Bid Doc Designs (mod).pdf

PDF 16 MB Posted

Attached to
Z2AA--VAOIG Houston VARO Space Renovation
Solicitation number
36C10D23R0008_1
Issued by

About this file

This file provides details on a federal solicitation opportunity from the Department of Veterans Affairs. The solicitation number is 36C10D23R0008_1 for the Z2AA--VAOIG Houston VARO Space Renovation project. Responses are due by the date specified in the attached Bid Doc Designs file, which contains plans and specifications for renovations to office spaces at the Houston Veterans Affairs Regional Office. Interested parties should review the 16MB Bid Doc Designs file for requirements and pricing terms. The renovation work includes general contracting services to update existing office layouts and configurations to meet current needs at the Houston VARO facility.

View the file

Other files

File Type Posted
09 65 19 Resilient Tile Flooring.pdf PDF
03 01 30 Maintenance of Cast-In-Place Concrete.pdf PDF
00 00 10 Table of Contents.pdf PDF
08 80 00 Glazing.pdf PDF
36C10D23R0008 0001.docx DOCX document
36C10D23R0008 Q-A.pdf PDF
P07 Wage Rates - OIG.pdf PDF
36C10D23R0008.docx DOCX document
ALA129I-DL2700-LR.pdf PDF
single duct units (002).pdf PDF
6AR_led (002).pdf PDF
1805.04 Bid Specs.pdf PDF
Wage Rates - OIG.pdf PDF
Trane Trace HVAC Room Checksums (002).pdf PDF
Bid Doc Design Binder_Combined.pdf PDF
Hvac_Output Summary (002).pdf PDF
Digital Finish Board.pdf PDF
36C10D23R0008_1.docx--.docx-.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project NumberCONSULTANTS:

Drawing #

U.S. DEPARTMENT OF VETERANS AFFAIRS

VA Health Care System Approval:

ARCHITECT:

SPUR SBBL

COLLABORATIVE JV, INC

100 N Stone Avenue, Ste 1102

TUSCON, AZ 85701

(405) 842-6100

SETH ANDREW CAVIN TX ARCH LIC#22680 EXP. 07/31/23

JAMES ROSS MYLES TX MECH LIC#136680 EXP. 09/30/23

EVANS SORDIASHIE TX ELEC LIC#144295 EXP. 03/31/24

MECH / ELEC / PLUMB / TECH ENGINEER

SPUR DESIGN

2519 MADISON AVE. SUITE 100

KANSAS CITY, MO 64108

(913) 369-7200

FULLY SPRINKLERED

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD, UNIT 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STAMP:

Drawing Number

Building Number

CONTROLLED UNCLASSIFIED INFORMATION - CUI

CONTROLLED UNCLASSIFIED INFORMATION - CUI

/2

/2

:1 :1

P

M

COVER SHEET

KJW 01 OF 41NR

BID DOCUMENTS

VA-OIG HOUSTON VARO SPACE

RENOVATION

VA PROJECT NUMBER: 36C10E22N0069

VA-OIG HOUSTON VARO

SPACE RENOVATION

03/30/2023

36C10E22N0069

HOUSTON REGIONAL VA OFFICE

6900 ALMEDA ROAD, SUITE 1073

HOUSTON, TX 77030

HOUSTON REGIONAL VA OFFICE

6900 ALMEDA ROAD, SUITE 1073

HOUSTON, TX 77030

BID DOCUMENTS

GI000

SPUR #: 1805.04

SHEET INDEX

SEQUENCE NUMBER SHEET NAME

[01] GENERAL

01 GI000 COVER SHEET

02 GI001 GENERAL INFORMATION

03 GI002 ICRA DETAILS

04 GI010 PHASING PLAN

05 GI011 LIFE SAFETY PLAN

[02] ARCHITECTURAL

06 AD011 DEMOLITION PLAN

07 AD012 DEMOLITION CEILING PLAN

08 AE101 REFERENCE PLAN

09 AE111 DIMENSION PLAN

10 AC131 REFLECTED CEILING PLANS

11 AE601 DOOR SCHEDULE, DOOR DETAILS, AND WALL TYPES

12 AF701 FINISH FLOOR PLAN AND FINISH SCHEDULE

13 AI721 INTERIOR ELEVATIONS AND SECTION DETAILS

[03] FIRE PROTECTION

14 FP100 LEVEL 1 - FIRE PROTECTION PLAN

[04] PLUMBING

15 P-000 PLUMBING LEGEND

16 PD101 PLUMBING DEMOLITION PLANS

17 PP101 DOMESTIC WATER PLUMBING PLANS

18 P-601 PLUMBING SCHEDULES

[05] MECHANICAL

19 M-000 LEGEND AND ABBREVIATIONS

20 MD101 MECHANICAL DEMO PLANS

21 MH100 MECHANICAL HVAC DUCT PLAN

22 M-501 MECHANICAL DETAILS

23 M-601 MECHANICAL SCHEDULES

24 M-701 MECHANICAL CONTROLS

[06] ELECTRICAL

25 E-000 ELECTRICAL SYMBOLS & ABBREVIATIONS

26 ED101 ELECTRICAL POWER DEMOLITION PLAN - LEVEL 1

27 ED102 ELECTRICAL LIGHTING DEMOLITION PLAN - LEVEL 1

28 EP101 ELECTRICAL POWER FLOOR PLAN - LEVEL 1

29 EP102 ELECTRICAL EQUIPMENT PLAN - LEVEL 1

30 EL102 ELECTRICAL LIGHTING CEILING PLAN - LEVEL 1

31 E-501 ELECTRICAL DETAILS

32 E-502 ELECTRICAL SCHEDULE DETAILS

33 E-601 ELECTRICAL ONE-LINE DIAGRAM

34 E-602 ELECTRICAL PANEL SCHEDULE

[07] TELECOM

35 T-000 TELECOM SYMBOLS & ABBREVIATIONS

36 TD101 TELECOM DEMOLITION PLAN - LEVEL 1

37 TN101 TELECOM FLOOR PLAN - LEVEL 1

38 TN500 TELECOM DETAILS

39 TY101 TELECOM SECURITY PLAN - LEVEL 1

40 TY500 SECURITY - DETAILS

41 TY600 SECURITY RISER DIAGRAMS

TOTAL SHEETS: 41

NN

LOCATION

PLAN

AREA

PLAN

PROJECT LOCATION

CONTROLLED BY: DEPARTMENT OF VETERAN AFFIARS

CUI CATEGORY: PRVCY, PHYS

LIMITED DISSEMINATION CONTROL: FED CON

POC: JENNIFER WHITWORTH

JENNIFER.WHITWORTH@VA.GOV

CONTROLLED UNCLASSIFIED INFORMATION - CONTACT

No. REVISION DESCRIPTION DATE

ABBREVIATIONS CODES STANDARDS AND EXECUTIVE ORDERS

VA TOILET ROOM

TURNING RADIUS

18" MIN

M

IN

FRONT APPROACH,

PULL SIDE

36" MIN

M

IN

HINGE APPROACH,

PULL SIDE

HINGE APPROACH,

PULL SIDE

*12" MIN48

M

IN

FRONT APPROACH,

PUSH SIDE

M

IN

HINGE APPROACH,

PUSH SIDE

22" MIN 24" MIN

*4 8"

M

IN

LATCH APPROACH,

PULL SIDE

24" MIN*4

2"

M

IN

LATCH APPROACH,

PUSH SIDE

*IF BOTH CLOSER

AND LATCH ARE

PROVIDED

*54" MIN IF CLOSER

IS PROVIDED

*48" IF CLOSER IS

PROVIDED

FRONT APPROACH,

PUSH SIDE

M

IN

42" MIN

DOOR AND FIXTURE CLEARANCES

MATERIALS LEGEND

PURPOSE: THE PUBLIC BUILDINGS AMENDMENT ACT OF 1988, PUBLIC LAW (PUB. L.) 100-678 REQUIRES FEDERAL AGENCIES TO FOLLOW NATIONAL RECOGNIZED "MODEL" BUILDING CODES. THE FEDERAL PARTICIPATION IN THE DEVELOPMENT AND USE OF VOLUNTARY STANDARDS, OFFICE OF MANAGEMENT AND BUDGET (OMB) CIRCULAR A-119, REQUIRES ALL EXECUTIVE AGENCIES TO RELY ON VOLUNTARY STANDARDS, BOTH DOMESTIC AND INTERNATIONAL, WHENEVER FEASIBLE, AND TO PARTICIPATE IN

VOLUNTARY STANDARD BODIES.

GENERAL: VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURES. VA DESIGN MANUALS AND MASTER SPECIFICATIONS

SPECIFY OTHER CODES AND STANDARDS THAT VA FOLLOWS ON ITS PROJECTS:

• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL

INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).

• 2021 INTERNATIONAL BUILDING CODE (IBC) (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN DOCUMENTS, SEE NOTES BELOW)

• 2021 INTERNATIONAL EXISTING BUILDING CODE (IEBC) (IF APPLICABLE)

• 2021 NFPA 101 LIFE SAFETY CODE (SEE NOTES BELOW)

• 2021 NATIONAL FIRE CODES (NFPA)

• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.

• 2020 VA SEISMIC DESIGN REQUIREMENTS, H-18-8

• 2021 INTERNATIONAL MECHANICAL CODE

• 2020 NATIONAL ELECTRICAL CODE (NEC), NFPA 70

• 2021 INTERNATIONAL PLUMBING CODE (IPC)

• 2016 SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) A 17.1.

• 2015 ARCHITECTURAL BARRIERS ACT (ABA) STANDARDS INCLUDING VA SUPPLEMENT, VA BARRIER FREE DESIGN STANDARD (PG-18-13)

• 2017 ANSI ICC A117.1 ACCESIBLE AND USABLE BUILDINGS AND FACILITIES

• 2019 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE AND COMMENTARY, AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318-19)

• 2017 STEEL CONSTRUCTION MANUAL (15TH EDITION), AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)

• ENERGY POLICY ACT OF 2005 (EPACT)

• 2007 DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND

NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.

