BID 2022-106 - Clarifying Questions 2.pdf

PDF 153 KB Posted

Attached to
BID 2022-106 Fischers Forest Park - Large Onsite Sewage System Treatment Process Upgrade
Solicitation number
S-C01010-00005288
Issued by
Clackamas County, Oregon

About this file

This document is a response to clarifying questions for Invitation to Bid #2022-106 for the Fischer's Forest Park: Large Onsite Sewage System Treatment Process Upgrade project in Clackamas County, Oregon and Oregon City. The project consists of approximately 4,400 linear feet of 8" Cured in Place Pipe (CIPP) installation, lateral reconnection and sealing, 3 point repairs, 5 manhole replacements, 1 new manhole installation, and manhole rehabilitation with epoxy coating and injection grouting. The document clarifies that sections of the Summary of Work contained errors and have been updated in Amendment #3.

Regarding pricing and funding, the document does not provide any details on pricing terms, set asides, incumbents, funding requirements or sources. The contract value has been updated, but the specific amount is not stated. The document focuses solely on clarifying the scope of work for the project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION TO BID #2022-106

FISCHER’S FOREST PARK:

LARGE ONSITE SEWAGE SYSTEM TREATMENT PROCESS UPGRADE

RESPONSE TO CLARIFYING QUESTIONS #2

January 31, 2023

Note that these are questions submitted by interested firms to the above referenced solicitation.

The below answers are for clarification purposes only and in no way alter or amend the BID as published.

1. In Addendum Number 1, Section 01010, Summary of Work 1.01. It was my understanding that the 8” pipe and 5 manhole replacements were not part of this project at the Pre-Bid. Please clarify.

SECTION 01010

SUMMARY OF WORK

PART 1 GENERAL

1.01 SUMMARY

A. This contract consists of installation of approximately 4,400 lf of 8” Cured in Place Pipe (CIPP), as well as, lateral reconnection, lateral sealing, 3 point repairs, 5 manhole replacements, 1 new manhole installation, and manhole rehab with epoxy coating and injection grouting.

Answer: Section 01010 contains errors in sections 1.01 Summary, 1.02 Permits, and 1.04.B.

Contractor Duties. The list of work under Section 1.04.A remains unchanged.

Section 1.01.A. contains Work unrelated to this project. Section 1.01.C. has had the contract length updated to be consistent with the rest of the contract language. The contract value in Section 1.01.D has been updated. Sections 1.02 and 1.04.B.2 have been updated to be consistent with the rest of the contract language.

See Amendment #3 for official clarification.