Addenda #3 for Bid 25-10 is a document issued by the Putnam County Procurement Department in Palatka, Florida, addressing multiple questions related to a solicitation for mulching and transport of yard trash and vegetative debris services. The addendum clarifies key aspects of the bid, specifically eliminating transport of mulch from the original scope of work. The document provides historical data on incoming yard trash volumes, showing 6,401.21 tons in 2024, 5,379.98 tons in 2023, and 4,965.39 tons in 2022, with a total of 18,112.78 tons mulched by the contractor during that timeframe.

The current contract pricing is $8.50 per ton for mulching, with no additional transport pricing (previously $5.00 per ton for on-site transport and $10.00 per ton for off-site transport). The addendum confirms that no annual Consumer Price Index (CPI) increase is included in the contract, and that the standard AIA form for a Bid Bond is acceptable. Potential bidders are advised that the bid now focuses solely on mulching services, with no transportation component, and that the contractor will be responsible for processing the incoming yard trash and vegetative debris at the facility.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PUTNAM COUNTY

PROCUREMENT DEPARTMENT

2509 CRILL AVE, STE 200

PALATKA, FL 32177

Bid 25-10 Mulching and / or Transport of Yard Trash and Vegetative Debris

Addenda # 3 February 27, 2025

TO ALL BIDDERS SUBMITTING A RESPONSE ON THIS PROJECT

The changes, additions, substitutions, and/or deletions contained in Addenda #3 are hereby made part of the Contract Documents fully and completely for this Bid.

1. Question:

Addendum # 2 provides a new Bid Form that removes the Price per Ton/Transport On-Site and Price per Ton/Transport Off-Site boxes and leaves only the requirement to provide: Price Per Ton for Mulching.

There are no additional explanations provided for this change, and if the language in Section 5.0 Scope of Work Specifications #’s 3. Addressing transported mulch leaving the Facility will go across the County’s Scale and 4. Material transported with the Facility will be delivered to an area designated by the Sanitation Director or designee; is still valid and part of the Scope of Services.

Answer:

There will be no transport of mulch.

2. Question:

If mulch transport offsite is a requirement, please provide information on whether plastic bags are accepted in the incoming yard trash and vegetative debris, and if the mulch transported off-site has plastic in it.

3. Question:

If mulch transport onsite is a requirement, please provide information on the distance onsite that it needs to be transported and condition of the roads to be transported on.

4. Question:

If mulch transport off-site or onsite is a requirement, please provide a minimum of 3 years of historical data for the amounts hauled offsite and onsite.

5. Question:

Please provide a minimum of 3 years of historical data on the amount of yard trash and vegetative debris received by the County for these services.

Answer:

2024 Incoming Yard Trash 6,401.21 tons 2023 Incoming Yard Trash 5,379.98 tons 2022 Incoming Yard Trash 4,965.39 tons

With the yard trash on site at the beginning of 2022, the total that was mulched by the contractor during this same timeframe was 18,112.78 tons.

6. Question:

Please provide the current price the County is paying for these services and the County’s current contractor.

Answer:

$8.50 / ton for mulching $5.00 / ton for transport on-Site $10.00 / ton for transport off-site

7. Question:

Article 32 provides language on the Change of Contract Price but it is related to an “occurrence of the event giving rise to the claim”. Does this include the ability to request an annual CPI increase, and to provide the CPI change over the past 12 months as the supporting data for the request?

No, an annual CPI increase in not included.

8. Question:

Is the standard AIA form for a Bid Bond acceptable to use for the Bid Bond?