• 2006 FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)

• 2018 EXECUTIVE ORDER 13834: EFFICIENT FEDERAL OPERATIONS

• 2021 THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 010000 OF THE VA MASTER CONSTRUCTION

SPECIFICATION.

• 2019 VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1

• 2019 SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15

LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION FEES.

NOTES:

1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT

NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN.

DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES

EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).

2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.

ASHRAE 90.1 - 2019 EDITION

BUILDING LOCATION: HOUSTON, TX

CLIMATE ZONE (TABLE ANNEX 1-1): ZONE 2A

INTERIOR DESIGN CONDITIONS:

THE INTERIOR DESIGN TEMPERATURES FOR HEATING AND COOLING AS DEPICTED IN THE PROJECT DESIGN CONDITIONS SCHEDULE IN THE MECHANICAL CONTROL DRAWINGS SHALL BE THE MAXIMUM

AND MINIMUM VALUES FOR THE ASSOCIATED TEMPERATURE CONTROL ZONES.

BUILDING ENVELOPE REQUIREMENTS (5.5 )

BUILDING ENVELOPE REQUIREMENTS FOR CLIMATE ZONE 4 (A,B,C)

ROOFS REQUIRED DESIGNED

INSULATION: R-30 c.i. R-30 METAL BUILDINGS: R-19 + R-11 Ls or R-25 + R-8 Ls N/A

ATTIC AND OTHER: R-49 N/A

WALLS, ABOVE GRADE

MASS: R-9.5 c.i. EXISTING METAL BUILDING: R-0 + R-15.8 c.i. EXISTING STEEL-FRAMED: R-13 + R-7.5 c.i. EXISTING WOOD-FRAMED AND OTHER: R-13 + R-3.8 c.i. or R-20 EXISTING

WALL, BELOW GRADE

BELOW-GRADE WALL: R-7.5 c.i. EXISTING

FLOORS

MASS: R-14.6 c.i. EXISTING

STEEL-FRAMED: R-30 R-30

WOOD-FRAMED AND OTHER: R-30 EXISTING

SLAB-ON-GRADE FLOORS

UNHEATED SLABS: R-15 for 24 in. EXISTING HEATED SLABS: R-20 for 24 in. EXISTING

OPAQUE DOORS

SWINGING: U-0.370 EXISTING

NONSWINGING: U-0.310 EXISTING

FENESTRATION (TABLE 5.5-4):

VERTICAL FENESTRATION, U-FACTOR

FIXED: U-0.36 EXISTING

OPERABLE: U-0.45 EXISTING

ENTRANCE DOOR: U-0.63 EXISTING

DEFINITIONS

c.i = CONTINUOUS INSULATION Ls = LINEAR SYSTEM

NR = NO (INSULATION) REQUIREMENT

ENERGY REQUIREMENTS

N

1. DRAWINGS ARE PART OF A COMPLETE DOCUMENTS SET. CONTRACTOR SHALL

CONFIRM ALL ITEMS REQUIRED BASED UPON THE OVERALL DESIGN INTENT OF THE

ENTIRE DOCUMENT SET.

2. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, PRIOR TO BEGINNING ANY

WORK, TO CONFIRM THE ACCURACY OF THE DRAWINGS AND REPORT ANY

DISCREPANCIES TO THE ARCHITECT. DO NOT SCALE THE DRAWINGS. FIELD VERIFY

ALL DIMENSIONS AND EXISTING STRUCTURAL CONDITIONS.

3. ALL AREAS NOT INVOLVED IN THE SCOPE OF WORK FOR THIS PROJECT SHALL BE KEPT

CLEAN AND FREE OF OBSTRUCTIONS AT ALL TIMES.

4. ALL TRASH AND DEBRIS TO BE REMOVED ON A DAILY BASIS.

5. PROVIDE PROTECTION FOR ALL EXISTING SURFACES AND CONDITIONS TO REMAIN IN

PLACE DURING THE SCOPE OF WORK. SHOULD ANY DAMAGE OCCUR, PATCH AND

REPAIR ANY DAMAGE TO ADJACENT FINISHES TO MATCH EXISTING.

6. ANY DAMAGE CAUSED TO THE BUILDING OR OWNER EQUIPMENT SHALL BE REPAIRED

OR REPLACED BACK TO ITS ORIGINAL CONDITIONS AT NO ADDITIONAL COST TO THE

OWNER.

7. COVER ALL RETURN AIR GRILLES WITHIN THE AREA OF CONSTRUCTION TO PREVENT

PARTICULATE MATERIAL FROM EXHAUSTING INTO SURROUNDING SPACES.

8. APPROPRIATE LIGHT FIXTURES SHALL BE TEMPORARILY SUSPENDED TO PROVIDE

ADEQUATE LIGHTING LEVELS FOR CONSTRUCTION.

9. CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO COORDINATE WITH OTHER

DISCIPLINES TO INSTALL COMPLETE AND OPERATIONAL SYSTEMS. DRAWINGS, AS A

WHOLE, REPRESENT A COMPLETE SET AND DEPICT REQUIREMENTS FOR COMPLETE

AND OPERATIONAL SYSTEMS. INDIVIDUAL DRAWINGS MAY NOT DEPICT COMPLETE AND

ACCURATE INFORMATION TO COORDINATE COMPLETE AND OPERATIONAL SYSTEMS,

BUT DO SO AS AN ENTIRE DOCUMENT TO BE REFERENCED WITH OTHER INDIVIDUAL

DRAWINGS. CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO REFERENCE

OTHER SHEETS AND SPECIFICATIONS AS AN ENTIRE SET OF CONSTRUCTION

DOCUMENTS THAT REFLECT WORK REQUIRED TO ACHIEVE A COMPLETE AND

OPERATIONAL GOAL. LACK OF COORDINATION AND REVIEW OF DRAWINGS AND

SPECIFICATIONS AS AN ENTIRE DOCUMENT TO INSTALL COMPLETE AND OPERATIONAL

SYSTEMS, BEING OBVIOUS AND TYPICAL INDUSTRY STANDARD, IDENTIFIED IN THE

DRAWINGS AND SPECIFICATIONS, SHALL NOT BE IN ANY WAY AN ADDITIONAL COST TO

THE GOVERNMENT.

10. CONTRACTOR SHALL SUBMIT A REQUEST, IN WRITING, TO INTERRUPT ANY SUCH

SERVICES TO COR (CONTRACTING OFFICER’S REPRESENTATIVE) 48 HOURS IN

ADVANCE OF PROPOSED INTERRUPTION. REQUEST SHALL STATE REASON, DATE,

EXACT TIME OF, AND APPROXIMATE DURATION OF SUCH INTERRUPTION. MAJOR

INTERRUPTIONS OF ANY SYSTEM MUST BE REQUESTED, IN WRITING, AT LEAST 60

CALENDAR DAYS PRIOR TO THE DESIRED TIME AND SHALL BE PERFORMED AS

DIRECTED BY THE COR. MAJOR INTERRUPTIONS SHALL BE COORDINATED WITH OTHER

MAJOR INTERRUPTIONS AND MAY NOT BE SCHEDULED FOR ONE DISCIPLINE MORE

THAN TWICE THROUGHOUT THE OVERALL CONSTRUCTION SCHEDULE UNLESS

REQUESTED IN WRITING AND APPROVED BY THE COR. CONTRACTOR WILL BE ADVISED,

IN WRITING, OF APPROVAL OF REQUEST, OR OF WHICH OTHER DATE AND/OR TIME

SUCH INTERRUPTION WILL CAUSE THE LEAST INCONVENIENCE TO OPERATIONS OF

THE MEDICAL CENTER. INTERRUPTION TIME APPROVED BY THE MEDICAL CENTER MAY

OCCUR AT TIMES OTHER THAN CONTRACTOR'S NORMAL WORKING HOURS. SCHEDULE

INTERRUPTION MAY BE ON WEEKENDS OR LATE HOURS AND MAY NOT BE AN

ADDITIONAL COST TO THE GOVERNMENT. COORDINATE ALL INTERRUPTIONS THAT MAY

AFFECT THE NORMAL OPERATION OF THE FACILITY WITH THE COR WHEN SUBMITTING

THE CONSTRUCTION SCHEDULE OR UPDATES TO THE CONSTRUCTION SCHEDULE.

11. NO ASBESTOS CONTAINING MATERIALS ARE TO BE USED ON THIS PROJECT. SPUR

DESIGN, THE A/E OF RECORD, CAN CERTIFY THAT NO ASBESTOS CONTAINING

BUILDING MATERIALS (ACBM) OR LEAD BASED PAINT (LBP) PRODUCTS WERE

DESIGNED/SPECIFIED AS BUILDING MATERIAL IN ANY OF THE CONSTRUCTION

DOCUMENTS.

