This document is a bid amendment for Request for Quote (RFQ) #24-426DOC-SHERI-B-42847 issued by the Illinois Department of Corrections (IDOC) for a 4-month rental of a 20-ton chiller and associated components for the Sheridan Correctional Center. The RFQ indicates the rental period is expected to be from June 1, 2024, through September 30, 2024. The amendment provides responses to various vendor questions, including clarification on the use of subcontractors, prevailing wage requirements, rental timeframe, equipment specifications, and utility requirements.

The RFQ states the facility staff can make the final electrical connections for the equipment. No additional details are provided regarding pricing terms, set-asides, incumbents, funding sources, or other salient information.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IDOC – Sheridan Correctional Center – DECRIPTION Bid #24-426DOC-SHERI-B-42847 Amendment #1 Response to Vendors’ Questions to Request for Quote (RFQ)

Below is he response to the questions that IDOC has received regarding the above RFQ:

1. Please advise if we can submit our bid utilizing a 100% subcontractor.

RESPONSE: Please see section 1.6 of the RFQ (contract) in the attachments tab for information regarding subcontractors.

2. Checking to see if this is a ‘prevailing wage’ job.

RESPONSE: This depends on if the project requires a prevailing wage position or not. (e.g. If an electrician is required for the project, then that electrician would have to be paid prevailing wage.)

3. Rental Start time frame?

RESPONSE: As per the attached RFQ (contract), the expected rental timeframe is June 1, 2024, through September 30, 2024.

4. As far as pumps, would you like us to provide them or use yours?

RESPONSE: We need a standalone unit that all equipment is incorporated into it. We do not have circulation pumps in place.

5. What will be your operating temperature?

RESPONSE: ~70 – 72 degrees

6. What distance of cables is needed?

RESPONSE: 50’ should cover it. Last year we were charged for 50’, but the 2022 season we were charged for 100’.

7. Would the site engineer take care of the duct work, final connections and hard wiring the electrical or would contractor(s) be needed to perform the final connection(s)?

RESPONSE: Facility staff is able to make final connection(s) if necessary.