BD7580A23_Brighton_Drawings.pdf

PDF 10 MB Posted

Attached to
Piezometer Automation at WSSC Water Dams
Solicitation number
1239
Issued by
Prince George's County, Maryland

About this file

This document is a set of engineering drawings prepared by AECOM Technical Services Inc. for the Washington Suburban Sanitary Commission (WSSC) detailing the design specifications for an Automated Data Acquisition System (ADAS) of piezometers at Brighton Dam in Montgomery and Howard Counties, Maryland. The project involves installing automated piezometer sensors at six existing monitoring wells (B-1 through B-6) to continuously measure groundwater pressure levels. The work includes installing Keller Acculevel pressure sensors (0-50 PSI range with 4-20mA output) within existing piezometer risers, running Schedule 80 PVC conduit approximately 320 feet along the concrete catwalk to connect sensors to a central PLC/data logger enclosure in the powerhouse, installing Stahlin J-series wall-mounted enclosures at each buttress-mounted location, and splicing sensor cables with appropriate fittings and hardware. The design incorporates heat tracing for the B-6 piezometer location to prevent freezing, concrete-encased below-grade enclosures with free-draining gravel bases, and stainless steel mounting hardware. The conduit and wiring schedule specifies total cable lengths ranging from 117.3 feet for B-1 to 391.4 feet for B-6, with junction boxes and 90-degree PVC turns as indicated.

The drawings were prepared by licensed professional engineer Bob Pinciotti (License No. 21984, expiration 05/24/2026) and digitally signed on June 3, 2025. Construction is contingent upon contractor verification of all existing field conditions prior to work commencement, with specific responsibility to notify WSSC if discrepancies exist. WSSC will provide and install the PLC controller enclosure, instrumentation power, and barometer; the contractor must verify sensor accuracy under direction of WSSC's process engineer and pull cables through conduit leaving three feet of slack inside the PLC enclosure for WSSC connection. All conduit penetrations into the PLC enclosure must occur at the lowest point possible on the side or through the bottom, with no top penetrations allowed. As-built surveys documenting location, bottom elevation, top elevation, and calculated sensor elevation are required, with benchmark information provided in the wiring schedule table.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENGINEER:

MONTGOMERY CO.

ADEQUATE SURVEY

NO

200'S OF

CONTRACT

DATE

DATE STARTED

DATE FINALED

Drawing No.

FINALED BY

DATE COMPLETED

TYPE MANHOLES

TYPE PIPE W.

1. thru Plans/Profiles/Details

Description

P.G.CO.D.P.W.&T.

SED. CONTROL

CONTRACT MANAGER

INSPECTOR

CONTRACTOR

L & G

AS BUILT DATA

TOWN NOTIFICATION

STATE HGWY. ADM.

STATE BD. HEALTH

PERMIT REQUIREMENTS

FEDERAL AID

M.N.C.P.&P.C.

WETLANDS / WATERWAYS

TREE

DATE REVISIONS

PAGECo. GRID

VICINITY MAP

ON PROP. R/W REQ'D

OFF PROP. R/W REQ'D

S.

THESE DOCUMENTS CONTAIN PRIVILEGED

AND CONFIDENTIAL INFORMATION WHICH

SHALL NOT BE REDISTRIBUTED WITHOUT

PRIOR WSSC APPROVAL

FOR LOCATION OF UTILITIES CALL 8-1-1 OR 1-800-257-7777

OR LOG ON TO www.call811.com or www.missutility.net 48

HOURS IN ADVANCE OF ANY WORK IN THIS VICINITY

OTHER UTILITIES

*TO BE ACQUIRED BY APPLICANT

MONTGOMERY/

HOWARD PAGE# GRID#

DRAWING INDEX

TYPE OF PIPE TYPE OF PIPE

TYPE OF MANHOLES

DRAWN

CHECK

ENGINEERING & ENVIRONMENTAL

SERVICES DIVISION

SECTION MANAGER

CIVIL SUPPORT SERVICES SECTION

DRAWN

CHECK

DATE DIVISION MANAGER

VE

R

IF

Y

SC

AL

E

- B

AR

IS

O N

E

IN

C H

O N

O R

IG

IN

AL

D

R

AW

IN

G

IF

N

O T

O N

E

IN

C H

O N

T H

IS

S

H

EE

T, A

D

JU

ST

S

C

AL

ES

A

C C

O R

D

IN

G

LY

WASHINGTON SUBURBAN SANITARY COMMISSION

WSSC

DELIVERING THE ESSENTIAL

LOCATION MAP

WASHINGTON SUBURBAN SANITARY COMMISSION

14501 SWEITZER LANE, LAUREL MARYLAND 20707

AUTOMATED DATA ACQUISITION SYSTEM OF PIEZOMETERS

AT BRIGHTON DAM

BASIN: PATUXENT NORTH

MONTGOMERY / HOWARD COUNTIES, MARYLAND

SCALE: 1" = 2,000'

