BID DOCUMENTS C26TR1.pdf
PDF 830 KB Posted
- Attached to
- Carpios Ridge Restroom Replacement - C26TR1
- Solicitation number
- IFB1 PMAA 2027000010 2
- Issued by
- El Paso County, Colorado Springs City, Colorado
About this file
This is a Bid Documents file for the Colorado Division of Parks and Wildlife seeking sealed bids for the removal and replacement of the existing Carpios Ridge Restroom Facility at Trinidad Lake State Park. The project involves demolition of the existing restroom building, foundation, and sidewalks, followed by installation of a CXT-Arapahoe Flush Restroom or approved equal, along with site preparation and concrete sidewalk installation. The mandatory pre-bid conference is scheduled for August 20, 2026, at 10:00 AM at the project site (Latitude: 37.1445, Longitude: -104.5679), with sealed bids due by September 2, 2026, at 10:00 AM at the Southeast Region Office, 4255 Sinton Road, Colorado Springs, Colorado 80907. The Notice of Intent to Award is tentatively scheduled for September 2, 2026, with a Notice to Proceed on September 16, 2026. The contract work must be completed within 180 calendar days from the Notice to Proceed, with substantial completion targeted for February 16, 2027. All questions must be submitted in writing by August 27, 2026, at 10:00 AM to Project Manager Dennis Beamis.
The project is estimated between $375,000 and $500,000, requiring a five-percent (5%) bid bond, certified check, or cashier's check with sealed bids. Base bid items include mobilization, demolition, utility disconnection and reconnection, site clearing and grading, restroom installation, and concrete sidewalk installation, all priced as lump-sum items. Colorado resident bidders receive preference under state law, and Service Disabled Veteran Owned Small Businesses (SDVOSBs) may receive a 5% bid preference if certified by the U.S. Department of Veterans Affairs. For projects exceeding $500,000, contractors must employ at least 80% Colorado labor or provide written justification for non-compliance. State prevailing wage requirements apply if the contract reaches $500,000 or more, and liquidated damages are set at $750.00 per day for completion delays beyond the contract time. Performance and labor bonds equal to 100% of the contract price are required for awards of $150,000 or more. The successful contractor must maintain comprehensive insurance coverage including general liability, workers' compensation, automobile liability, and pollution liability, with minimum combined single limits of $1,000,000.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Appendix D - Sample State Bid Bond Form.docx | DOCX document | |
| Addendum #1.pdf | ||
| Appendix C - Sample Construction Agreement (June 2024) .docx.pdf | ||
| Appendix F - SC6221LMBond (1).docx | DOCX document | |
| Pre-Bid Attendee List.pdf | ||
| Appendix B - 2018 CPW GCs 071818 FINAL.pdf | ||
| Appendix A - Drawings Bid Set.pdf | ||
| Appendix E - SC622PerfBond (DNR) (1).docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Trinidad Lake State Park
Carpios Ridge Restroom Replacement
BIDDING AND CONTRACT INFORMATION
PROJECT NO. C26TR1
IFB1: 2027*010
MANDATORY PRE-BID CONFERENCE: August 20, 2026 @ 10:00 AM
BID OPENING: September 2, 2026 at 10:00 AM
TABLE OF CONTENTS
C26TR1
BIDDING AND CONTRACT INFORMATION
Starting Page
Invitation for Bid Bid Schedule Measurement and Payment Instructions to Bidders
SPECIFICATIONS
APPENDICES Separate Files
Appendix A Bid Plans/Drawings
Appendix B General Conditions for Capital Construction
Appendix C Sample Construction Agreement
Appendix D Sample Bid Bond
Appendix E Sample Performance Bond
Appendix F Sample Labor & Materials Bond
Appendix G Prevailing Wage Requirements
END OF TABLE OF CONTENTS
INVITATION FOR BIDS
The Colorado Division of Parks and Wildlife is accepting sealed bids for Removal and Replacement of the existing Carpios Ridge Restroom Facility at Trinidad Lake State Park.
Sealed Bids will be received at the Southeast Region Office, 4255 Sinton Road, Colorado Springs, CO 80907 to the attention of Dennis Beamis until September 2, 2026 at 10:00 AM, after which the bids will then be opened, read out loud and made public. Bids shall be submitted using the Bid Schedule provided in the project specifications.
A five-percent (5%) Bid Bond, certified check, or cashier’s check is required with Sealed Bids.
Project is estimated between $375k and $500k.
(Mandatory) Pre-bid conference: August 20, 2026 @ 10:00 AM
We will meet at the existing Carpios Ridge Restroom (Project Coordinates) to cover project information and address questions.
Park Headquarters Address: Trinidad Lake State Park 32610 Highway 12 Trinidad, CO 81082
Project Coordinates: Carpios Ridge Restroom Replacement Latitude: 37.1445 Longitude: -104.5679 View Google Map Location – Carpios Ridge Restroom
Contractor Questions: All questions related to the project shall be submitted via e-mail to the Project Manager, Dennis Beamis at dennis.beamis@state.co.us. The deadline for questions is August 27, 2026 @ 10:00 AM. Questions submitted after the deadline will not be addressed. All questions and answers will be posted as solicitation amendments on the Vendor Self Service (VSS) website. Bidders may not automatically be notified of the existence of a modification or addendum. It is the responsibility of the bidder to check the VSS website periodically to see if any modifications have been issued. Failure to retrieve such modifications and include their provisions in your bid response may result in your bid being deemed non-responsive.
