Bid Form.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Redpoint Ridge Park Landscape Renovation
Solicitation number
24T0031
Issued by
Broomfield County, Colorado

About this file

The document is a Bid Form for the Redpoint Ridge Park Landscape Renovation project (Project 24T0031) issued by the City of Broomfield, Colorado. The project involves comprehensive landscape renovation, including removing and replacing existing plants, irrigation systems, electrical conduits, concrete headers, and crusher fines, as well as placing boulders, rocks, and other hardscape elements. The bid form includes 55 base bid items and additional alternate bid items covering general construction, site work, boulder/stone placement, site elements, concrete pads, planting, irrigation, and electrical work. The project requires furnishing all labor, materials, and equipment to complete the renovation according to the project plans and specifications.

The total base bid is $17,500.00, which includes a $2,500 construction water deposit and a $15,000 force account allowance. The bid form provides unit prices for various landscape elements, including 29 trees (2-inch caliper), 101 5-gallon shrubs, 54 1-gallon shrubs, 142 1-gallon perennials, 180 4-inch pot grasses, 560 4-inch pot perennials, and 675 4-inch pot ground covers. The City retains sole discretion in selecting add alternate bid items and has the option to increase, decrease, or omit quantities. Optional items are included for additional materials like import fill, earthwork, topsoil, and various types of river cobble, though these are not mandatory bid requirements and will not be used to determine contract award.

View the file

Other files

File Type Posted
Bid Document Package.pdf PDF
Project Specifications.pdf PDF
Sample Construction Agreement.pdf PDF
Project Plans.pdf PDF
Electrical Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Form

BID FORM
Redpoint Ridge Park Landscape Renovation, Project - 24T0031
Round ALL unit prices to the nearest penny
All bids shall be submitted on this bid form provided. The quantities appearing in the bid form are estimates prepared for the comparison of proposals, and the quantities of work performed and materials to be furnished may be increased, decreased, or omitted. Payment will be based on the actual quantities of work performed. CONTRACTOR price must include all necessary material, labor and other appurtenances for a complete and working project per the project plans and specifications.
BASE BID
ITEM NO.DESCRIPTIONUNITQUANTITYUNIT PRICETOTAL COST
General
1Mobilization (Not to Exceed 5% of Base Bid total)LS1$ - 0
2Construction SurveyingLS1$ - 0
3Traffic ControlLS1$ - 0
4Erosion ControlLS1$ - 0
5Tree ProtectionEA27$ - 0
6Construction Chain Link FenceLF1,200$ - 0
7Construction Plastic FenceLF1,500$ - 0
8Clearing and GrubbingSF38,000$ - 0
-Site Work
9Earthwork and GradingLS1$ - 0
10Import FillCY100$ - 0
11Granite Chip 3/4-inch at 2 inches Depth - SalvageSF8,000$ - 0
12Crusher Fines NewSF10,000$ - 0
13Dry Creek Bed CleanupLS1$ - 0
14MowbandLF410$ - 0
15Cobble Edge SingleLF110$ - 0
16Cobble Edge WideSF2,000$ - 0
17Steel EdgerLF150$ - 0
-Boulder / Stone
18Mossrock Red LEA3$ - 0
19Mossrock Red MEA3$ - 0
20Mossrock Red SEA17$ - 0
21Sandstone Buff MEA50$ - 0
22Sandstone Buff SEA60$ - 0
23Sandstone Bench AEA2$ - 0
24Sandstone Bench BEA5$ - 0
25Stepping StoneLS1$ - 0
26Stone EdgeLF600$ - 0
-Site Elements / Concrete Pad
27Picnic Table (3 seats)EA1$ - 0
28Picnic Table (4 seats)EA4$ - 0
29Creekview Bar Table Set 30-InchEA3$ - 0
30Creekview Bar Table Concrete PadSF96$ - 0
31Lounge ChairEA2$ - 0
32Lounge Chair Concrete PadSF40$ - 0
33Ledge TableEA2$ - 0
34Ledge Table Concrete PadSF15$ - 0
35Ping Pong TableEA1$ - 0
36Ping Pong Table Concrete PadSF210$ - 0
37Hammock PostEA5$ - 0
38CornholeLS1$ - 0
39Relocate (1) Bench and SignLS1$ - 0
-Planting
40Soil Prep and Cobble / Squeezee Mulch at Garden BedSF10,000$ - 0
41Soil Prep and Squeezee Mulch at Planting BedSF4,000$ - 0
42Trees (2-inch Caliper) (B&B)EA29$ - 0
43Shrub 5 GalEA101$ - 0
44Shrub 1 GalEA54$ - 0
45Perennials 1 GalEA142$ - 0
46Grass 4-inch PotsEA180$ - 0
47Perrenials 4-inch PotsEA560$ - 0
48Ground Cover 4-Inch PotsEA675$ - 0
49Native SeedingSF1,100$ - 0
50Tahoma 31SF1,600$ - 0
51SodSF3,500$ - 0
-Irrigation
52IrrigationLS1$ - 0
-Electrical
53ElectricalLS1$ - 0
-Miscellaneous
54Construction Water Deposit AllowanceLS1$ 2,500.00$ 2,500.00
55Force AccountLS1$ 15,000.00$ 15,000.00
TOTAL BASE BID$ 17,500.00
Contractor Name:
LANDSCAPE ADD ALTERNATES
ALT #DESCRIPTIONUNITQUANTITYUNIT PRICETOTAL COST
Landscape
1Picnic Table (Plan seet L5.1)EA1$ - 0
2Picnic Table (Plan sheet L5.1)EA1$ - 0
3Sandstone Slab Bench Type A (Plan sheet L5.3)EA3$ - 0
4Sandstone Slab Bench Type B (Plan sheet L5.2, L5.3)EA8$ - 0
5Trees (2-Inch Caliper) (Plan sheet L5.2, L5.4)EA4$ - 0
6Moss Rock L (Plan sheet L5.2, L5.3)EA2$ - 0
7Moss Rock M (Plan sheet L5.2, L5.3)EA6$ - 0
8Moss Rock S (Plan sheet L5.2, L5.3)EA7$ - 0
TOTAL LANDSCAPE ADD ALTERNATES$ - 0
IRRIGATION ADD ALTERNATES
ALT #DESCRIPTIONUNITQUANTITYUNIT PRICETOTAL COST
Irrigation
1Update and Furnish Primary Point-of-Connection Vault (Plan sheet IR1.0)EA1$ - 0
2Update and Reset Master Valve and Flows (Plan sheet IR1.0)EA1$ - 0
3Update and Furnish Secondary Point-of-Connection Vault (Plan sheet IR1.0)EA1$ - 0
4Update Controller and Associated Equipment (Plan sheet IR1.0)EA1$ - 0
TOTAL IRRIGATION ADD ALTERNATES$ - 0
Optional Costs
Item No.DESCRIPTIONUNITQUANTITYUNIT PRICETOTAL COST
1Import FillCY
2Earthwork - Cut Used as Fill, Backfill and Compaction on SiteCY
3TopsoilCY
4Four-inch (4") Perforated PipeLF
5Granite Chip (3/4 inch)TON
6River Cobble at Dry Creek Bed (2-inch to 4-inch) Color to Match ExistingTON
7River Cobble at Dry Creek Bed (5-inch to 12-inch) Color to Match ExistingTON
8River Cobble at Dry Creek Bed (12-inch to 20-inch) Color to Match ExistingTON
BID SUMMARY
BASE BID$ 17,500.00
BASE BID + Landscape ALT ( #1 through #8)$ 17,500.00
BASE BID + Irrigation ALT ( #1 through #4)$ 17,500.00
BASE BID + Landscape ALT + Irrigation ALT$ 17,500.00
For Add Alternate Bid Items:
All schedules (bid items) must be bid. Add alternate bid item wil not be awarded independent of the Base Bid. Add alternate bid item(s), if accepted, individually, or as a group, shall be inlcuded in the contract and the amount shall be adjusted from the Base Bid at the time of award. The City shall have sole discretion in determining the selection of the add alternate bid item(s). The award will be based on the Base Bid plus selected alternate items.
For Optional Items:
Optional items are not bid items. Bidders are requested to quote a unit price for all the available options with reasonable pricing, however, it is not part of the mandatory requirements of the bid. These items will not be used as a basis to award the contract. The City shall have sole discretion in utilizing these unit prices for the work as needed.

File details come from the government source that posted it. Updated .