BRIGHTON DAM LOCATION

SCALE: 1" = 8 MILES

PROJECT LOCATION

SHEET NUMBER

SHEET INDEX

SHEET TITLE

COVER SHEET

INSTRUMENTATION PLAN PIEZOMETERS AND CONDUIT RUNS

PIEZOMETER INSTALLATION DETAILS B-1 THROUGH B-5

PIEZOMETER INSTALLATION DETAILS B-6

CONTROL ROOM CONDUIT

ADAS SYSTEM ARCHITECTURE

CONDUIT AND WIRING SCHEDULE

PIEZOMETER DETAILS WITH WYE FITTING AND BALL VALVE

REQUIRED - N

NOT APPLICABLE

REQUIRED - N

REQUIRED - N

REQUIRED - N

REQUIRED - N

REQUIRED - N

REQUIRED - N

REQUIRED - N

REQUIRED - N

BD7580A23

228NE01

ELECTION DISTRICT: 7

COVER SHEET

AUTOMATED DATA ACQUISITION SYSTEMS OF PIEZOMETERS AT

BRIGHTON DAM

BASIN: PATUXENT NORTH, MONGOMERY AND HOWARD COUNTIES, MARYLAND

PROFESSIONAL CERTIFICATION

I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED

OR APPROVED BY ME, AND THAT I AM A DULY LICENSED

PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF

MARYLAND.

LICENSE NO.: 21984 EXPIRATION DATE: 05/24/2026

Z:

\G

ER

M

AN

TO

W N

-U

SG

R M

2\ D

C S\

PR

O

JE

C

TS

\W

TR

\6

2_

_W

SS

C _D

AM

SB

O A_

TA

SK

O R

D

ER

_8 \9

_C

AD

_G

IS

\9

_C

AD

\B

R

IG

H

TO

N _D

W G

_D R

AW

IN

G S\

_B

R

IG

H

TO

N _C

O

VE

R _S

H

EE

T.

D

W G

PA

TH

/F

IL

EN

AM

E:

NAME: AECOM TECHNICAL SERVICES INC.

ADDRESS: 12420 MILESTONE CENTER DRIVE, SUITE 150

GERMANTOWN, MD 20876

PHONE: 301-944-2545

CONTACT: BOB PINCIOTTI, P.E.

06/03/25 - PLOT DATE

Digitally signed by Pinciotti, Bob DN: cn=Pinciotti, Bob, ou=USGRM2, email=bob.pinciotti@aecom.com Date: 2025.06.03 15:08:02 -04'00'

Pinciotti, Bob

Docusign Envelope ID: 130DF43D-970C-4358-BBE3-2FBE9BF6B3C4

Jun 11, 2025 | 9:26 AM EDT

Jun 11, 2025 | 10:48 AM EDT

DATE REVISIONS

ADEQUATE SURVEY

NO

200'S OF

CONTRACT

ON PROP. R/W REQ'D

OFF PROP. R/W REQ'D

OTHER UTILITIES

DRAWN

CHECK

THESE DOCUMENTS CONTAIN PRIVILEGED

AND CONFIDENTIAL INFORMATION WHICH

SHALL NOT BE REDISTRIBUTED WITHOUT

PRIOR WSSC APPROVAL VE

R

IF

Y

SC

AL

E

- B

AR

IS

O

N E

IN

C

H O

N O

R

IG

IN

AL

D R

AW

IF

N O

T O

N E

IN

C

H O

N T

H

IS

S H

EE

T, A D

JU

ST

S C

AL

ES

A C

C O

R D

IN

G

LY

ENGINEER:

DATE REVISIONS

ADEQUATE SURVEY

NO

200'S OF

CONTRACT

ON PROP. R/W REQ'D

OFF PROP. R/W REQ'D

OTHER UTILITIES

DRAWN

CHECK

THESE DOCUMENTS CONTAIN PRIVILEGED

AND CONFIDENTIAL INFORMATION WHICH

SHALL NOT BE REDISTRIBUTED WITHOUT

PRIOR WSSC APPROVAL VE

R

IF

Y

SC

AL

E

- B

AR

IS

O

N E

IN

C

H O

N O

R

IG

IN

AL

D R

AW

IF

N O

T O

N E

IN

C

H O

N T

H

IS

S H

EE

T, A D

JU

ST

S C

AL

ES

A C

C O

R D

IN

G

LY

ENGINEERING & ENVIRONMENTAL

SERVICES DIVISION

WASHINGTON SUBURBAN SANITARY COMMISSION

WSSC

DELIVERING THE ESSENTIAL

NOTES:

1. At each riser pipe location, conduit brings piezometer sensor cable from existing PVC riser to a new concrete buttress-mounted enclosure. See Piezometer Installation Details, Drawing 03.

2. PVC conduit runs from B-6 along the catwalk railing to the PLC in the utility room.

At each piezometer location after B-6, the PVC conduit runs to each buttress-mounted enclosure to pick up signal cable.

3. Existing B-1 through B-5 riser tops are at approximately elevation 321.3 feet.

4. PLC/Data Logger and enclosure to be provided and installed by the WSSC.

5. Buttress are 20-feet center to center.

Legend

New Piezometer Sensor

Conduit Run

INSTRUMENTATION PLAN PIEZOMETERS

AND CONDUIT RUNS

New PLC/Datalogger located near existing PLC

Existing PLC location

Powerhouse

Catwalk

B-1 B-2 B-3 B-4 B-5

B-6

Catwalk

BD7580A23

228NE01

AUTOMATED DATA ACQUISITION SYSTEMS OF PIEZOMETERS AT

BRIGHTON DAM

BASIN: PATUXENT NORTH, MONGOMERY AND HOWARD COUNTIES, MARYLAND

PROFESSIONAL CERTIFICATION

I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED

OR APPROVED BY ME, AND THAT I AM A DULY LICENSED

PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF

MARYLAND.

