This document contains questions and responses related to solicitation number 36C10D23R0008 for the VA-OIG Houston VARO Space Renovation project. The contractor will be responsible for renovating office spaces at the Houston VA Regional Office, including demolishing existing walls, installing new HVAC, plumbing and electrical systems, and roughing in data and security systems. The contractor must coordinate work hours, access, and safety protocols with the VA given work will occur in occupied areas. Pricing should account for any work needed in adjacent rooms outside renovation zones. The VA will provide additional specifications and details requested by bidders. The contractor must obtain required permits and dispose of all demolition waste.

View the file

Other files

File Type Posted
09 65 19 Resilient Tile Flooring.pdf PDF
03 01 30 Maintenance of Cast-In-Place Concrete.pdf PDF
00 00 10 Table of Contents.pdf PDF
08 80 00 Glazing.pdf PDF
36C10D23R0008 0001.docx DOCX document
P07 Wage Rates - OIG.pdf PDF
36C10D23R0008.docx DOCX document
ALA129I-DL2700-LR.pdf PDF
single duct units (002).pdf PDF
6AR_led (002).pdf PDF
1805.04 Bid Specs.pdf PDF
Wage Rates - OIG.pdf PDF
Trane Trace HVAC Room Checksums (002).pdf PDF
Bid Doc Design Binder_Combined.pdf PDF
Hvac_Output Summary (002).pdf PDF
Digital Finish Board.pdf PDF
Bid Doc Designs (mod).pdf PDF
36C10D23R0008_1.docx--.docx-.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Responses to Solicitation No.

36C10D23R0008

VA-OIG Houston VARO Space Renovation

1. Please provide an access/egress plan. The plans do not clearly show how we are to access the areas beyond the project limits.

Response: Egress pathways are given to the common path of travel to connec�ng corridor per GI011. Egress pathways beyond the project limits to be coordinated with the VA to sequence with daily opera�ons.

2. What are the hours of construc�on for this project?

Response: VBA and GC to coordinate on construc�on schedule.

3. Will weekend and off hours work be required?

Response: VBA and GC to coordinate on construc�on schedule.

4. Please provide a specifica�on sec�on for short form concrete

Response: Specifica�on forthcoming in addendum.

5. Please provide a concrete slab trench repair detail.

Response: Specifica�on forthcoming in addendum.

6. Please provide a loca�on for ICRA nega�ve air discharge.

Response: GC Means and methods. Coordinate with VBA.

7. Please provide a specifica�on for the blast film listed on sheet AE101 note 2.66.

Response: Specifica�on forthcoming in addendum.

8. Please confirm if access control is to be provided, or if the scope only requires backbone raceways to be installed for a future access control system by others.

Response: Access control is rough-in only. Cabling and devices are future by others.

9. Please provide a specifica�on sec�on for Luxury Vinyl Tile flooring.

Response: Specifica�on forthcoming in addendum.

10. Please provide a basis of design or specifica�on for sealed concrete.

Response: Specifica�on forthcoming in addendum.

11. Please provide a make/model/size for the CCTV monitor shown as GC provided on sheet AI721.

Response: GC to coordinate with OIG staff for monitor size.

12. Please confirm that the refrigerator shown as VA provided on sheet AI721 will be delivered with li? gate service and that the contractor will not be required to unload.

Response: VBA to provide answer.

13. Will temp hea�ng or cooling be required for this project?

Response: Was not indicated as needed or requested during the updates to the exis�ng office space. New space is not currently in use and should not need temporary condi�oning.

14. Please provide contact informa�on for the incumbent DDC controls vendor that currently services the HVAC controls for this project/building.

Response: VA provide contact informa�on for coordina�on/ integra�on of controls?

15. What is the make/model of the exis�ng DDC control system?

Response: VA provide informa�on for coordina�on/ integra�on of controls?

16. What is the thickness of the exis�ng floor slab?

Response: As-built drawings were not available during design. Does the VA have any documenta�on showing this slab thickness?

17. Please provide a demoli�on plan that shows the limits of slab saw cuDng related to the plumbing work located under the slab.

Response: Only demo slab to width needed to install new under slab plumbing and to allow for appropriate constructability.

18. Please confirm that all circuits that are exis�ng to remain and to be reused for the new receptacle loca�ons are not expected to require new raceways or conductors beyond the exis�ng junc�on boxes in the immediate area where the new devices are shown.

Response: For all walls shown to demo, remove all conduits and conductors back to nearest junc�on box and install new conduits and conductors for receptacles at new wall loca�ons.

19. Note 2 on sheet EP101 does not make sense. Please clarify the intent of the note “core drill should have USB and HDMI that have conduit running back to wall outlet, provide USB and

HDMI”

Response: Disregard keynote 2 on EP101, refer to telecom sheet TN500 detail 3 "TELECOM DATA FLOOR BOX" and sheet TN500 detail 2 "TYPICAL WALL MONITOR CATV OUTLET".

