BELCHERTOWN-HAMPDEN-MONSON-SOUTH_HADLEY-SOUTHWICK-616302-134929-A-1.pdf
PDF 847 KB Posted
- Attached to
- 616302 BELCHERTOWN-HAMPDEN-MONSON-SOUTH HADLEY-SOUTHWICK Maintenance and Preservation of Municipal
- Solicitation number
- BD-27-1030-0H100-0H002-130918
- Issued by
- Hampden County, Massachusetts
About this file
This is Addendum No. 1 to a contract opportunity issued by the Massachusetts Department of Transportation (MassDOT) Highway Division for maintenance and preservation of municipal bridges at multiple locations in Belchertown, Hampden, Monson, South Hadley, and Southwick (D2 Contract 2, Proposal No. 616302-134929). The addendum transmits revisions to the contract documents dated August 6, 2026, including a question and response regarding Item 961.303 Clean (Full Removal) and Paint Steel Beam Ends for Bridge No. S-22-001, clarifying that temporary protective shielding and containment are incidental to the cleaning and painting item rather than requiring a separate line item. The proposal opening is scheduled for Tuesday, August 11, 2026 at 2:00 p.m. Bidders must acknowledge Addendum No. 1 in their proposal submission and incorporate all revised pages into their bid documents.
The contract is valued at $2.166 million and is subject to prevailing wage rates as determined by the Massachusetts Department of Labor and Workforce Development. A Proposal Guaranty equal to 5% of the bid value is required. The contract contains price adjustments for hot mix asphalt, Portland cement mixtures, diesel fuel, gasoline, and structural and reinforcing steel based on established base prices and indices, with adjustments posted on MassDOT's Highway Division website. All costs associated with design, installation, and removal of containment systems, work platforms, working barges, hazardous waste removal, and pigeon waste disposal are included as incidental costs within the square foot or linear foot pricing of respective line items. Prospective bidders must hold pre-qualification in the BRIDGE - CONSTRUCTION category from MassDOT prior to proposal submission, which requires completing a Request Proposal Form (R109) submitted to prequal.r109@dot.state.ma.us for approval.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A00801-616302.pdf | ||
| 616302 - Notice to Contractors.pdf | ||
| A00820-616302.pdf | ||
| A00870-616302.pdf | ||
| 616302 - Plan Holders List 7-28-2026.pdf | ||
| 616302 Bid Items List.txt | TXT text file | |
| A00803-616302.pdf | ||
| A00875-616302.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ten Park Plaza, Suite 4160, Boston, MA 02116 Tel: 857-368-4636, TTY: 857-368-0655 mass.gov/massdot
August 6, 2026
616302-134929
ADDENDUM NO. 1
To Prospective Bidders and Others on:
BELCHERTOWN – HAMPDEN – MONSON -
SOUTH HADLEY - SOUTHWICK
Maintenance and Preservation of Municipal Bridges at Multiple Locations (D2 Contract 2)
THIS PROPOSAL TO BE OPEN AND READ: TUESDAY, AUGUST 11, 2026 at 2:00 P.M.
Transmitting revisions to the Contract Documents as follows:
QUESTION AND RESPONSE: 1 page.
DOCUMENT 00102: Revised page 2.
DOCUMENT A00801: Revised page 67.
Take note of the above, substitute the revised pages for the originals and acknowledge Addendum No. 1 in your Expedite Proposal file before submitting your bid.
Very truly yours, Eric M. Cardone, P.E.
Construction Contracts Engineer
AB
cc: Dylan Brown, Project Manager
Eric M. Cardone Digitally signed by Eric M. Cardone Date: 2026.08.06 13:49:05 -04'00'
THIS PAGE IS INTENTIONALLY LEFT BLANK
BELCHERTOWN – HAMPDEN – MONSON -
SOUTH HADLEY - SOUTHWICK
Maintenance and Preservation of Municipal Bridges at Multiple Locations (D2 Contract 2)
(Proposal No. 616302-134929) Question and Response Addendum No. 1, August 6, 2026
Northern Construction Service, LLC, e-mailed August 5, 2026
Question 1) Item 961.303 Clean (Full Removal) and Paint Steel Beam Ends Bridge No. S-22-
001 (0RX) does not have a corresponding item for temporary protective shielding.
Is the shielding and containment incidental to item 961.303 or should an item be added for protective shielding?
Response 1) See revised page A00801 – 67.
Massachusetts Department Of Transportation Highway Division Proposal No. 616302-134929
00102 - 2
NOTICE TO CONTRACTORS (Continued)
All parties who wish to have access to information plans and specification must send a “Request for Informational Documents” to MassDOTBidDocuments@dot.state.ma.us.
A Proposal Guaranty in the amount of 5% of the value of the bid is required.
This project is subject to the schedule of prevailing wage rates as determined by the Commissioner of the Massachusetts Department of Labor and Workforce Development, and the Division of Occupational Safety.
PRICE ADJUSTMENTS
This Contract contains price adjustments for hot mix asphalt and Portland cement mixtures, diesel fuel, and gasoline. For reference the base prices are as follows: liquid asphalt $712.50 per ton, Portland cement $452.13 per ton, diesel fuel $4.372 per gallon, and gasoline $3.335 per gallon, and Steel Base Price Index 370.1. MassDOT posts the Price Adjustments on their Highway Division’s website at https://www.mass.gov/massdot-contract-price-adjustments
This Contract contains Price Adjustments for steel. See Document 00813 - PRICE ADJUSTMENT FOR STRUCTURAL STEEL AND REINFORCING STEEL for their application and base prices.
MassDOT projects are subject to the rules and regulations of the Architectural Access Board (521 CMR 1.00 et seq.)
Prospective bidders and interested parties can access this information and more via the internet at
WWW.COMMBUYS.COM.
BY: Phillip Eng, Interim MassDOT Secretary Jonathan L. Gulliver, Undersecretary and Highway Administrator
SATURDAY, JUNE 27, 2026
① Addendum No. 1, August 6, 2026
① mailto:MassDOTBidDocuments@dot.state.ma.us https://www.mass.gov/massdot-contract-price-adjustments http://www.commbuys.com/
Massachusetts Department Of Transportation Highway Division Proposal No. 616302-134929
A00801 - 67
ITEMS 961.301 through 961.312 (Continued)
Structural Steel Inspection
The Contractor shall notify the Engineer if significant amount of section loss is found on the structural steel during the cleaning and blasting process. If requested by the Engineer, the Contractor shall provide the access and time window to the Engineer to inspect and document the structural steel section loss after the cleaning and blasting operation.
METHOD OF MEASUREMENT
Items 961.301, 961.302, 961.303, and 961.304 will be measured for payment by the Square Foot of respective structural steel cleaned and painted, complete in place.
Item 961.312 will be measured for payment by the Foot of Railing cleaned and painted, complete in place.
BASIS OF PAYMENT
Item 961.301, Item 961.302, Item 961.303, and Item 961.304 will be paid for at the respective Contract unit prices per Square Foot, which prices shall include surface preparation, painting, all labor, materials, equipment, and all incidental costs required to complete the work.
Item 961.312 will be paid for at the Contract unit price per Foot, which price shall include surface preparation, painting, all labor, materials, equipment, and all incidental costs required to complete the work.
In no case will the Contractor be paid under more than one Item for the same area of cleaning and painting. The Contractor is responsible to sequence and steel repair work and painting, payment will not be made to paint the same area multiple times due to the Contractor’s sequence of work.
Payment areas considered incidental shall include any existing stiffeners, diaphragms, and cross bracing remaining in place cleaned and painted, new vertical projections from additional steel thickness of repair plates, bolts, nuts, or additional stiffeners. All costs associated with the design and installation and final removal of the required containment system/work platform and working barge will be incidental to the respective Item.
All costs for Hazardous Waste removal shall also be included in the square foot or linear foot cost of this item. The Engineer shall receive a copy of the hazardous waste manifest before final payment is made. All costs associated with the safe removal and disposal of accumulated pigeon waste are incidental to this item and no additional compensation will be made.
Additionally, incidental to the item, after the final coat of paint has cured, a seal shall be placed around the edges of all high strength bolted repair plates in contact with original steel. The seal shall be compatible with the paint system being used. The Contractor shall submit a catalogue of the material to be used to the District for review and approval prior to use.