Bid 25_18 _ Addendum 1.pdf
PDF 193 KB Posted
- Solicitation number
- PE-62600-NONST-2025-000000084
- Issued by
- Chatham County, Georgia
About this file
This is Addendum #1 to Bid 25-18 issued by the Savannah-Chatham County Public School System for a district-wide copy paper semi-annual contract. The addendum extends the bid closing date to January 28, 2025 at 11:00 AM, with an expected award date approximately 10 days after closing, subject to Board approval on March 5, 2025. The contract term is set to begin March 6, 2025, for a 6-month period. The first delivery of supplies will be required on the first day of the contract. The addendum clarifies delivery logistics, confirming the receiving location has an elevated loading dock, pallet jack, and forklift, with deliveries accepted between 7:30 AM and 3:00 PM.
The district currently uses Staples/324791 paper and has received a Premier case sample for evaluation. Regarding sourcing requirements, the bid includes domestic preference requirements under 2 C.F.R 200.322, requiring preference for products produced in the United States to the greatest extent practicable. The basis of award (all-or-none versus line-item) will be determined during bid evaluation, and pricing terms are referenced in the sample contract document under Duration ("Term") of Agreement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid 25_18 Copy Paper _District Wide (Semi_Ann.pdf | ||
| Bid 25_18 Notification Letter.pdf | ||
| Bid 25_18 Sample Contract.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Savannah-Chatham County Public School System 208 Bull Street / Savannah, Georgia 31401 / (912) 395-5572
Number: Bid 25-18 Copy Paper – District Wide (Semi-Annual Contract)
Posting Date: 12/19/2024
Addendum #1
Posting Date: 01/21/2025
Closing Date: 01/28/2025
@11 am
The information contained in this document shall become an official part of the original document and shall be acknowledged as noted on the Certification Form (Form 2) of the solicitation document in the space provided. Failure to acknowledge receipt of an addendum may result in a status of non-responsive. Firms are encouraged to review this document's contents and respond accordingly.
Addendum No.1 is being issued to respond to questions received for Bid 25-18 and to extend the Bid close date to January 28, 2025 @ 11 am.
Questions and Answers
# Questions Referenced Bid Section
Answers
1.
1. As it relates to “Section 4.0 Specifications / Item #1 (Truckload Paper)” please provide the information requested below for the delivery location(s) in question:
a. Does the receiving location(s) have an elevated loading dock (48” to 52” height) that can accept a trailer as large as 53’?
b. Does the receiving location(s) have a pallet jack?
c. Does the receiving location(s) have a forklift?
d. Is a lift gate required at this location?
e. Is there an expectation that the driver will assist in unloading the delivery?
f. Is inside delivery required?
g. Is a delivery appointment required?
Section 4.0 Specifications /
Item #1 (Truckload
Paper)”
a. Yes, the receiving location has an elevated dock.
b. Yes, the receiving location has a pallet jack.
c. Yes, the receiving location has a forklift.
d. No, a lift gate is not required at this location.
e. No, there is no expectation that the driver will assist in unloading the delivery.
f. No, inside delivery is not required.
g. Deliveries are accepted between 7:30 am and 3:00 pm.
2.
When is the expected award date for this bid?
The expected award date for Bid 25-18 is approximately 10 days after the bid close date of January 28, 2025.
However, this award will be subject to Board approval on March 5, 2025.
Section Answers
3. When is the expected start date for the 6-month term?
The expected start date for the 6-month term is March 6, 2025.
4. Is price to remain firm for the 6-month term or does the district consider an industrywide price increase with supporting documentation?
See sample contract document:
4. Duration (“Term”) of this Agreement
5. Will this bid be awarded all-or-none or by line-item?
ATTACHMENT
A: 12. Basis of
Award
Refer to solicitation document Attachment A. 12. Basis of Award.
This will be determined upon evaluation of bid.
6. When does the district anticipate needing to receive the 1st delivery of line item #1 and line item #2?
The awarded vendor should be able to provide needed supplies upon the first day of the contract.
7. What brand is the district currently using for line item #1 & #2?
The District is currently using Staples/324791
8. Could your Print Shop confirm receipt of the Premier case sample delivered on
November 13th (POD attached) and let me know if it can be used for testing for this bid?
The noted sample has been received and will be reviewed during the evaluation period.
9. Can you take an imported paper on this bid?
II. GENERAL
TERMS AND
CONDITIONS
FOR THIS ITB
Z. Federal
Requirements
8. Domestic Preference for Procurement (2 C.F.R 200.322) (all bids)
As appropriate and to the extent consistent with law, the Contractor and any subcontractors, to the greatest extent practicable, shall provide a preference for the purchase, acquisition, or use of goods, products, or materials produced in the United States (including but not limited to iron, aluminum, steel, cement, and other manufactured products).
For purposes of this section:
(1) “Produced in the United States” means, for iron and steel products, that all manufacturing processes, from the initial melting stage through the application of coatings, occurred in the United States.
(2) “Manufactured products” means items and construction materials
Section Answers composed in whole or in part of non-ferrous metals such as aluminum;
plastics and polymer-based products such as polyvinyl chloride pipe;
aggregates such as concrete; glass, including optical fiber; and lumber.
2 C.F.R. § 200.322
***ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED***
End of Addendum #1 to Bid 25-18 – Question & Answers and Bid Close date extension to January 28, 2025
SCCPSS Purchasing Department (Posted: January 21, 2025)
File details come from the government source that posted it. Updated .