Bid Documents are available for all bidders on the web at: www.colorado.gov/vss
The following is a tentative project schedule, which will be revised and expanded by the selected Contractor and submitted to the Project Manager for review:
(MANDATORY) PRE-BID CONFERENCE August 20, 2026 @ 10:00 AM WRITTEN QUESTIONS DUE August 27, 2026 @ 10:00 AM BID OPENING September 2, 2026 @ 10:00 AM NOTICE OF INTENT TO AWARD September 2, 2026 (Tentative) NOTICE TO PROCEED September 16, 2026 (Tentative) SUBSTANTIAL COMPLETION February 16, 2027 (Tentative) https://maps.app.goo.gl/wgFeWkNpo5AvMKFG8 http://www.colorado.gov/vss
BID SCHEDULE
DEPARTMENT OF NATURAL RESOURCES
COLORADO PARKS AND WILDLIFE
STATE OF COLORADO
Proposes to furnish all labor, equipment, materials, and incidentals needed to complete the Carpios Ridge Restroom Replacement.
The work shall be completed in 180 calendar days from the date of the Notice to Proceed.
We have read and made, the “Instructions to Bidders”, the “General Conditions for Capital Construction”, the Written Specifications, and the Construction Drawings part of this bid.
Technical Specifications related to construction materials and methods for work embraced under this Contract shall consist of references to, but not limited to, the Colorado Department of Transportation Most Current Standard Specifications for Roads and Bridge Construction.
Special attention should be given to these references and revisions noted within.
UNITS: LF= linear foot, SF= square foot, SFF= square face foot, LS= lump sum, SY= square yard, CY= cubic yard, TON= tons, AC= acres
Service Disabled Veteran Owned Small Business Statement (SDVOSB): The undersigned bidder shall certify by checking below that the corporation, partnership, or sole proprietorship IS or IS NOT claiming a 5% bid preference in accordance with C.R.S. 24-103-
905. SDVOSB certification must be included with your bid.
Is: ☐ Is Not: ☐
Colorado Labor: The undersigned bidder shall certify by indicating the percentage of Colorado labor of the total workforce to be utilized for this project in accordance with C.R.S.
8-17-101. Colorado Labor shall be employed to perform at least 80% of the work on a public works project greater than $500,000.00. A written justification for not meeting this percentage must be included with your bid.
% of Colorado Labor: ___________
Addendum Inclusion Statement: The undersigned bidder shall certify by listing below that all Addendums have been considered and included as part of the Contractor’s proposal. The Addendum numbers that the Contractor has included as part of his proposal shall be listed in the space provided.
Addendums:
Base Bid: Furnish all materials and labor for the completion of the Base Bid Items per the Bid Documents and Specifications.
Bid Items: Quantity Unit Unit Cost Total Item Cost
1. Mobilization. 1 LS $ $
2. Demo Existing Restroom Facility and Concrete 1 LS $ $
3. Disconnect/Protect Existing Utilities and Reconnect to New Building 1 LS $ $
4. Clear, Grub, and Grade Site 1 LS $ $
5. Install CXT-Arapahoe Flush Restroom or Equal 1 LS $ $
6. Install 5” Concrete Sidewalk 1 LS $ $
Base Bid Items TOTAL AMOUNT _$_________________________________________
TOTAL AMOUNT:(PLEASE WRITE OUT BID AMOUNT)
DOLLARS
(A Corporate Signature Block)
Company Name
A Corporation
Date , 20
Colorado VSS Vendor ID# (if available) _____________________________________
By President Attested to by Secretary
(A Partnership Signature Block) A limited partnership of , general partner;
doing business as (dba)
Company Name
Colorado VSS Vendor ID# (if available) _____________________________________ by General Partner
(A Sole Proprietorship Signature Block) A Sole Proprietorship of (dba)
Colorado VSS Vendor ID# (if available) _____________________________________ by Owner
MEASUREMENT AND PAYMENT
The following descriptions delineate the Work, materials, and how measurements of completed Work will be made and paid for, for each bid item in the Bid Schedule. The Bidder is to read these definitions and price their proposal accordingly.
Base Bid Items
Bid Item 1 – Mobilization This bid item includes the mobilization of personnel, equipment and supplies at the project site in preparation for the Work, as well as the establishment and maintenance for the duration of the Contract of the Contractor’s sanitary facilities, protective fencing and barricades not included elsewhere, necessary facilities, and all other costs incurred or labor and operations which must be performed prior to beginning the other items under the Contract. This item shall include any costs for required bonding of this project. This item shall also include marshalling, disassembly and security of all items indicated on the Construction Drawings or Specifications or installed as part of mobilization and demobilization from the site. Payment will be made in two installments: the first 60% will be paid when 10% of the work is complete. The remaining 40% will be paid when the equipment is removed from the site upon completion.
Bid Item 2 – Demo Existing Restroom Facility and Concrete This bid item includes labor, equipment, and incidental costs connected with demolishing the existing restroom building, foundation and sidewalks as shown in the plans and directed by the Project Manager. Contractor is responsible for offsite disposal of all materials including asbestos as indicated in the included report prepared by LTS Resource, LLC. Payment will be made as identified in the Bid Schedule based on work complete and accepted.
Bid Item 3 – Disconnect/Protect Existing Utilities and Reconnect to New Building This bid item includes labor, equipment, and incidental costs connected with disconnecting all utilities to the existing building and reconnecting to the new building. Contractor is to shut off all utilities prior to and protect the existing utilities during the demo process. Payment will be made as identified in the Bid Schedule based on work complete and accepted.
Bid Item 4 – Clear, Grub, and Grade Site This bid item includes labor, materials, equipment, and incidental costs connected with Clearing, Grubbing, and Grading the Site as shown in the plans and directed by the Project Manager. Payment will be made as identified in the Bid Schedule based on work complete and accepted.
Bid Item 5 – Install CXT-Arapahoe Flush Restroom or Equal This bid item includes labor, materials, equipment, and incidental costs connected with furnishing, placement and finishing of a CXT-Arapahoe Flush Restroom or approved Equal.
