1550
12866063.7680
12866462.3700
12866210.3800
12866302.7690
CONTROL POINTS
TOPOGRAPHIC SURVEY NOTES
CONSTRUCTION
ACCESS
FORT CUSTER DR
FORT CUSTER DR
JAMES B EADS RD
JA
MES
B
EA
DS R
D
A
FORT CUSTER DR
FORT CUSTER DR
MAINTENANCE
BUILDING
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
KALAMAZOO COUNTY, MICHIGAN
909CM3028
MARCH 24, 2023 Dwg. of
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
FORT CUSTER NATIONAL CEMETERY
RENOVATE & EXPAND
MAINTENANCE BUILDING 3001Leo A Daly
(202) 861-4600
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\33
-1
1 F
OR
T
CU
ST
ER
N C
BL
DG
A
ND
R
OA
DS
\E
NG
IN
\P
LA
NS
\90
9C M3
8\G
C1
.D W
G
GORDON - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
Integrity Federal Services, Inc.
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Above Group, Inc.
(321) 345-9026
GC100
CONSTRUCTION SEQUENCING
PLAN
GRAPHICAL SCALE: 1" = 100'
100 50 0 100 200 300
A
CONTRACTOR PRIMARY
CONSTRUCTION ACCESS
GRAPHIC LEGEND:
AREA A
RENOVATION AND EXPANSION OF
MAINTENANCE BUILDING 3001
SEQUENCE OF CONSTRUCTION:
1. PREPARE AND SUBMIT A DETAILED CONSTRUCTION SEQUENCING PLAN, PROJECT
SCHEDULE, TRAFFIC CONTROL PLAN, NETWORK ANALYSIS SYSTEM IN
ACCORDANCE WITH SPECIFICATION 01 32 16.13 TO THE RESIDENT
ENGINEER/CONTRACTING OFFICER REPRESENTATIVE (RE/COR).
2. CONFIRM ALL APPLICABLE LOCAL, STATE AND REGULATIVE AGENCY PERMITS ARE
ACQUIRED PRIOR TO CONSTRUCTION AND THE CONDITIONS OF ALL APPLICABLE
PERMITS ARE COMPLIED WITH THROUGHOUT CONSTRUCTION.
3. INSTALL TEMPORARY CONSTRUCTION FENCING AND TEMPORARY SIGNAGE. SEE
FENCE DETAIL 3/GC501 AND SIGNAGE DETAILS 6/CT501 & 7/CT501.
4. COMPLETE INSTALLATION OF EROSION AND SEDIMENT CONTROLS FOR THE WORK
AREAS WHERE WORK WILL BE PERFORMED. INSTALL IMMEDIATELY PRIOR TO THE
START OF THE WORK IN ACCORDANCE WITH THE APPROVED EROSION AND
SEDIMENT CONTROL PLAN.
5. COMPLETE WORK IN EACH AREA AS FOLLOWS (LIST IS NOT INTENDED TO BE ALL
INCLUSIVE):
AREA A CONSISTS OF THE FOLLOWING:
1. REMOVAL OF EXISTING CONCRETE SIDEWALK, PAVEMENT, & FENCING.
2. REMOVAL OF PORTION OF MAINTENANCE BUILDING
3. INSTALLATION OF ASPHALT PAVEMENT AND CONCRETE SIDEWALKS.
4. RENOVATION AND EXPANSION OF MAINTENANCE BUILDING.
5. CONSTRUCTION OF NEW CONCRETE SIDEWALK.
6. SOD DENUDED AREAS AND STABILIZE ALL AREAS WITHIN THE LIMITS OF
CONSTRUCTION.