13. REFER TO THE DESIGN BINDER FOR THE ICRA INFORMATION DOCUMENTATION.

GENERAL NOTES

AREA NAME

150 SF

A101

A101

SIM

A

00.0

A101

1 1

A101

LEVEL NAME

00'-00"

00'-00" 4B

3A

FIBERGLASS BATT

INSULATION

RIGID INSULATION

CONCRETE / PRECAST

CONCRETE

EARTH / SOIL

SAND, EIFS FINISH, OR

PLASTER FINISH

GYPSUM BOARD FINISH

BRICK

CONCRETE MASONRY

UNIT

STONE / CAST STONE

GYPSUM BOARD SECTION

EXTERIOR SHEATHING

BOARD SECTION

PLYWOOD SECTION

CLEAN UTILITY

000A

150 SF

/1 A101

X0000

ROOM TAG

AREA TAG

SPECIALTY EQUIPMENT TAG

DOOR TAG

KEYED NOTE TAG

WALL TAG

WINDOW TAG

A101

SIM

A101

SIM

A

ACB ACOUSTIC CEILING BAFFLE

ACP ACOUSTIC CEILING PANEL

ACST ACOUSTIC

ADA AMERICANS WITH DISABILITIES ACT

ACT ACOUSTICAL CEILING TILE

ADDL ADDITIONAL

ADDN ADDITION

ADJ ADJACENT, ADJOINING, OR

ADJUSTABLE

ADMIN ADMINISTRATION

AE ARCHITECT/ENGINEER

AF ACCESS FLOORING

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AHJ AUTHORITY HAVING JURISDICTION

AIA AMERICAN INSTITUTE OF

ARCHITECTS

ALT ALTERNATE

ALT NO ALTERNATE NUMBER

ALUM ALUMINIUM (TRIM)

AMT AMOUNT

APPROX APPROXIMATE

ARCH ARCHITECT

ASC ABOVE SUSPENDED CEILING

AT ACOUSTIC CEILING TILE

AVG AVERAGE

B

BD BOARD

BLDG BUILDING

BLKG BLOCKING

BLT IN BUILT-IN

BOS BOTTOM OF STEEL

BOT BOTTOM

BRKT BRACKET

BTWN BETWEEN

C

CAB CABINET

CAV CAVITY

CBB CONCRETE BACKER BOARD

CD CONSTRUCTION DOCUMENTS

CFM CUBIC FEET PER MINUTE

CFS CUBIC FEET PER SECOND

CG CORNER GUARD

CH BD CHALK BOARD

CIP CAST-IN-PLACE

CJ CONTROL JOINT

CL CENTER LINE

CLG CEILING

CLG HT CEILING HEIGHT

CLR CLEAR

CMU CONCRETE MASONRY UNIT

CO CONTRACTING OFFICER

COL COLUMN

COMM COMMUNICATION

CONC CONCRETE

CONT CONTINUOUS

COORD COORDINATE

COR CONTRACTING OFFICER'S

REPRESENTATIVE

CP CONTRACTOR PROVIDED

CP/CI CONTRACTOR PROVIDED /

CONTRACTOR INSTALLED

CPT CAROET/CARPET TILE

CS CONCRETE SEALED

CSWK CASEWORK

CT CERAMIC TILE

CTB CERAMIC TILE BASE

CTR CENTER

CU FT CUBIC FEET

D

DBL DOUBLE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DIA DIAMETER

DIR DIRECTION

DIST DISTANCE

DOC DOCUMENT

DR DOOR

DS DOWNSPOUT

DWG DRAWING

DWP DIMENSIONAL WALL PANEL

E

EA EACH

EJ EXPANSION JOINT

EL ELEVATION

ELEV ELEVATOR

ENTR ENTRANCE

EPY EPXOY FLOORING

EQ EQUAL

ETR EXISTING TO REMAIN

EX EXISTING

EXP EXPOSED

EXT EXTERIOR

F

FAB FABRIC

FED FEDERAL

FF FINISH FACE

FF EL FINISH FLOOR ELEVATION

FIN FINISH

FIN BS FINISH BOTH SIDES

FIN FLR FINISH FLOOR

FIN GR FINISH GRADE

FIXT FIXTURE

FLDG FOLDING

FLEX FLEXIBLE

FLG FLOORING

FLMT FLUSH MOUNT

FLR FLOOR

FOC FACE OF CONCRETE

FOM FACE OF MASONRY

FP FIRE PROTECTION

FR FIRE RESISTANT

FT FEET

FTG FOOTING

FV FIELD VERIFY

FWC FABRIC WALL COVERING

G

GDR GUARDRAIL

GL GLASS/GLAZING

GRAN GRANITE

GR FL GROUND FLOOR

GT GROUT

GSM GALVANIZED SHEET METAL

GYP BD GYPSUM BOARD

H

HDW HARDWARE

HEPA HIGH EFFICIENCY

PARTICULATE AIR (FILTER)

HM HOLLOW METAL

HORIZ HORIZONTAL

HR HANDRAIL

HT HEIGHT

I

IBC INTERNATIONAL BUILDING CODE

INSUL INSULATION

INT INTERIOR

ILO IN LIEU OF

J

J-BOX JUNCTION BOX

L

LAV LAVATORY

LBS POUND

LDG LANDING

LF LINEAR FEET (FOOT)

LIN LINEAR

LN LINOLEUM

LOC LOCATION

LT LIGHT

LVR LOUVER

LVT LUXURY VINYL TILE

M

MAT CARPET MAT / WALK-OFF MAT

MATL MATERIAL

MAX MAXIMUM

MECH MECHANICAL

MEMB MEMBRANE

MFR MANUFACTURER

MID MIDDLE

MIL STD MILITARY STANDARD

MIN MINIMUM

MISC MISCELLANEOUS

MO MASONRY OPENING

MOD MODIFY

MTG MOUNTING

MTL METAL

MVBL MOVABLE

N

NA NOT APPLICABLE

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NTS NOT TO SCALE

O

OA OVERALL

OC ON CENTER

OD OUTSIDE DIAMETER

OPNG OPENING

OPP OPPOSITE

OPR OPERABLE

ORD OVERFLOW ROOF DRAIN

ORIG ORIGINAL

P

P PAINT

PA PUBLIC ADDRESS

PBD PARTICLE BOARD

PCF POUNDS PER CUBIC FOOT

PCT PERCENT

PERF PERFORATED

PERIM PERIMETER

PERP PERPENDICULAR

PL PROPERTY LINE

PLAM PLASTIC LAMINATE

PLBG PLUMBING

PNL PANEL

PR PAIR

PRB PROFILE BASE

PRKG PARKING

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PORCELAIN TILE

PWR POWER

Q

QA QUALITY ASSURANCE

QC QUALITY CONTROL

QTY QUANTITY

REFERENCE SYMBOLS IDENTIFICATION TAGS

GRID HEAD AND

LINE

LEVEL INDICATOR

MATCH LINE AND

VIEW REFERENCE

NORTH ARROW W/

PROJECT NORTH

SPOT ELEVATION

DETAIL

SECTION

**48" MIN IF BOTH CLOSER

AND LATCH PROVIDED

WALL

SECTION

BUILDING

SECTION

DETAIL

ELEVATION

INTERIOR

ELEVATION

BUILDING

ELEVATION

1 1

5'- 6"

M

IN

R

RAF RESILIENT ATHETIC FLOORING

RB RUBBER BASE/RESILIENT BASE

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

REC RECESSED

REF REFERENCE

REM REMOVABLE

REP REPAIR

REPL REPLACE

REQ REQUIRE

REQD REQUIRED

RES RESINOUS FLOORING

RES-W RESINOUS / EPOXY WALL / CEILING

RF RUBBER FLOORING

RFG ROOFING

RM ROOM

RO ROUGH OPENING

RP RESIN PANEL

RSF RESILIENT SHEET FLOORING

RV ROOF VENT

RWC RIGID VINYL WALLCOVERING

S

SC SPECIALTY COATING

SD STATIC DISSIPATIVE FLOORING/TILE

SCHED SCHEDULE

SECT SECTION

SF SQUARE FOOT (FEET)

SGL SINGLE

SIM SIMILAR

SJ SCORED JOINT

SLNT SEALANT

SM SHEET METAL

SPEC SPECIFICATION

SQ SQUARE

SQ IN SQUARE INCH

SQ YD SQUARE YARD

SS SOLID SURFACE

ST STONE

STD STANDARD

STOR STORAGE

SV SHEET VINYL (ROLLED OR TILE)

T

TEL TELEPHONE

TEMP TEMPORARY

TER TERRAZO

TOF TOP OF FOOTING/ FOUNDATION

TOM TOP OF MASONRY

TOS TOP OF SLAB/ STEEL

U

UNO UNLESS NOTED OTHERWISE

UTIL UTILITY

V

VAR VARIES

VC VA PROVIDED / CONTRACTOR

INSTALLED

VCT VINYL COMPOSITION TILE

VFAT VINYL FACED ACOUSTICLAL TILE

VP VENEERED PLASTER

VT VINYL TILE

VV VA PROVIDED / VA INSTALLED

VWC VINYL WALLCOVERING

VWF VINYL WALL FABRIC

W

W/ WITH

W/O WITHOUT

W/C WATER CLOSET

WC WHEELCHAIR

WD WOOD

WFAB WALL FABRIC

WPM WATERPROOF MEMBRANE

WSF WELDED SHEET FLOOR

X

X BRACE CROSS BRACE

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project NumberCONSULTANTS:

Drawing #

VA Health Care System Approval:

ARCHITECT:

SPUR SBBL

COLLABORATIVE JV, INC

100 N Stone Avenue, Ste 1102

TUSCON, AZ 85701

(405) 842-6100

SETH ANDREW CAVIN TX ARCH LIC#22680 EXP. 07/31/23

JAMES ROSS MYLES TX MECH LIC#136680 EXP. 09/30/23

EVANS SORDIASHIE TX ELEC LIC#144295 EXP. 03/31/24

MECH / ELEC / PLUMB / TECH ENGINEER

SPUR DESIGN

2519 MADISON AVE. SUITE 100

KANSAS CITY, MO 64108

(913) 369-7200

FULLY SPRINKLERED

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD, UNIT 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STAMP:

Drawing Number

Building Number

CONTROLLED UNCLASSIFIED INFORMATION - CUI

CONTROLLED UNCLASSIFIED INFORMATION - CUI

/2

/2

:1 :2

P

M

GENERAL INFORMATION

KJW 02 OF 41NR

BID DOCUMENTS

VA-OIG HOUSTON VARO

SPACE RENOVATION

03/30/2023

36C10E22N0069

HOUSTON REGIONAL VA OFFICE

6900 ALMEDA ROAD, SUITE 1073

HOUSTON, TX 77030

GI001

SPUR #: 1805.04No. REVISION DESCRIPTION DATE

OUTSIDE OF BUILDING

WEEKLY CHANGED

HEPA FILTER

HEPA NEGATIVE

AIR UNIT

WEEKLY CHANGED

(OR MORE AS

NEEDED) PRE FILTER

FIRE RATED PLYWOOD

F

LE

X D

U C

T

SUPPLY DUCTS EITHER KEEP

RUNNING OR COVER WHEN

RUNNING TO KEEP DUST OUT.

