This Bid Notice is issued by the Kansas Department of Transportation (KDOT) for a lighting installation project on Interstate 70 at the K-177 Junction in Geary County, Kansas. The project involves the installation of an electric lighting system, including five high mast light towers (100 feet tall with 48-inch concrete bases). The work must be completed to open the project to unrestricted traffic within 35 restricted days and finished entirely within 45 total contract working days. The earliest start date is May 3, 2027, with a latest start date of May 18, 2026. The letting date is June 17, 2026, with electronic proposals due by 1:00 P.M. local time on that date via the Bid Express website. Proposals will be opened and read at 3:00 P.M. local time at the Eisenhower State Office Building in Topeka, Kansas. Successful contractors must execute the contract within ten business days after award notification.
The project is funded entirely by state funds. Bids are submitted electronically through KDOT's Bid Express system using the AASHTO Project Bids software, with contractors required to be prequalified and identified as bid holders no later than 5:00 P.M. on the Monday preceding the letting date. All proposals must include unit costs for each individual electric lighting item, with the sum of unit costs multiplied by quantities in the Summary of Quantities equaling no more than the lump sum bid. Contractors must provide a current Tax Clearance Certificate from the Kansas Department of Revenue at the time of contract award and comply with all required contract provisions, including certifications regarding noncollusion, financial prequalification, EEO requirements, and prohibitions on foreign unmanned aerial systems. Additional requirements include a bid bond, compliance with the KDOT Standard Specifications for State Road and Bridge Construction (2015 Edition), and satisfaction of all special provisions identified in the project documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ADDENDUM_1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Dwight D. Eisenhower State Office Building 700 S.W. Harrison Street Topeka, KS 66603-3745
Phone: 785-296-3576 Hearing Impaired - 711 publicinfo@ksdot.org http://www.ksdot.org
Bureau of Construction and Materials
STATE PROJECT NUMBER: I070-031 KA 7706-01
CALL ORDER NUMBER: 621
PROPOSAL NUMBER: 526066212
LETTING DATE 06/17/2026
COUNTY: GEARY
FUND TYPE: STATE
JUNCTION CITYKDOT CONSTRUCTION OFFICE:
PROJECT DESCRIPTION
LIGHTING. I-70: I-70/K-177 JCT IN GE CO.
RESTRICTED DAYS
(35)
TOTAL CONTRACT DAYS
(45)
MAY 03, 2027
Earliest Start Date:
Latest Start Date:
9:53:55AM5/18/2026 @
Letting 06/17/2026 Kansas Department of Transportation Project No. I070-031 KA 7706-01
Contract No. 526066212
I070-031 KA 7706-01 I070-031 KA 7706-01
CONTRACT PROPOSAL
DOT Form No. 202 Rev. 02/19
Contract ID: 526066212
1. The Secretary of Transportation of the State of Kansas [Secretary] will accept only electronic internet proposals from prequalified contractors for construction, improvement, reconstruction, or maintenance work in the State of Kansas, said work known as Project No.:
I070-031 KA 7706-01 / I070-031 KA 7706-01
The general scope, location and net length are:
LIGHTING. I-70: I-70/K-177 JCT IN GE CO.
2. This is the Proposal of
[Contractor] to complete the Project for the amount set out in the accompanying Unit
Prices List.
3. The Contractor makes the following ties and riders as part of its Proposal in addition to state ties, if any:
4. Contractors and other interested entities may examine the Bidding Proposal Form/
Contract Documents (see paragraph 11 below) at the County Clerk's Office in the County in which the Project is located and at the Kansas Department of Transportation [KODT] Bureau of Construction and Materials, Eisenhower State Office Building, 700 SW Harrison, Topeka, Kansas 66603. Contractors may examine and print the Bidding Proposal Form/Contract
Documents by using KDOT's website at http://www.ksdot.gov and choosing the following selections: "Doing Business", "Highway Contractors" and "Highway Letting Information",and using the links provided in the Project information for this project. KDOT will not print and mail paper copies of Proposal Forms. Contractors shall notify KDOT of their intent to bid as a prime contractor by identifying themselves as a Bid Holder on the website above.
Contractors shall furnish this notice no later than 5:00 P.M. on the Monday preceding the scheduled Letting Date. For a fee, Contractors and other interested entities may order paper copies of the KDOT Standard Specifications for State Road and Bridge Construction, 2015 Edition, [Standard Specifications] by using KDOT's website of http://www.ksdot.org and choosing the following selections: "Doing Business", "Highway Contractors", "Contractor Resources and "Specifications".