GENERAL SEQUENCING REQUIREMENTS:
BEFORE ANY GENERAL CONSTRUCTION ACTIVITIES MAY COMMENCE, THE CONTRACTOR SHALL:
1. RETAIN A PRIVATE UNDERGROUND LOCATOR SERVICE AT THEIR COST AND HAVE THEM PERFORM THE TRACING AND MARKING OF ALL THE EXISTING ONSITE BELOW GRADE IMPROVEMENTS WITHIN OR
ADJOINING THE CONTRACTOR WORK AREAS FOR THE PROJECT, WALK THE CONSTRUCTION AREAS
WITH THE RE/COR AND, IF REQUESTED BY THE RE/COR, ADJUST THE LOCATIONS OF THE NEW WORK AS REQUIRED TO AVOID CONFLICTS, DAMAGE, OR UNINTENDED INTERRUPTIONS OF THE SERVICES BEING PROVIDED BY THE UNDERGROUND FACILITIES. CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL
PAINT MARKINGS UPON COMPLETION OF WORK.
2. CONTROL TRUCK AND EQUIPMENT MOVEMENT SO THEY DO NOT TRANSIT BETWEEN ONGOING
SERVICES AT THE COMMITTAL SERVICE SHELTERS OR CHAPEL
3. CONTRACTOR'S PRIMARY STAGING AREA FOR OPERATION WILL BE ADJACENT TO THE CONSTRUCTION AREA THAT IS CURRENTLY ACTIVE AT ANY GIVEN TIME, WITHIN THE WORK AREA IDENTIFIED ON THE
CONTRACT DOCUMENTS.
4. THE CONTRACTOR MAY REQUEST LIMITED USE OF OPEN AREAS THROUGHOUT THE CEMETERY FOR SECONDARY STAGING. USE OF SUCH OPEN AREAS MUST APPROVED BY THE RE/COR AND MUST BE
DETERMINED TO BE OUT OF THE WAY OF DAILY OPERATIONS.
5. THE CONTRACTOR WILL BE RESPONSIBLE FOR ADEQUATE TRAFFIC CONTROL AND SIGNAGE TO SAFELY
REROUTE THE PUBLIC AND STAFF DURING DURING EXISTING CEMETERY ROAD CLOSURES.
6. ALL SIGNAGE AND TRAFFIC MARKINGS INCLUDING CONSTRUCTION SIGNAGE SHALL COMPLY WITH THE
MICHIGAN MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES.
7. EXISTING FACILITIES DAMAGED BY CONTRACTOR DURING CONSTRUCTION OPERATIONS SHALL BE
REPLACED BY CONTRACTOR TO APPLICABLE AGENCY STANDARDS.
8. THE CONTRACTOR WILL BE RESPONSIBLE FOR GRADING ALL AREAS TO ENSURE POSITIVE DRAINAGE.
9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL AND LEGAL OFFSITE DISPOSAL OF ALL
WASTE MATERIAL GENERATED BY CONSTRUCTION.
10. THE CONTRACTOR MUST KEEP ALL EXISTING STREETS CLEAN AND CLEAR OF CONSTRUCTION RELATED DEBRIS AND EQUIPMENT AT ALL TIMES. OFF - SITE TRACKING OF CONSTRUCTION SITE SEDIMENTS OR OTHER SUBSTANCES SHALL NOT BE ALLOWED. CONSTRUCTION SITE ENTRANCE/EXIT STABILIZATION
MEASURES, ALONG WITH FREQUENT ADJACENT STREET SWEEPING OR CLEANING OF EQUIPMENT
WASH RACK AREAS, SHALL BE EMPLOYED TO PREVENT OFF-SITE TRACKING AND TO CONTROL THE GENERATION OF FUGITIVE DUST. OFF - SITE TRACKING CONTROLS WILL BE REQUIRED TO PROTECT ROADS AND FACILITIES WITH EXISTING CEMETERY PROPERTY AS WELL AS EXTERIOR ROADS AND
FACILITIES.
11. WHEREVER EXCAVATION FOR NEW UTILITY LINES CROSS EXISTING ROADS, AT LEAST ONE LANE MUST BE OPEN TO TRAFFIC AT ALL TIMES. FLAGGING PERSONNEL SHALL BE PROVIDED FOR SUCH INSTANCES OF ROAD WORK. WHERE EXISTING ROADS ARE BEING REMOVED, MODIFIED OR NEW ROADS ARE BEING
CONSTRUCTED, PROVIDE TEMPORARY ACCESS ROADS, FLAGGERS, AND /OR SIGNAGE TO SAFELY
MAINTAIN TRAFFIC FLOW AND VEHICULAR ACCESS TO AND FROM FUNCTIONING AREAS.