LICENSE NO.: 21984 EXPIRATION DATE: 05/24/2026

Z:

\G

ER

M

AN

TO

W N

-U

SG

R M

2\ D

C S\

PR

O

JE

C

TS

\W

TR

\6

2_

_W

SS

C _D

AM

SB

O A_

TA

SK

O R

D

ER

_8 \9

_C

AD

_G

IS

\9

_C

AD

\B

R

IG

H

TO

N _D

W G

_D R

AW

IN

G S\

_B

R

IG

H

TO

N _I

N

ST

R _P

LA

N

.D W

G

PA

TH

/F

IL

EN

AM

E:

NAME: AECOM TECHNICAL SERVICES INC.

ADDRESS: 12420 MILESTONE CENTER DRIVE, SUITE 150

GERMANTOWN, MD 20876

PHONE: 301-944-2545

CONTACT: BOB PINCIOTTI, P.E.

Downstream

Upstream

SUGGESTED CONSTRUCTION SEQUENCE:

1. At Piezometer B-6 location:

a. Remove the plastic bucket and adjust the height of the existing well casing to accommodate the below ground enclosure.

b. Install the below grade enclosures at piezometer location routing conduit into enclosure.

c. Trench PVC conduit for the power supply cable from the existing location on Buttress 25 (upstream of the concrete catwalk) to the below ground enclosure.

d. Trench PVC conduit for the piezometer cable between the below ground enclosure and the Buttress 25 wall downstream of the concrete catwalk.

e. Extend the PVC conduit of the piezometer cable up the Buttress 25 wall to approximately 2.5 feet above the concrete catwalk.

f. Extend the PVC conduit of the piezometer cable to the location of piezometer B-5

2. At Piezometer B-1 through B-5 location:

a. Install Stahlin J series enclosures on the buttress at each piezometer location.

b. Install PVC conduit along downstream handrails of the concrete catwalk between enclosure locations.

3. Extend conduit from piezometer B-1 enclosure to the new PLC enclosure installed by WSSC in the powerhouse.

4. Install cable between the piezometer locations by pulling cable through the conduit.

5. Install Keller piezometer transducers by measuring cable and marking depth of sensor from top of riser. Set cap with cable grip at the mark and lower transducer into well riser.

6. Splice the sensor cable to the cable that runs back to the datalogger/PLC in the powerhouse.

7. Contractor shall verify the accuracy of all sensors at the direction of WSSC's process engineer.

320± foot conduit (actual length to be verified in the field)

20' between buttress center-lines (typ.)

06/03/25 - PLOT DATE

Digitally signed by Pinciotti, Bob DN: cn=Pinciotti, Bob, ou=USGRM2, email=bob.pinciotti@aecom.com Date: 2025.06.03 15:08:48 -04'00'

Pinciotti, Bob

Docusign Envelope ID: 130DF43D-970C-4358-BBE3-2FBE9BF6B3C4

ADEQUATE SURVEY

NO

200'S OF

CONTRACT

ON PROP. R/W REQ'D

OFF PROP. R/W REQ'D

OTHER UTILITIES

DRAWN

CHECK

THESE DOCUMENTS CONTAIN PRIVILEGED

AND CONFIDENTIAL INFORMATION WHICH

SHALL NOT BE REDISTRIBUTED WITHOUT

PRIOR WSSC APPROVAL VE

R

IF

Y

SC

AL

E

- B

AR

IS

O

N E

IN

C

H O

N O

R

IG

IN

AL

D R

AW

IF

N O

T O

N E

IN

C

H O

N T

H

IS

S H

EE

T, A D

JU

ST

S C

AL

ES

A C

C O

R D

IN

G

LY

ENGINEER:

DATE REVISIONS

ADEQUATE SURVEY

NO

200'S OF

CONTRACT

ON PROP. R/W REQ'D

OFF PROP. R/W REQ'D

OTHER UTILITIES

DRAWN

CHECK

THESE DOCUMENTS CONTAIN PRIVILEGED

AND CONFIDENTIAL INFORMATION WHICH

SHALL NOT BE REDISTRIBUTED WITHOUT

PRIOR WSSC APPROVAL VE

R

IF

Y

SC

AL

E

- B

AR

IS

O

N E

IN

C

H O

N O

R

IG

IN

AL

D R

AW

IF

N O

T O

N E

IN

C

H O

N T

H

IS

S H

EE

T, A D

JU

ST

S C

AL

ES

A C

C O

R D

IN

G

LY

ENGINEERING & ENVIRONMENTAL

SERVICES DIVISION

WASHINGTON SUBURBAN SANITARY COMMISSION

WSSC

DELIVERING THE ESSENTIAL 8

3" to 1.5" diameter reducer fitting

Existing 3" diameter PVC riser

NOT TO SCALE

¼” cable grip

¼” cable grip

Sensor cable

Concrete buttress

½” liquid-tight conduit to protect cable.

No fitting required on conduit ends.

Stainless steel tie-wrap

Stainless steel clamps with concrete anchors

Stainless steel tie-wrap

Stainless steel clamps

Buttress Concrete Catwalk

Sensor cable

Stahlin J series enclosure, NEMA 1/3R/4X/6P/12, 10 x 8 x 4in (HxWxD), wall mount, fiberglass reinforced polyester, white, single-door,

(2) quick-release latches, padlock hasp

Latches on top, door drops down.

