Beulah_Rd_Improvements-_Potable_Water_Permit.pdf
PDF 233 KB Posted
- Attached to
- CEI - Beulah Road Realignment
- Solicitation number
- PD 25-26.074
- Issued by
- Escambia County, Florida
About this file
This is a Notification of Acceptance of Use of a General Permit issued by the Florida Department of Environmental Protection (FDEP) Northwest District for the Beulah Road Improvements project. The permit, issued February 5, 2026, authorizes Farm Hill Utilities Inc., under the direction of permittee Mr. Shaun Condon, to relocate portions of existing water infrastructure consisting of approximately 130 linear feet of 8-inch water main and 1,490 linear feet of 6-inch water main. The permit is effective for five years, expiring February 4, 2031. The permittee is required to comply with all applicable Florida Administrative Code rules including Rule 62-555.405 and General Conditions for All General Drinking Water Permits found in 62-4.540, F.A.C. Prior to placing any water main extension into operation for purposes other than disinfection or testing for leaks, the permittee must submit a Certification of Construction Completion (DEP Form No. 62-555.900(9)) and obtain departmental approval or clearance. Additionally, if ownership of the project is transferred before receiving full departmental clearance, both the current and proposed permittees must submit a permit transfer application within 30 days.
Upon project completion, the permittee must submit record drawings showing any deviations from the approved permit specifications and bacteriological analysis results obtained within 60 days of departmental receipt of the clearance request. Bacteriological sampling must be conducted at the endpoint of the proposed addition, at any branching water lines, and at intervals of every 1,200 feet on straight pipe runs, with each location sampled on two consecutive days and chlorine residual readings documented. The permit fee was received on February 5, 2026, and a civil penalty may be incurred if the project is placed into operation before obtaining departmental clearance. Engineering oversight and coordination are being provided by HDR Inc., with primary contact Heather Manganiello, P.E., and departmental inquiries directed to Alyssa Tessier at the FDEP.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
February 5, 2026
Notification of Acceptance of Use of a General Permit
Project: Beulah Rd Improvements Utilities Permit No.: 0468739-001-DSGP/02 Issued: February 5, 2026 Expires: February 4, 2031 Water Supplier: Farm Hill Utilities Inc
PWS ID: 1170259
Permittee:
Mr. Shaun Condon Farm Hill Utilities, Inc.
120 Madrid Road Cantonment, Florida 32533 scondon21@gmail.com
Dear Mr. Condon:
On February 2, 2026, the Florida Department of Environmental Protection received a “Notice of Intent to Use the General Permit for Construction of Water Main Extensions for PWSs” [DEP Form No. 62-555.900(7)], under the provisions of Rule 62-4.530 and Chapter 62-555, Florida Administrative Code (F.A.C.), with permit fee received February 5, 2026. The purpose of the project is to relocate portions of the existing 8” and 6” water mains. Construction consists of approximately 130 LF of 8” water main and 1,490 LF of 6” water main.
Based upon the submitted Notice and accompanying documentation, this correspondence is being sent to advise that the Department does not object to the use of such general permit at this time. Please be advised that the permittee is required to abide by Rule 62-555.405, F.A.C., all applicable rules in Chapters 62-4, 62-550, 62-555, F.A.C., and the General Conditions for All General Drinking Water Permits (found in 62-4.540, F.A.C.).
The permittee shall comply with all sampling requirements specific to this project. These requirements are attached for review and implementation.
FLORIDA DEPARTMENT OF
Environmental Protection
Northwest District
160 W. Government St., Suite 308 Pensacola, FL 32502
Ron DeSantis Governor
Jay Collins
Lt. Governor
Alexis A. Lambert Secretary mailto:scondon21@gmail.com http://www.dep.state.fl.us/water/drinkingwater/forms.htm https://www.flrules.org/gateway/RuleNo.asp?title=PERMITS&ID=62-4.530 https://www.flrules.org/gateway/ChapterHome.asp?Chapter=62-555 https://www.flrules.org/gateway/RuleNo.asp?title=PERMITTING,%20CONSTRUCTION,%20OPERATION,%20AND%20MAINTENANCE%20OF%20PUBLIC%20WATER%20SYSTEMS&ID=62-555.405 https://www.flrules.org/gateway/ChapterHome.asp?Chapter=62-4 https://www.flrules.org/gateway/ChapterHome.asp?Chapter=62-550 https://www.flrules.org/gateway/ChapterHome.asp?Chapter=62-555 https://www.flrules.org/gateway/RuleNo.asp?title=PERMITS&ID=62-4.540
Permittee: Beulah Rd Improvements Utilities Shaun Condon DEP File No.: 0468739-001-DSGP/02 Farm Hill Utilities, Inc.