12. IN THE EVENT THAT ELECTRICAL POWER ON SITE WILL BE REQUIRED TO BE SHUT OFF FOR IMPROVEMENTS THE CONTRACTOR SHALL NOTIFY THE RE/COR AND CEMETERY DIRECTOR. SHUT OFF OF ELECTRICAL POWER MUST BE COORDINATED WITH AND APPROVED BY THE RE/COR AND CEMETERY DIRECTOR. THE CONTRACTOR MUST MAKE REASONABLE EFFORTS TO COMPLETE WORK AND LIMIT THE
TIME THAT THE CEMETERY GOES WITHOUT ELECTRICAL POWER.
13. THE CONTRACTOR WILL BE RESPONSIBLE FOR REMOVAL OF TEMPORARY FACILITIES REQUIRED BY THIS SEQUENCING PLAN AND BY THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL RESTORE ALL GRADES, LANDSCAPING, IRRIGATION, UTILITIES, SIDEWALK, CURB AND PAVEMENT ALTERED OR DAMAGED BY INSTALLATION OF USE OF TEMPORARY FACILITIES BACK TO THEIR PRE-CONSTRUCTION CONDITION OR TO THE PROPOSED CONDITION WHERE SPECIFIED BY THE CONTRACT DOCUMENTS.
MAINTENANCE OF TRAFFIC
1. PREPARE A CONSTRUCTION TRAFFIC CONTROL PLAN IN ACCORDANCE WITH PART 1.16 USE OF
ROADWAYS IN SPECIFICATION SECTION 01 00 01 GENERAL REQUIREMENTS.
2. TEMPORARY SIGNAGE IS REQUIRED THROUGHOUT THE PROJECT TO FACILITATE PUBLIC ACCESS TO THE
CEMETERY AND ADVANCE NOTIFICATION OF CONSTRUCTION ACTIVITIES.
3. CONTRACTOR SHALL USE THE PRIMARY CONSTRUCTION ACCESS IDENTIFIED IN THE CONSTRUCTION
DOCUMENTS UNLESS OTHERWISE AUTHORIZED IN ADVANCE BY THE RE/COR.
4. MAINTAIN ONE LANE OF TRAFFIC ON EXISTING CEMETERY ROADS OPEN TO THE PUBLIC AT ALL TIMES, UNLESS OTHERWISE AUTHORIZED BY THE RE/COR.
5. CONTRACTOR SHALL ENSURE THE NOISE FROM TRUCK AND EQUIPMENT TRAFFIC DOES NOT INTERFERE
WITH FUNERAL SERVICES AT THE COMMITTAL SERVICE SHELTERS.
6. ROADWAY ACCESS TO THE ADMINISTRATION BUILDING AND MAINTENANCE YARD SHALL REMAIN OPEN AT ALL TIMES DURING CONSTRUCTION, INCLUDING PAVING OPERATIONS. ONE LANE CLOSURES AND THE
USE OF FLAGMEN IS ACCEPTABLE.
CONTRACTOR STAGING/STORAGE AREAS:
SEE PLAN (THIS SHEET) AND EROSION & SEDIMENT CONTROL PLAN (SHEET GC101)
FOR AREAS FOR POTENTIAL USE BY CONTRACTOR AS STAGING/STORAGE/
PARKING/JOB TRAILER SPACE (SYMBOL ). CONTRACTOR TO CONFIRM
WITH RE/COR & CEMETERY STAFF AT THE BEGINNING OF THE PROJECT.