5. Contractors shall use the AASHTO's Project Bids software in combination with the electronic bidding system file created for the Project with Project Bids software [EBSX file] to generate an electronic internet proposal. The Project Bids software and Project
EBSX file are available on Bid Express' website at http://ui.bidx.com.
Contractor: Page 1 Check: 2585D209A4
6. Contractors shall only use the Project Bids software to create a proposal and submit an electronic internet proposal to KDOT using the Bid Express website at http:// ui.bidx.com.
7. The KDOT Bureau of Construction and Materials will only accept electronic internet proposals on-line using Bid Express until 1:00 P.M. Local Time on the Letting Date. KDOT will open and read these proposals at the Eisenhower State Office Building, 700 SW
Harrison, Topeka, Kansas 66603 at 3:00 P.M. Local Time on the Letting Date. Bids are read on a conference call at 785-414-8630. The conference ID is 856 616 050#.
8. The Contractor shall execute a contract for the proposed work within ten (10) business days after notice of the award of the contract.
9. The contractor shall complete work to open the project to unrestricted traffic within
_35_ Restricted Days and shall complete the work within the total Contract Working Days of _45_.
10. The Contractor shall complete the Project according to the plans, Standard
Specifications, provisions identified in the Special Provision List and all other
Contract Documents identified in Standard Specifications subsection 101.3
11. The undersigned declares that the Contractor has carefully examined the Bidding
Proposal Form for the Project. The Contractor understands the following:
A. The Bidding Proposal Form consists of the following documents: the Project EBSX files on the Bid Express website (which includes DOT Form 202, required contract provisions, and the Unit Prices List), special provision list, project special provisions, special provisions, Standard Specifications, plans, exploratory work documents, any additional contract information, any addenda, all questions and answers posted on the Bid Express website, and any amendments the Secretary provides for the Project. The Contractor can obtain these documents at KDOT's website (see paragraph 4).
B. The special provision list identifies all required contract provisions, project special provisions and special provisions that apply to the Project.
C. The Bidding Proposal form becomes the Contractor's Proposal after the Contractor completes the EBSX file, electronically signs the Proposal where required on DOT Form
202, and submits the completed EBSX file documents and bid bond to KDOT using Bid
Express. The special provision list, project special provisions, special provisions, Standard Specifications, plans, exploratory work documents, any additional contract information, all questions and answers posted on the Bid Express website, and any addenda are incorporated by reference into the Proposal. These documents are part of the
Contractor's Proposal.
D. In electronically signing this Proposal, the Contractor waives the right to claim that the Contractor misunderstood the contents of the Proposal or the procurement process.
12. The Contractor has inspected the actual location of the work. The Contractor has determined the availability of materials. The Contractor has evaluated all quantities and conditions. In electronically signing this Proposal, the Contractor waives the right to claim that the Contractor misunderstood the scope of the work.
Contractor: Page 2 Check: 2585D209A4
13. SPECIAL PROVISIONS REQUIRING INFORMATION. The following Required Contract Provisions
(I-XVII) require the Contractor to furnish information. The current versions of these provisions are contained in the Project EBSX file. Some or all of these apply to the
Project as indicated in the Special Provision List. The Contractor shall complete these provisions within the EBSX file. When these documents are required, the Secretary will reject proposals that fail to contain completed Provisions I, II, or III in the EBSX file, and may reject proposals that fail to contain completed Provisions IV, V, VI, VII, VIII, IX, X, XI, XII, XIII, XIV, XV, XVI, or XVII in the EBSX file.
