Base and Option Year Price Sheet.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- High Reach Genie Services
- Solicitation number
- FA660626Q0033
About this file
This is a Base and Option Year Price Sheet for preventative maintenance and emergency repair services for aerial lift equipment at Westover Air Reserve Base. The contract spans a five-year period from September 29, 2026, through September 28, 2031, consisting of one base year and four option years. The pricing structure includes four primary Contract Line Item Numbers (CLINs) for each period: Scheduled Preventative Maintenance Inspections (annual and quarterly safety inspections for eight platforms), Unscheduled Emergency Repair Labor (55.5 hours per year at a fixed hourly rate for certified technicians), Replacement Parts & Consumables (capped ceiling lot pricing), and a Future Equipment Phase-In Modification Pool (pro-rated maintenance and repair allocation for two JLGs and two Toyota tow tractors). The Base Year (0001-0004) establishes the baseline pricing, with the emergency repair labor pool set at $8,333.33 based on a $150.00 hourly rate for evaluation purposes only.
All four Option Years (1001-1004, 2001-2004, 3001-3004, and 4001-4004) mirror the Base Year structure with identical service descriptions and quantities. The hourly rates and replacement parts ceilings for Option Years 1 through 4 are escalated by 3.5% annually. The price sheet does not include completed total values for individual CLINs or annual period totals, indicating this is a template for contractor pricing submission. This 100% small business set-aside solicitation requires contractors to provide certified technicians meeting ANSI/IPAF standards and comply with decoupled emergency response timelines, including 24-hour on-site diagnosis availability and 24-business-hour estimate submission requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI - Genie Lift Services v2.pdf | ||
| RFI - Genie Lift Services v2.pdf | ||
| RFI - Genie Lift Services.pdf | ||
| Base and Option Year Price Sheet.xlsx | XLSX spreadsheet | |
| SCA 2015-6113 v5 8-13-2026.txt | TXT text file | |
| Genie JLG Performance Work Statement 13 Aug 26 updated 9-14-26.pdf | ||
| Genie JLG Performance Work Statement 13 Aug 26 updated.docx | DOCX document | |
| Solicitation - FA660626Q0033.pdf | ||
| 15-6117.txt | TXT text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| BASE YEAR: 29 September 2026 – 28 September 2027 | |||||
| CLIN | Description | Qty | Unit | Unit Price | Total Price |
| 0001 | Scheduled Preventative Maintenance Inspections | 12 | Month | ||
| Perform annual and quarterly safety inspections in accordance with manufacturer (Genie/JLG) specifications for eight (8) platforms. | |||||
| 0002 | Unscheduled Emergency Repair Labor | 55.5 | Hour | ||
| Hourly rate for certified technicians. For evaluation purposes only, a pool of $8,333.33 at the fixed hourly rate of $150.00 is established. | |||||
| 0003 | Replacement Parts & Consumables (Lot) | 1 | Lot | ||
| Exempted proprietary OEM parts and standard COTS consumables. Capped ceiling for Base Year. | |||||
| 0004 | Future Equipment Phase-In Modification Pool | 1 | Lot | ||
| Pro-rated PM and repair allocation for two (2) future JLGs and two (2) Toyota tow tractors on-order. Activated via administrative modification. | |||||
| TOTAL BASE YEAR VALUE | |||||
| OPTION YEAR 1: 29 September 2027 – 28 September 2028 | |||||
| CLIN | Description | Qty | Unit | Unit Price | Total Price |
| 1001 | Scheduled Preventative Maintenance Inspections | 12 | Month | ||
| Perform annual and quarterly safety inspections for eight (8) platforms. | |||||
| 1002 | Unscheduled Emergency Repair Labor | 55.5 | Hour | ||
| Hourly rate for certified technicians. Escalated by 3.5% for Option Year 1. | |||||
| 1003 | Replacement Parts & Consumables (Lot) | 1 | Lot | ||
| Capped ceiling escalated by 3.5% for Option Year 1. | |||||
| 1004 | Future Equipment Phase-In Modification Pool | 1 | Lot | ||
| Pro-rated PM and repair allocation for integrated assets. | |||||
| TOTAL OPTION YEAR 1 VALUE | |||||
| OPTION YEAR 2: 29 September 2028 – 28 September 2029 | |||||
| CLIN | Description | Qty | Unit | Unit Price | Total Price |
| 2001 | Scheduled Preventative Maintenance Inspections | 12 | Month | ||
| Perform annual and quarterly safety inspections for eight (8) platforms. | |||||
| 2002 | Unscheduled Emergency Repair Labor | 55.5 | Hour | ||
| Hourly rate for certified technicians. Escalated by 3.5% for Option Year 2. | |||||
| 2003 | Replacement Parts & Consumables (Lot) | 1 | Lot | ||
| Capped ceiling escalated by 3.5% for Option Year 2. | |||||
| 2004 | Future Equipment Phase-In Modification Pool | 1 | Lot | ||
| Pro-rated PM and repair allocation for integrated assets. | |||||
| TOTAL OPTION YEAR 2 VALUE | |||||
| OPTION YEAR 3: 29 September 2029 – 28 September 2030 | |||||
| CLIN | Description | Qty | Unit | Unit Price | Total Price |
| 3001 | Scheduled Preventative Maintenance Inspections | 12 | Month | ||
| Perform annual and quarterly safety inspections for eight (8) platforms. | |||||
| 3002 | Unscheduled Emergency Repair Labor | 55.5 | Hour | ||
| Hourly rate for certified technicians. Escalated by 3.5% for Option Year 3. | |||||
| 3003 | Replacement Parts & Consumables (Lot) | 1 | Lot | ||
| Capped ceiling escalated by 3.5% for Option Year 3. | |||||
| 3004 | Future Equipment Phase-In Modification Pool | 1 | Lot | ||
| Pro-rated PM and repair allocation for integrated assets. | |||||
| TOTAL OPTION YEAR 3 VALUE | |||||
| OPTION YEAR 4: 29 September 2030 – 28 September 2031 | |||||
| CLIN | Description | Qty | Unit | Unit Price | Total Price |
| 4001 | Scheduled Preventative Maintenance Inspections | 12 | Month | ||
| Perform annual and quarterly safety inspections for eight (8) platforms. | |||||
| 4002 | Unscheduled Emergency Repair Labor | 55.5 | Hour | ||
| Hourly rate for certified technicians. Escalated by 3.5% for Option Year 4. | |||||
| 4003 | Replacement Parts & Consumables (Lot) | 1 | Lot | ||
| Capped ceiling escalated by 3.5% for Option Year 4. | |||||
| 4004 | Future Equipment Phase-In Modification Pool | 1 | Lot | ||
| Pro-rated PM and repair allocation for integrated assets. | |||||
| TOTAL OPTION YEAR 4 VALUE |
File details come from the government source that posted it. Updated .