OFFICE OF ENVIRONMENT, HEALTH AND SAFETY
Environmental Management Division
Wastewater Sampling Matrix
017-10 Attachment 25 - Laboratory Analysis.xlsm Page 1 of 3
Date Sample Location
Grab or 24 Hr.
Composite Flow Tem pe rat ure pH Cu, Pb, Hg, Ni, Z n, m
L
P-W M (H
NO 3
pH
<2
As, Cd, Mo, Ag, m L
P-W M (H
NO 3
pH
<2
As, Hg, Mo, m
L P -W
M
(H
NO 3
pH <2
Cya nid e, 0 m L P
-W M
(N aO
H pH >12
, A sc orb ic
Acid
4° C)
TTO-V
OC, 2
-40 m
L G Tefl on lin ed se pta vi al
(H Cl, p
H<2
4° C)
TPH 16
, 2 -1L
G -W
M wTefl on lin er
(H 2
SO 4
, p H<2, 4° C)
Cr, N i, C d, Cu, Pb, Ag, Zn, m L P
-W M (H
NO 3
pH
<2
Cr, N i, 1
0 m
L P -W
M
(H
NO 3
pH <2
TTO-P
es t&
PCB, 2
-1 L A m-G
NM w /Tefl on -lin er ( p
H 5- 9, 4° C)
TTO-S
em i-V ol
(B
NA), 2
-1 L A m-
G-N M w
/Tefl on
-lin er
( p H 5-
9, 4° C)
TTO-P
CB, 2
-1 L A m-G -N
M w/Tefl on
-lin er
( p H 5-
9, 4°
C)
11/03/15 019 Composite X X 01/12/16 018 Composite X X
01/12/16 018 GRAB X X (4) X
01/12/16 019 Composite X X X X
01/12/16 019 GRAB X X (4) X X
03/01/16 019 Composite X X 05/03/16 019 Composite X X 07/12/16 018 Composite X X
07/12/16 018 GRAB X X (4) X
07/12/16 019 Composite X X X X
07/12/16 019 GRAB X X (4) X X
09/13/16 019 Composite X X 11/01/16 019 Composite X X 01/10/17 018 Composite X X
01/10/17 018 GRAB X X (4) X
01/10/17 019 Composite X X X X
01/10/17 019 GRAB X X (4) X X
03/07/17 019 Composite X X 05/02/17 019 Composite X X 07/11/17 018 Composite X X
07/11/17 018 GRAB X X (4) X
07/11/17 019 Composite X X X X
07/11/17 019 GRAB X X (4) X X
09/12/17 019 Composite X X 11/07/17 019 Composite X X 01/09/18 018 Composite X X
01/09/18 018 GRAB X X (4) X
01/09/18 019 Composite X X X X
01/09/18 019 GRAB X X (4) X X
03/06/18 019 Composite X X 05/01/18 019 Composite X X 07/10/18 019 Composite X X X X
07/10/18 019 GRAB X X (4) X X
09/11/18 019 Composite X X 11/06/18 018 Composite X X X X
11/06/18 018 GRAB X X (4) X X X
11/06/18 019 Composite X X X X X
11/06/18 019 GRAB X X (4) X X X
Wastewater Sampling Matrix
017-10 Attachment 25 - Laboratory Analysis.xlsm Page 2 of 3
01/08/19 018 Composite X X
01/08/19 018 GRAB X X (4) X
01/08/19 019 Composite X X X X
01/08/19 019 GRAB X X (4) X X
03/05/19 019 Composite X X 05/07/19 019 Composite X X 07/02/19 018 Composite X X
07/02/19 018 GRAB X X (4) X
07/02/19 019 Composite X X X X
07/02/19 019 GRAB X X (4) X X
09/10/19 019 Composite X X 11/05/19 019 Composite X X 01/07/20 018 Composite X X
01/07/20 018 GRAB X X (4) X
01/07/20 019 Composite X X X X
01/07/20 019 GRAB X X (4) X X
03/03/20 019 Composite X X 05/05/20 019 Composite X X 07/07/20 018 Composite X X
07/07/20 018 GRAB X X (4) X
07/07/20 019 Composite X X X X
07/07/20 019 GRAB X X (4) X X
09/01/20 019 Composite X X
Legend: Sample Label Example P Plastic EPA Method Max Hold Time G Glass 4500-H+ B 15 minutes
WM Wide-Mouth
1664B SGT-HEM;
Non-polar material 28 days
NM Narrow Mouth 200.7 or 200.8 6 months Cu Copper 245.1 or 245.2 28 days Pb Lead 335.4 14 days Hg Mercury 624 14 days Ni Nickel 608 7 days Date Taken 9/13/2005 Time Taken 1300 Zn Zinc 625 7 days Filtered Not Filtered As Arsenic Cd Cadmium Mo Molybdenum Ag Silver HCl Hydrochloric Acid
H2SO4 Sulfuric Acid HNO3 Nitric Acid m Milli or 1/1000 L Liter = 1.06 quarts
Sample No./ID
Outfall 018 TPH 1664
Hg
TPH O&G
Metals (X Hg)
Analyte pH
Client BEP
Mark Appropriate
Mark Appropriate Preservative
TTO - VOC
TTO - Pest&PCB
Site WWPP
TTO - Semi-Vol (BNA)
Cyanide
Wastewater Sampling Matrix
017-10 Attachment 25 - Laboratory Analysis.xlsm Page 3 of 3 pH -log of the Hydrogen ion concentration expressed in Standard Units or S.U.
Important Additional Lab Service Information
6. All incoming raw materials testing that cannot be accomplished by the onsite lab shall be included as well. This testing may be found on the individual materials specifications.
5. The equavalent of a complete semi-annual compliance sampling event should be added annually to the above items for purposes of estimating project analysis for wastewater process improvement projects and special projects.
4. Sampling will need to occur when the new equipment is fully operational in the form of a baseline monitoring compliance sampling event for both system outfalls, the PWPP and the new WSWPP. This is separate from counting as a semi-annual sampling event.
1. The above chart shows estimated compliance sampling as noted in the current wastewater discharge permit Attachment 1.
2. The current permit, however, only runs through August 1, 2018. Therefore, sampling shown to occur after that date is subject to change.
3. Additional sampling occurs when DC Water comes in once annually to perform compliance sampling, in that split samples are collected and analyzed. The effect of the DC Water split sampling analysis is equavalent to an additional complete semi-annual sampling event for all outfalls.
017-10