I. 08-10-66 Certification-Noncollusion & History of Debarment
II. 04-30-82 Certification-Financial Prequalification Amount
III. 04-26-90 Declaration-Limitations on Use of Federal Funds for Lobbying
IV. 04-06-26 Certification of Company Not Currently Engaged in the Procurement or Use of Prohibited Foreign Unmanned Aeriel Systems
V. 08-04-92 Certification-Contractual Services with a Current Legislator or a Current Legislator's Firm
VI. 10-10-00 Price Adjustment for Fuel
VII. 08-08-01 Furnishing and Planting Plant Materials
VIII. 06-01-06 Price Adjustment for Asphalt Material
IX. 05-18-07 Repair (Structures)
X. 08-31-09 Price Adjustment for Emulsified Asphalt
XI. 11-15-17 Electric Lighting System Unit Cost
XII. 04-06-09 ITS Unit Cost
XIII. 08-17-16 Water System Unit Cost
XIV. 06-19-19 Sanitary Sewer System Unit Cost
XV. 01-01-18 Smart Work Zone System Unit Cost
XVI. 08-12-24 Continuously Operating Reference Station Unit Cost
XVII. 01-01-11 Kansas Department of Revenue Tax Clearance Certificate
14. The funding source for this Project is STATE. On Projects involving City or County funds, the Secretary acts as the Agent of the City or County and as the administrator of federal or state funds. Each governmental entity's responsibilities are described in a contract between the entities which is available on request.
15. FEDERAL AID DOCUMENTS INCLUDED IN PROPOSAL. If the Project is supported in whole or in part by Federal funds, the latest revisions of the following provisions (I - V) also apply to the Project. These documents are not included in the Project EBSX file but are accessible on KDOT's website and incorporated by reference into the proposal like other provisions and the exploratory work documents.
I. 11-03-80 Affirmative Action For EEO
II. 11-15-96 Affirmative Action & EEO Policies
III. 09-06-94 U.S. DOT Fraud Hotline
IV. FHWA-1273 Federal-Aid Required Contract Provisions
16. The Secretary reserves the right to reject any and all proposals and to waive any or all technicalities.
Contractor: Page 3 Check: 2585D209A4
17. SIGNATURE SECTION:
A. Electronic Internet Proposal
The person submitting the electronic internet Proposal, on the Contractor's behalf, shall be the person whose digital identification is used to submit this Proposal. That person shall complete paragraphs B and C. The person whose digital identification is used to electronically sign this Proposal binds the Contractor to this Proposal and binds the named individual to the certification in paragraph B.
B. Certification
I CERTIFY THAT I AM AUTHORIZED TO REPRESENT THE CONTRACTOR IN PREPARING AND PRESENTING
THIS PROPOSAL. I CERTIFY UNDER PENALTY OF PERJURY THAT THE FOREGOING (INCLUDING BUT NOT
LIMITED TO THE INFORMATION CONTAINED IN THE SPECICIAL PROVISIONS REFERENCED IN PARAGRAPH
13) IS TRUE AND CORRECT.
EXECUTED ON
C. Signature
Number of company or joint venture:
Name of company or joint venture:
Name of person signing:
Title of the person signing:
Signature: Electronic Internet Proposal
RELEASED FOR CONSTRUCTION:
Date:____________________________________
Chief of Construction and Materials
Contractor: Page 4 Check: 2585D209A4
KANSAS DEPARTMENT OF TRANSPORTATION
SPECIAL PROVISION LIST
PAGE:
DATE:
05/15/26
STATE PROJECT NO: I070-031 KA 7706-01 STATE CONTRACT NO: 526066212
FEDERAL PROJ NO.
PRIMARY DISTRICT:
DESCRIPTION:
PRIMARY COUNTY: GEARY2
LIGHTING. I-70: I-70/K-177 JCT IN GE CO.
PROVISION NO. DESCRIPTION
NOTE: THE FOLLOWING LIST OF SPECIAL PROVISIONS ARE FOR THIS PROJECT.
OMISSION OF ALL OR PART OF A SPECIAL PROVISION IN THE ATTACHED
PROPOSAL (CONTRACT) DOES NOT RELIEVE THE CONTRACTOR OF THE
RESPONSIBILITY FOR OBTAINING THE COMPLETE PROVISION AS LISTED.
