BID FORM BP 2.pdf

PDF 70 KB Posted

Attached to
Hillcrest Park Playground - Bid Package 2
Solicitation number
OREM202320754
Issued by
Utah

About this file

This is a Bid Form for Hillcrest Park - Bid Package 2, issued by the City of Orem and solicited through Bud Mahas Construction, Inc. The document outlines bidding requirements for a construction project with specific instructions for potential contractors. The bid is subject to Davis Bacon Wage requirements, and bidders must provide a comprehensive proposal that includes all layout, cleanup, and installation costs for the project. The construction duration will follow the Construction Manager's schedule, with liquidated damages of $500 per day for delays.

The bid form requires detailed information from contractors, including their Experience Modifier rate for worker's compensation insurance and the potential cost of payment and performance bonds. Bidders must submit a complete bid package and are advised that the Construction Manager and Owner reserve the right to accept or reject any proposals. Low bidders may be required to submit a Contractor's Qualification Statement (AIA Document A305), and the evaluation will prioritize past performance, ability to complete work on schedule, and overall project satisfaction. The document includes an optional section for Value Engineering Alternates, allowing bidders to propose cost-saving modifications to the original bid.

View the file

Other files

File Type Posted
1106689-event.pdf PDF
Notice to Contractors BP 2.pdf PDF
HUD Form 4010.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID FORM PAGE 1 OF 2

BID FORM

HILLCREST PARK – BID PACKAGE 2

City of Orem

Name of Bidder:

Full Address:

Contractor’s License #:

Phone: Fax:

Bid to: Bud Mahas Construction, Inc.

917 West Duluth Avenue, Salt Lake City, UT 84116

Phone: (801) 521-7533 Fax: (801) 531-0314 bids@budmahas.com

Addenda Noted: NONE ALL # , , , , , ,,, BASE BID (in case of discrepancy between written amount and numerals, written amount will govern)

THIS PROJECT IS SUBJECT TO DAVIS BACON WAGES.

By submitting a bid you acknowledge that Davis Bacon wages have been included in your price.

Specification Section(s) included:

(if bidding multiple sections, attach a separate sheet with breakdown of price by section)

Amount: dollars ($ )

Furnished and Installed Furnished Only

Specification Section(s) included:

(if bidding multiple sections, attach a separate sheet with breakdown of price by section)

Amount: dollars ($ )

Furnished and Installed Furnished Only

ADDITIONAL BIDDING REQUIREMENTS: (Failure to respond where required may result in disqualification of bid)

1. By its signature below, Bidder verifies that it has included in the base bid all amounts necessary to accomplish all layout and cleanup (including off site disposal) as necessary to accomplish the complete performance of the work covered in the bid. If the layout necessary for it to perform Bidder’s scope of work is performed by others, the amount of $ may be deducted from the base bid amount. If the cost of off site disposal of all debris generated by Bidder’s scope of work is provided by others, the amount of $ may be deducted from the base bid.

2. Bids shall be priced lump sum to furnish and/or install all material and/or equipment as required by plans and specifications. A 5% BID SECURITY MUST BE ATTACHED FOR BIDS OVER $50,000.

BID FORM PAGE 2 OF 2

3. The construction duration of this project will be per construction schedule. Material and equipment must be delivered and installed in accordance with the Construction Manager’s schedule as updated throughout the project. Liquidated damages are $500.00 per day.

4. COST OF PAYMENT AND PERFORMANCE BOND: $ (This amount will be added to the base bid amount, if payment and performance bonds are required. If no amount is provided, it will be presumed that the bidder is unable to bond for its work on this project).

5. The bidder’s Experience Modifier (“E-mod”) rate for worker’s compensation insurance is .

(This information is available from your worker’s compensation insurance carrier.)

6. The Construction Manager and Owner reserve the right to accept or reject any and all proposals or alternates with or without cause for any reason determined to be in the Owner’s best interest and to waive any bidding informality or irregularity.

7. The undersigned bidder, having examined the Drawings, Specifications and related documents in their entirety, and the site of the proposed work, and being familiar with all of the conditions surrounding the construction of the proposed project including the availability of labor, hereby proposes to complete the work listed above in accordance with the Contract Documents and within the time set forth, at the price stated above and upon the subcontract form included in the Specifications. The above price is to cover all expenses incurred in performing the work required under the Contract Documents.

8. CONTRACTOR'S QUALIFICATION STATEMENT: Upon request the low bidders shall submit AIA Document

A305 Contractor's Qualification Statement. Failure to show a statement satisfactory to the Owner or

Construction Manager will be reason to reject the bid as nonresponsive. Past performance on similar projects, the demonstrated ability to complete work on schedule and ability to perform the work on this project to the satisfaction of the Owner and Construction Manager will be a priority.

BY ITS SIGNATURE, BIDDER ACKNOWLEDGES THAT THE BID DOCUMENTS ARE A COMPLETE PACKAGE.

BIDDER CERTIFIES IT HAS REVIEWED ALL BID DOCUMENTS TO DETERMINE ITS TOTAL SCOPE OF WORK AND

HAVE INCLUDED ALL RELATED COSTS.

Name of Bidder (Company)

_______________________________________________________________ Date

Authorized Signature _____________________ Print Name

Value Engineering Alternates (Optional)

Include a description of each value engineering proposals and the cost impact that each would have on the bid items listed above (attach a separate sheet if necessary):

File details come from the government source that posted it. Updated .