BID 2022-106 Addendum 3.pdf
PDF 127 KB Posted
- Attached to
- BID 2022-106 Fischers Forest Park - Large Onsite Sewage System Treatment Process Upgrade
- Solicitation number
- S-C01010-00005288
- Issued by
- Clackamas County, Oregon
About this file
This document is Addendum #3 to Invitation to Bid #2022-106 issued by Clackamas County, Oregon for the Fischer's Forest Park: Large Onsite Sewage System Treatment Process Upgrade project. The contract consists of the installation of approximately 52,000 square feet of Netafim subsurface distribution system, one manhole, six 3,000-gallon precast tanks, three AdvanTex AX100 filtration units, one Orenco Durafiber shelter, two custom flow split structures, and the reconfiguration of an existing recirculation tank, as well as additional work to rehabilitate the septic tanks, treatment process, and drain field system for a 26-home communal septic system. The work is to be substantially completed within 150 days of the Notice to Proceed and ready for final payment 30 days thereafter. The estimated construction cost for the work scope is $800,000.
The contractor will be responsible for obtaining all required permits and maintaining compliance, with the owner paying the cost of obtaining the permits. The contractor will also be responsible for any penalties or fines resulting from noncompliance with the permit terms.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION TO BID #2022-106
FISCHER’S FOREST PARK:
LARGE ONSITE SEWAGE SYSTEM TREATMENT PROCESS UPGRADE
ADDENDUM NUMBER 3
January 31, 2023
On December 28, 2022, Clackamas County (“County”) published Invitation to Bid #2022-106 (“BID”). The County has found that it is in its interest to amend the BID through the issuance of this Addendum #3. Except as expressly amended below, all other terms and conditions of the original BID and subsequent Addenda shall remain unchanged.
A. SECTION 01010 – SUMMARY OF WORK
1. Part 1 General
a. Section 1.01: Summary
1) Replace part A with the following:
This contract consists of installation of approximately 52,000 square feet of Netafim subsurface distribution system, one (1) manhole, six
(6) 3,000-gallon precast tanks, three (3) AdvanTex AX100 filtration units, one (1) Orenco Durafiber shelter, two (2) custom flow split structures, along with reconfiguring an existing recirculation tank and additional work and materials necessary to rehabilitate the septic tanks, treatment process and drain field system for a 26-home communal septic system.
2) Replace part C with the following:
All Work is to be substantially completed within 150 days of Notice to Proceed and ready for final payment 30 days thereafter.
3) Replace part D with the following:
The estimated construction cost for Work scope is $800,000.
b. Section 1.02: Permits
1) Replace the entirety of the section with the following:
Contractor will be responsible for obtaining all required permits and maintaining compliance with those permits throughout the performance of the Work. Owner will pay the cost of obtaining all permits. The Contractor shall be responsible for any penalties or fines that result from Contractor’s noncompliance with the terms of the permits. The Contractor will be responsible for compliance with the terms of all permits throughout the performance of the Work.
c. Section 1.04: Work of This Contract
1) Replace B.2 with the following:
2. All required permits and licenses.
File details come from the government source that posted it. Updated .