Pursuant to Rule 62-555.345, F.A.C., the permittee shall submit a certification of construction completion [DEP Form No. 62-555.900(9)] to the Department and obtain approval, or clearance, from the Department before placing any water main extension constructed under this general permit into operation for any purpose other than disinfection or testing for leaks.
Within 30 days after the sale or legal transfer of ownership of the permitted project that has not been cleared for service in total by the Department, both the permittee and the proposed permittee shall sign and submit an application for transfer of the permit using Form 62-555.900(8), F.A.C., with the appropriate fee. The permitted construction is not authorized past the 30-day period unless the permit has been transferred.
This permit will expire five years from the date of issuance. If the project has been started and not completed by that time, a new permit must be obtained before the expiration date in order to continue work on the project, per Rule 62-4.030, F.A.C.
Sincerely, Jonice Hicks Engineering Specialist III Water and Wastewater Permitting
Cc:
Heather Manganiello, P.E. (heather.manganiello@hdrinc.com) Farm Hill Utilities (scondon21@gmail.com) http://www.dep.state.fl.us/legal/rules/drinkingwater/62-555.pdf http://www.dep.state.fl.us/water/drinkingwater/forms.htm http://www.dep.state.fl.us/water/drinkingwater/forms.htm https://www.flrules.org/gateway/RuleNo.asp?title=PERMITS&ID=62-4.030 mailto:heather.manganiello@hdrinc.com mailto:scondon21@gmail.com
Permittee: Beulah Rd Improvements Utilities Shaun Condon DEP File No.: 0468739-001-DSGP/02 Farm Hill Utilities, Inc.
A Civil Penalty May Be Incurred if this project is placed into operation before obtaining a clearance from this office.
Requirements for clearance upon completion of projects are as follows:
1) Clearance Form
Submission of a fully completed Department of Environmental Protection (DEP) Form 62- 555.900(9) Certification of Construction Completion and Request for Clearance to Place Permitted PWS Components into Operation. We recommend that the form be submitted electronically by using the Department’s Business Portal at https://www.fldepportal.com/go/ (via “Submit” then “Registration/Notification” and “Request for Clearance to Place Permitted PWS Components into Operation.”
2) Record Drawings, if deviations were made
Submission of the portion of record drawings showing deviations from the DEP construction permit, including preliminary design report or drawings and specifications, if there are any deviations from said permit (Note that it is necessary to submit a copy of only the portion of record drawings showing deviations and not a complete set of record drawings.).
3) Bacteriological Results Copies of satisfactory bacteriological analysis (a.k.a. Main Clearance), taken within sixty
(60) days of Department receipt of Certification of Construction Completion and Request for Clearance to Place Permitted PWS Components into operation, from locations within the distribution system or water main extension to be cleared, in accordance with Rules 62-555.315(6), 62-555.340, and 62-555.330, F.A.C. and American Water Works Association (AWWA) Standard C 651-92, as follows:
• The end point of the proposed addition
• Any water lines branching off a main extension
• Every 1,200 feet on straight runs of pipe
Each location shall be sampled on two consecutive days, with sample points and total and free chlorine residual readings clearly indicated on the report. A sketch or description of all bacteriological sampling locations must also be provided.
For further clarification contact:
Alyssa Tessier Florida DEP
(850) 595-0685 Alyssa.Tessier@FloridaDEP.gov https://www.fldepportal.com/go/ https://www.flrules.org/gateway/RuleNo.asp?title=PERMITTING,%20CONSTRUCTION,%20OPERATION,%20AND%20MAINTENANCE%20OF%20PUBLIC%20WATER%20SYSTEMS&ID=62-555.315 https://www.flrules.org/gateway/RuleNo.asp?title=PERMITTING,%20CONSTRUCTION,%20OPERATION,%20AND%20MAINTENANCE%20OF%20PUBLIC%20WATER%20SYSTEMS&ID=62-555.340 https://www.flrules.org/gateway/RuleNo.asp?title=PERMITTING,%20CONSTRUCTION,%20OPERATION,%20AND%20MAINTENANCE%20OF%20PUBLIC%20WATER%20SYSTEMS&ID=62-555.330 mailto:Alyssa.Tessier@FloridaDEP.gov