Engineered Stamped Plans must be submitted for approval if Contractor opts to install/build a non-CXT facility. Payment will be made as identified in the Bid Schedule based on work complete and accepted.
Bid Item 6 – Install 5” Concrete Sidewalk This bid item includes labor, materials, equipment, and incidental costs connected with furnishing, placement and finishing of cast-in-place 5” thick concrete flatwork as shown in the plans and directed by the Project Manager. This pay item shall include fiber-mesh reinforcing.
Payment will be made as identified in the Bid Schedule based on work complete and accepted.
As a footnote to the bid items, the following items have NOT been included as specific pay items and ARE to be considered incidental to the construction for which they are required:
● State electrical permits and inspections
● Regional or State plumbing permits
● Demolition Permit
● Water, watering, and dust control
● Dewatering
● Temporary facilities and utilities
● Barricades and other required safety provisions
This concludes the bid items listed in the proposal. The only payments made under this contract are for the bid items listed herein, and no additional payments will be made to the Contractor for work specified or shown in these Contract Documents. If any discrepancies exist, the Contractor shall notify the Project Manager in writing, requesting clarification.
END OF SECTION
INSTRUCTIONS TO BIDDERS
PROJECT: Carpios Ridge Restroom Replacement
PROJECT NO: C26TR1
1. Bidders must review the plans and specifications, construction site and conditions in their entirety, and determine the problems that may be encountered in performing the work.
The bidder shall include any costs associated with his/her findings in the prices quoted in the proposal. Documents will be available on the State of Colorado VSS website www.colorado.gov/vss. No additional copies of the drawings and specifications will be provided by the Division of Parks and Wildlife at any time before or after the bid opening.
2. All work must conform to the requirements stated in the “General Conditions for Capital Construction”.
3. All questions concerning this project shall be in writing directed to the Project Manager identified in the Invitation for Bids. The Invitation for Bids also identifies important dates and deadlines for this project.
BID SCHEDULE:
A. The bidder shall include on the signature page, their Vendor ID (if available) obtained from registration on the Colorado VSS website.
B. The bidder shall complete the Minority Business, Service Disabled Veteran Owned Small Business and Colorado Labor statements as well as acknowledge addendum(s) on the first page of the Bid Schedule.
C. All bid items shall include a unit and extended price or the bid will be disqualified. The bidder shall write in words and numerically the total base bid and add/alternate (if applicable) amounts on the included Bid Schedule. If conflicts exist between the written words and the numerical amount, the actual line item unit cost shall take precedence.
D. The Bid Schedule shall be signed manually in ink:
1) If the bidder is a corporation, use the corporate signature block, insert the name of the state in which the company was incorporated, and include the Employer Identification Number (E.I.N.) in the appropriate spaces. The bid must be signed by an officer (President or Vice President), and the title indicated. The signature of the officer shall be attested to by the Secretary and properly sealed. Cross out incorrect titles and insert correct ones, if necessary.
2) If the bidder is a partnership, use the partnership signature block. Cross out the word "Limited" if the partnership is a general one. Print each partner's name and note the proportion of the partnership that each partner has. The majority or general partner must sign the proposal. The same person must sign the contract, if awarded. Print the company name in the appropriate space.
3) If the bidder is a proprietorship, use the sole proprietorship signature block, print in the owner's name, Social Security number, and the business name in the blanks provided, and the owner signs the owner blank.
5. BID BOND: A bid bond is required for all competitive sealed bids when the price exceeds
$50,000. A bid guarantee in an amount not less than five percent (5%) of the total bid price must be submitted in the form of a firm commitment, such as a bid bond, bank money order, certified check or cashier's check. Checks or money orders should be made payable to the Treasurer, State of Colorado. An irrevocable letter of credit is not acceptable as a bid guarantee. Failure to furnish a bid guarantee in the proper form and amount by the time set for opening of bids may be cause for rejection of the bid.
6. PERFORMANCE BOND, LABOR AND MATERIAL BOND: The successful bidder shall furnish a bond in the amount of 100% of the contract price for performance and for material and labor payment when bid is equal to or exceeds $150,000. The bond shall be executed on the standard State of Colorado form. The State requests that the Surety and Contractor leave the date of the Contract found on the first page of each bond form, blank and we will ‘pen’ in the date after the Controller executes the Contract. These bonds will be submitted along with the standard State Agreement form within 10 days of the "Notice of Award."
7. VENDOR BOND ASSISTANCE: Any vendors that need support responding to solicitations may contact the Colorado Supplier Diversity Navigator at the Statewide Equity Office of Supplier Diversity dhr.colorado.gov/statewide-equity-office/supplier-diversity. Services provided include assistance with responding to solicitations, interpretation of solicitation documents, technical assistance referrals, availability of resources, and bond assistance under the Construction Statewide Bond Assistance Program dhr.colorado.gov/statewide-equity-office/supplier-diversity/construction-and-bond-assistance , through which eligible contractors can apply for assistance in securing the required bonding. The office can be reached during normal business hours by calling 303-866-5765 or emailing DPA_SupplierDiversityHelp@state.co.us.
8. RESIDENT BIDDER PREFERENCE: When a contract for commodities or services is to be awarded to a bidder (projects >$500,000), a resident bidder shall be allowed a preference against a nonresident bidder equal to the preference given or required by the state in which the nonresident bidder is a resident. (§8-19-104 C.R.S.) A resident bidder is authorized to transact business in the State of Colorado, maintains a place of business in Colorado and pays unemployment compensation taxes.