PVC conduit with sensor cable from Stahlin enclosure to main conduit on catwalk.

Concrete anchor

Concrete anchor

Concrete anchor

Note:

1. This design assumes the existing riser pipe is threaded at the top.

2. Existing risers B1, B-2, B-3, and B-5 are to be equipped with a 6-inch diameter PVC Schedule 80 conduit, 4-inches tall filled with concrete, similar construction to the WSSC constructed concrete ring at the base of piezometer B-4.

See note 2

PIEZOMETER INSTALLATION DETAILS

B-1 THROUGH B-5

BD7580A23

228NE01

AUTOMATED DATA ACQUISITION SYSTEMS OF PIEZOMETERS AT

BRIGHTON DAM

BASIN: PATUXENT NORTH, MONGOMERY AND HOWARD COUNTIES, MARYLAND

PROFESSIONAL CERTIFICATION

I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED

OR APPROVED BY ME, AND THAT I AM A DULY LICENSED

PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF

MARYLAND.

LICENSE NO.: 21984 EXPIRATION DATE: 05/24/2026

Z:

\G

ER

M

AN

TO

W N

-U

SG

R M

2\ D

C S\

PR

O

JE

C

TS

\W

TR

\6

2_

_W

SS

C _D

AM

SB

O A_

TA

SK

O R

D

ER

_8 \9

_C

AD

_G

IS

\9

_C

AD

\B

R

IG

H

TO

N _D

W G

_D R

AW

IN

G S\

_B

R

IG

H

TO

N _D

ET

AI

L_ B1

-B 5.

D W

G

PA

TH

/F

IL

EN

AM

E:

NAME: AECOM TECHNICAL SERVICES INC.

ADDRESS: 12420 MILESTONE CENTER DRIVE, SUITE 150

GERMANTOWN, MD 20876

PHONE: 301-944-2545

CONTACT: BOB PINCIOTTI, P.E.

06/03/25 - PLOT DATE

Digitally signed by Pinciotti, Bob DN: cn=Pinciotti, Bob, ou=USGRM2, email=bob.pinciotti@aecom.com Date: 2025.06.03 15:09:13 -04'00'

Pinciotti, ADEQUATE SURVEY

NO

200'S OF

CONTRACT

ON PROP. R/W REQ'D

OFF PROP. R/W REQ'D

OTHER UTILITIES

DRAWN

CHECK

THESE DOCUMENTS CONTAIN PRIVILEGED

AND CONFIDENTIAL INFORMATION WHICH

SHALL NOT BE REDISTRIBUTED WITHOUT

PRIOR WSSC APPROVAL VE

R

IF

Y

SC

AL

E

- B

AR

IS

O

N E

IN

C

H O

N O

R

IG

IN

AL

D R

AW

IF

N O

T O

N E

IN

C

H O

N T

H

IS

S H

EE

T, A D

JU

ST

S C

AL

ES

A C

C O

R D

IN

G

LY

ENGINEER:

DATE REVISIONS

ADEQUATE SURVEY

NO

200'S OF

CONTRACT

ON PROP. R/W REQ'D

OFF PROP. R/W REQ'D

OTHER UTILITIES

DRAWN

CHECK

THESE DOCUMENTS CONTAIN PRIVILEGED

AND CONFIDENTIAL INFORMATION WHICH

SHALL NOT BE REDISTRIBUTED WITHOUT

PRIOR WSSC APPROVAL VE

R

IF

Y

SC

AL

E

- B

AR

IS

O

N E

IN

C

H O

N O

R

IG

IN

AL

D R

AW

IF

N O

T O

N E

IN

C

H O

N T

H

IS

S H

EE

T, A D

JU

ST

S C

AL

ES

A C

C O

R D

IN

G

LY

ENGINEERING & ENVIRONMENTAL

SERVICES DIVISION

WASHINGTON SUBURBAN SANITARY COMMISSION

WSSC

DELIVERING THE ESSENTIAL 8

BD7580A23

228NE01

AUTOMATED DATA ACQUISITION SYSTEMS OF PIEZOMETERS AT

BRIGHTON DAM

BASIN: PATUXENT NORTH, MONGOMERY AND HOWARD COUNTIES, MARYLAND

PROFESSIONAL CERTIFICATION

I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED

OR APPROVED BY ME, AND THAT I AM A DULY LICENSED

PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF

MARYLAND.

LICENSE NO.: 21984 EXPIRATION DATE: 05/24/2026

Z:

\G

ER

M

AN

TO

W N

-U

SG

R M

2\ D

C S\

PR

O

JE

C

TS

\W

TR

\6

2_

_W

SS

C _D

AM

SB

O A_

TA

SK

O R

D

ER

_8 \9

_C

AD

_G

IS

\9

_C

AD

\B

R

IG

H

TO

N _D

W G

_D R

AW

IN

G S\

_B

R

IG

H

TO

N _B

-6 _D

ET

AI

LS

.D

W G

PA

TH

/F

IL

EN

AM

E:

Piezometer Flush Mount Detail

B-6 (Not to Scale)

Set sensor bottom at 6" from PVC standpipe open bottom

Splice sensor cable with epoxy kit Below grade enclosure

Hubbell/Pencell PE1015 HDPE box and cover 15"L x 10"W x 12"D

Run sensor cable along Buttress 25 below the concrete walkway, then up to the height of handrail, and then toward piezometer B-5

Sch 80 PVC conduit. Diameter is based on number of sensor cables. See Conduit Table on Drawing 04.