REQUIRED CONTRACT PROVISION-NONCOLLUSION / HISTORY-DEBARMENT08-10-66-R05
REQUIRED CONTRACT PROVISION-FINANCIAL PREQUALIFICATION04-30-82-R07
REQUIRED CONTRACT PROVISION-CONTRACTUAL SERVICES-LEGISLATOR08-04-92-R03
REQUIRED CONTRACT PROVISION-EEO REQUIREMENT11-15-96-R06
REQUIRED CONTRACT PROVISION - BOYCOTT OF ISRAEL PROHIBITED07-01-17-R1
MINIMUM WAGE RATE (GEARY COUNTY)KS20260136
REQUIRED CONTRACT PROVISION-TAX CLEARANCE CERTIFICATE01-01-11-R01
REQUIRED CONTRACT PROVISION - ELECTRIC LIGHTING SYSTEM UNIT COST11-15-17-R02
POLICY AGAINST SEXUAL HARASSMENT03-01-18
ERRATA SHEET FOR STD SPEC BOOK FOR RD & BR CONST, 2015 ED15-ER-1-R23
REQUIRED CONTRACT PROVISIONS KS FUNDED CONST CONTRACTS15-01003
ENVIRONMENTAL CONCERNS - MIGRATORY BIRD TREATY ACT15-01011-R06
PROSECUTION AND PROGRESS15-01016-R04
CONTROL OF WORK15-01019-R02
BIDDING REQUIREMENTS AND CONDITIONS15-01021-R03
SCOPE OF WORK15-01022-R04
BIDDING REQUIREMENTS AND CONDITIONS15-01023
AWARD AND EXECUTION OF CONTRACT15-01024
STRUCTURAL CONCRETE15-04002-R01
GENERAL CONCRETE15-04005-R04
STRUCTURAL METALS FABRICATION15-07004-R02
DRILLED SHAFT (SPECIAL)15-07007-R01
CONTRACTOR CONSTRUCTION STAKING15-08015
WORK ZONE TRAFFIC CONTROL AND SAFETY15-08019-R03
ELECTRIC LIGHTING SYSTEMS AND TRAFFIC SIGNALS15-08028-R01
WORK ZONE TRAFFIC CONTROL AND SAFETY (WORKERS PRESENT SIGNS)15-08029
STORMWATER POLLUTION MANAGEMENT15-09002-R05
AGGS FOR CONCRETE NOT PLACED ON GRADE15-11003-R04
AIR-ENTRAINING ADMIXTURES FOR CONCRETE15-14001-R01
SHEET MATERIALS FOR CURING CONCRETE15-14002
LIQUID MEMBRANE FORMING COMPOUNDS15-14003
STRUCTURAL STEEL TUBING15-16001-R01
STEEL SIGN POSTS15-16002-R03
STRUCTURAL STEEL15-16005-R01
ANCHOR BOLTS FOR STRUCTURAL USES15-16006-R01
STEEL FASTENERS15-16007-R02
KANSAS DEPARTMENT OF TRANSPORTATION
SPECIAL PROVISION LIST
PAGE:
DATE:
05/15/26
STATE PROJECT NO: I070-031 KA 7706-01 STATE CONTRACT NO: 526066212
FEDERAL PROJ NO.
PRIMARY DISTRICT:
DESCRIPTION:
PRIMARY COUNTY: GEARY2
LIGHTING. I-70: I-70/K-177 JCT IN GE CO.
PROVISION NO. DESCRIPTION
NOTE: THE FOLLOWING LIST OF SPECIAL PROVISIONS ARE FOR THIS PROJECT.
OMISSION OF ALL OR PART OF A SPECIAL PROVISION IN THE ATTACHED
PROPOSAL (CONTRACT) DOES NOT RELIEVE THE CONTRACTOR OF THE
RESPONSIBILITY FOR OBTAINING THE COMPLETE PROVISION AS LISTED.
HELICAL REINFORCEMENT15-16009
PORTLAND CEMENT AND BLENDED HYDRAULIC CEMENT15-20001-R02
HYDRATED LIME15-20002
FLYASH FOR USE IN CONCRETE15-20004-R01
SILICA FUME15-20005
SLAG CEMENT FOR USE IN CONCRETE AND MORTAR15-20006
IMAGE SYSTEMS15-22005-R03
RETROREFLECTIVE SHEETING15-22006-R01
ROLL-UP SIGNS15-22011
WOOD POSTS15-23001-R03
FIELD HANDLING AND PRESERVATIVE TREATMENT OF WOOD PRODUCTS15-23003-R02
PART V15-25001-R07
MATERIALS CERTIFICATIONS15-26001-R13
END OF SPECIAL PROVISION LIST
REQUIRED CONTRACT PROVISION - 08-10-66-R05 (Rev. 07/05)
CERTIFICATION - NONCOLLUSION AND HISTORY OF DEBARMENT
K.A.R. 36-30-4, 49 C.F.R. 29.335, 23 U.S.C. 112(c), 49 U.S.C. 322
Complete the exceptions below if applicable. The Contractor's signature on the last page of the Contractor's Proposal (DOT Form 202) supplies the necessary signature for this
Certificate.