9. SERVICE DISABLED VETERAN OWNED SMALL BUSINESSES (SDVOSB’s): SDVOSB’s, who are incorporated or organized in Colorado or maintain a place of business or have an office in Colorado and who are officially registered and verified as a SDVOSB by the Center for Veteran Enterprise within the U.S. Department of Veterans Affairs. (www.vip.vetbiz.gov), may receive a 5% preference on their bid. This preference applies only to the price, and the SDVOSB’s must still meet all other qualifications required in the bid. SDVOSB’s claiming this preference shall submit documentation of SDVOSB certification Issued through the U.S.
Department of Veterans Affairs in their response to the solicitation. Bid submissions without this documentation will not be given a preference.
10. COLORADO LABOR: Colorado Labor shall be employed to perform at least eighty percent
(80%) of the work on a public works project (>$500,000) per CRS 8-17-101. BIDS/CORE notice to require bidder to indicate 80% Colorado labor in bid or proposal and provide written justification if the 80% Colorado labor is not included in the bid. The justification is a requirement of the bid or proposal submittal. State Agency shall waive the 80% requirement and post justification on its web site; if there is reasonable evidence to demonstrate insufficient Colorado labor to perform the work and if compliance with the 80% would create an undue burden that would substantially prevent a project from proceeding to completion. Posting of the agency’s written waiver should include but not be limited to contractor’s justification for insufficient available Colorado labor and the agency’s determination that there is an undue burden negatively impacting the project schedule, budget/appropriation, quality/standards of care or any other specific requirement of the project due to compliance with the 80% Colorado labor requirement.
The posting of rational should be made on the date of the award and remain for not less https://dhr.colorado.gov/statewide-equity-office/supplier-diversity https://dhr.colorado.gov/statewide-equity-office/supplier-diversity/construction-and-bond-assistance https://dhr.colorado.gov/statewide-equity-office/supplier-diversity/construction-and-bond-assistance mailto:DPA_SupplierDiversityHelp@state.co.us http://www.vip.vetbiz.gov/ than thirty (30) calendar days in a conspicuous web site location of the state agency under the title – “Reporting Requirements for Public Projects as per HB13-1292”.
11. APPRENTICESHIP UTILIZATION CERTIFICATION for projects over $1 million: In order to comply with CRS 24-92-115 regarding statutorily required utilization of apprenticeship programs for certain trades, the awarded bidder will be required to complete a copy of the compliance form available at <https://drive.google.com/file/d/1J4MSGuLyZTO3FgTcvgKrybAoalDkC8am/view> prior to execution of the contract. Please indicate on the Apprenticeship Utilization Survey document attached to the solicitation. Please review the “Special Considerations for Public Projects” section of the Contract Sample for additional details regarding applicable apprenticeship utilization statutes.
12. SUBMITTAL OF BID: The completed Bid must be received by the deadline identified in the
Invitation for Bid. You must include as part of your bid the following items:
A. Provide completed Bid Schedule as described above.
B. Provide Bid Bond (if required) as described above.
C. SDVOSB certification issued through the U.S Department of Veterans Affairs (if applicable).
D. Colorado Labor Justification if not using 80% Colorado Labor (if applicable).
E. Apprenticeship Utilization Survey. [If Applicable]
This information is to be enclosed in a sealed envelope marked "SEALED BID". Include the bid opening date and time.
The envelope shall be addressed to:
ATTN: Dennis Beamis (receiving the bids) Southeast Region Office Colorado Parks and Wildlife 4255 Sinton Road Colorado Springs, Colorado 80907
Bidders Name and Address should appear in the Upper Left Corner of the envelope.
13. METHOD OF AWARD: The lowest responsible bid, taking into account the Colorado resident bidder preference provision of Colorado Law which is set forth in Article 48 of the General Conditions, will be determined by and the purchase order or contract will be issued, to the extent that the total dollar amount is within available funds to finance the construction. If all bids exceed such amount, the right is reserved to reject all bids. The Division of Parks and Wildlife reserves the right to reject any or all proposals, to waive informalities, and to accept any proposal deemed desirable.
Additive alternates will be used in determining the lowest responsible bidder within the amount available to finance the contract, added in the numeric order listed. An equal number of alternates shall be added to the base bid of each bidder within funds available to finance the contract for purposes of determining the lowest responsible bidder.
https://drive.google.com/file/d/1J4MSGuLyZTO3FgTcvgKrybAoalDkC8am/view
The bidder must be registered to do business in the State of Colorado with the Secretary of State www.sos.state.co.us. A Certificate of Good Standing will be required to process the Agreement.
If Federal funds are utilized for this project, the contract cannot be awarded to a contractor which has been disbarred or suspended or is otherwise excluded from or ineligible for participation in federal assistance programs. The excluded parties list can be found at the following web site: https://www.sam.gov/
14. UNIT COST: The price quoted in the proposal shall include the costs of labor, materials, equipment, and incidentals required to provide a fully complete and functioning unit as shown and described in the plans and specifications. The price stated in the proposal shall be complete and represent total payment for each item in the proposal. No additional payment will be made for the work presented in the proposal.
15. INSURANCE: The successful bidder will be required to submit proof of insurance at the time of executing the agreement. Proof of insurance must be submitted on certificates showing the minimum coverage amounts.
A. The Contractor is required to procure and maintain at all times during the term of this contract the insurance coverage listed below:
1) Workers’ Compensation and Employer’s Liability Insurance, as required by state statute, including occupational disease, covering all of contractor’s employees at the work site.
2) Commercial General Liability Insurance written on ISO occurrence form CG 00 01 10/93 or equivalent, covering premises operations, fire damage, independent contractors, products and completed operations, blanket contractual liability, personal injury, and advertising liability with minimum limits as follows:
a. $1,000,000 combined single limit written on an occurrence basis;
b. $1,000,000 general aggregate;
c. $1,000,000 products and completed operations aggregate; and
d. $50,000 any one fire.
e. If any aggregate limit is reduced below $1,000,000 because of claims made or paid, the contractor shall immediately obtain additional insurance to restore the full aggregate limit and furnish to the State a certificate or other document satisfactory to the State showing compliance with this provision.
