Attachment_7_-_BEP_Furnished_Equipment.pdf

PDF 13 KB Posted

Attached to
BEP ECF Wastewater Pretreatment Plant Maintenance Services
Solicitation number
BEP-RFP-15-0371
Issued by

About this file

Attachment 7 Government Furnished Property

View the file

Other files

File Type Posted
Attachment_F-_Questions_and_Answers_Solicitation_BEP-RFP-15-0371.pdf PDF
QASP-Attachment_B-DCF_Wastewater_revised_8-19-15.pdf PDF
BEP-RFP-15-0371-A0005_US.pdf PDF
PWS-BEP_WWPP_Performance_Work_Statement_FFP_Chemical_Update_8-21-15.pdf PDF
BEP-RFP-15-0371-A0004.pdf PDF
BEP-RFP-15-0371-A0003.pdf PDF
Attachment_E_Question_and_Answer_8-12-15_Solicitation_BEP-RFP-15-0371.pdf PDF
Sign-In_Sheet-ECF_Wastewater_Pretreatment_Maintenance_Site_Visit_8-12-15.pdf PDF
QASP-Attachment_B-DCF_Wastewater_revised_7-30-15.pdf PDF
BEP-RFP-15-0371-A0002.pdf PDF
QASP-Attachment_B-DCF_Wastewater_revised_7-27-15.pdf PDF
BEP-RFP-15-0371_Conform_Copy_7-30-15.pdf PDF
PWS-BEP_WWPP_Performance_Work_Statement.pdf PDF
BEP-RFP-15-0371-A0001.pdf PDF
Sign-In_Sheet-ECF_Wastewater_Pretreatment_Maintenance_Site_Visits.pdf PDF
Questions_ _Answers_-__Wastewater_Pretreatment_Plant_Maintenance_Services.pdf PDF
Attachment_4_-_GTWPP_Process_Description.pdf PDF
Attachment_20_-_Boxes_-_Lids_Specification.pdf PDF
Attachment_14_-_Bentonite_Specification.pdf PDF
Attachment_25_-_Laboratory_Analysis.pdf PDF
Attachment_22_-_Process_and_Treatment_Chemicals.pdf PDF
Attachment_9_-_WSWPP_Equipment_List.pdf PDF
Attachment_13_-_Restricted_Materials_at_DCF.pdf PDF
Attachment_C_Non_Disclosure_Agreement.pdf PDF
Attachment_12_-__EHS_Requirements_for_Purchased_Materials.pdf PDF
Attachment_6_-_New_WSWPP_Process_Description.pdf PDF
Attachment_26_-_Outfall_Flow_Masurements.pdf PDF
Attachment_B-QASP.pdf PDF
Attachment_27_-_Corrosion_Monitoring.pdf PDF
Attachment_18_-_Sodium_Hydroxide_Specification.pdf PDF
PAST_PERFORMANCE_QUESTIONNAIRE.pdf PDF
Attachment_21_-_Pallets_Specification.pdf PDF
Attachment_3_-_PWPP_Process_Description.pdf PDF
Attachment_17_-_Filter_Aid_Specification.pdf PDF
Attachment_15_-_Sulfuric_Acid_Specification.pdf PDF
Attachment_16_-_Sodium_Bisulfite_Specification.pdf PDF
Attachment_2_-_WSWPP_Process_Description.pdf PDF
Attachment_24_-_Nonreimburseable_Tools_-_Janitorial_-_PPE_Supplies.pdf PDF
Attachment_11-SCA_Wage_Determination.pdf PDF
Attachment_A_-_Subcontracting_Plan.pdf PDF
Attachment_19__-_Sodium-Sulfated_Castor_Oil_Specification.pdf PDF
Attachment_1_-_WW_Permit_017-9.pdf PDF
Attachment_10_-_PWPP_Equipment_List.pdf PDF
BEP-RFP-15-0371.pdf PDF
Attachment_5_-_New_WSR_-_MU_Process_Description.pdf PDF
Attachment_23_-_Spare_Parts_and_Supplies.pdf PDF
Attachment_8_-_EHS_Contractor_Requirements.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 7

Page 1 of 1 Page

In reference to the PWS of the RFQ the below is a listing of the equipment to be provided by the Government in performance of the contract. Government furnished equipment shall be shared amongst Contractors supporting the Plant, as necessary.

1. Sump Pump Hose

2. Storage Cabinets

3. Fans and Heaters

4. Floor Scale

5. Pallet jacks (2)

6. Personal Computers

7. Motorized 3 hole punch

8. Sheet laminator

9. The following is a listing of sampling and test equipment:

a. pH Meter

b. Redox Meter

c. Assorted Glassware

d. Jar Test Apparatus

e. Drying Oven

f. Analytical Balance

g. Vacuum Filter Apparatus

h. Spectrophotometers (2)

i. Moisture Analyzer, 45g Capacity

j. TitraLab 870 pH/EP/IP/EC/ISE; NB

k. Lab Refrigerator

10. The following is a listing of the Plant safety equipment:

a. First Aid Kit

b. Six Self Contained Breathing Apparatus (SCBA)

c. Six SCBA Spare Air Tanks

d. Fire Extinguishers

e. Confined Space Monitors (2)

File details come from the government source that posted it. Updated .