NONCOLLUSION
I certify that the Contractor submitting this bid has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action, in restraint of free competitive bidding in connection with the submitted bid.
HISTORY OF DEBARMENT
I certify that, except as noted below, the Contractor submitting this bid and any person associated with this Contractor in the capacitiy of owner, partner, director, officer, principal, investigator, project director, manager, auditor, or any position involving the administration of federal funds:
1. Are not currently suspended, debarred, voluntarily excluded or disqualified from bidding by any federal or state agency;
2. Have not been suspended, debarred, voluntarily excluded or disqualified from bidding by any federal or state agency within the past three years;
3. Do not have a proposed debarment pending;
4. Within the past three years, have not been convicted or had a civil judgment rendered against them by a court of competent jurisdiction in any matter involving fraud, anti-trust violations, theft, official misconduct, or other offenses indicating a lack of business integrity or business honesty; and
5. Are not currently indicted or otherwise criminally or civilly charged by a federal, state, or local government with fraud, anti-trust violations, theft, official misconduct, or other offenses indicating a lack of business integrity or business honesty; and
6. Have not had one or more federal, state, or local government contracts terminated for cause or default within the past three years.
Answer 'Yes' if there are exceptions to the above described circumstances. Answer 'No' if there are no exceptions.
Yes No
The exceptions, if any, are:
Contractor: Page 5 Check: 2585D209A4
REQUIRED CONTRACT PROVISION - 04-30-82-R07 (Rev. 01/11)
CERTIFICATION - FINANCIAL PREQUALIFICATION AMOUNT
Select the appropriate response below to indicate whether this Proposal exceeds the
Contractor's financial prequalification amount. The Contractor's signature on the last page of the Contractor's Proposal (DOT Form 202) supplies the necessary signature for this Certificate.
I understand that I may be required to identify the outstanding contract and subcontract work of my firm, association or corporation on DOT Form 284 prior to an award of contract. Unless I obtain approval, I understand that the Secretary may reject this
Proposal if the dollar value of work on this Contract combined with unearned amounts on our unfinished contract and subcontract work exceeds our prequalification amount.
I certify that the amount of this Proposal plus the total unearned amount of other contracts with the Kansas Department of Transportation plus the unearned amount of all other contracts in this state or other states exceeds does not exceed the financial prequalification amount of our firm, association or corporation. I also certify that our firm, association or corporation has the financial ability to do the work.
If this Proposal exceeds the financial prequalification amount, I certify that I obtained approval to submit this bid from the KDOT representative I have listed below. (Prior approval to exceed the prequalification limit may be made by telephone or personal contact).
KDOT Approval Granted by:
KDOT Approval Date:
Contractor: Page 6 Check: 2585D209A4
REQUIRED CONTRACT PROVISION - 08-04-92-R03 (Rev. 07/05)
CERTIFICATION - CONTRACTUAL SERVICES WITH A CURRENT
LEGISLATOR OR A CURRENT LEGISLATOR'S FIRM
Select the appropriate response below to indicate whether this contract is with a legislator or a firm in which a legislator is a member. The Contractor's signature on the last page of the Contractor's Proposal (DOT Form 202) supplies the necessary signature for this Certificate.
Kansas Law, K.S.A. 46-239(c), requires this agency to report all contracts entered into with any legislator or any member of a firm of which a legislator is a member, under which the legislator or member of the firm is to perform services for this agency for compensation. The Contractor certifies that:
This Contract is is not with a legislator or a firm in which a legislator is a member. That Legislator is:
Name:
Address:
City State Zip:
Business Telephone:
Contractor: Page 7 Check: 2585D209A4
REQUIRED CONTRACT PROVISION - 11-15-17-R02 (Rev. 03/26)
ELECTRIC LIGHTING SYSTEM UNIT COST
The Contractor shall comply with Section 814 of the Standard Specifications when providing and installing elements of the Electric Lighting System. Add the following at the end of Section 814.4 Measurement and Payment.