3) Automobile Liability Insurance covering any auto (including owned, hired and non-owned autos) with a minimum limit as follows: $1,000,000 each accident combined single limit.
4) Pollution liability policy with minimum limits of $1,000,000 each occurrence and $1,000,000 Annual Aggregate covering any environmental damage caused by the contractor or subcontractor during the Work with the State included as an additionally insured party.
B. The State of Colorado shall be named as an Additional Insured on the Commercial General Liability policy insurance certificate and Colorado Parks and Wildlife must be named as the certificate holder (leases and construction contracts will require the additional insured coverage for completed operations on endorsements CG 2010 11/85, CG 2037, or equivalent). Coverage required of the contract will be primary over any insurance or self-insurance program carried by the State of Colorado.
C. The Insurance shall include provisions preventing cancellation or non-renewal without at least 45 days prior notice to the State by certified mail.
D. The Insurance shall include a waiver of subrogation on general liability, auto and workers comp insurance.
http://www.sos.state.co.us/ https://www.sam.gov/
E. The contractor will require all insurance policies in any way related to the contract and secured and maintained by the contractor to include clauses stating that each carrier will waive all rights of recovery, under subrogation or otherwise, against the State of Colorado, its agencies, institutions, organizations, officers, agents, employees and volunteers.
F. All policies evidencing the insurance coverage required hereunder shall be issued by insurance companies satisfactory to the State. No later than 15 days prior to the expiration date of any such coverage, the contractor shall deliver the State certificates of insurance evidencing renewals thereof.
16. If the successful bidder, upon acceptance of his bid by the OWNER, fails to execute such further contractual documents, and give such bond(s) (including any necessary coinsurance or reinsurance agreements) as may be required within ten (10) days after receipt of the Notice of Award, the contract may be terminated for default. In such event the CONTRACTOR shall be liable for any cost of procuring the work which exceeds the amount of his bid, and the bid guarantee shall be available toward offsetting such difference.
17. The bidder is not to give any information concerning his proposal to any other bidder or receive any information concerning another proposal.
18. SALES TAX: The Division of Parks and Wildlife is exempt from paying Colorado sales tax.
Any materials and supplies purchased for this contract are exempt. The Contractor will need to obtain an exemption number from the Department of Revenue for this project and each subcontractor is required to obtain one under the general contractor.
19. QUANTITIES: Quantities stated in the bid schedule and construction documents are estimates only and may increase or decrease during construction. The contractor will perform the required quantity of work based on the unit prices stated in the Bid Schedule except as provided in Section 4.2 of the "General Conditions for Capital Construction."
20. WORK STOPPAGE: Work stoppage is a possibility. The contractor must request all shutdowns or stoppages in writing. If a shutdown is granted, the Division will pay for only work that has been totally completed. No advanced payment of mobilization will be made.
21. CONSTRUCTION SCHEDULE: The Contractor shall submit a written project schedule and supporting data to the Project Manager as soon as possible after the receipt of the Notice of Award. The schedule shall describe key milestones and duration of project activities.
The supporting data for the schedule shall include a complete list of anticipated submittals and due dates, and the key ordering and delivery lead times. The Contractor shall schedule the sequence of construction to consider the delivery of long lead-time items. It shall be the Contractor's responsibility to notify the Project Manager of any problem in conforming to the Contract Documents, Specifications, and Construction Drawings for any element of the proposed improvements prior to its construction.
22. SCHEDULE OF VALUES: Submit typed schedule of values on AIA Form G703, or a similar typewritten format on white 8-1/2" x 11" paper. Use the Table of Contents of these Contract Documents as a basis of format. Identify each line item with number and title of the Specification section. The schedule of values shall aggregate the total contract amount, and be divided so as to facilitate payments to subcontractors and suppliers. Upon request by the Project Manager, support values given with data that will substantiate their correctness. The schedule, when approved by the Project Manager, will be used as a basis for the Contractor's application for payment. Break down installed costs into delivered costs of products and total installed costs with overhead and profit. Provide a summary of the cost and origin of the five most costly manufactured items containing more than fifty percent iron or steel to be installed on the project. Revise the schedule to list change orders for each application for payment.
23. SCHEDULE OF SUBCONTRACTORS, MAJOR EQUIPMENT AND MATERIALS SUPPLIERS: The
Contractor shall provide the Owner, prior to the commencement of any Work, a detailed listing of subcontractors and major equipment and materials suppliers indicating their name, address, description of service or equipment and materials being provided, if they are a woman owned or minority owned business enterprise (WBE/MBE), and their vested monetary interest in the contract. The Contractor shall not award any Work to a subcontractor, transfer or assign any portion of the Contract Work, without the written approval of the Owner. Records shall be maintained throughout the duration of the Contract and periodically submitted at the time the Contractor submits progress payment applications. The Owner will use these records to verify the Contractor’s level of indebtedness prior to making final payment.
24. CONSTRUCTION CONTROL PLAN: A traffic, excavation, and construction access control plan shall be submitted by the Contractor and approved by the Owner prior to the commencement of work. The disruption to project area visitors shall be kept to a minimum.
The plan shall take into consideration all users, including motorists, cyclists, and pedestrians. The Contractor shall provide all lights, signs, barricades, flagmen, or other devices necessary to provide for public safety in accordance with the current United States Department of Transportation’s Manual of Uniform Traffic Control Devices.
25. STORMWATER MANAGEMENT PLAN: This project will not disturb more than 1 acre of ground, so a State stormwater control permit will not be required.
26. Colorado Parks and Wildlife shall not be obligated or liable for any cost incurred by any company or individual reviewing this proposed project or prior to the issuance of a contract approved by the Controller of the State of Colorado or such assistant as he may designate.