CONTRACTOR
STAGING/
STORAGE
AREAS (SEE NOTE)
LIMITS OF
CONSTRUCTION
LIMITS OF
CONSTRUCTION
MAINTENANCE
BUILDING
EXPANSION
TEMPORARY
WORK TRAILER
+/-1,400 SF
UGE
UGE UGE
UG
E
UG
E
UG
E
UGE
UGE UGE UGE
UG
E
UG
E
UG
E
MAINTENANCE FACILITY (BLDG. #3001)
C O
VE
R
ED
S
TO
R
AG
E
ASPHALT
PAVEMENT
C H
AIN
-LIN
K FEN
C
E
DOUBLE-LEAF
GATE
CONCRETE
PAVEMENT
SANITARY SEWER
(APPROX.)
ELEC./TELEPHONE
LINES (APPROX.)
ELEC./TELEPHONE
LINES (APPROX.)
SANITARY SEW
ER
(APPROX.)
SANITARY TILE
ABSORPTION FIELD
(APPROX.)
W
ATER LINE (APPROX.)
W
ATER LINE (APPROX.)
W
ATER LINE (APPROX.)
ELEC. LINES (APPROX.)
CS
CE
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X X
X
X
X
X
CF
CF
CF
CG
CG
CONTRACTOR
STAGING/
STORAGE
AREA (SEE NOTE)
CONTRACTOR
STAGING/
STORAGE
AREA (SEE NOTE)
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
KALAMAZOO COUNTY, MICHIGAN
909CM3028
MARCH 24, 2023 Dwg. of
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
FORT CUSTER NATIONAL CEMETERY
RENOVATE & EXPAND
MAINTENANCE BUILDING 3001Leo A Daly
(202) 861-4600
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\33
-1
1 F
OR
T
CU
ST
ER
N C
BL
DG
A
ND
R
OA
DS
\E
NG
IN
\P
LA
NS
\90
9C M3
8\G
C1
.D W
G
GORDON - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
Integrity Federal Services, Inc.
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Above Group, Inc.
(321) 345-9026
GC101
EROSION AND SEDIMENT
CONTROL PLAN
GRAPHICAL SCALE: 1" = 10'
10 5 0 10 20 30
CE
KEY NO. DESCRIPTION DETAIL/PG.
TEMPORARY STONE ACCESS DRIVE
SF SILT FENCE
E&S KEY NOTE LEGEND:
SF
STONE CONSTRUCTION ENTRANCE
REINFORCED SILT FENCE
E&S GRAPHIC LEGEND:
CS COMPOST SOCK CONCRETE WASHOUT
COMPOST SOCK CONCRETE WASHOUT
1 INSTALL TEMPORARY 18" DIA. CULVERT
LIMITS OF CONSTRUCTION
TEMPORARY CULVERT
CHAIN-LINK CONSTRUCTION FENCINGX X
CF CHAIN-LINK CONSTRUCTION FENCING
CG DOUBLE-LEAF GATE FOR CONSTRUCTION FENCING
CONTRACTOR STAGING/STORAGE AREAS:
SEE PLAN (THIS SHEET) AND CONSTRUCTION SEQUENCING PLAN (SHEET GC100) FOR
AREAS FOR POTENTIAL USE BY CONTRACTOR AS STAGING/STORAGE/PARKING/JOB
TRAILER SPACE (SYMBOL ) . CONTRACTOR TO CONFIRM WITH RE/COR &
CEMETERY STAFF AT THE BEGINNING OF THE PROJECT.
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
KALAMAZOO COUNTY, MICHIGAN
909CM3028
MARCH 24, 2023 Dwg. of
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
FORT CUSTER NATIONAL CEMETERY
RENOVATE & EXPAND
MAINTENANCE BUILDING 3001Leo A Daly
(202) 861-4600
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\33
-1
1 F
OR
T
CU
ST
ER
N C
BL
DG
A
ND
R
OA
DS
\E
NG
IN
\P
LA
NS
\90
9C M3
8\G
C5
.D W
G
GORDON - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
Integrity Federal Services, Inc.
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Above Group, Inc.