TAPE ALL SERVICES

TO PROTECT AGAINST

CONTAMINATION A

O

V

FIRE EXTINGUISHER ON PORTABLE

FLOOR BRACKET (ILSM MAY REQUIRE

MORE THAN ONE)

SUSPENDED PLASTIC

ZIPPER WALL

CURTAIN BARRIER

6 MIL PLASTIC

TEMPORARY DIGITAL MANOMETER FOR NEGATIVE

PRESSURE MONITORING OUTSIDE OF ICRA BARRIER

FOR VA'S INSPECTION. INDICATOR SHALL BE AT -0.01

OR GREATER (VERIFY DAILY). IF NOT, VERIFY ALL

OPENINGS, SUCH AS DOOR CLOSED, AND/OR CHANGE

OUT NEGATIVE AIR PRE-FILTER.

PROVIDE STICKY MAT, DRY MAT, WET MAT

(CHANGED END OF SHIFT OR MORE IF

NECESSARYTO MAINTAIN CLEANLINESS)

PROVIDE WIPES AND SPRAY FOR WET MAT

POST ICRA ILSM FIRE

INSPECTION SHEETS

CONTAINER VISIBLE TO

PUBLIC

COVER ALL RETURNS AT THE

GRATE/DIFFUSERS

OPTIONAL EXHAUST DUCTS

(COVER THE GRATES AND THE DIFFUSERS)

E

DOOR OPENING

VENT TO OUTSIDE ROUTE

TO BE APPROVED BY COR.

FIRE PULL STATION WITH AUDIO/

VISUAL

ILSM SIGNAGE

ICRA BARRIER, SEE PLANS FOR TYPE AND LOCATION

CB DA

C E

IL

IN

G H

E

IG

H T

V A

R

IE

S F

IE

L D

V E

R

IF

Y

W A

L L H

E

IG

H T

V A

R

IE

S F

IE

L D

V E

R

IF

Y

4 7/8"

C E

IL

IN

G H

E

IG

H T

V A

R

IE

S F

IE

L D

V E

R

IF

Y

/2

4 7/8"

C E

IL

IN

G H

E

IG

H T

V A

R

IE

S F

IE

L D

V E

R

IF

Y

W A

L L H

E

IG

H T

V A

R

IE

S F

IE

L D

V E

R

IF

Y

6 1/8"

REQU.

AS

3 5/8" INSULATED WALL WITH 16

GAUGE METAL STUDS @ 16" O.C.

WALL TO EXTEND TO UNDERSIDE

OF DECK

5/8" FIRE RESISTANT GYPSUM

BOARD - BOTH SIDES

EXISTING CEILING SYSTEM

BASE - TO MATCH EXISTING

AREA

EXISTING FLOOR

UNDERSIDE OF EXISTING DECK

5/8" FIRE RESISTANT GYPSUM

BOARD - BOTH SIDES

EXISTING CEILING SYSTEM

BASE - TO MATCH EXISTING

AREA

EXISTING FLOOR

UNDERSIDE OF EXISTING DECK

3 5/8" 16 GAUGE METAL STUDS @

16" O.C. WALL TO EXTEND TO

UNDERSIDE OF DECK

3 5/8" INSULATED WALL WITH 16

GAUGE METAL STUDS @ 16" O.C.

(2) LAYERS 5/8" GYPSUM BOARD

EACH SIDE. WALL TO EXTEND TO

UNDERSIDE OF DECK

5/8" FIRE RESISTANT GYPSUM

BOARD - BOTH SIDES

EXISTING CEILING SYSTEM

BASE - TO MATCH EXISTING

AREA

EXISTING FLOOR

UNDERSIDE OF EXISTING DECK

FIRE RESISTANT SEALANT, BOTH

SIDES

FIRE RESISTANT SEALANT, BOTH

SIDES

FIRE RESISTANT SEALANT, BOTH

SIDES

1-HR RATED AND SMOKE RATED

U.L. DESIGN NO. U404

SMOKE RATED 2-HR RATED AND SMOKE

RATED

U.L. DESIGN NO. U404

PLASTIC SHEET BARRIER

NON RATED

PLASTIC SHEET

BARRIER

EXISTING WALL

ASSEMBLY

EXISTING

CEILING

BOTTOM SEALING RUNNER

TOP SEALING

RUNNER

SUPPORT POLES,

QUANTITY PER MANUF.

RECOMMENDATIONS

AREA UNDER CONSTRUCTION

PERSONNEL ENTERING MUST HAVE: HARD HAT,

SAFETY GLASSES AND PROPER I.D.

--DESCRIPTION ON NEWLY PROPOSED OCCUPANCY--

COMING SOON!!!

XXXXXX

XXXXXX

XXXXXX

POST ICRA, ILSM, FIRE

INSPECTION SHEETS VISIBLE

TO THE PUBLIC

SUSPENDED PLASTIC ZIPPER

WALL CURTAIN BARRIER

INDICATOR MUST MAINTAIN -0.01 INCHES OR MORE

NEGATIVE (VERIFY DAILY), IF NOT VERIFY ALL

OPENINGS SUCH AS DOORS ARE CLOSED AND/OR

CHNAGE OUT NEGATIVE AIR PRE-FILTER.

ICRA, ISLM, FIRE

WATCH, MISC. FORMS

PAPER CADDY

INDICATOR (REFER TO PLAN

AND ELEVATION) FRAMED PICTURE

OF C.O.R. WITH

CONTACT

INFORMATION

CONSTRUCTION SUPERVISOR

NAME AND CELL PHONE

XXXXX

BOILER/CHILLER PLANT AFTER

HOURS CONTACT PHONE XXXXX

FIRE EMERGENCY DIAL 911

THIS IS A RESTRICTED AREA

4' -0

"A .F

.F

INSPECTIONS AND NON-INVASTIVE ACTIVITES

MATRIX OF PRECAUTIONS FOR CONSTRUCTION & RENOVATION

TYPE A

INCLUDES BUT NOT LIMITED TO:

• REMOVAL OF CEILING TILES FOR VISUAL INSPECTION LIMITED TO 1 TILE PER

50 SQUARE FEET.

• PAINTING (BUT NOT SANDING).

• WALL COVERING, ELECTRICAL TRIM, MINOR PLUMBING AND ACTIVITIES WHICH

DO NOT GENERATE DUST OR REQUIRE CUTTING OF WALLS OR ACCESS TO

CEILINGS OTHER THAN FOR VISUAL INSPECTION

SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATES MINIMAL DUSTTYPE B

INCLUDES BUT NOT LIMITED TO:

• INSTALLATION OF TELEPHONE AND COMPUTER CABLING.

• ACCESS TO CHASE SPACES.

• CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE

CONTROLLED.

WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR REQUIRES

DEMOLITION OR REMOVAL OF ANY FIXED BUILDING COMPONENTS OR ASSEMBLIES

TYPE C

INCLUDES BUT NOT LIMITED TO:

• SANDING OF WALLS FOR PAINTING OR WALL COVERING.

• REMOVAL OF FLOOR COVERINGS, CEILING TILES OR CASEWORK.

• NEW WALL CONSTRUCTION.

• MINOR DUCT WORK OR ELECTRICAL WORK ABOVE CEILINGS.

• MAJOR CABLING ACTIVITIES.

• ANY ACTIVITY WHICH CANNOT BE COMPLETED WITHIN A SINGLE WORK SHIFT.

MAJOR DEMOLITION AND CONSTRUCTION PROJECTSTYPE D

INCLUDES BUT NOT LIMITED TO:

• ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK SHIFTS.

• REQUIRES HEAVY DEMOLITION OR REMOVAL OF A COMPLETE CABLING

SYSTEM.

• NEW CONSTRUCTION.

INFECTION CONTROL RISK ASSESSMENT (ICRA)

LOW RISK

PATEINT RISK GROUPS

MEDIUM RISK HIGH RISK HIGHEST RISK

• OFFICE AREAS • CARDIOLOGY

• ECHOCARDIOGRAPHY

• ENDOSCOPY

• NUCLEAR MEDICINE

• PHYSICAL THERAPY

• RADIOLOGY/MRI

• RESPIRATORY

THERAPY

• CCU

• EMERGENCY ROOM

• LABOR & DELIVERY

• LABORATORY (SPECIMEN)

• NEWBORN NURSERY

• OUTPATIENT SURGERY

• PEDIATRICS

• PHARMACY

• POST ANESTHESIA CARE

UNIT

• SURGICAL UNITS

• ANY AREA FOR

IMMUNOCOMPROMISED PATIENTS

• BURN UNIT

• CARDIAC CATH LAB

• CENTRAL STERILE SUPPLY

• INTENSIVE CARE UNITS

• MEDICAL UNIT

• NEGATIVE PRESSURE ISOLATION

ROOMS

• ONCOLOGY

• OPERATING ROOMS INCLUDING

• C-SECTION ROOMS

RISK RELATED GROUP TYPE A TYPE B TYPE C TYPE D

LOW RISK GROUP

MEDIUM RISK GROUP

HIGH RISK GROUP

HIGHEST RISK GROUP

I

I

I

II

II

II

II

III/IV

II

III

III/IV

III/IV

III/IV

IV

IV

IV

IC MATRIX - CLASS OF PRECAUTIONS:

CONSTRUCTION PROJECT BY PATIENT RISK

CONSTRUCTION PROJECT TYPE

NOTE: INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION ACTIVITY AND RISK LEVEL INDICATE

THAT CLASS III OR CLASS IV CONTROL PROCEDURES ARE NECESSARY.

A. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE AREAS WITHOUT PRIOR

APPROVAL OF THE COR AND THE MEDICAL CENTER.

B. ACTIVITY HAZARD RISK CLASSIFICATIONS OF CLASS I OR CLASS II SHALL REQUIRE APPROVAL BY THE FACILITY SAFETY MANAGER AND CONTRACTING OFFICER REPRESENTATIVE BEFORE BEGINNING ANY CONSTRUCTION WORK. HAZARD RISK CLASSIFICATIONS OF CLASS III OR IV SHALL REQUIRE A

PERMIT BEFORE BEGINNING ANY CONSTRUCTION WORK. INFECTION CONTROL PERMITS WILL BE

ISSUED BY THFACILITY SAFETY MANAGER AND CONTRACTING OFFICER REPRESENTATIVE.

C. INFECTION CONTROL PERMITS SHALL BE POSTED OUTSIDE THE APPROPRIATE CONSTRUCTION

AREA. MORE THAN ONE PERMIT MAY BE ISSUED, AS WORK IS LOCATED IN MULTIPLE AREAS.

D. THE REQUIRED INFECTION CONTROL PRECAUTIONS ARE AS FOLLOWS:

CLASS I:

• NOTIFY THE COR.

• EXECUTE WORK USING METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION

OPERATIONS.

• CEILING TILES: IMMEDIATELY REPLACE ANY CEILING TILES DISPLACED FOR VISUAL INSPECTION.

• UPON COMPLETION: CLEAN WORK AREA, AND NOTIFY COR.

CLASS II:

• NOTIFY THE COR.

• PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE

SUCH AS WET METHODS OR TOOL MOUNTED DUST COLLECTORS.

• WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.

• SEAL UNUSED DOORS WITH PAINTERS TAPE.

• BLOCK OFF AND SEAL AIR VENTS.

• REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

• UPON COMPLETION: WIPE WORK SURFACES WITH CLEANER/ DISINFECTANT. CONTAIN

CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

CLASS III:

DURING CONSTRUCTION WORK:

• OBTAIN PERMIT FROM THE COR.

• REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT

CONTAMINATION OF DUCT SYSTEM.

• COMPLETE ALL CRITICAL BARRIERS TO SEAL AREA FROM NON-WORK AREA OR IMPLEMENT

CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK

SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.

INSTALL CONSTRUCTION BARRIERS AND CEILING PROTECTION CAREFULLY, OUTSIDE OF NORMAL

WORK HOURS.

• MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF WATER GAUGE, WITHIN WORK SITE

UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND CONTINUOUSLY MONITORED WITH A

DIGITAL DISPLAY, RECORDING AND ALARM INSTRUMENT, WHICH MUST BE CALIBRATED ON

INSTALLATION, MAINTAINEDWITH PERIODIC CALIBRATION AND MONITORED BY THE CONTRACTOR.

• CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

• COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.

UPON COMPLETION:

• DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT THOROUGHLY

CLEANED, AND IS INSPECTED BY THE CONTRACTING OFFICER REPRESENTATIVE AND BY THE VA

ENVIRONMENTAL SERVICES DEPARTMENT.

• REMOVE CONSTRUCTION BARRIERS AND CEILING PROTECTION CAREFULLY TO MINIMIZE

SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION, OUTSIDE OF NORMAL

WORK HOURS.

• VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.

• WET MOP AREA WITH CLEANER/DISINFECTANT.

• UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK WAS PERFORMED.

• RETURN PERMIT TO THE COR.

CLASS IV:

DURING CONSTRUCTION WORK:

• OBTAIN PERMIT FROM THE COR.

• ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF

DUCT SYSTEM.

• COMPLETE ALL CRITICAL BARRIERS TO SEAL AREA FROM NON-WORK AREA OR IMPLEMENT

CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK

SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.

INSTALL CONSTRUCTION BARRIERS AND CEILING PROTECTION CAREFULLY, OUTSIDE OF NORMAL

WORK HOURS.

• MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF WATER GAUGE, WITHIN WORK SITE

UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND CONTINUOUSLY MONITORED WITH A

DIGITAL DISPLAY, RECORDING AND ALARM INSTRUMENT, WHICH MUST BE CALIBRATED ON

INSTALLATION, MAINTAINED WITH PERIODIC CALIBRATION AND MONITORED BY THE

CONTRACTOR.

• SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES.

• CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY

CAN BE VACUUMED USING A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE OR THEY CAN

WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE WORK SITE.

• ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE COVERS

MUST BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA.

UPON COMPLETION:

• DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT THOROUGHLY

CLEANED, AND IS INSPECTED BY THE CONTRACTING OFFICER REPRESENTATIVE.

• REMOVE CONSTRUCTION BARRIERS AND CEILING PROTECTION CAREFULLY TO MINIMIZE

SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION, OUTSIDE OF NORMAL

WORK HOURS.

• CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

• COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.

• VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.

• AREA TO BE CLEANED/DISINFECTED PER VA ENVIRONMENTAL SERVICES GUIDELINES AS

COORDINATED BY THE COR.

• UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK WAS PERFORMED.

• RETURN PERMIT TO THE COR.

GENERAL ICRA NOTES

PLASTIC WINDOW

SWIVEL CASTERS

WITH TWO LOCKING

BRAKES

MOBILE CART

A D

JU

S

T A

B

LE

H E

IG

H

T

HEPA NEGATIVE AIR

UNIT

EXISTING WALL

EXISTING CEILING

FLEX DUCT

HEATED DETECTOR CUT-OFF

BASIS OF DESIGN: HEPA NEGATIVE AIR

UNIT INTEGRAL WITH EDGEGUARD

BARRIER SYSTEM.

FIRE RATED PLYWOOD (TEMP.

REMOVE GLASS PANEL)

EXISTING WINDOW FRAME

TYPE A OR C ICRA BARRIER, SEE

PLANS FOR TYPE AND LOCATION

TYPE B OR D ICRA

BARRIER, SEE PLANS FOR

TYPE AND LOCATION

EXISTING CEILING

EXISTING CONCRETE SLAB FLOORING

FINISHED FLOORING TO BE KEPT

CLEAN. FLOORS NOT BEING

REPLACED MUST BE PROTECTED.

COVER WITH ROSIN PAPER/ FIRE

RATED PLYWOOD.

WHEN WORKING ABOVE CEILING

WITH BARRIERS THAT

TERMINATE AT CEILING,

PROVIDE PLASTIC ENCLOSURE

IN PLENUM SPACE.

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project NumberCONSULTANTS:

Drawing #

VA Health Care System Approval:

ARCHITECT:

SPUR SBBL

COLLABORATIVE JV, INC

100 N Stone Avenue, Ste 1102

TUSCON, AZ 85701

(405) 842-6100

SETH ANDREW CAVIN TX ARCH LIC#22680 EXP. 07/31/23

JAMES ROSS MYLES TX MECH LIC#136680 EXP. 09/30/23

EVANS SORDIASHIE TX ELEC LIC#144295 EXP. 03/31/24

MECH / ELEC / PLUMB / TECH ENGINEER

SPUR DESIGN

2519 MADISON AVE. SUITE 100

KANSAS CITY, MO 64108

(913) 369-7200

FULLY SPRINKLERED

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD, UNIT 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STAMP:

Drawing Number

Building Number

CONTROLLED UNCLASSIFIED INFORMATION - CUI

CONTROLLED UNCLASSIFIED INFORMATION - CUI

/2

/2

:1 :2

P

M

ICRA DETAILS

KJW 03 OF 41NR

BID DOCUMENTS

VA-OIG HOUSTON VARO

SPACE RENOVATION

03/30/2023

36C10E22N0069

HOUSTON REGIONAL VA OFFICE

6900 ALMEDA ROAD, SUITE 1073

HOUSTON, TX 77030

GI002

SPUR #: 1805.04

1/2" = 1'-0"

GENERAL ICRA CONSTRUCTION PLAN LAYOUT1

3/4" = 1'-0"

ICRA BARRIER WALL TYPES5

3/8" = 1'-0"

ICRA ELEVATION4

3/8" = 1'-0"

ICRA MOBILE CONTAINMENT CART23/8" = 1'-0"

SECTION AT ICRA CONSTRUCTION3

T

T T

T

T

8. 7. 6.

1.

2.

3.

5.

4.

5.

4.

1080−05 1080−04

V− 111

PB36 PB36

P B

P B

P B

P B

PB30 PB30

#1

PTR.

UP

STAND

P B

P B

#1

TYPEWRITERTYPEWRITER

MAIL

FORMSFORMS

FAXFAXFAX

L /F

L/F

L/F

L /F

L /F

L /F

L /F

L /F

L /F

L /F

L /F

L /F

L /F

L /F

L /F

L /F

L /F

L /F

L /F

L /F

L/FL/F

L /F

L/F

L/F

L/F

L/F

L/F

B/L

C

PTR.

11'x19' file file file file

8. 7. 6.

1.

2.

3.

5.

4.

5.

4.

1080−05 1080−04

V− 111

.7

.7

.7

F24

F24 48

F24 48

F

F

F

48F24 48

.7

.7

.7

F24

TV

TARGET

EMERGENCY

EXIT

180.0000

48.0000

51.5923

48.0000

48.0000

48.0000

48.0000

48.0000

48.0000

48.0000

57.8739

57.8739

57.8739

51.2310

48.0000

EVIDENCE

ROOM

1073G

OFFICE

1073H

STORAGE

1073F

OFFICE

1073E

PRINT/COPY

AREA

1073D

STORAGE

1073C

OFFICE

STORAGE

ROOM

TEAM SPACE

OFFICE

CONFERENCE

ROOM

BREAK AREA

OPEN

WORKSTATIONS

PHASE 1

PHASE 2

ELEC.