90 degree PVC conduit sweep elbow with minimum radius 1 foot

Pressure sensor (Keller Acculevel with 4-20mA Output)

Existing 2.5" OD solid PVC standpipe

Insulated casing with Thermon Powerblanket or heat trace equivalent to prevent freezing

Sch 80 PVC conduit for #12 -3 THHN or equivalent.

To be connected to electric service on the inside of Buttress 25. Circuit to be connected to the existing service through a manual switch with an indicator light when the heat trace is on.

Seal end of conduits with duct seal or sealing foam to prevent water intrusion.

Note:

1. The riser pipe will need to be cut down below grade and pipe threads added to the top section.

2. Encase enclosure in fiber-reinforced bag-mixed concrete.

3. Granular Material Base shall be free draining crushed rock or gravel meeting the gradation of ASTM C-33 Coarse Aggregate No. 57, or as approved by WSSC.

PIEZOMETER INSTALLATION DETAILS

B-6

120AC power cable for heat trace

Sensor cable installed through PVC conduit

Conduit trench 3" wide 12" to 18" depth

Concrete encasement, See Note 2

"6" thick compacted Granular Material Base, See Note 3

NAME: AECOM TECHNICAL SERVICES INC.

ADDRESS: 12420 MILESTONE CENTER DRIVE, SUITE 150

GERMANTOWN, MD 20876

PHONE: 301-944-2545

CONTACT: BOB PINCIOTTI, P.E.

15"

06/03/25 - PLOT DATE

Digitally signed by Pinciotti, Bob DN: cn=Pinciotti, Bob, ou=USGRM2, email=bob.pinciotti@aecom.com Date: 2025.06.03 15:09:30 -04'00'

Pinciotti, ADEQUATE SURVEY

NO

200'S OF

CONTRACT

ON PROP. R/W REQ'D

OFF PROP. R/W REQ'D

OTHER UTILITIES

DRAWN

CHECK

THESE DOCUMENTS CONTAIN PRIVILEGED

AND CONFIDENTIAL INFORMATION WHICH

SHALL NOT BE REDISTRIBUTED WITHOUT

PRIOR WSSC APPROVAL VE

R

IF

Y

SC

AL

E

- B

AR

IS

O

N E

IN

C

H O

N O

R

IG

IN

AL

D R

AW

IF

N O

T O

N E

IN

C

H O

N T

H

IS

S H

EE

T, A D

JU

ST

S C

AL

ES

A C

C O

R D

IN

G

LY

ENGINEER:

DATE REVISIONS

ADEQUATE SURVEY

NO

200'S OF

CONTRACT

ON PROP. R/W REQ'D

OFF PROP. R/W REQ'D

OTHER UTILITIES

DRAWN

CHECK

THESE DOCUMENTS CONTAIN PRIVILEGED

AND CONFIDENTIAL INFORMATION WHICH

SHALL NOT BE REDISTRIBUTED WITHOUT

PRIOR WSSC APPROVAL VE

R

IF

Y

SC

AL

E

- B

AR

IS

O

N E

IN

C

H O

N O

R

IG

IN

AL

D R

AW

IF

N O

T O

N E

IN

C

H O

N T

H

IS

S H

EE

T, A D

JU

ST

S C

AL

ES

A C

C O

R D

IN

G

LY

ENGINEERING & ENVIRONMENTAL

SERVICES DIVISION

WASHINGTON SUBURBAN SANITARY COMMISSION

WSSC

DELIVERING THE ESSENTIAL 8

BD7580A23

228NE01

AUTOMATED DATA ACQUISITION SYSTEMS OF PIEZOMETERS AT

BRIGHTON DAM

BASIN: PATUXENT NORTH, MONGOMERY AND HOWARD COUNTIES, MARYLAND

PROFESSIONAL CERTIFICATION

I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED

OR APPROVED BY ME, AND THAT I AM A DULY LICENSED

PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF

MARYLAND.

LICENSE NO.: 21984 EXPIRATION DATE: 05/24/2026

Z:

\G

ER

M

AN

TO

W N

-U

SG

R M

2\ D

C S\

PR

O

JE

C

TS

\W

TR

\6

2_

_W

SS

C _D

AM

SB

O A_

TA

SK

O R

D

ER

_8 \9

_C

AD

_G

IS

\9

_C

AD

\B

R

IG

H

TO

N _D

W G

_D R

AW

IN

G S\

_B

R

IG

H

TO

N _C

O N

D U

IT

_C

N

TL

_R O

O M

.D W

G

PA

TH

/F

IL

EN

AM

E:

1" diameter PVC conduit mounted through doorway to walkway railing.

