Bid Alternates.doc
DOC document 72 KB Posted
- Solicitation number
- IFB1 GJBA 2016000332 1
- Issued by
- Arapahoe County, Colorado
About this file
This is a Bid Alternates Form from the State of Colorado Office of the State Architect State Buildings Programs for Arapahoe Community College's 2016-061M15 Upgrade Campus Access Control and Monitoring project. The form provides a structured template for bidders to submit pricing for additive and deductive alternates related to the access control and monitoring system upgrade. The document establishes clear parameters that additive and deductive alternates are mutually exclusive—only one category may be used in a single bid submission. The form accommodates up to ten additive alternates and ten deductive alternates, with bidders required to enter dollar amounts for each applicable line item as specified in the project specifications section.
The document functions as a pricing schedule mechanism rather than a complete procurement document. Bidders must complete the form by entering dollar amounts for selected alternates and providing company name, signature, and date. The form does not specify which alternates are mandatory or optional, nor does it detail the specific scope descriptions, pricing guidelines, or evaluation criteria, as these are referenced as located elsewhere in the specification documents. This form serves as the standardized template (State Form SBP-6.131, issued 7/2010) used by Colorado state building programs to collect bid pricing for project variations in a consistent and comparable format.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Contractor's Agreement.doc | DOC document | |
| Bid.docx | DOCX document | |
| Bid Bond.doc | DOC document | |
| Information for Bidders.doc | DOC document | |
| UI-1.doc | DOC document | |
| Performance Bond.doc | DOC document | |
| General Conditions.doc | DOC document | |
| Ad for Bid.doc | DOC document | |
| Labor and Material Payment Bond.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAMS
BID ALTERNATES FORM
| Institution/Agency: |
| Arapahoe Community College |
| Project No./Name: |
| 2016-061M15 Upgrade Campus Access Control and Monitoring |
Additive alternates will not be used if deductible alternates are used and deductible alternates will not be used if additive alternates are used.
Additive Alternates (If Applicable)
Refer to specification section for descriptions of add alternates. If the add alternates are accepted, the base bid would be modified by the amount entered by the bidder.
A.A. No. 1
Add $
A.A. No. 2
Add $
A.A. No. 3
Add $
A.A. No. 4
Add $
A.A. No. 5
Add $
A.A. No. 6
Add $
A.A. No. 7
Add $
A.A. No. 8
Add $
A.A. No. 9
Add $
A.A. No. 10
Add $
Deductive Alternates (If Applicable)
Refer to specification section for descriptions of the deductive alternates. If the deductive alternates are accepted, the base bid would be modified by the amount entered by the bidder.
D.A. No. 1
Deduct $
D.A. No. 2
Deduct $
D.A. No. 3
Deduct $
D.A. No. 4
Deduct $
D.A. No. 5
Deduct $
D.A. No. 6
Deduct $
D.A. No. 7
Deduct $
D.A. No. 8
Deduct $
D.A. No. 9
Deduct $
D.A. No. 10
Deduct $
THE BIDDER:
Company Name
Signature
Date
State Form SBP –6.131
Issued 7/2010
File details come from the government source that posted it. Updated .