(321) 345-9026
GC501
EROSION AND SEDIMENT CONTROL
NOTES & DETAILS
EROSION AND SEDIMENT CONTROL NOTES:
1. ALL EARTH DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS WELL AS CUTS AND FILLS SHALL
BE DONE IN ACCORDANCE WITH THE APPROVED E&S PLAN. A COPY OF THE APPROVED DRAWINGS (STAMPED, SIGNED AND DATED BY THE REVIEWING AGENCY) MUST BE AVAILABLE AT THE PROJECT SITE
AT ALL TIMES.
2. AT LEAST 2 FULL BUSINESS DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR EXPANDING INTO AN AREA PREVIOUSLY UNMARKED, MISS DIG SYSTEM, INC. SHALL BE NOTIFIED AT
1-800-482-7171 FOR THE LOCATION OF EXISTING UNDERGROUND UTILITIES.
3. ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE
PROVIDED ON THE PLAN DRAWINGS.
4. PRIOR TO COMMENCING CLEARING AND GRADING, CONTRACTOR TO INSTALL PERIMETER EROSION
AND SEDIMENT CONTROLS.
5. AREAS TO BE FILLED ARE TO BE CLEARED, GRUBBED, AND STRIPPED OF TOPSOIL TO REMOVE TREES, VEGETATION, ROOTS AND OTHER OBJECTIONABLE MATERIAL.
6. CLEARING, GRUBBING, AND TOPSOIL STRIPPING SHALL BE LIMITED TO THOSE AREAS DESCRIBED IN EACH STAGE OF THE CONSTRUCTION SEQUENCE. GENERAL SITE CLEARING, GRUBBING AND TOPSOIL STRIPPING MAY NOT COMMENCE IN ANY STAGE OR PHASE OF THE PROJECT UNTIL THE E&S BMP'S SPECIFIED BY THE BMP SEQUENCE FOR THAT STAGE OR PHASE HAVE BEEN INSTALLED AND ARE
FUNCTIONING AS DESCRIBED IN THIS E&S PLAN.
7. AT NO TIME SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE LIMIT OF WORK BOUNDARIES SHOWN ON THE PLAN MAPS. THESE AREAS MUST BE CLEARLY MARKED BEFORE
CLEARING AND GRUBBING OPERATIONS BEGIN.
8. TOPSOIL REQUIRED FOR THE ESTABLISHMENT OF VEGETATION SHALL BE STOCKPILED AT THE LOCATION(S) SHOWN ON THE PLAN MAPS(S) IN THE AMOUNT NECESSARY TO COMPLETE THE FINISH GRADING OF ALL EXPOSED AREAS THAT ARE TO BE STABILIZED BY VEGETATION. EACH STOCKPILE SHALL BE PROTECTED IN THE MANNER SHOWN ON THE PLAN DRAWINGS. STOCKPILE HEIGHTS SHALL
NOT EXCEED 35 FEET. STOCKPILE SLOPES SHALL BE 2H:1V OR FLATTER.
9. IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL FOR
ACCELERATED EROSION AND/OR SEDIMENT POLLUTION, THE OPERATOR SHALL IMPLEMENT
APPROPRIATE BEST MANAGEMENT PRACTICES TO MINIMIZE THE POTENTIAL FOR EROSION AND
SEDIMENT POLLUTION.
10. ALL BUILDING MATERIALS AND WASTES SHALL BE REMOVED FROM THE SITE AND RECYCLED OR
DISPOSED OF IN ACCORDANCE WITH THE LOCAL/STATE REGULATIONS.
11. ALL OFF-SITE WASTE AND BORROW AREAS MUST HAVE AN E&S PLAN APPROVED BY THE APPROPRIATE
GOVERNING AUTHORITY FULLY IMPLEMENTED PRIOR TO BEING ACTIVATED.
12. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY MATERIAL BROUGHT ON SITE IS CLEAN
FILL.
13. ALL PUMPING OF WATER FROM ANY WORK AREA SHALL BE DONE ACCORDING TO THE PROCEDURE
DESCRIBED IN THIS PLAN, OVER UNDISTURBED VEGETATED AREAS.
14. UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT BMP'S SHALL BE MAINTAINED IN ACCORDANCE WITH LOCAL AND STATE REGULATIONS. MAINTENANCE SHALL INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENT BMP'S AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, REGRADING, RESEEDING, REMULCHING AND RENETTING MUST BE PERFORMED WITHIN 24 HOURS. IF THE E&S BMP'S FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMP'S, OR MODIFICATIONS OF THOSE
INSTALLED WILL BE REQUIRED TO BE IMPLEMENTED WITHIN 48 HOURS.
15. A LOG SHOWING DATES THAT E&S BMP'S WERE INSPECTED AS WELL AS ANY DEFICIENCIES FOUND AND THE DATE THEY WERE CORRECTED SHALL BE MAINTAINED ON THE SITE AND BE MADE AVAILABLE TO
REGULATORY AGENCY OFFICIALS AT THE TIME OF INSPECTION.
16. SEDIMENT TRACKED ONTO ANY PUBLIC ROADWAY OR SIDEWALK SHALL BE RETURNED TO THE CONSTRUCTION SITE BY THE END OF EACH WORK DAY AND DISPOSED IN THE MANNER DESCRIBED IN THIS PLAN. IN NO CASE SHALL THE SEDIMENT BE WASHED, SHOVELED, OR SWEPT INTO ANY ROADSIDE
DITCH, STORM SEWER, OR SURFACE WATER.
17. ALL SEDIMENT REMOVED FROM BMP'S SHALL BE DISPOSED OF IN THE MANNER DESCRIBED ON THE
PLAN DRAWINGS.
18. AREAS WHICH ARE TO BE TOPSOILED SHALL BE SCARIFIED TO A MINIMUM DEPTH OF 3 TO 5 INCHES, 6 TO 12 INCHES ON COMPACTED SOILS, PRIOR TO PLACEMENT OF TOPSOIL. AREAS TO BE VEGETATED SHALL HAVE A MINIMUM 4 INCHES OF TOPSOIL IN PLACE PRIOR TO SEEDING AND MULCHING. FILL
OUTSLOPES SHALL HAVE A MINIMUM OF 2 INCHES OF TOPSOIL.
19. ALL FILLS SHALL BE COMPACTED AS REQUIRED TO REDUCE EROSION, SLIPPAGE, SETTLEMENT, SUBSIDENCE OR OTHER RELATED PROBLEMS. FILL INTENDED TO SUPPORT BUILDINGS, STRUCTURES AND CONDUITS, ETC. SHALL BE COMPACTED IN ACCORDANCE WITH LOCAL REQUIREMENTS OR CODES.
20. ALL EARTHEN FILLS SHALL BE PLACED IN COMPACTED LAYERS NOT TO EXCEED 8 INCHES IN
THICKNESS.
21. SEEPS OR SPRINGS ENCOUNTERED DURING CONSTRUCTION SHALL BE HANDLED IN ACCORDANCE WITH
THE STANDARD AND SPECIFICATION FOR SUBSURFACE DRAIN OR OTHER APPROVED METHOD.
22. ALL GRADED AREAS SHALL BE PERMANENTLY STABILIZED IMMEDIATELY UPON REACHING FINISHED GRADE. CUT SLOPES IN COMPETENT BEDROCK AND ROCK FILLS NEED NOT BE VEGETATED. SEEDED AREAS WITHIN 50 FEET OF A SURFACE WATER, OR AS OTHERWISE SHOWN ON THE PLAN DRAWINGS, SHALL BE BLANKETED ACCORDING TO THE STANDARDS OF THIS PLAN.
23. IMMEDIATELY AFTER EARTH DISTURBANCE ACTIVITIES CEASE IN ANY AREA OR SUBAREA OF THE PROJECT, THE OPERATOR SHALL STABILIZE ALL DISTURBED AREAS. DURING NON-GERMINATING MONTHS, MULCH OR PROTECTIVE BLANKETING SHALL BE APPLIED AS DESCRIBED IN THE PLAN. AREAS NOT AT FINISHED GRADE, WHICH WILL BE REACTIVATED WITHIN 1 YEAR, MAY BE STABILIZED IN ACCORDANCE WITH THE TEMPORARY STABILIZATION SPECIFICATIONS. THOSE AREAS WHICH WILL NOT BE REACTIVATED WITHIN 1 YEAR SHALL BE STABILIZED IN ACCORDANCE WITH THE PERMANENT
STABILIZATION SPECIFICATIONS.