PLC and PLC enclosure provided by WSSC

1" diameter PVC conduit mounted through doorway to walkway

PLC and PLC enclosure provided by WSSC

Wall mount bracket

LR 90° condulet

LL 90° condulet

LB 90° condulets

PLC

PLC

NOTES:

1. EXISTING CONDITIONS/ FACILITY SHOWN ON PLAN VIEW HEREON ARE BASED ON AVAILABLE DESIGN RECORDS AND MAY NOT REFLECT CURRENT EXISTING CONDITIONS. CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING CONDITIONS PRIOR TO ANY CONSTRUCTION WORK. CONTRACTOR TO NOTIFY THE ENGINEER AND WSSC PROJECT MANAGER IF ANY DISCREPANCIES OR CONFLICTS EXIST.

2. DRAWING SHOWS THE GENERAL ALIGNMENT OF THE CONDUIT FROM THE WALKWAY TO THE PLC ENCLOSURE. THE EXACT ROUTE SHALL BE DETERMINED IN THE FIELD BY THE CONTRACTOR AND

MUST BE APPROVED BY WSSC.

CONTROL ROOM CONDUIT

NAME: AECOM TECHNICAL SERVICES INC.

ADDRESS: 12420 MILESTONE CENTER DRIVE, SUITE 150

GERMANTOWN, MD 20876

PHONE: 301-944-2545

CONTACT: BOB PINCIOTTI, P.E.

Wall mount brackets to be field located by Contractor. Spacing shall comply with the National Electrical Code.

6'

06/03/25 - PLOT DATE

Digitally signed by Pinciotti, Bob DN: cn=Pinciotti, Bob, ou=USGRM2, email=bob.pinciotti@aecom.com Date: 2025.06.03 15:09:47 -04'00'

Pinciotti, ADEQUATE SURVEY

NO

200'S OF

CONTRACT

ON PROP. R/W REQ'D

OFF PROP. R/W REQ'D

OTHER UTILITIES

DRAWN

CHECK

THESE DOCUMENTS CONTAIN PRIVILEGED

AND CONFIDENTIAL INFORMATION WHICH

SHALL NOT BE REDISTRIBUTED WITHOUT

PRIOR WSSC APPROVAL VE

R

IF

Y

SC

AL

E

- B

AR

IS

O

N E

IN

C

H O

N O

R

IG

IN

AL

D R

AW

IF

N O

T O

N E

IN

C

H O

N T

H

IS

S H

EE

T, A D

JU

ST

S C

AL

ES

A C

C O

R D

IN

G

LY

ENGINEER:

DATE REVISIONS

ADEQUATE SURVEY

NO

200'S OF

CONTRACT

ON PROP. R/W REQ'D

OFF PROP. R/W REQ'D

OTHER UTILITIES

DRAWN

CHECK

THESE DOCUMENTS CONTAIN PRIVILEGED

AND CONFIDENTIAL INFORMATION WHICH

SHALL NOT BE REDISTRIBUTED WITHOUT

PRIOR WSSC APPROVAL VE

R

IF

Y

SC

AL

E

- B

AR

IS

O

N E

IN

C

H O

N O

R

IG

IN

AL

D R

AW

IF

N O

T O

N E

IN

C

H O

N T

H

IS

S H

EE

T, A D

JU

ST

S C

AL

ES

A C

C O

R D

IN

G

LY

ENGINEERING & ENVIRONMENTAL

SERVICES DIVISION

WASHINGTON SUBURBAN SANITARY COMMISSION

WSSC

DELIVERING THE ESSENTIAL 8

BD7580A23

228NE01

AUTOMATED DATA ACQUISITION SYSTEMS OF PIEZOMETERS AT

BRIGHTON DAM

BASIN: PATUXENT NORTH, MONGOMERY AND HOWARD COUNTIES, MARYLAND

PROFESSIONAL CERTIFICATION

I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED

OR APPROVED BY ME, AND THAT I AM A DULY LICENSED

PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF

MARYLAND.

LICENSE NO.: 21984 EXPIRATION DATE: 05/24/2026

Z:

\G

ER

M

AN

TO

W N

-U

SG

R M

2\ D

C S\

PR

O

JE

C

TS

\W

TR

\6

2_

_W

SS

C _D

AM

SB

O A_

TA

SK

O R

D

ER

_8 \9

_C

AD

_G

IS

\9

_C

AD

\B

R

IG

H

TO

N _D

W G

_D R

AW

IN

G S\

_B

R

IG

H

TO

N _A

D

AS

S

YS

TE

M

A R

C H

IT

EC

TU

R

E.

D

W G

PA

TH

/F

IL

EN

AM

E:

PLC Controller Enclosure

Terminal Enclosure

Terminal Enclosure

Terminal Enclosure

Terminal Enclosure

Terminal Enclosure

B-1 B-2 B-3 B-4 B-5 B-6

Brighton Dam

ADAS SYSTEM ARCHITECTURE

NAME: AECOM TECHNICAL SERVICES INC.

ADDRESS: 12420 MILESTONE CENTER DRIVE, SUITE 150

GERMANTOWN, MD 20876

PHONE: 301-944-2545

CONTACT: BOB PINCIOTTI, P.E.

NOTES:

1. Keller Acculevel sensors have 4-20mA output and a 0-50PSI level sensing range.

(Item number: 0507.00203.051305.13)

2. The PLC Control Enclosure, PLC, instrumentation power, and barometer will be provided and installed by the WSSC.

3. Contractor shall verify the accuracy of all sensors at the direction of WSSC's process engineer.

4. Contractor shall connect the PVC conduit(s) to the PLC Control Enclosure and pull the sensor cables into the enclosure and leave three feet of sensor cable inside the enclosure for connection of the sensor cables to the PLC by the WSSC.