CORRIDOR

1073K

CORRIDOR

WORK

STATIONS

1073A

WORK

STATION

1073B

OFFICE OF THE CHIEF

AST SSD CHIEF

SSD CHIEF

ACCOUNTING

IT SECTION

IT TRAINING ROOM

CONF. ROOM

FILE ROOM

BADGING

IT REPAIR/WORKSHOP

IT/ELECTRICAL

VETERANS MUSEUM AREA

STORAGE ROOM

ELEC. PANELS

WOMEN'S RR

MEN'S RR

MECH. ROOM

DATA ROOM

WOMEN'S RR

MEN'S RR

DINING AREA

OFFICE

ELEV.

VENDING

OFFICE

BREAK

ISO WORKSTATIONS

STORAGE

ELEVATOR

EQUIPMENT

STORAGE

PROJECT SCOPE

PHASE 1 - CURRENTLY UNUSED SPACE TO

BE REMODELED

PHASE 2 - EXISTING OFFICE AREA TO BE

REMODELED AFTER PHASE 1 COMPLETION

PHASING PLAN LEGEND

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project NumberCONSULTANTS:

Drawing #

VA Health Care System Approval:

ARCHITECT:

SPUR SBBL

COLLABORATIVE JV, INC

100 N Stone Avenue, Ste 1102

TUSCON, AZ 85701

(405) 842-6100

SETH ANDREW CAVIN TX ARCH LIC#22680 EXP. 07/31/23

JAMES ROSS MYLES TX MECH LIC#136680 EXP. 09/30/23

EVANS SORDIASHIE TX ELEC LIC#144295 EXP. 03/31/24

MECH / ELEC / PLUMB / TECH ENGINEER

SPUR DESIGN

2519 MADISON AVE. SUITE 100

KANSAS CITY, MO 64108

(913) 369-7200

FULLY SPRINKLERED

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD, UNIT 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STAMP:

Drawing Number

Building Number

CONTROLLED UNCLASSIFIED INFORMATION - CUI

CONTROLLED UNCLASSIFIED INFORMATION - CUI

/2

/2

:1 :2

P

M

PHASING PLAN

KJW 04 OF 41NR

BID DOCUMENTS

VA-OIG HOUSTON VARO

SPACE RENOVATION

03/30/2023

36C10E22N0069

HOUSTON REGIONAL VA OFFICE

6900 ALMEDA ROAD, SUITE 1073

HOUSTON, TX 77030

GI010

SPUR #: 1805.04

N

1/8" = 1'-0"

LEVEL 1 - PHASING PLAN1

LEVEL 1 - KEY PLAN

N

T T

T

T

8. 7. 6.

1.

2.

3.

5.

4.

5.

4.

1080−05 1080−04

V− 111

PB36 PB36

P B

P B

P B

P B

PB30 PB30

#1

PTR.

UP

STAND

P B

P B

#1

Voucher Audit

Payroll

FIRST FLOOR

MIDDLE STAIRWELL

TYPEW RITERTYPEW RITER

MAIL

FOR MSFOR MS

FAXFAXFAX

L /F

L/F

L/F

L /F

L /F

L /F

L /F

L /F

L /F

L /F

L /F

L /F

L /F

L /F

L /F

L /F

L /F

L /F

L /F

L /F

L/FL/F

L /F

L/F

L/F

L/F

L/F

L/F

B/L

C

TB L .

P T R .

LATERAL

WATER

RE F R I G .C O F F E E

P T R .

Projection Screen

VR&E

CONFERENCE

Projection Screen Projection Screen

SSD Storage

Fire Extinguisher

ELEVATOR ELEVATOR

TELEPHONETELEPHONE

VENTING MACHINES

FAX

Fire Extinguisher

API

API

SPECIAL

PROJECTS

ROOM

fed/ex

PITNEY

BOWES

PITNEY

MACHINE

TAPE

HOSP. MAIL

BOWES

SCALE

TABLES

WORKING

MAIL

L E T T E R O P E N E R

INSERTER

MACHINE

MAIL

SCALE

OVERHEAD

MESSENGER WORKSTATIONS

POPCORN

Projection Screen

TESTING

ROOM

FAX

FAX

VR&E

1087−05 V− 24 V− 223

2V/2D supply

Table

VETERANS

MUSEUM

AREA

Panic Button Panic

Button

Panic Button

Panic Button

Panic Button

Panic Button

Panic Button

Panic ButtonPanic

Button

Panic Button

Panic Button

Panic Button

Panic Button

Panic Button

Panic Button

Panic Button

Panic Button

Panic Button

Panic Button

Panic Button

Panic Button

Panic Button

Panic Button

Panic Button

Panic Button

1087−05 V− 24 V− 223

2V/2D

TRNG. RM 2

BOOKCASE

TRNG. RM 3

MICRO

FRIG

VFWAL

AL

MOPH

AMVETS

PVA

DAV

Storage

B O O K C A S E

T V

LOADING

DOCK

TRNG. RM 1

TYPEW RITER

VR&E

MAIL

WORK STATION EXISTING

VR&E OFFI CER

ASSISTANT

KELLY

SHUPAK

BETTY

KUCERA

DAWN

JACKSON

JAMES

ZIRUOLO

JAMES

BAYLES

VACANT

FMT

Public Contact

VR&E

CHIEF

Trainer

TRAINING ROOM "C"

Trainer

Travel

ISO w/station

11'x19' file file file file

8. 7. 6.

1.

2.

3.

5.

4.

5.

4.

1080−05 1080−04

V− 111

.7

.7

.7

F24

F24 48

F24 48

F

F

F

48F24 48

.7

.7

.7

F24

Room 1033

Panic Button

Room 1132

Room 1129

Room

Room 1128

Room 1127

Room

WAITING

ROOM

UNION

HEARING

ROOM

CONTROLLER

A/V MASTER

T2

XFMR

KTCH

CP

XFMR

XFMR

Room 1021 Room 1022

TX WORK FORCE

CREDIT UNION

SPECIAL

PROJECTS

ROOM

Room 1019

Panic Button

Room 1024

Suppy Cabinet

INHOUSE

PHONE AREA

Panic Button

Panic Button

Panic Button

FORMS

ROOM

Panic Button

Panic Button

Panic Button

HOT

MEN

WOMEN

Panic Button

Room 1028

Room 1034

Shelv ing

DSL

S

Panic Button

Fax

Room 1053

Panic ButtonRoom 1042

Room 1055

Panic Button

ATM

Liebert Unit # 2

Data and Telephone Room

Closet

Room 1063Room 1054

TVC

Room 1058

L1

IT Training Room

Projection Screen

CONF. ROOM

AGENT CASHIER

Room 1084

BREAK

Room 1065

SPECIAL

PROJECTS

ROOM

PNL

MDP

D W

C W S C W R

G

F W

T1

XFMR

H1PNL

MCP

Room 1131

FITNESS

CENTER

FITNESS

CENTER

LOCKERS

LOCKERS

CATERING

SHOWERS

SHOWERS

Room

Room 1130

AREA

Room

1122Room

VR&E JOB LAB

Panic Button

PUBLC

CONTACT

COACH

EXIT

Training Room "B"

File Laterals

WWP Office

IT SECTION

Storage Room

EvonTonyTremell

Steve Hebert Josie

Union Office

No number

FIRST FLOOR

WEST STAIRWELL FIRST FLOOR

EAST STAIRWELL

WALKTHRU

SECURITY

X−RAY

SCREENING

SECURITY

STAFF

STATION

this door

Water

Badging

Operations

Adaptive

PUBLC

CONTACT

COACH

TV

T A R G E T

EMERGENCY

EXIT

180.0000

48.0000

51.5923

48.0000

48.0000

48.0000

48.0000

48.0000

48.0000

48.0000

57.8739

57.8739

57.8739

51.2310

48.0000

FIRE - 1 HOUR

FIRE - 2 HOUR

FIRE - 3 HOUR

PARTITION LEGEND

SMOKE

EXISTING WALL TO REMAIN

NEW NON-RATED WALLS

OVERVIEW

INTERIOR RENOVATION OF EXISTING SPACE. NO CHANGE IN USE OR OCCUPANCY.

USING NFPA 101-2021 CHAPTER 39 - EXISTING BUSINESS OCCUPANCIES.

FIRE-RESISTIVE REQUIREMENTS:

NON COMBUSTIBLE MATERIALS FOR STRUCTURAL FRAME, FLOORS, ROOF DECK, EXTERIOR

NON-BEARING WALLS, INTERIOR NON-BEARING WALLS (U.N.O. AT EXTERIOR)

NFPA 101-2021 CHAPTER 39.2.4.5 COMMON PATH OF TRAVEL

SHALL NOT EXCEED 75 FT OR 100 FT IF PROTECTED THROUGHOUT BY AN APPROVED

AUTOMATIC SPRINKLER SYSTEM.

NFPA 101-2021 CHAPTERS 39 DEAD END CORRIDOR

SHALL NOT EXCEED 50 FT.

PROTECTED AREAS: STORAGE ROOMS/CLEAN/SOILED:

PER VA FIRE PROTECTION DESIGN MANUAL 3.1.A, STORAGE ROOMS ARE HAZARDOUS AREAS.

PER NFPA 101: 39.3.2.1, HAZARDOUS AREAS SHALL BE PROTECTED AS STATED IN SECTION 8.7.

