BEP-RFP-15-0371-A0002.pdf

PDF 116 KB Posted

Attached to
BEP ECF Wastewater Pretreatment Plant Maintenance Services
Solicitation number
BEP-RFP-15-0371
Issued by

About this file

Amendment BEP-RFP-15-0371-A0002

View the file

Other files

File Type Posted
BEP-RFP-15-0371-A0005_US.pdf PDF
PWS-BEP_WWPP_Performance_Work_Statement_FFP_Chemical_Update_8-21-15.pdf PDF
Attachment_F-_Questions_and_Answers_Solicitation_BEP-RFP-15-0371.pdf PDF
QASP-Attachment_B-DCF_Wastewater_revised_8-19-15.pdf PDF
BEP-RFP-15-0371-A0004.pdf PDF
Attachment_E_Question_and_Answer_8-12-15_Solicitation_BEP-RFP-15-0371.pdf PDF
BEP-RFP-15-0371-A0003.pdf PDF
Sign-In_Sheet-ECF_Wastewater_Pretreatment_Maintenance_Site_Visit_8-12-15.pdf PDF
QASP-Attachment_B-DCF_Wastewater_revised_7-30-15.pdf PDF
PWS-BEP_WWPP_Performance_Work_Statement.pdf PDF
QASP-Attachment_B-DCF_Wastewater_revised_7-27-15.pdf PDF
BEP-RFP-15-0371_Conform_Copy_7-30-15.pdf PDF
Questions_ _Answers_-__Wastewater_Pretreatment_Plant_Maintenance_Services.pdf PDF
BEP-RFP-15-0371-A0001.pdf PDF
Sign-In_Sheet-ECF_Wastewater_Pretreatment_Maintenance_Site_Visits.pdf PDF
PAST_PERFORMANCE_QUESTIONNAIRE.pdf PDF
Attachment_21_-_Pallets_Specification.pdf PDF
Attachment_18_-_Sodium_Hydroxide_Specification.pdf PDF
Attachment_3_-_PWPP_Process_Description.pdf PDF
Attachment_2_-_WSWPP_Process_Description.pdf PDF
Attachment_4_-_GTWPP_Process_Description.pdf PDF
Attachment_9_-_WSWPP_Equipment_List.pdf PDF
Attachment_13_-_Restricted_Materials_at_DCF.pdf PDF
Attachment_C_Non_Disclosure_Agreement.pdf PDF
Attachment_12_-__EHS_Requirements_for_Purchased_Materials.pdf PDF
Attachment_17_-_Filter_Aid_Specification.pdf PDF
Attachment_15_-_Sulfuric_Acid_Specification.pdf PDF
Attachment_16_-_Sodium_Bisulfite_Specification.pdf PDF
Attachment_7_-_BEP_Furnished_Equipment.pdf PDF
Attachment_11-SCA_Wage_Determination.pdf PDF
Attachment_A_-_Subcontracting_Plan.pdf PDF
Attachment_20_-_Boxes_-_Lids_Specification.pdf PDF
Attachment_25_-_Laboratory_Analysis.pdf PDF
Attachment_14_-_Bentonite_Specification.pdf PDF
Attachment_8_-_EHS_Contractor_Requirements.pdf PDF
Attachment_10_-_PWPP_Equipment_List.pdf PDF
Attachment_23_-_Spare_Parts_and_Supplies.pdf PDF
BEP-RFP-15-0371.pdf PDF
Attachment_19__-_Sodium-Sulfated_Castor_Oil_Specification.pdf PDF
Attachment_1_-_WW_Permit_017-9.pdf PDF
Attachment_5_-_New_WSR_-_MU_Process_Description.pdf PDF
Attachment_22_-_Process_and_Treatment_Chemicals.pdf PDF
Attachment_6_-_New_WSWPP_Process_Description.pdf PDF
Attachment_26_-_Outfall_Flow_Masurements.pdf PDF
Attachment_B-QASP.pdf PDF
Attachment_27_-_Corrosion_Monitoring.pdf PDF
Attachment_24_-_Nonreimburseable_Tools_-_Janitorial_-_PPE_Supplies.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE

DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

BEP-RFP-15-0371-A0002

Summary of Changes

The purpose of this amendment is the following:

1. To incorporate the revised Quality Assurance Plan (QASP), Attachment B, that removes language regarding disincentives.

2. To notify interested offerors of a follow up site visit scheduled for Wednesday, 12 August 2015, at 8:00 AM ET. Interested offerors esday, 11 August 2015.

must respond and confirm attendance by 2:00PM ET on Tuesday, 11 August 2015.

3. To extend the Solicitation due date from 10 August 2015 at 4:00PM ET to 17 August 2015 at 4:00PM ET.

All other terms and conditions remain unchanged.

Text52:
Text54: 1
Check Box91: Yes
Check Box92: Off
Check Box95: Yes
Check Box96: Off
Check Box97: Off
Check Box98: Off
Check Box99: Off
Check Box100: Off
Check Box101: Off
CUST_PROJ_CODE:
NO_OF_COPIES: 1
TOTAL_NO_OF_PAGES: 2
Text1: AMENDMENT CONTROL NUMBER :
AMENDMENT_DESCRIPTION: See summary of changes for amendment details.
Text134: SUMMARY OF CHANGES :
SOL_DOCUMENT_NUMBER: BEP-RFP-15-0371
OPEN_BIDDING_DATE: 08/10/2015
Text2: Same As Issuing Office
SOL_OPEN_BID_DATE: 07/02/2015
AMD_ISSUING_OFFICE_LADDR: BEP-ACQUISITION

Bureau of Engraving and Printing, Office of Acquisition, 301 14th Street SW Washington, DC, 20228-0001, US

AMD_ISSUING_OFFICE_LOCCODE: EP001
CLOSE_DATE_EXTEND_FLAG: Y
HDR_DOCUMENT_NUMBER: BEP-RFP-15-0371-A0002

File details come from the government source that posted it. Updated .