This document is a response to clarifying questions submitted by interested firms regarding Invitation to Bid #2022-60 for the Stokes Building Membrane Reroof and Infill Project issued by Clackamas County and Oregon City. The project involves replacing the building membrane, addressing the skylight infill, and potentially replacing the parapet cap. The county will provide a core sample and perform the work on the interior access hatch. Contractors will be responsible for any required permits and approvals related to accessing or staging on the railroad side of the building. Electrical conduit will require sleeper protection, and the existing built-up roofing (BUR) system will remain in place.
The document clarifies that no insurance is required for railroad right-of-way access, as this access is not permitted unless specifically authorized. Pricing terms, set-asides, incumbent information, and funding sources are not provided in this response to clarifying questions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION TO BID #2022-60
Stokes Building Membrane Reroof and Infill Project (“BID”)
RESPONSE TO CLARIFYING QUESTIONS #1
June 9, 2022
Note that these are questions submitted by interested firms to the above referenced solicitation.
The below answers are for clarification purposes only and in no way alter or amend the BID as published.
1. Are there specs on the infill for the skylight?
Answer: Yes, this is included in the package. Permits are in place for the skylight.
Permits are required for the roof
2. Is the parapet cap being replaced?
Answer: If possible, the same cap will be reused. Please provide an add/alternate to cover replacement if deemed necessary.
3. Does the electrical conduit need sleeper protection?
Answer: Yes.
4. Will there be a core sample?
Answer: Yes, this will be performed in house by Clackamas County.
5. Does the BUR stay?
Answer: Yes, only the membrane comes off.
6. Do we need insurance for RXR?
Answer: No, we do not have approval to access or work along the upper tracks. Any requirements, permits and or approvals related to accessing or staging on the South facing wall (track side) shall be the sole responsibility of the contractor.
7. Can interior access hatch be accessed in the future?
Answer: No, this was a onetime exception. All future access must be performed from the exterior. Using the railroad side of the building is not permitted unless authorized as per question #6 above.
End of Clarifying Questions #1