PER NFPA 101: 8.7, ANY AREA HAVING A DEGREE OF HAZARD GREATER THAN THAT NORMAL

TO THE GENERAL OCCUPANCY SHALL BE PROVIDED BY ONE OF THE FOLLOWING:

• 1 HR FIRE BARRIER OR PROTECTING THE AREA WITH AUTOMATIC EXTINGUISHING SYSTEM

1 HR FIRE BARRIER WITH SPRINKLER PROTECTION, PROVIDED.

SMOKE COMPARTMENTALIZATION: NOT REQUIRED FOR BUSINESS OCCUPANCIES, NOT PROVIDED.

FIRE ALARM SYSTEM: REQUIRED / PROVIDED MANUAL SYSTEM.

LIFE SAFETY CODE ANALYSIS

LIFE SAFETY LEGEND

FEC FIRE EXTINGUISHER CABINET

EXIT LIGHT / SIGN

NOT IN SCOPE

EGRESS PATH

C O

M M

O N

P A

T H

O F

T R

A V

E L

4'

C O

M M

O N

P A

T H

O F

T R

A V

E L

3'

115 SF

EVIDENCE

ROOM

1073G

97 SF

STORAGE

1073F

111 SF

OFFICE

1073E

STORAGE

ROOM

95 SF

STORAGE

1073C

292 SF

WORK

STATION

1073B

69 SF

CORRIDOR

1073J

30 SF

PRINT/COPY

AREA

1073D

344 SF

WORK

STATIONS

1073A

141 SF

OFFICE

1073H

116 SF

OFFICE

29 SF

ELEC.

163 SF

OPEN

WORKSTATIONS

111 SF

TEAM SPACE

127 SF

OFFICE

223 SF

CONFERENCE

ROOM

83 SF

CORRIDOR

VETERANS MUSEUM AREA

STORAGE ROOM

ELEC. PANELS

WOMEN'S RR

MEN'S RR

ELEV.

VENDING

STORAGE

ELEVATOR

EQUIPMENT

STORAGE

OFFICE OF THE CHIEF

AST SSD CHIEF

SSD CHIEF

ACCOUNTING

CONF. ROOM

FILE ROOM

BADGING

OFFICE

BREAK

IT SECTION

IT TRAINING ROOM

IT REPAIR/WORKSHOP

IT/ELECTRICAL

MECH. ROOM

DATA ROOM

WOMEN'S RR

MEN'S RR

DINING AREA

OFFICE

ISO WORKSTATIONS

F E

C

F E

C

PROJECT SCOPE

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project NumberCONSULTANTS:

Drawing #

VA Health Care System Approval:

ARCHITECT:

SPUR SBBL

COLLABORATIVE JV, INC

100 N Stone Avenue, Ste 1102

TUSCON, AZ 85701

(405) 842-6100

SETH ANDREW CAVIN TX ARCH LIC#22680 EXP. 07/31/23

JAMES ROSS MYLES TX MECH LIC#136680 EXP. 09/30/23

EVANS SORDIASHIE TX ELEC LIC#144295 EXP. 03/31/24

MECH / ELEC / PLUMB / TECH ENGINEER

SPUR DESIGN

2519 MADISON AVE. SUITE 100

KANSAS CITY, MO 64108

(913) 369-7200

FULLY SPRINKLERED

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD, UNIT 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STAMP:

Drawing Number

Building Number

CONTROLLED UNCLASSIFIED INFORMATION - CUI

CONTROLLED UNCLASSIFIED INFORMATION - CUI

/2

/2

:1 :2

P

M

LIFE SAFETY PLAN

KJW 05 OF 41NR

BID DOCUMENTS

VA-OIG HOUSTON VARO

SPACE RENOVATION

03/30/2023

36C10E22N0069

HOUSTON REGIONAL VA OFFICE

6900 ALMEDA ROAD, SUITE 1073

HOUSTON, TX 77030

GI011

SPUR #: 1805.04

N

1/8" = 1'-0"

LEVEL 1 - LIFE SAFETY PLAN1

LEVEL 1 - KEY PLAN

N

No. REVISION DESCRIPTION DATE

OIGBEDWhitwJ Text Box Room 1073F to be 1 hour fire rated.

Make applicable changes in bid documents per this modification.

PB36 PB36

P B

P B

P B

P B

PB30 PB30

#1

PTR.

UP

STAND

P B

P B

#1

Voucher Audit

Payroll

FIRST FLOOR

MIDDLE STAIRWELL

TYPEW RITERTYPEW RITER

MAIL

FOR MSFOR MS

FAXFAXFAX

L /F

L/F

L/F

L /F

L /F

L /F

L /F

L /F

L /F

L /F

L /F

L /F

L /F

L /F

L /F

L /F

L /F

L /F

L /F

L /F

L/FL/F

L /F

L/F

L/F

L/F

L/F

L/F

B/L

C

TB L .

P T R .

LATERAL

WATER

RE F R I G .C O F F E E

P T R .

Projection Screen

VR&E

CONFERENCE

Projection Screen Projection Screen

SSD Storage

Fire Extinguisher

ELEVATOR ELEVATOR

TELEPHONETELEPHONE

VENTING MACHINES

FAX

Fire Extinguisher

API

API

SPECIAL

PROJECTS

ROOM

fed/ex

PITNEY

BOWES

PITNEY

MACHINE

TAPE

HOSP. MAIL

BOWES

SCALE

TABLES

WORKING

MAIL

L E T T E R O P E N E R

INSERTER

MACHINE

MAIL

SCALE

OVERHEAD

MESSENGER WORKSTATIONS

POPCORN

Projection Screen

TESTING

ROOM

FAX

FAX

VR&E

1087−05 V− 24 V− 223

2V/2D supply

Table

VETERANS

MUSEUM

AREA

Panic Button Panic

Button

Panic Button

Panic Button

Panic Button

Panic Button

Panic Button

Panic ButtonPanic

Button

Panic Button

Panic Button

Panic Button

Panic Button

Panic Button

Panic Button

Panic Button

Panic Button

Panic Button

Panic Button

Panic Button

Panic Button

Panic Button

Panic Button

Panic Button

Panic Button

1087−05 V− 24 V− 223

2V/2D

TRNG. RM 2

BOOKCASE

TRNG. RM 3

MICRO

FRIG

VFWAL

AL

MOPH

AMVETS

PVA

DAV

Storage

B O O K C A S E

T V

LOADING

DOCK

TRNG. RM 1

TYPEW RITER

VR&E

MAIL

WORK STATION EXISTING

VR&E OFFI CER

ASSISTANT

KELLY

SHUPAK

BETTY

KUCERA

DAWN

JACKSON

JAMES

ZIRUOLO

JAMES

BAYLES

VACANT

FMT

Public Contact

VR&E

CHIEF

Trainer

TRAINING ROOM "C"

Trainer

Travel

ISO w/station

11'x19' file file file file

8. 7. 6.

1.

2.

3.

5.

4.

5.

4.

1080−05 1080−04

V− 111

.7

.7

.7

F24

F24 48

F24 48

F

F

F

48F24 48

.7

.7

.7

F24

Room 1033

Panic Button

Room 1132

Room 1129

Room

Room 1128

Room 1127

Room

WAITING

ROOM

UNION

HEARING

ROOM

CONTROLLER

A/V MASTER

T2

XFMR

KTCH

CP

XFMR

XFMR

Room 1021 Room 1022

TX WORK FORCE

CREDIT UNION

SPECIAL

PROJECTS

ROOM

Room 1019

Panic Button

Room 1024

Suppy Cabinet

INHOUSE

PHONE AREA

Panic Button

Panic Button

Panic Button

FORMS

ROOM

Panic Button

Panic Button

Panic Button

HOT

MEN

WOMEN

Panic Button

Room 1028

Room 1034

Shelv ing

DSL

S

Panic Button

Fax

Room 1053

Panic ButtonRoom 1042

Room 1055

Panic Button

ATM

Liebert Unit # 2

Data and Telephone Room

Closet

Room 1063Room 1054

TVC

Room 1058

L1

IT Training Room

Projection Screen

CONF. ROOM

AGENT CASHIER

Room 1084

BREAK

Room 1065

SPECIAL

PROJECTS

ROOM

PNL

MDP

D W

C W S C W R

G

F W

T1

XFMR

H1PNL

MCP

Room 1131

FITNESS

CENTER

FITNESS

CENTER

LOCKERS

LOCKERS

CATERING

SHOWERS

SHOWERS

Room

Room 1130

AREA

Room

1122Room

VR&E JOB LAB

Panic Button

PUBLC

CONTACT

COACH

EXIT

Training Room "B"

File Laterals

WWP Office

IT SECTION

Storage Room

EvonTonyTremell

Steve Hebert Josie

Union Office

No number

FIRST FLOOR

WEST STAIRWELL FIRST FLOOR

EAST STAIRWELL

WALKTHRU

SECURITY

X−RAY

SCREENING

SECURITY

STAFF

STATION

this door

Water

Badging

Operations

Adaptive

PUBLC

CONTACT

COACH

TV

T A R G E T

EMERGENCY

EXIT

180.0000

48.0000

51.5923

48.0000

48.0000

48.0000

48.0000

48.0000

48.0000

48.0000

57.8739

57.8739

57.8739

51.2310

48.0000

8. 7. 6.

1.

2.

3.

5.

4.

5.

4.

1080−05 1080−04

V− 111

1. ALL EXISTING WALL DIMENSIONS ARE TO FINISH FACE, UNLESS OTHERWISE NOTED

2. THE CONTRACTOR SHALL VERIFY DIMENSIONS OF AS-BUILT CONDITIONS, AND NOTIFY THE

ARCHITECT IN WRITING OF ANY DISCREPANCIES. ALL INFORMATION SHOWN ON THE CONSTRUCTION

DOCUMENTS IS BASED ON FIELD OBSERVATIONS AND/OR THE ORIGINAL CONSTRUCTION

DOCUMENTS OF THE FACILITY.

3. DEMOLITION AND CONSTRUCTION WORK MUST BE DONE UNDER NEGATIVE PRESSURE UTILIZING

HEPA FILTRATION UNITS. SEE INFECTION CONTROL NOTES.

4. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT OR AREA HAS BEEN

INSPECTED BY THE SAVAHCS SAFETY OFFICER AND INFECTION CONTROL COORDINATOR AND

THOROUGHLY CLEANED BY ENVIRONMENTAL MANAGEMENT SERVICES

5. THE CONTRACTOR SHALL PROVIDE PROTECTIVE COVERING FOR EXISTING FLOOR, WALL AND

CEILING FINISHES IN EXISTING AREAS NOT DESIGNATED FOR DEMOLITION OR NEW CONSTRUCTION.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR OF ANY DAMAGE CAUSED BY HIS

WORK OR ANY SUBCONTRACTOR.

6. THE CONTRACTOR SHALL VERIFY THAT NEW MECHANICAL SYSTEMS CAN BE INSTALLED IN EXISTING

SPACES TO CLEAR EXISTING CEILING AND OTHER CONSTRUCTED ITEMS AND MAINTAIN FLOOR TO

CEILING HEIGHTS INDICATED ON DRAWINGS. IF DISCREPANCIES OCCUR DUE TO EXISTING

CONDITIONS, CONSULT WITH THE ARCHITECT BEFORE PROCEEDING.

7. THE FINISH FACE OF MATERIAL OF NEW PARTITIONS SHALL ALIGN ON BOTH SIDES OF THE

PARTITION WITH THE FACE OF THE MATERIALS ON EXISTING COLUMNS, WALLS, OR PARTITIONS, UNLESS NOTED OTHERWISE.

8. NO WORK TO BE DONE IN AREAS HATCHED GRAY IN PLANS, HOWEVER WORK MIGHT NEED TO BE

PERFORMED IN CEILING OR EXISTING CHASES THROUGHOUT BUILDING. REFERENCE MECHANICAL

AND ELECTRICAL DRAWINGS FOR EXTENT OF WORK. COORDINATE ACCESS TO ROOMS OUTSIDE OF

SCOPE WITH OWNER

GENERAL DEMOLITION NOTES

PROJECT SCOPE

CONFERENCE

OFFICE

OFFICE

EVIDENCE

OFFICE

OFFICE

2.16

2.16

2.162.16

2.16

2.16

2.16

2.162.16

2.16

2.16

2.62

2.63

25'-1" 8'-0 1/2" 9'-4 3/4"

32'-3"

'-9

/2

'-0

'-1

/2

9'-0" 8'-5 1/2" 15'-6"

'-8

'-2

'-2

'-9

'-3

'-9

/2

'-0

'-4

'-8

/2

5'-5 1/2" 1'-6" 9'-3" 7'-3" 33'-8 1/2"

3'-4" 9'-2"

5'-0"

'-0

5'-0"

'-0

2.65

2.65

2.67

2.67

2.67

OFFICE OF THE CHIEF

AST SSD CHIEF

SSD CHIEF

ACCOUNTING

IT SECTION

IT TRAINING ROOM

CONF. ROOM

FILE ROOM

BADGING

IT REPAIR/WORKSHOP

STORAGE

IT/ELECTRICAL

VETERANS MUSEUM AREA

STORAGE ROOM

ELEC. PANELS

WOMEN'S RR

MEN'S RR

MECH. ROOM

DATA ROOM

WOMEN'S RR

MEN'S RR

DINING AREA

OFFICE

ELEV.

ELEVATOR

EQUIPMENT

VENDING

OFFICE

BREAK

ISO WORKSTATIONS

STORAGE

'-1

57'-2"

'-0

'-4

2.68

2.69 2.70

2.70

2.262.26

2.26

2.26

2.262.26

2.262.26

2.26

2.61

2.71

OFFICE

2.712.71

2.71

2.71

2.71

2.71

2.72

2.72

2.72

'-1

/2 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project NumberCONSULTANTS:

Drawing #

VA Health Care System Approval:

ARCHITECT:

SPUR SBBL

COLLABORATIVE JV, INC

100 N Stone Avenue, Ste 1102

TUSCON, AZ 85701

(405) 842-6100

SETH ANDREW CAVIN TX ARCH LIC#22680 EXP. 07/31/23

JAMES ROSS MYLES TX MECH LIC#136680 EXP. 09/30/23

EVANS SORDIASHIE TX ELEC LIC#144295 EXP. 03/31/24

MECH / ELEC / PLUMB / TECH ENGINEER

SPUR DESIGN

2519 MADISON AVE. SUITE 100

KANSAS CITY, MO 64108

(913) 369-7200

FULLY SPRINKLERED

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD, UNIT 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STAMP:

Drawing Number

Building Number

CONTROLLED UNCLASSIFIED INFORMATION - CUI

CONTROLLED UNCLASSIFIED INFORMATION - CUI

/2

/2

:1 :1

P

M

DEMOLITION PLAN

KJW 06 OF 41NR

BID DOCUMENTS

VA-OIG HOUSTON VARO

SPACE RENOVATION

03/30/2023

36C10E22N0069

HOUSTON REGIONAL VA OFFICE

6900 ALMEDA ROAD, SUITE 1073

HOUSTON, TX 77030

AD011

SPUR #: 1805.04

LEVEL 1 - KEY PLAN

N

1/8" = 1'-0"

LEVEL 1 - DEMOLITION PLAN1

KEYNOTE LEGEND

2.16 DEMOLISH EXISTING WALL CONSTRUCTION TO EXTENT INDICATED.

2.26 DEMOLISH EXISTING DOOR AND FRAME TO EXTENT INDICATED.

2.61 DISMANTLE EXISTING EVIDENCE METAL CAGE.

2.62 DEMOLSIH PORTION OF WALL IN PREPARATION FOR NEW DOOR OPENING.

2.63 EXISTING ELECTRICAL PANEL TO REMAIN.

2.65 WALK OFF MAT.

2.67 ALL WINDOW SHADES ARE TO BE REMOVED, KEPT SAFE AND RE-INSTALLED.

2.68 REPLACE DOOR HARDWARE ON EXISTING DOOR.

2.69 EXISTING WINDOW TO BE REMOVED AND WALL TO BE INFILLED.

2.70 EXISTING DOOR AND FRAME TO BE REMOVED AND WALL TO BE INFILLED.

2.71 REMOVE EXISTING FLOORING AND PREPARE FOR NEW FLOORING.

2.72 PREPARE FOR NEW FLOORING.

B

P B

P B

P B

PB30 PB30

#1

PTR.

UP

STAND

P B

P B

#1

Voucher Audit

Payroll

FIRST FLOOR

MIDDLE STAIRWELL

TYPEW RITERTYPEW RITER

MAIL

FOR MSFOR MS

FAXFAXFAX

L /F

L/F

L/F

L /F

L /F

L /F

L /F

L /F

L /F

L /F

L /F

L /F

L /F

L /F

L /F

L /F

L /F

L /F

L /F

L /F

L/FL/F

L /F

L/F

L/F

L/F

L/F

L/F

B/L

C

TB L .

P T R .

LATERAL

WATER

RE F R I G .C O F F E E

P T R .

Projection Screen

VR&E

CONFERENCE

Projection Screen Projection Screen

SSD Storage

Fire Extinguisher

ELEVATOR ELEVATOR

TELEPHONETELEPHONE

VENTING MACHINES

FAX

Fire Extinguisher

API

API

SPECIAL

PROJECTS

ROOM

fed/ex

PITNEY

BOWES

PITNEY

MACHINE

TAPE

HOSP. MAIL

BOWES

SCALE

TABLES

WORKING

MAIL

L E T T E R O P E N E R

INSERTER

MACHINE

MAIL

SCALE

OVERHEAD

MESSENGER WORKSTATIONS

POPCORN

Projection Screen

TESTING

ROOM

FAX

FAX

VR&E

1087−05 V− 24 V− 223

2V/2D supply

Table

VETERANS

MUSEUM

AREA

Panic Button Panic

Button

Panic Button

Panic Button

Panic Button

Panic Button

Panic Button

Panic ButtonPanic

Button

Panic Button

Panic Button

Panic Button

Panic Button

Panic Button

Panic Button

Panic Button

Panic Button

Panic Button

Panic Button

Panic Button

Panic Button

Panic Button

Panic Button

Panic Button

Panic Button

1087−05 V− 24 V− 223

2V/2D

TRNG. RM 2

BOOKCASE

TRNG. RM 3

MICRO

FRIG

VFWAL

AL

MOPH

AMVETS

PVA

DAV

Storage

B O O K C A S E

T V

LOADING

DOCK

TRNG. RM 1

TYPEW RITER

VR&E

MAIL

WORK STATION EXISTING

VR&E OFFI CER

ASSISTANT

KELLY

SHUPAK

BETTY

KUCERA

DAWN

JACKSON

JAMES

ZIRUOLO

JAMES

BAYLES

VACANT

FMT

Public Contact

VR&E

CHIEF

Trainer

TRAINING ROOM "C"

Trainer

Travel

ISO w/station

11'x19' file file file file

8. 7. 6.

1.

2.

3.

5.

4.

5.

4.

1080−05 1080−04

V− 111

.7

.7

.7

F24

F24 48

F24 48

F

F

F

48F24 48

.7

.7

.7

F24

Room 1033

Panic Button

Room 1132

Room 1129

Room

Room 1128

Room 1127

Room

WAITING

ROOM

UNION

HEARING

ROOM

CONTROLLER

A/V MASTER

T2

XFMR

KTCH

CP

XFMR

XFMR

Room 1021 Room 1022

TX WORK FORCE

CREDIT UNION

SPECIAL

PROJECTS

ROOM

Room 1019

Panic Button

Room 1024

Suppy Cabinet

INHOUSE

PHONE AREA

Panic Button

Pa…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .