Attachment_25_-_Laboratory_Analysis.pdf

PDF 41 KB Posted

Attached to
BEP ECF Wastewater Pretreatment Plant Maintenance Services
Solicitation number
BEP-RFP-15-0371
Issued by

About this file

Attachment 25 Laboratory Analysis

View the file

Other files

File Type Posted
BEP-RFP-15-0371-A0005_US.pdf PDF
PWS-BEP_WWPP_Performance_Work_Statement_FFP_Chemical_Update_8-21-15.pdf PDF
Attachment_F-_Questions_and_Answers_Solicitation_BEP-RFP-15-0371.pdf PDF
QASP-Attachment_B-DCF_Wastewater_revised_8-19-15.pdf PDF
BEP-RFP-15-0371-A0004.pdf PDF
Attachment_E_Question_and_Answer_8-12-15_Solicitation_BEP-RFP-15-0371.pdf PDF
BEP-RFP-15-0371-A0003.pdf PDF
Sign-In_Sheet-ECF_Wastewater_Pretreatment_Maintenance_Site_Visit_8-12-15.pdf PDF
BEP-RFP-15-0371-A0002.pdf PDF
QASP-Attachment_B-DCF_Wastewater_revised_7-30-15.pdf PDF
PWS-BEP_WWPP_Performance_Work_Statement.pdf PDF
QASP-Attachment_B-DCF_Wastewater_revised_7-27-15.pdf PDF
BEP-RFP-15-0371_Conform_Copy_7-30-15.pdf PDF
Questions_ _Answers_-__Wastewater_Pretreatment_Plant_Maintenance_Services.pdf PDF
BEP-RFP-15-0371-A0001.pdf PDF
Sign-In_Sheet-ECF_Wastewater_Pretreatment_Maintenance_Site_Visits.pdf PDF
PAST_PERFORMANCE_QUESTIONNAIRE.pdf PDF
Attachment_21_-_Pallets_Specification.pdf PDF
Attachment_18_-_Sodium_Hydroxide_Specification.pdf PDF
Attachment_3_-_PWPP_Process_Description.pdf PDF
Attachment_2_-_WSWPP_Process_Description.pdf PDF
Attachment_4_-_GTWPP_Process_Description.pdf PDF
Attachment_9_-_WSWPP_Equipment_List.pdf PDF
Attachment_13_-_Restricted_Materials_at_DCF.pdf PDF
Attachment_C_Non_Disclosure_Agreement.pdf PDF
Attachment_12_-__EHS_Requirements_for_Purchased_Materials.pdf PDF
Attachment_17_-_Filter_Aid_Specification.pdf PDF
Attachment_15_-_Sulfuric_Acid_Specification.pdf PDF
Attachment_16_-_Sodium_Bisulfite_Specification.pdf PDF
Attachment_7_-_BEP_Furnished_Equipment.pdf PDF
Attachment_11-SCA_Wage_Determination.pdf PDF
Attachment_A_-_Subcontracting_Plan.pdf PDF
Attachment_20_-_Boxes_-_Lids_Specification.pdf PDF
Attachment_14_-_Bentonite_Specification.pdf PDF
Attachment_8_-_EHS_Contractor_Requirements.pdf PDF
Attachment_10_-_PWPP_Equipment_List.pdf PDF
Attachment_23_-_Spare_Parts_and_Supplies.pdf PDF
BEP-RFP-15-0371.pdf PDF
Attachment_19__-_Sodium-Sulfated_Castor_Oil_Specification.pdf PDF
Attachment_1_-_WW_Permit_017-9.pdf PDF
Attachment_5_-_New_WSR_-_MU_Process_Description.pdf PDF
Attachment_22_-_Process_and_Treatment_Chemicals.pdf PDF
Attachment_6_-_New_WSWPP_Process_Description.pdf PDF
Attachment_26_-_Outfall_Flow_Masurements.pdf PDF
Attachment_B-QASP.pdf PDF
Attachment_27_-_Corrosion_Monitoring.pdf PDF
Attachment_24_-_Nonreimburseable_Tools_-_Janitorial_-_PPE_Supplies.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OFFICE OF ENVIRONMENT, HEALTH AND SAFETY

Environmental Management Division

Wastewater Sampling Matrix

017-10 Attachment 25 - Laboratory Analysis.xlsm Page 1 of 3

Date Sample Location

Grab or 24 Hr.

Composite Flow Tem pe rat ure pH Cu, Pb, Hg, Ni, Z n, m

L

P-W M (H

NO 3

pH

<2

As, Cd, Mo, Ag, m L

P-W M (H

NO 3

pH

<2

As, Hg, Mo, m

L P -W

M

(H

NO 3

pH <2

Cya nid e, 0 m L P

-W M

(N aO

H pH >12

, A sc orb ic

Acid

4° C)

TTO-V

OC, 2

-40 m

L G Tefl on lin ed se pta vi al

(H Cl, p

H<2

4° C)

TPH 16

, 2 -1L

G -W

M wTefl on lin er

(H 2

SO 4

, p H<2, 4° C)

Cr, N i, C d, Cu, Pb, Ag, Zn, m L P

-W M (H

NO 3

pH

<2

Cr, N i, 1

0 m

L P -W

M

(H

NO 3

pH <2

TTO-P

es t&

PCB, 2

-1 L A m-G

NM w /Tefl on -lin er ( p

H 5- 9, 4° C)

TTO-S

em i-V ol

(B

NA), 2

-1 L A m-

G-N M w

/Tefl on

-lin er

( p H 5-

9, 4° C)

TTO-P

CB, 2

-1 L A m-G -N

M w/Tefl on

-lin er

( p H 5-

9, 4°

C)

11/03/15 019 Composite X X 01/12/16 018 Composite X X

01/12/16 018 GRAB X X (4) X

01/12/16 019 Composite X X X X

01/12/16 019 GRAB X X (4) X X

03/01/16 019 Composite X X 05/03/16 019 Composite X X 07/12/16 018 Composite X X

07/12/16 018 GRAB X X (4) X

07/12/16 019 Composite X X X X

07/12/16 019 GRAB X X (4) X X

09/13/16 019 Composite X X 11/01/16 019 Composite X X 01/10/17 018 Composite X X

01/10/17 018 GRAB X X (4) X

01/10/17 019 Composite X X X X

01/10/17 019 GRAB X X (4) X X

03/07/17 019 Composite X X 05/02/17 019 Composite X X 07/11/17 018 Composite X X

07/11/17 018 GRAB X X (4) X

07/11/17 019 Composite X X X X

07/11/17 019 GRAB X X (4) X X

09/12/17 019 Composite X X 11/07/17 019 Composite X X 01/09/18 018 Composite X X

01/09/18 018 GRAB X X (4) X

01/09/18 019 Composite X X X X

01/09/18 019 GRAB X X (4) X X

03/06/18 019 Composite X X 05/01/18 019 Composite X X 07/10/18 019 Composite X X X X

07/10/18 019 GRAB X X (4) X X

09/11/18 019 Composite X X 11/06/18 018 Composite X X X X

11/06/18 018 GRAB X X (4) X X X

11/06/18 019 Composite X X X X X

11/06/18 019 GRAB X X (4) X X X

Wastewater Sampling Matrix

017-10 Attachment 25 - Laboratory Analysis.xlsm Page 2 of 3

01/08/19 018 Composite X X

01/08/19 018 GRAB X X (4) X

01/08/19 019 Composite X X X X

01/08/19 019 GRAB X X (4) X X

03/05/19 019 Composite X X 05/07/19 019 Composite X X 07/02/19 018 Composite X X

07/02/19 018 GRAB X X (4) X

07/02/19 019 Composite X X X X

07/02/19 019 GRAB X X (4) X X

09/10/19 019 Composite X X 11/05/19 019 Composite X X 01/07/20 018 Composite X X

01/07/20 018 GRAB X X (4) X

01/07/20 019 Composite X X X X

01/07/20 019 GRAB X X (4) X X

03/03/20 019 Composite X X 05/05/20 019 Composite X X 07/07/20 018 Composite X X

07/07/20 018 GRAB X X (4) X

07/07/20 019 Composite X X X X

07/07/20 019 GRAB X X (4) X X

09/01/20 019 Composite X X

Legend: Sample Label Example P Plastic EPA Method Max Hold Time G Glass 4500-H+ B 15 minutes

WM Wide-Mouth

1664B SGT-HEM;

Non-polar material 28 days

NM Narrow Mouth 200.7 or 200.8 6 months Cu Copper 245.1 or 245.2 28 days Pb Lead 335.4 14 days Hg Mercury 624 14 days Ni Nickel 608 7 days Date Taken 9/13/2005 Time Taken 1300 Zn Zinc 625 7 days Filtered Not Filtered As Arsenic Cd Cadmium Mo Molybdenum Ag Silver HCl Hydrochloric Acid

H2SO4 Sulfuric Acid HNO3 Nitric Acid m Milli or 1/1000 L Liter = 1.06 quarts

Sample No./ID

Outfall 018 TPH 1664

Hg

TPH O&G

Metals (X Hg)

Analyte pH

Client BEP

Mark Appropriate

Mark Appropriate Preservative

TTO - VOC

TTO - Pest&PCB

Site WWPP

TTO - Semi-Vol (BNA)

Cyanide

Wastewater Sampling Matrix

017-10 Attachment 25 - Laboratory Analysis.xlsm Page 3 of 3 pH -log of the Hydrogen ion concentration expressed in Standard Units or S.U.

Important Additional Lab Service Information

6. All incoming raw materials testing that cannot be accomplished by the onsite lab shall be included as well. This testing may be found on the individual materials specifications.

5. The equavalent of a complete semi-annual compliance sampling event should be added annually to the above items for purposes of estimating project analysis for wastewater process improvement projects and special projects.

4. Sampling will need to occur when the new equipment is fully operational in the form of a baseline monitoring compliance sampling event for both system outfalls, the PWPP and the new WSWPP. This is separate from counting as a semi-annual sampling event.

1. The above chart shows estimated compliance sampling as noted in the current wastewater discharge permit Attachment 1.

2. The current permit, however, only runs through August 1, 2018. Therefore, sampling shown to occur after that date is subject to change.

3. Additional sampling occurs when DC Water comes in once annually to perform compliance sampling, in that split samples are collected and analyzed. The effect of the DC Water split sampling analysis is equavalent to an additional complete semi-annual sampling event for all outfalls.

017-10

File details come from the government source that posted it. Updated .