24. PERMANENT STABILIZATION IS DEFINED AS A MINIMUM UNIFORM, PERENNIAL 70% VEGETATIVE COVER
OR OTHER PERMANENT NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST
ACCELERATED EROSION. CUT AND FILL SLOPES SHALL BE CAPABLE OF RESISTING FAILURE DUE TO
SLUMPING, SLIDING, OR OTHER MOVEMENTS.
25. E&S BMP'S SHALL REMAIN FUNCTIONAL AS SUCH UNTIL ALL AREAS TRIBUTARY TO THEM ARE
PERMANENTLY STABILIZED OR UNTIL THEY ARE REPLACED BY ANOTHER BMP APPROVED BY THE
APPROPRIATE GOVERNING AUTHORITY.
26. AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION AND SEDIMENT BMP'S
MUST BE REMOVED OR CONVERTED TO PERMANENT POST CONSTRUCTION STORMWATER
MANAGEMENT BMP'S. AREAS DISTURBED DURING REMOVAL OR CONVERSION OF THE BMP'S SHALL BE STABILIZED IMMEDIATELY. IN ORDER TO ENSURE RAPID REVEGETATION OF DISTURBED AREAS, SUCH
REMOVAL/CONVERSIONS ARE TO BE DONE ONLY DURING THE GERMINATING SEASON.
27. CONCRETE WASH WATER SHALL BE HANDLED IN THE MANNER DESCRIBED ON THE PLAN DRAWINGS. IN
NO CASE SHALL IT BE ALLOWED TO ENTER ANY SURFACE WATERS OR GROUNDWATER SYSTEMS.
28. THE SOIL EROSION WILL BE MAINTAINED WEEKLY AND AFTER EVERY STORM EVENT BY THE
CONTRACTOR.
NOT TO SCALE
COMPOST SOCK CONCRETE WASHOUT2
PLAN SECTION
COMPOST FILTER SOCK. 4' MIN. OVERLAP ON
UPSLOPE SIDE OF FILTER RING
DIRECT CONCRETE WASHOUT WATER INTO FILTER
RING
2"x2"x48" WOODEN STAKES PLACED 5' O.C.
2"x2"x48" WOODEN STAKES
PLACED 5' O.C.
MAXIMUM DEPTH OF CONCRETE WASHOUT WATER IS
50% OF FILTER RING HEIGHT
24" DIA. COMPOST FILTER SOCK
10 MIL PLASTIC LINING
NOT TO SCALE
SOIL EROSION AND SEDIMENTATION CONTROL DETAILS1
MI
NI
MU
M)
SCALE: NTS
CONSTRUCTION FENCE WITH PRIVACY SCREENING3
CONSTRUCTION FENCE NOTES:
1. BEFORE CONSTRUCTION OPERATIONS BEGIN, THE CONTRACTOR SHALL PROVIDE A CHAIN
LINK CONSTRUCTION FENCE, SEVEN FEET MINIMUM HEIGHT, AROUND AREAS OF ACTIVE
CONSTRUCTION. THE TEMPORARY FENCING SHALL ENCOMPASS THE CONSTRUCTION WORK
AREA(S) TO SERVE AS A PEDESTRIAN BARRIER TO ALERT CEMETERY PATRONS OF THE
CONSTRUCTION SITE. THE CONSTRUCTION FENCE SHALL BE PROVIDED WITH PRIVACY
SCREENING MATERIALS TO PRODUCE A VISUAL BARRIER TO THE PUBLIC FROM THE ADJOINING
CEMETERY INTO THE CONTRACTOR WORK AREAS. THE VISUAL BARRIER SHALL ACCOMMODATE
WIND LOADING WITHOUT CAUSING THE FENCE TO BEND OR FALL OVER.
