Base Offer Price Breakdown - 1 page.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Y1DA--FY25: NRM (PROJ:673-23-115) BB Renovate Pharmacy Hood Ductwork
Solicitation number
36C24825R0112
Issued by

About this file

The provided file is a Base Offer Price Breakdown template for a federal contract opportunity with the Department of Veterans Affairs (VA) for the renovation of a pharmacy hood ductwork at James A. Haley VA Hospital in Tampa, FL. The solicitation (36C24825R0112) is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) with a project budget between $250,000 and $500,000. Key contract details include a site visit scheduled for 06/25/2025, proposal due date not specified in the provided documents, a 90-calendar day performance period, and requirements for a payment and performance bond covering 100% of the order price.

The price breakdown template requires offerors to detail costs across 34 construction divisions, including labor and material costs, with sections for overhead, profit, and bonding percentages. Contractors must demonstrate they will perform at least 25% of the contract cost with their own employees, comply with Davis-Bacon wage determinations, and have an Experience Modification Rate (EMR) not exceeding 1.0. The evaluation will be based on technical factors including specialized experience in healthcare HVAC work, project schedule, past performance, and price, with the goal of selecting the most advantageous offer to the government.

View the file

Other files

File Type Posted
36C24825R0112 0002.pdf PDF
36C24825R0112 0001.docx DOCX document
EMR 1 page.pdf PDF
WD FL20250208 05232025.pdf PDF
P01_673-23-115-Bid Documents - Maps.pdf PDF
36C24825R0112_1.docx DOCX document
07- 673-23-115 Specifications update.pdf PDF
Past Performance Questionnaire - 4 Pages.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer Base Offer Cost Breakdown

Project Number: N/A Edward L Roy: VA assigned project #

Date:
Project Title
Edward L Roy: VA assigned Project TitleProject Location
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements$ - 0$ - 0
Division 2Existing Conditions- 0- 0
Division 3Concrete- 0- 0
Division 4Masonry- 0- 0
Division 5Metals- 0- 0
Division 6Wood and Plastic- 0- 0
Division 7Thermal & Moisture Protect- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0

Offerors shall provide additional price breakdown to avoiding lump sum, etc. This price offer breakdown is the overall base offer price for Government price analysis

File details come from the government source that posted it. Updated .