The Contractor will submit a unit cost in this Required Contract Provision for each individual Electric Lighting item the contract requires. Even though the bid item is a lump sum price, the Engineer will adjust the lump sum price by any increase or decrease in the quantities indicated in the Summary of Quantities shown in the plans. To calculate the adjustment, the Engineer will determine the overrun or underrun quantity for each
Electric Lighting System item list in the contract. The Engineer will multiply any overrun or underrun quantity by the unit cost the Contractor provided below. The Engineer will increase the lump sum price by the cost of any overruns and decrease the lump sum price by the cost of any underruns. The sum of the unit costs multiplied by the items listed in the Summary of Quantities for each site or the entire project must be less than or equal to the lump sum bid, or the unit cost submittal will be rejected. Contractor will then be required to resubmit this Required Contract Provision that meets this requirement for the bid to be accepted. The Engineer will only negotiate or receive new prices on Electric Lighting System items if they were not identified in the original
Summary of Quantities.
Furnished items shall comply with either the List of Prequalified Roadway Lighting
Systems and Equipment, or the specifications in the contract document or otherwise approved by the Engineer.
The Secretary may reject this Proposal if the Contractor fails to complete this Required
Contract Provision before noon on Friday after letting day.
ID# Unit Cost ID# Unit Cost ID# Unit Cost
*Refer to the Summary of Quantities sheet in the Plans for the ID #
Contractor: Page 8 Check: 2585D209A4
REQUIRED CONTRACT PROVISION - 01-01-11-R01 (01-01-11-R01)
TAX CLEARANCE CERTIFICATE
Answer 'Yes' if the Contractor has a current Tax Clearance Certificate. Answer 'No' if the Contractor does not have a current Tax Clearance Certificate.
Yes No
Insert the Tax Clearance Confirmation Number if available at the time of bidding:
Contractors shall have a current Tax Clearance Certificate from the Kansas Department of
Revenue [KDOR] at the time of contract award. The Tax Clearance process is a tax account review by KDOR to determine that the Contractor's account is compliant with Kansas tax laws administered by the Director of Taxation. The Secretary will reject the Contractor's
Proposal as non-responsive if the Contractor does not have a current Tax Clearance
Certificate at the time of the contract award.
To obtain a Tax Clearance Certificate, the Contractor shall complete and submit to KDOR an Application for Tax Clearance obtained from KDOR's website at http:// www.ksrevenue.org/taxclearance.htm. The Application Form can be completed and submitted on-line, by mail, or by fax. After the Contractor submits the Application, KDOR will provide the Contractor a Transaction ID number. The Contractor shall use the Transaction
ID number to retrieve the Tax Clearance Certificate. Decisions on on-line applications are generally available the following business day.
After the Contractor obtains the Tax Clearance Certificate, the Contractor shall insert on this Required Contract Provision the Confirmation Number contained in the Certificate or the Contractor shall submit a copy of the Tax Clearance Certificate to the KDOT Bureau of Construction and Materials by hand delivery, mail, e-mail or fax. Before awarding a contract, the Bureau of Construction and Materials will authenticate the Certificate through the Confirmation Number inserted on this Required Contract Provision or contained on the Certificate submitted.
If the Contractor is unable to retrieve the Tax Clearance Certificate or if KDOR denies the Contractor's Application for Tax Clearance, the Contractor shall call KDOR's Special
Projects Team at 785-296-3199 to determine why KDOR failed to issue the certificate.
Tax Clearance Certificates are valid for 90 days after issue. To renew a clearance, submit a new Tax Clearance Application. Information pertaining to a Tax Clearance is subject to change for various reasons, including a state tax audit, federal tax audit, agent actions, hearings, and other legal actions. The Tax Clearance Certificate is not
"clearance" for all types of taxes the State of Kansas may assess.
Subcontractors also shall have a current Tax Clearance Certificate from KDOR before the
Secretary approves them for subcontract work. The Contractor shall submit to the KDOT
Field Office the Subcontractor's Tax Clearance Certificate with KDOT Form 259, Request for Approval of Subcontractor.
Contractor: Page 9 Check: 2585D209A4
Line Number Item Number Quantity Unit Unit Price Extension Price
Section 01
COMMON ITEMS
1 025323 1.000 LS
MOBILIZATION /
2 020100 1.000 LS
CONTRACTOR CONSTRUCTION STAKING /
3 025324 1.000 LS
TRAFFIC CONTROL /
4 070580 1.000 HOUR $30.000 $30.00
FLAGGER (SET PRICE) /
Section 01 Total $30.00
Section 02
LIGHTING ITEMS
5 025300 1.000 LS
ELECTRIC LIGHTING SYSTEM /
6 014486 5.000 EACH
HIGH MAST LIGHT TOWER (100') (48" CONCRETE BASE) /
Section 02 Total
Item Total $30.00
Contractor: Page 10 Check: 2585D209A4
���!����������&"'�"()*��+�� ,-� '+��.,+/0� �1 ��2� �� ��������������������������������������',+�����3��4��5������������������������������������������,��������������6���#��',+�(+,�0,7�� ,-� -,)8&&&&&&&&&&&9��4&���������������5&��3333333333333333333333333333333333333333333333333333333333333333:�-);�3��3�������������������������������������������������,��������������6���#��8)<+,0,���.�����!��&&&&&&&&&&&&&&9���&���������������5&=�3333333333333333333333333333333333333333333333333333333333333333���-�����43�=������4����4����������������������������������,��������������6���#���),.0� 0,7�'� ������6 �>&&&&9���&���������������5&�����010� �1)�+���+��,0 0�6'�'�"0,&&&9���&����������������&����080� ,'�')�&&&&&&&&&&&&&&&&&&&&&&9��4&4��������������5&�5��',+�(+,�0,7�,0'�6+,�'��&&&&&&&&&&9���&5?��������������&����8)<+,0,���� ���������&&&&&&9��5&�?��������������&����8)<+,0,���� �������%�@"������"����(��>�<�$���A&&&&&&&&&&&&&&&&9��4&���������������5&����8)<+,0,���6��##��&&&&&&&&&&&&&&&&9���&����������������&����8)<+,0,���1�� �� ������3����������� ����&&&&&&&&&&&&&&&&&&9��4&=���������������&?���+.0,) +,�����<� ��0B �C�� �&&&&&&&9��4&55��������������&����+.0,) +,���< ����>������������>���8 ����&&&&&&&&&&&&&&&&9���&=?��������������&����+.0,) +,���<�
���%�����&&&&&&&&&9��5&?���������������&����+.0,) +,���<���� D��&&&&&&&&&&&&&9��4&���������������5&����+.0,) +,���� �����6����$��#���1� $���&&&&&&&&&&&&&&&&&&&&&&&&&&9��5&����������������&����+.0,) +,��������&&&&&&&&&&&&&&&&&9���&54�������������?&����
EFGFHIJ�KLEM�NO PNOQRST
UVVWXLFFXYZQRSTF[YR\]̂\V\_Z̀aYV̀SaFbPHcHIcEdIFc EFG
�/���.��$��0�$( ���1��������������������������������������������������� �������������������)�)�������������������������������2( ������������������"��"������������������������������2( ��$�3�$���������)�����������������������������������# ������������������� �*������������������������������2� $����������*"�*"�������������*�*������4450�0�6���!����2� ������������������������������)��"����������������������4450�25�6�!57��5�6����� (�2 /$���5$������� ��$�3�$1����������������������������)���������������������809� �5&�����:���
| �(;���������**�)����������������������809� | �5&���� | �3-��$����$��3��������������������������������809� | �5&����4��������$����!�<��=�����������������������������*���*������������� �� ����809� | �5&�����%%������� |
| �(;�������� ��������������������>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>:�! | ��2�>���(� |
��$����????????????????????????????????????????????????????????????????6������@�(�� �,��1���"��.������� ��2 �4��� ���0�$� �(������A�(������'� �+ �����1��$�� �B�$�� =��.�*��"���5%��' �3����- ���3-��=����< ��3-��=����3�������-�
$A� �C������� �����%�3 �=�3�3�� ;��%�3 �=�����'���3-��=��1�<'�� $A� �C�� �3.�� �����%�3 �=�3�3�� ;��%�3 �=�����'���3-��=��1�<'�� 3��%.���3��� 3��
DEFEGHI�JKDL�MN OMNPQRS
TUUVWKEEWXYPQRSEZXQ[\][U[̂Y_̀XU_R̀EaOGbGHbDcHEb GEF
��.���������$��������������0.�������������
��1� � ,������ ��2������������������������������ �������3�.��������� ��������.�������������������������+,+"���4������������������
�5���
2+-67/�"�"�2�3�2�3�2���33�����������������������������������������������������������������4������$��.���������������������������
��������������������.�������$��2 3��.���� �����������������������������������$������������������������4������
����������2� ��������������������3*���
�.�������������5�����/����0�����.��� �����������889588*�885(:;88*�<9(<*����<96<�������
���$����������=>5?,�-#�,,"�,@�,��+,+A��=>5?��
�>�����,�-#��4��������
����������������������������4�������*�,@�,��+,+A��������������*�� ���������������������5�������������������������
�������������������������������BC&������������
���������������������������������������26'(3�����������������
�.��������5�����(�������/����0�����.��� 4���5(:;�������.������������
��������,,D��.�������������������.���������
���E(?=>��5(:;��C�,,�,�,��,��+,+A��5(:;��������� ��������������������C��������� �����9������.������4���������
FGHGIJK�LMFN�OP QOPRSTU
VWWXYMGGYZ[RSTUG\ZS]̂_]W]̀[abZWaTbGcQIdIJdFeJGd eGH
| ����� | ���� | � |
| ������ !� | � |
| ������#�� | ��������#����$���� | #�� |
| ����� |
| ����� | �� | |
| � | � |
| ��� | � |
| �����"�����%� | ��#�&� |
| ���� | �����((%�((����� |
| ���� | ������� |
| � | � |
| ��� | ��������*���������������+�,-&����.�� |
| � |
| ����� | ��#� |
| � |
| ��� | � |
| �������� | �����"#� |
| ��� | � |
| �� | �� |
| ����� | ��#�� |
| � |
| ����� | ���� | � |
| ��������������� | � | |
| ��� | �� |
����/������0�%�-1����)��23��2�������%��������
| �������� | |
| ������ | ���� |
| ���� | ��#��� |
���-1�������
| ������������� | |
| ��#�� | � |
| ������� | � |
| ���� | �"������������� |
| ����"� | ����2���� |
��3��2���������
| ������� | � |
| ������� | � |
���� �4%�4������ � ����5 ���6��������5 � �7����� ��*657.�����
| ������� | � |
| ������� | ��+�,-&���3*�.*�.�% |
| ���� | �����((%�((����� |
| ���� | ������� |
| �� | ���� |
| ��� | ��� |
������� ��+�,�-�&���8*�.)*�.���/������0�%�9/���8)��2����8�������%�� �����
| ��� | � |
| ���� | ��� |
����9/ ��� �� ��9���������8����
| ������ | � |
| ���� | ��"������������� |
| ����"� | ����2���� |
�������8���������
| ������� | � |
| ������� | � |
���4%�4�����
| ��� | � |
| ����� | ��� |
���)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))6�!/�7/�/&9';��'<;��==/�1%�=&<,/%%�.�5���
| � | 4���������"�0������������.����� | ��#����� | �#������������� |
| � | ���� |
����657���
| ������ | ���� | |
| ���� | ��#����� | |
| ����"���� | �� |
| ���657�? | ���� |
| ��6����%� | ��#���&�>��� |
| �"#������ | |
| 0������������? | ����� |
| ��6����%� | ��#� |
ABCBDEF�GHAI�JK LJKMNOP
QRRSTHBBTUVMNOPBWUNXYZXRX[V\]UR\O]B̂LD_DE_ÀEB_ aBC
| ��� | ��������� �!����� |
| �����"� | �����#���������� |
| ���������� | ||
| $����$ | �� | ����$����$ |
| ������% | |
| ������ | �� |
| &�� | �'���()�� | ||
| $�*� | &�� | �� | ��"��� |
| &�� | +������������'���$�� | ��� | ���� |
| �������������"�.�� | �������$�����"������$� |
| �,������� |
| ����� | ��.�����/��0!�1���� �2������/��0!�1����3,�!�% |
| ������ | ����� |
| �#�������$ | �� |
| �*� | &�� | �� | ���"��� | |
| &�� | +���������������������� |
��� ��������� �4�����%
| &&����������� | ����� |
| ��������������"5��� | � |
| ��������"� | ||
| �� | ���� | |
| ��.#������"������������ | 6�$�����$� |
| ��� | ��$ | �� |
| �������&������� | ����� |
��7,�-��������$
| ����� | �� | |
| ��� | ����� | ���&����� |
| �#�' | ����.� | ����&"���������������&��' | ���,����� |
| ���� | +��������������� |
��� ��������� ��8888888888888888888888888888888888888888888888888888888888888888����������9���)0�:9�9!����9�-�-)�;��������
<=>=?@A�BC<D�EF GEFHIJK
LMMNOC==OPQHIJK=RPISTUSMSVQWXPMWJX=YG?Z?@Z<[@=Z >=>
File details come from the government source that posted it. Updated .