5. All sensor cables pulled into the PLC Control Enclosure shall be clearly and permanently marked with the appropriate piezometer number.

6. Conduit shall enter the PLC enclosure through a penetration at the lowest point possible on the side of the enclosure and if it is possible penetrate through the bottom of the enclosure. No top penetration of any conduit through enclosure shall be allowed. Locations of penetrations must be approved by WSSC.

2-wire current loop

(NTS)

2-wire current loop

(NTS)

Barometer

06/03/25 - PLOT DATE

Digitally signed by Pinciotti, Bob DN: cn=Pinciotti, Bob, ou=USGRM2, email=bob.pinciotti@aecom.com Date: 2025.06.03 15:10:07 -04'00'

Pinciotti, ADEQUATE SURVEY

NO

200'S OF

CONTRACT

ON PROP. R/W REQ'D

OFF PROP. R/W REQ'D

OTHER UTILITIES

DRAWN

CHECK

THESE DOCUMENTS CONTAIN PRIVILEGED

AND CONFIDENTIAL INFORMATION WHICH

SHALL NOT BE REDISTRIBUTED WITHOUT

PRIOR WSSC APPROVAL VE

R

IF

Y

SC

AL

E

- B

AR

IS

O

N E

IN

C

H O

N O

R

IG

IN

AL

D R

AW

IF

N O

T O

N E

IN

C

H O

N T

H

IS

S H

EE

T, A D

JU

ST

S C

AL

ES

A C

C O

R D

IN

G

LY

ENGINEER:

DATE REVISIONS

ADEQUATE SURVEY

NO

200'S OF

CONTRACT

ON PROP. R/W REQ'D

OFF PROP. R/W REQ'D

OTHER UTILITIES

DRAWN

CHECK

THESE DOCUMENTS CONTAIN PRIVILEGED

AND CONFIDENTIAL INFORMATION WHICH

SHALL NOT BE REDISTRIBUTED WITHOUT

PRIOR WSSC APPROVAL VE

R

IF

Y

SC

AL

E

- B

AR

IS

O

N E

IN

C

H O

N O

R

IG

IN

AL

D R

AW

IF

N O

T O

N E

IN

C

H O

N T

H

IS

S H

EE

T, A D

JU

ST

S C

AL

ES

A C

C O

R D

IN

G

LY

ENGINEERING & ENVIRONMENTAL

SERVICES DIVISION

WASHINGTON SUBURBAN SANITARY COMMISSION

WSSC

DELIVERING THE ESSENTIAL 8

BD7580A23

228NE01

AUTOMATED DATA ACQUISITION SYSTEMS OF PIEZOMETERS AT

BRIGHTON DAM

BASIN: PATUXENT NORTH, MONGOMERY AND HOWARD COUNTIES, MARYLAND

PROFESSIONAL CERTIFICATION

I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED

OR APPROVED BY ME, AND THAT I AM A DULY LICENSED

PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF

MARYLAND.

LICENSE NO.: 21984 EXPIRATION DATE: 05/24/2026

Z:

\G

ER

M

AN

TO

W N

-U

SG

R M

2\ D

C S\

PR

O

JE

C

TS

\W

TR

\6

2_

_W

SS

C _D

AM

SB

O A_

TA

SK

O R

D

ER

_8 \9

_C

AD

_G

IS

\9

_C

AD

\B

R

IG

H

TO

N _D

W G

_D R

AW

IN

G S\

_B

R

IG

H

TO

N _W

IR

E_

AN

D

_C O

N D

U

IT

_S C

H

ED

U

LE

.D W

G

PA

TH

/F

IL

EN

AM

E:

NAME: AECOM TECHNICAL SERVICES INC.

ADDRESS: 12420 MILESTONE CENTER DRIVE, SUITE 150

GERMANTOWN, MD 20876

PHONE: 301-944-2545

CONTACT: BOB PINCIOTTI, P.E.

NOTES:

1. At each riser pipe location, conduit brings piezometer sensor cable from existing PVC riser to a new concrete buttress mounted enclosure. See Piezometer Installation Details on Drawing 03.

2. PVC conduit runs from B-6 along the catwalk railing to the PLC in the powerhouse. At each piezometer location after B-6, the PVC conduit runs to beach buttress mounted enclosure to pick up the signal cable.

3. All PVC shall be Schedule 80.

4. Expansion fittings shall be included on PVC conduit runs in accordance with NEMA PRP 4-2009 (R2016) guidance and Section 347-9 of the National Electric Code.

5. Piezometer sensor shall be set 6-inches above the bottom of the existing piezometer.

6. Contractor shall survey as-built location, bottom elevation, top elevation of completed installation, and calculate the elevation of the piezometer pressure sensor. Survey benchmarks are shown in the table below.

7. Drawing shows the general alignment and approximate length of the conduit from each piezometer to the PLC enclosure. The exact routes and cable lengths shall be determined in the field by the Contractor and must be approved by WSSC.