2. PROVIDE GATES AS REQUIRED FOR ACCESS WITH NECESSARY HARDWARE, INCLUDING HASPS
AND PADLOCKS.
3. FASTEN FENCE FABRIC TO TERMINAL POSTS WITH TENSION BANDS AND TO LINE POSTS AND
TOP AND BOTTOM RAILS WITH TIE WIRES SPACED AT MAXIMUM 15 INCHES.
4. BOTTOM OF FENCES SHALL EXTEND TO ONE INCH ABOVE GRADE. REMOVE THE FENCE WHEN
DIRECTED BY RE/COR.
5. DETAIL PROVIDED IS FOR ILLUSTRATIVE PURPOSES ONLY. FENCING WITH EQUIVALENT
FORM/FUNCTION SHALL BE SUBMITTED AND CONSIDERED FOR APPROVAL.
BOTTOM OF FENCE
TO 1" ABOVE GRADE
NOTCHED & WELDED NOTCHED & WELDEDWIRE TIES
MA
XI
MU
M)
MA
XI
MU
M) GALVANIZED STEEL
TUBE
FASTEN FENCE FABRIC AT TERMINAL
POSTS WITH TENSION BANDS
SPACED AT MAXIMUM 15 INCHES.
FASTEN FENCE FABRIC TO
TOP/BOTTOM RAILS & LINE POSTS
WITH TIE WIRES SPACED AT
MAXIMUM 15 INCHES.
GALVANIZED STEEL
TUBE
STEEL FEET, BLOCKS OR OTHER
ACCEPTABLE MEANS OF SUPPORT
O
VE
R
ED
S
TO
R
AG
E
STORAGE
FIRE HYDRANT
GAS
GAL
DIESEL
FUEL
GAL
FLAMMABLE
STORAGE
PUMP
HOUSE
POND
CHAIN-LINK FENCE
CHAIN-LINK FENCE
C H
AI
N
-L
IN
K
FE
N C
E
ASPHALT
PAVEMENT
ASPHALT
PAVEMENT
ASPHALT
PAVEMENT
C H
AIN
-LIN
K FEN
C
E
DOUBLE-LEAF
GATE
DOUBLE-LEAF
GATE
DOUBLE-LEAF
GATE
CONCRETE
PAVEMENT
CONCRETE
PAVEMENT
JAM
ES B EADS
DRIVE
SANITARY SEWER
(APPROX.)
ELEC./TELEPHONE
LINES (APPROX.)
ELEC./TELEPHONE
LINES (APPROX.)
ELEC. LINES
(APPROX.) ELEC. LINES
(APPROX.)
SANITARY SEW
ER
(APPROX.)
SANITARY TILE
ABSORPTION FIELD
(APPROX.)
W
ATER LINE (APPROX.)
W
ATER LINE (APPROX.)
W
ATER LINE (APPROX.)
W
ATER LINE (APPROX.)
W
ATER LINE (APPROX.)
ELEC. LINES (APPROX.)
34.4'
28'
40'
7.7'
5.1'
9.2'
19.9'
12.8'
LEGEND:
REMOVE ASPHALT PAVEMENT (INCLUDES ALL
PAVEMENT COURSES AND AGGREGATE BASES)
REMOVE CONCRETE PAVEMENT
(INCLUDES ALL AGGREGATE BASES)
REMOVE EX. BUILDING (REFER TO ARCHITECTURAL
DRAWINGS FOR BUILDING DEMOLITION PLANS)
SAW CUT EX. ASPHALT & CONCRETE
EXISTING SITE FEATURES TO BE REMOVED (SEE
KEYNOTE)
EXISTING SITE FEATURES TO BE REMOVED (SEE
KEYNOTE)
LIMITS OF WORK
NOTES:
CD101
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
KALAMAZOO COUNTY, MICHIGAN
909CM3028
MARCH 24, 2023 Dwg. of
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .