Bid Form.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- Redpoint Ridge Park Landscape Renovation
- Solicitation number
- 24T0031
- Issued by
- Broomfield County, Colorado
About this file
The document is a Bid Form for the Redpoint Ridge Park Landscape Renovation project (Project 24T0031) issued by the City of Broomfield, Colorado. The project involves comprehensive landscape renovation, including removing and replacing existing plants, irrigation systems, electrical conduits, concrete headers, and crusher fines, as well as placing boulders, rocks, and other hardscape elements. The bid form includes 55 base bid items and additional alternate bid items covering general construction, site work, boulder/stone placement, site elements, concrete pads, planting, irrigation, and electrical work. The project requires furnishing all labor, materials, and equipment to complete the renovation according to the project plans and specifications.
The total base bid is $17,500.00, which includes a $2,500 construction water deposit and a $15,000 force account allowance. The bid form provides unit prices for various landscape elements, including 29 trees (2-inch caliper), 101 5-gallon shrubs, 54 1-gallon shrubs, 142 1-gallon perennials, 180 4-inch pot grasses, 560 4-inch pot perennials, and 675 4-inch pot ground covers. The City retains sole discretion in selecting add alternate bid items and has the option to increase, decrease, or omit quantities. Optional items are included for additional materials like import fill, earthwork, topsoil, and various types of river cobble, though these are not mandatory bid requirements and will not be used to determine contract award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Document Package.pdf | ||
| Project Specifications.pdf | ||
| Sample Construction Agreement.pdf | ||
| Project Plans.pdf | ||
| Electrical Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Form
| BID FORM |
| Redpoint Ridge Park Landscape Renovation, Project - 24T0031 |
| Round ALL unit prices to the nearest penny |
| All bids shall be submitted on this bid form provided. The quantities appearing in the bid form are estimates prepared for the comparison of proposals, and the quantities of work performed and materials to be furnished may be increased, decreased, or omitted. Payment will be based on the actual quantities of work performed. CONTRACTOR price must include all necessary material, labor and other appurtenances for a complete and working project per the project plans and specifications. |
| BASE BID |
| ITEM NO. | DESCRIPTION | UNIT | QUANTITY | UNIT PRICE | TOTAL COST |
| General | |||||
| 1 | Mobilization (Not to Exceed 5% of Base Bid total) | LS | 1 | $ - 0 | |
| 2 | Construction Surveying | LS | 1 | $ - 0 | |
| 3 | Traffic Control | LS | 1 | $ - 0 | |
| 4 | Erosion Control | LS | 1 | $ - 0 | |
| 5 | Tree Protection | EA | 27 | $ - 0 | |
| 6 | Construction Chain Link Fence | LF | 1,200 | $ - 0 | |
| 7 | Construction Plastic Fence | LF | 1,500 | $ - 0 | |
| 8 | Clearing and Grubbing | SF | 38,000 | $ - 0 | |
| - | Site Work | ||||
| 9 | Earthwork and Grading | LS | 1 | $ - 0 | |
| 10 | Import Fill | CY | 100 | $ - 0 | |
| 11 | Granite Chip 3/4-inch at 2 inches Depth - Salvage | SF | 8,000 | $ - 0 | |
| 12 | Crusher Fines New | SF | 10,000 | $ - 0 | |
| 13 | Dry Creek Bed Cleanup | LS | 1 | $ - 0 | |
| 14 | Mowband | LF | 410 | $ - 0 | |
| 15 | Cobble Edge Single | LF | 110 | $ - 0 | |
| 16 | Cobble Edge Wide | SF | 2,000 | $ - 0 | |
| 17 | Steel Edger | LF | 150 | $ - 0 | |
| - | Boulder / Stone | ||||
| 18 | Mossrock Red L | EA | 3 | $ - 0 | |
| 19 | Mossrock Red M | EA | 3 | $ - 0 | |
| 20 | Mossrock Red S | EA | 17 | $ - 0 | |
| 21 | Sandstone Buff M | EA | 50 | $ - 0 | |
| 22 | Sandstone Buff S | EA | 60 | $ - 0 | |
| 23 | Sandstone Bench A | EA | 2 | $ - 0 | |
| 24 | Sandstone Bench B | EA | 5 | $ - 0 | |
| 25 | Stepping Stone | LS | 1 | $ - 0 | |
| 26 | Stone Edge | LF | 600 | $ - 0 | |
| - | Site Elements / Concrete Pad | ||||
| 27 | Picnic Table (3 seats) | EA | 1 | $ - 0 | |
| 28 | Picnic Table (4 seats) | EA | 4 | $ - 0 | |
| 29 | Creekview Bar Table Set 30-Inch | EA | 3 | $ - 0 | |
| 30 | Creekview Bar Table Concrete Pad | SF | 96 | $ - 0 | |
| 31 | Lounge Chair | EA | 2 | $ - 0 | |
| 32 | Lounge Chair Concrete Pad | SF | 40 | $ - 0 | |
| 33 | Ledge Table | EA | 2 | $ - 0 | |
| 34 | Ledge Table Concrete Pad | SF | 15 | $ - 0 | |
| 35 | Ping Pong Table | EA | 1 | $ - 0 | |
| 36 | Ping Pong Table Concrete Pad | SF | 210 | $ - 0 | |
| 37 | Hammock Post | EA | 5 | $ - 0 | |
| 38 | Cornhole | LS | 1 | $ - 0 | |
| 39 | Relocate (1) Bench and Sign | LS | 1 | $ - 0 | |
| - | Planting | ||||
| 40 | Soil Prep and Cobble / Squeezee Mulch at Garden Bed | SF | 10,000 | $ - 0 | |
| 41 | Soil Prep and Squeezee Mulch at Planting Bed | SF | 4,000 | $ - 0 | |
| 42 | Trees (2-inch Caliper) (B&B) | EA | 29 | $ - 0 | |
| 43 | Shrub 5 Gal | EA | 101 | $ - 0 | |
| 44 | Shrub 1 Gal | EA | 54 | $ - 0 | |
| 45 | Perennials 1 Gal | EA | 142 | $ - 0 | |
| 46 | Grass 4-inch Pots | EA | 180 | $ - 0 | |
| 47 | Perrenials 4-inch Pots | EA | 560 | $ - 0 | |
| 48 | Ground Cover 4-Inch Pots | EA | 675 | $ - 0 | |
| 49 | Native Seeding | SF | 1,100 | $ - 0 | |
| 50 | Tahoma 31 | SF | 1,600 | $ - 0 | |
| 51 | Sod | SF | 3,500 | $ - 0 | |
| - | Irrigation | ||||
| 52 | Irrigation | LS | 1 | $ - 0 | |
| - | Electrical | ||||
| 53 | Electrical | LS | 1 | $ - 0 | |
| - | Miscellaneous | ||||
| 54 | Construction Water Deposit Allowance | LS | 1 | $ 2,500.00 | $ 2,500.00 |
| 55 | Force Account | LS | 1 | $ 15,000.00 | $ 15,000.00 |
| TOTAL BASE BID | $ 17,500.00 | |
| Contractor Name: |
| LANDSCAPE ADD ALTERNATES | |||||
| ALT # | DESCRIPTION | UNIT | QUANTITY | UNIT PRICE | TOTAL COST |
| Landscape | |||||
| 1 | Picnic Table (Plan seet L5.1) | EA | 1 | $ - 0 | |
| 2 | Picnic Table (Plan sheet L5.1) | EA | 1 | $ - 0 | |
| 3 | Sandstone Slab Bench Type A (Plan sheet L5.3) | EA | 3 | $ - 0 | |
| 4 | Sandstone Slab Bench Type B (Plan sheet L5.2, L5.3) | EA | 8 | $ - 0 | |
| 5 | Trees (2-Inch Caliper) (Plan sheet L5.2, L5.4) | EA | 4 | $ - 0 | |
| 6 | Moss Rock L (Plan sheet L5.2, L5.3) | EA | 2 | $ - 0 | |
| 7 | Moss Rock M (Plan sheet L5.2, L5.3) | EA | 6 | $ - 0 | |
| 8 | Moss Rock S (Plan sheet L5.2, L5.3) | EA | 7 | $ - 0 | |
| TOTAL LANDSCAPE ADD ALTERNATES | $ - 0 | ||||
| IRRIGATION ADD ALTERNATES | |||||
| ALT # | DESCRIPTION | UNIT | QUANTITY | UNIT PRICE | TOTAL COST |
| Irrigation | |||||
| 1 | Update and Furnish Primary Point-of-Connection Vault (Plan sheet IR1.0) | EA | 1 | $ - 0 | |
| 2 | Update and Reset Master Valve and Flows (Plan sheet IR1.0) | EA | 1 | $ - 0 | |
| 3 | Update and Furnish Secondary Point-of-Connection Vault (Plan sheet IR1.0) | EA | 1 | $ - 0 | |
| 4 | Update Controller and Associated Equipment (Plan sheet IR1.0) | EA | 1 | $ - 0 | |
| TOTAL IRRIGATION ADD ALTERNATES | $ - 0 |
| Optional Costs | |||||
| Item No. | DESCRIPTION | UNIT | QUANTITY | UNIT PRICE | TOTAL COST |
| 1 | Import Fill | CY | |||
| 2 | Earthwork - Cut Used as Fill, Backfill and Compaction on Site | CY | |||
| 3 | Topsoil | CY | |||
| 4 | Four-inch (4") Perforated Pipe | LF | |||
| 5 | Granite Chip (3/4 inch) | TON | |||
| 6 | River Cobble at Dry Creek Bed (2-inch to 4-inch) Color to Match Existing | TON | |||
| 7 | River Cobble at Dry Creek Bed (5-inch to 12-inch) Color to Match Existing | TON | |||
| 8 | River Cobble at Dry Creek Bed (12-inch to 20-inch) Color to Match Existing | TON |
| BID SUMMARY | ||
| BASE BID | $ 17,500.00 | |
| BASE BID + Landscape ALT ( #1 through #8) | $ 17,500.00 | |
| BASE BID + Irrigation ALT ( #1 through #4) | $ 17,500.00 | |
| BASE BID + Landscape ALT + Irrigation ALT | $ 17,500.00 |
| For Add Alternate Bid Items: |
| All schedules (bid items) must be bid. Add alternate bid item wil not be awarded independent of the Base Bid. Add alternate bid item(s), if accepted, individually, or as a group, shall be inlcuded in the contract and the amount shall be adjusted from the Base Bid at the time of award. The City shall have sole discretion in determining the selection of the add alternate bid item(s). The award will be based on the Base Bid plus selected alternate items. |
| For Optional Items: |
| Optional items are not bid items. Bidders are requested to quote a unit price for all the available options with reasonable pricing, however, it is not part of the mandatory requirements of the bid. These items will not be used as a basis to award the contract. The City shall have sole discretion in utilizing these unit prices for the work as needed. |
File details come from the government source that posted it. Updated .