Any and all costs, to review the project, inspect the proposed construction site, prepare and or submit bids will be the sole responsibility of the bidder.
27. A submission in response to the solicitation acknowledges acceptance by the proposer of all unaltered terms and conditions, as set forth herein. Any proposed exception taken to the State’s Terms and Conditions must be clearly and thoroughly identified and supported and acceptable alternatives must be proposed. Failure to do so shall be deemed a waiver of any rights to subsequently raise exception and/or request modification, except as outlined or specified in this solicitation. Submission of exceptions does not guarantee their acceptance, however, and such submittal will be taken into consideration during proposal review and scoring by the evaluation team. The state reserves the right to reject any changes suggested to PO or Contact terms and conditions and award to the next most advantageous qualified responsive vendor.
28. PROTESTED SOLICITATIONS AND AWARDS: An aggrieved party may file a protest concerning a material issues(s), at any phase of solicitation, including but not limited to, specifications, award or a disclosure of information marked confidential in the bid. The protest shall be submitted via email to the DNR Procurement Official as noted below within ten (10) business days after such aggrieved person knows, or should have known, of the facts giving rise thereto. Reference CRS 24-109-102, as amended, and Procurement Rule R-24-109-102-01, et seq.
DNR Procurement Official: Ion Cotsapas, ion.cotsapas@state.co.us
The written protest shall include, as a minimum, the following:
A. The name and address of the protestor;
B. Appropriate identification of the procurement by bid or award number;
C. A statement of the reasons for the protest, and any available exhibits, evidence, or documents substantiating the protest.
29. ACH/EFT PAYMENTS: Contractors are highly encouraged to consider signing up for ACH/EFT payments. ACH/EFT payments provide the advantage of ensuring quick and secure payments for the goods and services that vendors provide to the State. ACH/EFT payments help avoid the unnecessary, and sometimes inevitable delays in mail, and the possibility of lost warrants which will further delay vendor payment. DNR’s goal is to pay vendors as soon as possible - signing up for the ACH/EFT is an important step in making this happen. For additional information about signing up for ACH/EFT payments, please contact the Project Manager identified in the Invitation for Bids.
30. In accordance with procurement code and CRS 24-103-207.5 titled “Purchasing Preference for Environmentally Preferable Products”, bidders responding to this solicitation may seek to qualify for the preference and governmental bodies conducting this solicitation shall award a contract to a bidder who offers environmentally preferable products subject to the condition in the code and procurement rules.
31. ALTERNATIVE PRODUCTS: Certain materials and equipment have been specified by manufacturers’ trade names. This was done to establish the minimum quality and type of product desired. Alternatives to the manufacturers’ products may be used if the Project Manager determines they are equal. The Award will be based on the products identified in the plans.
32. DAVIS-BACON WAGE LAW:
The subject Project is not a Federal prevailing wage rate project so Davis-Bacon Wage Rates do not apply. The State of Colorado prevailing wage requirements do apply; see below.
33. PREVAILING WAGES: A public construction project in the amount of five hundred thousand dollars or more shall be subject to the State prevailing wage rate, of the regular, holiday, and overtime wages paid and the general prevailing payments on behalf of employees to lawful welfare, pension, vacation, apprentice training, and educational funds in the State, for each employee needed to execute the contract. Payments to the funds must constitute an ordinary business expense deduction for federal income tax purposes by contractors and subcontractors. Contractors are required to pay their employees at weekly intervals and shall comply with the enforcement provisions of C.R.S. §24-92-209. Contractors awarded a project of this size will be required to utilize the LCPTracker cloud-based labor compliance and certified payroll application. Upon award, the Contractor will need to return a completed copy of this form for LCPTracker enrollment:
https://drive.google.com/file/d/13Xvu5GttmOerEViwQsXlnbVI40YwsllD/view.
34. NOTICE OF CONTRACTOR’S SETTLEMENT: If the project exceeds $150,000.00, a Final
Settlement will be advertised via electronic media on the Colorado VSS website at www.colorado.gov/vss.
mailto:ion.cotsapas@state.co.us https://drive.google.com/file/d/13Xvu5GttmOerEViwQsXlnbVI40YwsllD/view http://www.colorado.gov/vss
35. CONTRACT CLOSE OUT: Final Payment Statement: In addition to submittals required by the conditions of the Contract, provide submittals required by governing authorities and submit a final statement of accounting giving total adjusted Contract Sum, previous payments and sum remaining due. Provide a final summary of the cost and origin of the five most costly manufactured items containing more than fifty percent iron or steel that were installed on the project. The Contractor shall submit lien waivers for all subcontractors and material suppliers as part of the final payment statement.
36. LIQUIDATED DAMAGES: The parties agree that time is of the essence of the Contract and of the Specifications wherever a definite and certain length of time is fixed for the performances of any act. A daily charge will be made against the Contractor for each calendar day that any work remains uncompleted after the elapse of contract time. This daily charge will be deducted from any money due to the Contractor. This deduction will not be considered a penalty, but as liquidated damages.
The liquidated damages set forth is an amount, agreed to by the Contractor and the Division, as reasonably representing additional project construction administration costs incurred by the Division and projected loss of revenue to the Park if the Contractor fails to complete performance within the contract time. For this project, the Liquidated Damages will be $750.00 per day.
Due account shall be taken of any adjustment of the contract time for completion of the work granted under the provisions of subsection 8.5 of the General Conditions for Capital Construction. Permitting the Contractor to continue and finish the work or any part thereof after elapse of contract time will not operate as a waiver on the part of the Division on any of its rights under the Contract.
Any deduction assessed as liquidated damages under this section shall not relieve the Contractor from liability for any damages or costs resulting from delays to other contractors on the project or other projects caused by a failure of the assessed Contractor to complete the work according to contract times.
