Bid_Bond_Form.docx

DOCX document 15 KB Posted

Attached to
Electric Substation Equipment Painting
Solicitation number
IFB196740
Issued by
Santa Clara County, California

About this file

This is a Bid Bond Form for the City of Palo Alto, California, establishing the required bid security instrument for the Electric Substation Equipment Painting project. The form establishes that contractors submitting bids must provide a bid bond equal to 10 percent of the maximum bid proposal amount, inclusive of additive and alternate bid items. The project involves surface preparation and protective coating services across seven electric substations within the city's distribution system, covering equipment from multiple manufacturers including transformers, circuit breakers, switchgear, steel structures, and associated components. A non-mandatory pre-bid meeting and site walk is scheduled for April 15, 2026, at 9:00 a.m. at the Colorado Substation; written questions must be submitted by April 17, 2026, at 1:00 p.m.; and electronic bids are due April 24, 2026, at 3:00 p.m. Work is anticipated to commence July 1, 2026, with completion required within 1,095 working days from the Notice to Proceed. The bid bond obligates the contractor and surety jointly and severally to honor the bid and execute all contract documents if awarded, with the surety waiving notice of contract modifications and agreeing to pay all costs and attorney fees should the owner pursue legal action on the bond.

The bid bond form specifies that the penalty amount shall not exceed the difference between the contractor's bid and any higher amount the city incurs to contract with another party for the same work. The contractor must enter into a contract and provide performance and payment surety bonds within 10 days of the Notice of Award, each in the amount of 100 percent of the contract sum. The surety must be duly admitted under California law and acceptable to the owner. The form permits time extensions of up to 60 calendar days without surety notice but requires surety consent for extensions beyond 60 days. The bond is conditioned on the contractor's compliance with all contract documents and specifications, with no changes to the contract terms relieving the surety of its obligations. Based on the engineering estimate, the Year 1 project cost is approximately $940,500, including $840,500 in painting costs and $100,000 in mobilization, with subsequent annual expenditures ranging from $274,000 to $327,000 over a four-year timeline.

View the file

Other files

File Type Posted
Electric_Substation_Equipment_Painting_(Addendum_#2_Revision).pdf PDF
Electric_Substation_Equipment_Painting_(Addendum_#1_Revision).pdf PDF
Appendix_VII_Maybell.docx DOCX document
Appendix_VIII_Quarry_Substation.docx DOCX document
Appendix_X_Hanover_Substation.docx DOCX document
Appendix_XI_Hansen_Way.docx DOCX document
Appendix_IX_ParkBlvd.docx DOCX document
Appendix_V_Colorado_Substation.docx DOCX document
Bid_Bond_Form.docx DOCX document
Appendix_VI_Adobe_Creek.docx DOCX document
Performance_Bond.docx DOCX document
Payment_Bond.docx DOCX document
REVISED_Equipment_list_2025_(1).xlsx XLSX spreadsheet
Substation_Painting_Specs.docx DOCX document
Equipment_list_2025.xlsx XLSX spreadsheet
Bid_Form_For_Substation_Equipment_Painting.docx DOCX document
Construction_Contract,_General_Conditions,_and_Change_Orders.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID BOND

CONTRACTOR: _________________________________________________________________________________ (Insert name, legal status, and complete business address (principal place of business).

SURETY:_______________________________________________________________________________
(Insert name, legal status, and complete business address (principal place of business).
Surety warrants that it is a duly admitted surety insurer under the laws of the State of California.
OWNER:City of Palo Alto, 250 Hamilton Avenue, Palo Alto, CA 94301

BOND AMOUNT: (Insert the amount of this Bid Bond in numbers and words) __________________________________________________________________Dollars and ____________ Cents The Bond Amount set forth above shall be the penal sum (“penalty amount”) of TEN PERCENT (10%) of the maximum amount of the Bid Proposal submitted by Contractor to Owner, inclusive of additive and/or alternate bid items, if any, and be paid in lawful money of the United States of America. Contactor has submitted the accompanying Bid Proposal to Owner for the Project described below. The Bid Proposal must be accompanied by Bid Security.

PROJECT:______________________________________________________________________________
(Insert the name, location or address, and project number (if applicable) of the Project to which this Bid Bond applies.

Contractor has purchased this Bid Bond from Surety as a guarantee to Owner that Contractor will honor its bid and execute all contract documents if awarded the contract by Owner. Contractor and Surety are bound to Owner in the amount set forth above (the Bond Amount). Under the provisions and conditions of this Bid Bond, Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, for the payment of the Bond Amount.

The conditions of this Bid Bond are such that if within ten (10) days of issuance of the Notice of Award, or within such time period as may be agreed to by Owner and Contractor, and Contractor either:
1)enters into a contract with Owner in accordance with the terms of its Bid and gives such bond(s) as may be specified the Contract Documents, with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt payment of labor and materials furnished in the prosecution of the Contract; or
2)fails to do so and pays to Owner the difference, not to exceed the amount of this Bid Bond, between the amount specified in said bid and such larger amount for which Owner may in good faith contract with another party to perform the work covered by said bid,

then this obligation shall be null and void, otherwise this obligation shall remain in full force and effect.

Surety herby waives any notice of an agreement between Owner and Contractor to extend the time in which Owner may accept the bid. Waiver of such notice by Surety shall not apply to any time extensions which exceed sixty (60) calendar days after award of contract as specified in the Contract Documents. Owner and Contractor shall obtain Surety‘s consent for any time extension beyond sixty (60) days.
For value received, Surety stipulates and agrees that no change, alteration or addition to the terms of the Contract or the Invitation for Bids, the Work to be performed thereunder, the Drawings or the Specifications accompanying the same, or any other portion of the Contract Documents shall in any way affect its obligations under this Bond. Surety hereby waives notice of any such change, alteration or addition to the terms of said Contract, the Invitation for Bids, the Work, the Drawings or the Specifications, or any other portion of the Contract Documents.
If this Bid Bond is issued in connection with a subcontractor’s bid to Contractor, the term Contractor which is included in this Bid Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor.
When this Bid Bond has been furnished to comply with statutory or other legal requirement(s) in the location of the Project, any provision in this Bid Bond which conflicts with said statutory or legal requirement shall be deemed deleted from this Bid Bond and the provisions conforming to such statutory or other legal requirement(s) shall be deemed incorporated herein by reference. When so furnished, the intent is that this Bid Bond shall be construed as a statutory bond, and not as a common law bond.
In the event that suit or other proceeding is brought upon this Bond by Owner, Surety shall pay to Owner all costs, expenses and fees incurred by Owner in connection such action, including without limitation, attorneys fees. Surety hereby waives the provisions of California Civil Code Section 2845.

The Contractor and Surety have executed this Bid Bond on this day _______ of ___________, 20__ by their duly authorized agents or representatives.

(Corporate Seal)_______________________________________
Contractor Name

By:_______________________________________

_______________________________________
Typed or Printed Name of Signatory

Its _______________________________________ Title of Signatory

(Corporate Seal)_______________________________________
Surety Name
By: _______________________________________
Signature of Attorney-in-Fact for Surety
_______________________________________
(Attach Attorney-in-Fact Certificate)Typed or Printed Name
( )__________________________________
Area Code and Telephone Number of Surety