Brighton Dam Wiring Schedule

Well ID:

Top Elevation (ft) Bottom Elevation (ft)

Cable length in standpipe (ft)

Total cable length (ft)

Cable length: standpipe to new PLC enclosure (ft)

B-1 321.3 280.5

40.8

117.3

76.5

B-2 321.3 280.5

40.8

157.3

116.5

B-3 321.3 280.5

40.8

197.3

156.5

B-4 321.3 280.5

40.8

237.3

196.5

B-5 321.3 280.5

40.8

277.3

236.5

B-6 327.7 273.3

54.4

391.4

337.0

Sch80 PVC Section

B-6 to B-5

3/4" Diameter

160.0 40.0

40.0

280.0 120.0

Brighton Dam Conduit Schedule

1" Diameter 90 Deg Turns Junction Box Note

B-5 to B-4 B-4 to B-3 B-3 to B-2 B-2 to B-1 B-1 to PLC

Total conduit length (ft)

40.0

40.0 80.0

80ft for sensor and 80ft for heat trace, 2 each 90 Turns

CONDUIT AND WIRING SCHEDULE

06/03/25 - PLOT DATE

Digitally signed by Pinciotti, Bob DN: cn=Pinciotti, Bob, ou=USGRM2, email=bob.pinciotti@aecom.com Date: 2025.06.03 15:10:28 -04'00'

Pinciotti, ADEQUATE SURVEY

NO

200'S OF

CONTRACT

ON PROP. R/W REQ'D

OFF PROP. R/W REQ'D

OTHER UTILITIES

DRAWN

CHECK

THESE DOCUMENTS CONTAIN PRIVILEGED

AND CONFIDENTIAL INFORMATION WHICH

SHALL NOT BE REDISTRIBUTED WITHOUT

PRIOR WSSC APPROVAL VE

R

IF

Y

SC

AL

E

- B

AR

IS

O

N E

IN

C

H O

N O

R

IG

IN

AL

D R

AW

IF

N O

T O

N E

IN

C

H O

N T

H

IS

S H

EE

T, A D

JU

ST

S C

AL

ES

A C

C O

R D

IN

G

LY

ENGINEER:

DATE REVISIONS

ADEQUATE SURVEY

NO

200'S OF

CONTRACT

ON PROP. R/W REQ'D

OFF PROP. R/W REQ'D

OTHER UTILITIES

DRAWN

CHECK

THESE DOCUMENTS CONTAIN PRIVILEGED

AND CONFIDENTIAL INFORMATION WHICH

SHALL NOT BE REDISTRIBUTED WITHOUT

PRIOR WSSC APPROVAL VE

R

IF

Y

SC

AL

E

- B

AR

IS

O

N E

IN

C

H O

N O

R

IG

IN

AL

D R

AW

IF

N O

T O

N E

IN

C

H O

N T

H

IS

S H

EE

T, A D

JU

ST

S C

AL

ES

A C

C O

R D

IN

G

LY

ENGINEERING & ENVIRONMENTAL

SERVICES DIVISION

WASHINGTON SUBURBAN SANITARY COMMISSION

WSSC

DELIVERING THE ESSENTIAL 8

BD7580A23

228NE01

AUTOMATED DATA ACQUISITION SYSTEMS OF PIEZOMETERS AT

BRIGHTON DAM

BASIN: PATUXENT NORTH, MONGOMERY AND HOWARD COUNTIES, MARYLAND

PROFESSIONAL CERTIFICATION

I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED

OR APPROVED BY ME, AND THAT I AM A DULY LICENSED

PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF

MARYLAND.

LICENSE NO.: 21984 EXPIRATION DATE: 05/24/2026

Z:

\G

ER

M

AN

TO

W N

-U

SG

R M

2\ D

C S\

PR

O

JE

C

TS

\W

TR

\6

2_

_W

SS

C _D

AM

SB

O A_

TA

SK

O R

D

ER

_8 \9

_C

AD

_G

IS

\9

_C

AD

\B

R

IG

H

TO

N _D

W G

_D R

AW

IN

G S\

_B

R

IG

H

TO

N _W

YE

_B

AL

L_

VA

LV

E_ D

ET

AI

L.

D

W G

PA

TH

/F

IL

EN

AM

E:

NOT TO SCALE

1.5” Brass Wye

1.5” x 0.25" Male to Female brass Hex reducing bushing

IP 68 cable gland 0.25" thread

Sensor cable routed to junction box

Pipe fitted to existing riser pipe

1.5” Brass nipple 3" long

1.5” Bronze ball valve with stainless steel ball

PIEZOMETER DETAILS WITH WYE FITTING

AND BALL VALVENAME: AECOM TECHNICAL SERVICES INC.

ADDRESS: 12420 MILESTONE CENTER DRIVE, SUITE 150

GERMANTOWN, MD 20876

PHONE: 301-944-2545

CONTACT: BOB PINCIOTTI, P.E.

As-Built top elevation

06/03/25 - PLOT DATE

Digitally signed by Pinciotti, Bob DN: cn=Pinciotti, Bob, ou=USGRM2, email=bob.pinciotti@aecom.com Date: 2025.06.03 15:10:43 -04'00'

Pinciotti,

Sheets and Views
Layout
Sheets and Views
Layout1
Sheets and Views
Layout1
Sheets and Views
Layout1
Sheets and Views
Layout1
Sheets and Views
Layout1
Sheets and Views
Layout1
Sheets and Views
Layout1
2025-06-12T08:23:13-0700
Digitally verifiable PDF exported from www.docusign.com

File details come from the government source that posted it. Updated .