37. WORK HOURS ON PROJECT SITE: All work on this project site will be allowed as follows:
8am to 6pm or otherwise approved by the Project Manager.
38. PERFORMANCE MONITORING CRS §§ 24-106-107:
A. PERFORMANCE MEASURES AND STANDARDS:
Performance measures and Standards as defined in the General Conditions for Capital Construction shall be the basis for this Contract. This includes but is not limited to the following:
1) The Contractor shall prepare a project schedule at project startup and continue to update the schedule throughout construction providing detailed justifications for construction delays and schedule changes.
2) The Contractor shall submit all required product information as defined in the Construction Drawings & Specifications. In turn, the State’s Project Manager shall review and comment within 10 days of receipt.
3) The State’s Project Manager and the Contractor shall conduct Construction Progress Meetings and Quantity Verification Inspections at least monthly or as otherwise determined necessary during Construction activities.
B. ACCOUNTABILITY:
Project and Contract administration will provide accountability by documenting and evaluating the progression of construction and the ability to follow the agreed upon construction schedule. The Contractor shall report regularly on achievement of the performance measures and standards specified above and failure to do so allows the governmental body to withhold payment until successful completion of all or part of the contract and the achievement of established performance standards. Payment by the State to the Contractor shall be made without delay upon successful completion of all or any part of the contract in accordance with the payment schedule specified in the contract or as otherwise agreed upon by the parties.
C. MONITORING REQUIREMENTS:
The State will evaluate the Contractor’s performance by preparing monthly progress reports and monthly construction schedule updates provided by the Contractor as well as performing site visits to verify quantities based on the Bid Schedule, inspections to verify quality of work, and reviews of performance data as construction progresses to ensure that the results, objectives and obligations of the contract are met.
D. NONCOMPLIANCE RESOLUTION:
Methods and mechanisms as defined in the General Conditions for Capital Construction shall be used to resolve any situation in which the State's monitoring assessment determines noncompliance, including termination of the contract.
END OF SECTION
Apprenticeship Utilization Survey
Pursuant to CRS 24-92-115
The bidder acknowledges that they have reviewed Apprenticeship Utilization provisions contained in the Sample Contract and the Apprenticeship Utilization Certification form available at: https://drive.google.com/file/d/1J4MSGuLyZTO3FgTcvgKrybAoalDkC8am/view
If awarded the project, the bidder (choose one):
• Reasonably expects to be able to comply with the requirements outlined in the Apprenticeship Utilization Certification form and should be able to supply a completed version of that form prior to contract execution.
• Does not expect to be able to comply with the requirements outlined in the Apprenticeship Utilization Certification form. Please use the space provided below to explain this expectation.
https://drive.google.com/file/d/1J4MSGuLyZTO3FgTcvgKrybAoalDkC8am/view
SPECIFICATIONS
PROJECT I.D. NO. C26TR1
IFB1: IFB1 2027*010
PRE-BID CONFERENCE: August 20, 2026 @ 10:00 AM
BID OPENING: September 2, 2026 at 10:00 AM
TABLE OF CONTENTS
C26TR1
DIVISION I - SPECIFICATIONS
DIVISION 1 - GENERAL REQUIREMENTS
SECTION 01010 - SUMMARY OF WORK
SECTION 01023 - MINOR CONTRACT REVISION
SECTION 01200 - CONSTRUCTION MEETINGS
SECTION 01202 - ALLOWANCES
SECTION 01300 - SUBMITTALS
SECTION 01310 - CONSTRUCTION SCHEDULES
SECTION 01500 - TEMPORARY UTILITIES AND CONTROLS
SECTION 01710 - PROJECT CLEANING
SECTION 01720 - AS-CONSTRUCTED AND RECORD DOCUMENTS
DIVISION 2 - SITE WORK
SECTION 02050 - MOBILIZATION
SECTION 02070 – STRUCTURE REMOVAL
SECTION 02111 – VEGETATION CLEARING AND GRUBBING
SECTION 02279 - WATER QUALITY CONTROL
SECTION 02300 - EARTHWORK
DIVISION 3 - CONCRETE
SECTION 03100 - STRUCTURAL CONCRETE FORMWORK
SECTION 03200 - CONCRETE REINFORCEMENT
SECTION 03300 - CAST IN PLACE STRUCTURAL CONCRETE
DIVISION 13 – SPECIAL CONSTRUCTION
SECTION 13124 - PRE-MANUFACTURED TOILET BUILDING
DIVISION 1 - GENERAL REQUIREMENTS
GENERAL CONDITION:
Please read the most current "General Conditions for Capital Construction" in your possession.
They apply to all Divisions of these specifications, accompanying drawings and to this proposed project.
SECTION 01010 - SUMMARY OF WORK
1. LOCATION:
Project is estimated between $375k and $500k.
(Mandatory) Pre-bid conference: August 20, 2026 @ 10:00 AM
We will meet at the existing Carpios Ridge Restroom (Project Coordinates) to cover project information and address questions.
Park Headquarters Address: Trinidad Lake State Park 32610 Highway 12 Trinidad, CO 81082
Project Coordinates: Carpios Ridge Restroom Replacement Latitude: 37.1445 Longitude: -104.5679
View Google Map Location – Carpios Ridge Restroom
2. DESCRIPTION OF THE WORK:
The project consists of Removal of the existing Restroom Facilty and installation of a CXT- Arapahoe Flush Restroom or approved equal.
All work shall be in compliance with these specifications and drawings.
3. CONSTRUCTION COMMENCEMENT:
The Contractor shall be allowed from the date of approval of contract documents through the CONTRACT START DATE (as indicated on the Notice to Proceed letter) to submit shop drawings and product approvals and order and delivery of materials.
