This is a Bid Amendment and Notice to Vendors issued by the Commonwealth of Massachusetts Executive Office of Energy and Environmental Affairs (EEA) Department of Conservation and Resources (DCR) for Project Number DCR-001-26, pertaining to electric vehicle charging station installation at Great Brook Farm State Park in Carlisle, Massachusetts. The project requires vendors to install two Level 2 dual-port networked pedestal-mounted charging stations, one 100-ampere electrical subpanel, charging station foundations, four bollards, disconnect switches, conduit, wiring, and circuit breakers at the park's Headquarters Building. A mandatory site visit was conducted on March 10, 2026, and only vendors who attended this visit or coordinated otherwise will be considered for the contract award. Vendor questions were due by March 16, 2026, at 9:30 AM EST with responses posted by March 19, 2026. Final proposals must be submitted electronically through COMMBUYS by March 23, 2026, at 5:00 PM EST, with an estimated contract start date of March 30, 2026, and all deliverables required to be completed by June 1, 2026.
The amendment clarifies several technical and design requirements based on feedback from the site visit, including the removal of one handhole from the green docket, a requirement that conduit routing pass through the house interior and cabinet rather than through the concrete foundation, mandatory weatherization and sealing of new penetrations, and vendor confirmation of disconnect switch placements with the local Fire Department. DCR will remove obstructions prior to trenching and will place the new subpanel to the left of the current panel. The bid amendment recommends that vendors confirm compatibility of their networking software with WEX cards and provide separate, clearly defined pricing for 1-year and 5-year networking and warranty options, including intermediate 2-year, 3-year, and 4-year options. This is a not-to-exceed fixed-price contract with itemized costs, and the compensation structure will be determined based on vendor proposals submitted during the competitive sealed process.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Notice to Vendors Project Number: DCR-001-26 DCR Fleet EV Charging Stations Great Brook Farm State Park Thank you to the vendors who attended the March 10th Site Visit for Great Brook Farm State Park. Please note that the only bids that will be considered are from the vendors who attended the site Mandatory Site Visit or coordinated otherwise. Based on the information collected during the site visit and feedback from prospective bidders, EEA/DCR is issuing the following amendment and clarification to the bid
DCR will now suggest:
· The removal of one handhole from the green docket (bringing the total to just 1) DCR will now require:
· Vendor proposals must include conduit routing that does not pass through the concrete foundation. Instead, pathing will run up through the house, through the cabinet above and exit out to the side of the building
· Vendors perform appropriate weatherization and sealing for any new penetrations to ensure that no leaks or structural issues are created
· Vendors must confirm disconnect switch placements and guidelines for the EV chargers with the local Fire Department and/or Fire Department Inspector DCR will alert vendors that:
· The new subpanel will be placed to the left of the current panel, obstructions will be removed prior to trenching DCR recommendations for bid:
· Vendors should confirm, and clearly state in their bid, that their networking software is compatible with the WEX cards
· Vendors should include separate and clearly defined pricing for:
· 1-year networking and warranty options
· 5-year networking and warranty options (include 2 year, 3 year, and 4 year) Please ensure that these updates are reflected in your final bid submission.