20. Please provide specifica�ons and a length required for the USB and HDMI if required.

Response: Standard HDMI and USB cabling may be procured locally and as needed.

21. Sheet TD101 has general notes, but does not call out any counts or loca�ons on the plan view.

Please provide a plan that shows the exis�ng device types, loca�ons and counts.

Response: Notes state all devices are to be demolished back to source. Any devices to remain are specifically notated.

22. Is the project floor a slab on grade, or slab on deck? If there is exis�ng accessible space below, please provide a plan that shows the layout of the floor below.

Response: Slab-on-grade.

23. Please confirm if note 9 on sheet TN101 will be required to be installed, and if so, provide a rou�ng plan through the exis�ng areas not under construc�on as part of this project.

Response: Confirmed, contractor is required to install data connec�vity above doorframe.

Coordinate with VA OIG prior to installa�on for exact loca�on.

This is a local VMS specific for this suite. This will not be integrated into the site SCC.

Therefore, the only pathway would be from the local TR to the VMS loca�on. We do not model pathways this small.

24. Please confirm that the contractor is only required to provide the floor box assembly shown on detail 4/TN500 and not any connec�ons or devices between the floor box and any VA provided furniture/conference table.

Response: Contractor is required to provide the floor box and assembly and route cables through conduit to the TV outlet indicated. Addi�onal cables or devices between the floor box and any

VA provided furniture/ conference table are not a part of this scope therefore are not to be provided.

25. Please provide a basis of design for the cipher style pin code lock listed on detail 1/TY500. The detail also says electrified lockset by others. Please confirm that the contractor is not required to provide this.

Response: See Door Hardware Specifica�on 08 71 00 for Cipher Lock Basis of Design. Contractor is required to provide and install Cipher style lock. Contractor is not required to provide or install addi�onal PIV locking mechanism.

26. Please provide a basis of design and specifica�ons for the intercom system shown on sheet

TY101.

Response: Concur, will provide. (See Attached)

27. Please confirm that the new surveillance cameras will be �ed into an exis�ng VMS system with available licenses.

Response: New surveillance cameras will not be tied into an existing VMS system; however, a new VMS will be provided as shown on sheet TY101.

28. Where can I locate the Performance & Payment Bonds for this Project?

Response: FAR Clause 52.236-15. The bonds must be provided 10 days after award and the amount for each bond must be for 100% of the total amount.

29. Is it two separate Bonds at 20% of Base Bid?

Response: The Bid Bond must be furnished with offer and must be 20% of total amount of the bid.

30. Per the plans I noticed other areas of the building that would need to be accessed for work to be done to complete the scope presented in the phase 1 and phase 2 plans.

Specifically in the phase 1 plan I noted:

a. pg 16, Plan page MD101, the hvac demolition extends into the “dining area” which is outside the southern boundary of the phase 1 dimensions, as well as outside of the western boundary into the “electric room”, and outside of the eastern boundary in to the “hall”.

b. pg 17, Plan page MH100, the new hvac installation plan extends outside of the southern boundary of the phase 1 dimensions into the “dining area”.

1. pg 22, Plan page PD101, the plumbing demolition extends into the “elec room” to the west

2. pg 23, Plan page PP101, the plumbing installation plan connects a DHW pipe in the

“restroom” to the west.

3. pg 30, Plan page EL102, the electrical installation plan shows panels added to an area outside the phase 1 dimensions, in the “electric room” to the west.

4. pg 37, Plan page TN101, wiring is to be connected to room 1050, which is well outside the boundary of the phase 1 dimensions.

Overall, my question is the same for each of these areas, and is kind of a broad generalized point: Are we to include pricing to repair/replace items that must be removed/cut/moved to provide the required installation. Will these areas be quarantined off during our demolitions and installations for our workers alone, or will these areas be operational and used during our work? And if so, will this quarantining be done by us at our cost, or by the VA?

Basically, we will need access to these areas that are outside of our quarantine zone per the plans, and we just want to ensure we understand how we will be provided access and how to ensure the safety of others that may be accessing these same spaces while our work is underway.

Response: Yes. Provide pricing for removal and re-installation of items/ materials for areas shown. Include area protection measures & coordination with personnel of adjacent spaces that are affected.

31. How many employees allowed to work in PHASE 1?

Response: VBA to provide answer. Contractors means and methods?

32. Permits required to be pulled from the City of Houston?

Response: Contractor to coordinate and provide permits as required by the authorities having jurisdiction.

33. Different Bins required for different materials to be disposed at a Proper Landfill with weight tickets corresponding with demolished materials?

Response: There is not a requirement for waste management other than “removal from site” per typical demolition. IF there is a specification or note that led to this thinking; please reference and we can make any necessary correction.

34. Is it the Prime Contractors duty to demolish and dispose of materials on Phase 11 of the contract?

Response: Phase 1? Yes. Contractor responsible for demo, removal from building, and disposal of all demoed materials.