4. ADDITIONAL PROVISIONS:
The work and the compensation, therefore, shall be as covered by these specifications consisting of furnishing all labor, equipment and materials required to perform the work https://maps.app.goo.gl/wgFeWkNpo5AvMKFG8 shown on the drawings and listed in the bid schedule, unless otherwise stipulated or approved in writing by the Capital Development Program Manager.
Division field Project Managers are authorized to supervise the construction of this project in accordance with the previously approved plans and specifications and change orders.
All changes in the work shall be approved in writing by the Capital Development Program Manager before being activated in accordance with Section 4, Item 4.2 of the General Conditions for Capital Construction.
The specifications included herein are the Specifications for this project. If there should be a difference between the Specifications and the drawings, the Specifications shall govern.
5. CONTRACTOR RESPONSIBILITY:
Visit the site and determine to your own satisfaction the amount and type of work to be performed to complete the project in accordance with the drawings, specifications and Contract Documents before submitting your bid.
6. SUBCONTRACTED WORK:
Contractor shall not subcontract any portion of the work without written consent of the Project Manager, which consent shall not unreasonably be withheld. In cases where such consent is given, the Contractor shall perform with his own organization work amounting to not less than 50 percent of the total contract cost, as determined by the Project Manager, except that any items agreed to by the Project Manager as “specialty items” may be performed by subcontract and the cost of any such specialty items so performed by subcontractor may be deducted from the total cost before computing the amount of work required to be performed by the Contractor with his own organization. However, under no circumstances shall less than 20 percent of the total contract cost be performed by the Contractor’s organization after deduction of specialty items.
7. CONSTRUCTION LIMITS:
At the commencement of construction, the Project Manager will designate the area allowed for the construction process. Restrict work to that designated area. Any changes deemed necessary shall be discussed with and approved by the Project Manager.
8. JOB CONDITIONS:
Examine the site, determine the nature of conditions to be encountered and accept the site as found upon the examination. Examination must be made prior to bidding as no additional compensation will be considered after receipt of bids for existing conditions which are required to be worked, adapted, or modified to these specifications. Do not remove or alter structural components without prior written approval from the Project Manager.
9. BUILDING CODES:
Local city or county building codes shall be used for all construction. Where there is no local authority and/or code, the current codes required by the Office of the State Architect, State Electrical Board or State Plumbing Board shall be utilized. All contractors and subcontractors are required to be licensed to work in the State of Colorado.
Appropriate inspections and certificates shall be obtained from the state or local inspector.
Submit copies of inspection reports, notices and similar communications to the Project Manager. See relative specification section(s) for additional detail.
10. PROTECTION AND SAFETY PRACTICE:
I. General:
All work shall be carried out in a safe manner in accordance with local codes and the safety requirements of the Colorado State Division of Labor.
II. Provide shoring, sheeting, barricading, bracing to prevent caving, erosion and gullying of side of excavation. The design, engineering, construction and maintenance of all temporary protection, including its adequacy and safety shall be the Contractor's responsibility and shall comply with the Occupational Safety and Health Administration (OSHA).
III. Contactor shall be required to conform to all industry standard safety requirements as well as OSHA requirements (i.e. Confined Space Entry, etc.) in effect at the time of construction.
IV. Existing Utilities:
Colorado SB 93-155 requires that anyone that engages in any type of excavation must provide advance notice to the underground facility owners. Prior to any moving or excavating of earth, the Contractor shall call the Utility Notification Center of Colorado (UNCC) or “Common Ground Alliance” (CGA) – the “Call Before You Dig” number – at 811. Utility owners have three business days to perform locates. If facilities are not marked within the three business days, you are required to call back to UNCC and process a Second Notice Request. UNCC encourages both Contractors and Sub-Contractors to obtain a locate ticket. A “no response” from the utility owner does not allow the Contractor to start digging. Notify the Project Manager when working near utility lines or appurtenances.
V. Aquatic concerns and equipment cleaning:
For this project; If heavy equipment is acquired or used that was previously working in another stream, river, lake, pond, or wetland, one of the following disinfection practices is necessary prior to construction to prevent the spread of New Zealand mud snails and other aquatic hitchhikers into this drainage. The practice is also necessary after project completion, prior to this equipment being used in another stream, river, lake, pond, or wetland, for the same purpose:
● Remove all mud and debris from equipment (tracks, turrets, buckets, drags, teeth, etc.) and spray/soak equipment a 1:15 solution of Super HDQ Neutral institutional cleaner and water. Keep equipment moist for at least 10 minutes OR
● Remove all mud and debris from equipment (tracks, turrets, buckets, drags, teeth, etc.) and spray/soak equipment with water greater than 140 degrees F for at least 10 minutes.
● Clean hand tools, boots, and any other equipment that will be used in the water using one of the above options as well.
● Super HDQ Neutral (Spartan Chemical Company, Inc.) is available in the Denver area from Waxie Denver at (303) 749-8000 or (800) 377-4128, High Country Chemical at (303) 287-6700 and AmSan Colorado Chemical at (303) 388-9331.
VI. Surface Drainage:
Provide for surface drainage during the construction period in a manner to avoid creating a nuisance to adjacent properties.
VII. Location Markers:
Carefully maintain and protect all bench marks, corner monuments and other points. If disturbed or destroyed, replace at no cost to the Owner as directed by the Project Manager.
11. STATE PROJECT MANAGER'S OFFICE APPROVAL:
The plans and specifications may not be materially changed in any particular except with the written consent of the State Project Manager. The project construction shall not be considered complete until the written approval has been received from the State Project Manager.
All questions must be submitted in writing to the Project Manager.
12. OWNER FURNISHED MATERIALS:
Owner furnished material shall be delivered to and possession taken of the material by the Contractor.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .