BAH Water LAB Solicitation.pdf
PDF 759 KB Posted
- Solicitation number
- N3319121R4003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment (4) - F-1800000 - Environmental Services Deliveries_rev1.doc | DOC document | |
| ATT (8) - CNIC M-5090.1_Ch4_LaboratoryAccreditation.pdf | ||
| Attachment (3) Spec Item C-1800000 - Environmental Services_rev2.doc | DOC document | |
| Attachment (1) - C-0100000 - General Information Environmental Services_rev1.doc | DOC document | |
| ATT (9) VENDOR VETTING REQUIREMENTS.docx | DOCX document | |
| Attachment (2) - C-0200000 - Mgmt Admin Environmental_rev1.doc | DOC document | |
| Attachment (7) - Price Schedule_rev1.doc | DOC document | |
| Attachment (6) - J-1800000-03 - IDIQ ELINS_rev2.XLS | XLS spreadsheet | |
| Attachment (5) - J-1800000 - Dcouments Exhibits And Other Attachments_rev1.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until local time
X
A X B X C
D
EX
X G F
19 - 23 X H 24 - 31 steven.guzman@eu.navy.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 31
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N33191 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
STEVEN A. GUZMAN 39 081 568 8124
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 6
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT
PACKAGING AND MARKING
7 J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 10 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 11 - 12 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
13 - 18
PART II - CONTRACT CLAUSES
NAVFAC EUROPE AFRICA CENTRAL
VIALE PORTO CAPODICHINO
NAPOLI 80144
39 081 568 7750
39 081 568 7750FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
10 Dec 2020
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N3319121R4003
Section B - Supplies or Services and Prices
SERVICES AND PRICES
B.SERVICES AND PRICES
Section B - Supplies or Services and Prices
SERVICES AND PRICES
B.1 Contract Title: Environmental Laboratory Services IDIQ for Bahrain, UAE, and Djibouti.
• Type of Contract: Indefinite-Delivery Indefinite-Quantity Service – type contract as noted in Section L, Instructions, Conditions, and Notices to Bidders, FAR 52.216-1 Type of Contract (APR 1984).
• Contract Term: This contract contains provisions for one (1) base period and four option performance periods in accordance with Section I, Contract Clause, FAR 52.217-9, Option to Extend the Term of the Contract (Mar 2000).
• Period of Performance:
CLIN 0001 IDIQ BASE 9 APR 2021 through 8 APR 2022 CLIN 0002 IDIQ OPTION Period 1: 9 APR 2022 through 8 APR 2023 CLIN 0003 IDIQ OPTION Period 2: 9 APR 2023 through 8 APR 2024 CLIN 0004 IDIQ OPTION Period 3: 9 APR 2024 through 8 APR 2025 CLIN 0005 IDIQ OPTION Period 4: 9 APR 2025 through 8 APR 2026 CLIN 0006 Value Added Tax (VAT): The proposed price shall indicate any Value Added Tax
B.5 Contract Line Item Numbers (CLINs) and Exhibit Line Item Numbers (ELINs)
(1) Bidders shall enter unit prices and amounts for CLINs on SF33 and ELINs on Attachment J-1800000-03, Exhibit Line Items (ELINs) – Estimated Quantities.
• Indefinite Quantity Individual Contract Line Item Quantities: Once the estimated quantities for individual ELINs shown in the Attachment Exhibit Line Items (ELINs) – Estimated Quantities (Labor Rates -A011, B011, C011, D011, and E011) have been ordered, additional quantities may be ordered as long as the overall not-to-exceed (NTE) amount of the contract CLIN per year is not exceeded and the Contractor agrees by signing the task order.
• Unit Prices for Labor: The unit price proposed by the Contractor shall be in accordance with Section J Attachment J-1800000-03, Exhibit Line Items (ELINs) – Estimated Quantities.
• Indefinite quantity work may be ordered at the prices offered by the issuing activity using a DD Form 1155 “Order for Supplies and Services”.
i. Incorporation of Technical Proposal: The Contractor’s technical proposal, including revisions and amendments made prior to contract award and a copy of which is in the possession of both parties, will be incorporated into this contract upon award by reference with the same force and effect as if set forth in full text.
ii. The U.S. Government and contractors performing work for the U.S. Government are not exempt from paying Value Added Taxes (VAT). Your prices and invoices are to include VAT.
iii. This contract and all task orders will be awarded and paid in United States dollars ($) utilizing the United States Government Wide Area Workflow (WAWF) secure web based electronic invoicing application.
Offerors are required to have a United States bank affiliate capable of receiving electronic payments from the Defense Finance and Accounting Service (DFAS).
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Each Base Period
FFP
The Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services outlined and described in the Performance Work Statement (PWS) at U.S. bases and sites located within the Kingdom of Bahrain, the United Arab Emirates (UAE) and CLDJ.
FOB: Destination
NET AMT
0002 1 Each Option Period 1
FFP
Option to extend environmental laboratory services for U.S. bases and sites located within the Kingdom of Bahrain, the United Arab Emirates (UAE) and CLDJ for 1 year. The Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services outlined and described in the Performance Work Statement (PWS) at U.S. bases and sites located within the Kingdom of Bahrain, the United Arab Emirates (UAE) and CLDJ.
0003 1 Each Option Period 2
FFP
Option to extend environmental laboratory services for U.S. bases and sites located within the Kingdom of Bahrain, the United Arab Emirates (UAE) and CLDJ for 1 year. The Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services outlined and described in the Performance Work Statement (PWS) at U.S. bases and sites located within the Kingdom of Bahrain, the United Arab Emirates (UAE) and CLDJ
0004 1 Each Option Period 3
FFP
Option to extend environmental laboratory services for U.S. bases and sites located within the Kingdom of Bahrain, the United Arab Emirates (UAE) and CLDJ for 1 year. The Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services outlined and described in the Performance Work Statement (PWS) at U.S. bases and sites located within the Kingdom of
0005 1 Each Option Period 4
FFP
Option to extend environmental laboratory services for U.S. bases and sites located within the Kingdom of Bahrain, the United Arab Emirates (UAE) and CLDJ for 1 year. The Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services outlined and described in the Performance Work Statement (PWS) at U.S. bases and sites located within the Kingdom of
0006 1 Each Value Added Tax (VAT)
FFP
The proposed price shall indicate any Value Added Tax (Reference 2 Code of Federal Regulations (CFR) § 200.470 - Taxes (including Value Added Tax, VAT).
Section C - Descriptions and Specifications
STATEMENT OF WORK
STATEMENT OF WORK ATTACHMENTS
Attachment (1) - C-0100000 - General Information Environmental Services_rev1 Attachment (2) - C-0200000 - Mgmt Admin Environmental_rev1 Attachment (3) - Spec Item C-1800000 - Environmental Services_rev2 Attachment (4) - F-1800000 - Environmental Services Deliveries_rev1 Attachment (5) - J-1800000 - Dcouments Exhibits And Other Attachments_rev1 Attachment (6) - J-1800000-03 - IDIQ ELINS_rev2 Attachment (7) - Price Schedule_rev1 Attachment (8) - CNIC M-5090.1 29 JUN 2018 Chapter 4 Laboratories Attachment (9) – Vendor Vetting Requirements
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 N/A N/A N/A Government 0002 N/A N/A N/A Government 0003 N/A N/A N/A Government 0004 N/A N/A N/A Government 0005 N/A N/A N/A Government 0006 N/A N/A N/A Government
CLAUSES INCORPORATED BY REFERENCE
52.246-4 Inspection Of Services--Fixed Price AUG 1996
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 09-APR-2021 TO
08-APR-2022
N/A NAVFAC EUROPE AFRICA CENTRAL
STEVEN A. GUZMAN
PSC 817 BOX 51
FPO AE 09622-0051
39 081 568 8124
N33191
0002 POP 09-APR-2022 TO
08-APR-2023
N/A N/A
0003 POP 09-APR-2023 TO
08-APR-2024
0004 POP 09-APR-2024 TO
08-APR-2025
0005 POP 09-APR-2025 TO
08-APR-2026
0006 POP 09-APR-2021 TO
08-APR-2026
52.242-15 Stop-Work Order AUG 1989 52.247-34 F.O.B. Destination NOV 1991
Section G - Contract Administration Data
Section H - Special Contract Requirements
252.222-7002 Compliance With Local Labor Laws (Overseas) JUN 1997 252.225-7042 Authorization to Perform APR 2003 252.232-7008 Assignment of Claims (Overseas) JUN 1997 252.233-7001 Choice of Law (Overseas) JUN 1997
CLAUSES INCORPORATED BY FULL TEXT
52.232-36 PAYMENT BY THIRD PARTY (MAY 2014)
(a) General.
(1) Except as provided in paragraph (a)(2) of this clause, the Contractor agrees to accept payments due under this contract, through payment by a third party in lieu of payment directly from the Government, in accordance with the terms of this clause. The third party and, if applicable, the particular Governmentwide commercial purchase card to be used are identified elsewhere in this contract.
(2) The Governmentwide commercial purchase card is not authorized as a method of payment during any period the System for Award Management (SAM) indicates that the Contractor has delinquent debt that is subject to collection under the Treasury Offset Program (TOP). Information on TOP is available at http://fms.treas.gov/debt/index.html.
If the SAM subsequently indicates that the Contractor no longer has delinquent debt, the Contractor may request the Contracting Officer to authorize payment by Governmentwide commercial purchase card.
(b) Contractor payment request.
(1) Except as provided in paragraph (b)(2) of this clause, the Contractor shall make payment requests through a charge to the Government account with the third party, at the time and for the amount due in accordance with those clauses of this contract that authorize the Contractor to submit invoices, contract financing requests, other payment requests, or as provided in other clauses providing for payment to the Contractor.
(2) When the Contracting Officer has notified the Contractor that the Governmentwide commercial purchase card is no longer an authorized method of payment, the Contractor shall make such payment requests in accordance with instructions provided by the Contracting Officer during the period when the purchase card is not authorized.
(c) Payment. The Contractor and the third party shall agree that payments due under this contract shall be made upon submittal of payment requests to the third party in accordance with the terms and conditions of an agreement between the Contractor, the Contractor's financial agent (if any), and the third party and its agents (if any). No payment shall be due the Contractor until such agreement is made. Payments made or due by the third party under this clause are not payments made by the Government and are not subject to the Prompt Payment Act or any implementation thereof in this contract.
(d) Documentation. Documentation of each charge against the Government's account shall be provided to the Contracting Officer upon request.
(e) Assignment of claims. Notwithstanding any other provision of this contract, if any payment is made under this clause, then no payment under this contract shall be assigned under the provisions of the assignment of claims terms of this contract or the Assignment of Claims Act of 1940 (31 U.S.C. 3727, 41 U.S.C. 6305).
(f) Other payment terms. The other payment terms of this contract shall govern the content and submission of payment requests. If any clause requires information or documents in or with the payment request, that is not provided in the third party agreement referenced in paragraph (c) of this clause, the Contractor shall obtain instructions from the Contracting Officer before submitting such a payment request.
(End of clause)
Section I - Contract Clauses
52.202-1 Definitions JUN 2020 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-6 Restrictions On Subcontractor Sales To The Government JUN 2020 52.203-7 Anti-Kickback Procedures JUN 2020 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity
MAY 2014
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014 52.203-12 Limitation On Payments To Influence Certain Federal
Transactions
JUN 2020
52.203-13 Contractor Code of Business Ethics and Conduct JUN 2020 52.203-16 Preventing Personal Conflicts of Interest JUN 2020 52.203-17 Contractor Employee Whistleblower Rights and Requirement
To Inform Employees of Whistleblower Rights
JUN 2020
52.204-2 Security Requirements AUG 1996 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber
Content Paper
MAY 2011
52.204-7 System for Award Management OCT 2018 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier
Subcontract Awards
JUN 2020
52.204-13 System for Award Management Maintenance OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-21 Basic Safeguarding of Covered Contractor Information
Systems
JUN 2016
52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities.
JUL 2018
52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment.
AUG 2020
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
AUG 2020
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
JUN 2020
52.209-7 Information Regarding Responsibility Matters OCT 2018 52.209-9 Updates of Publicly Available Information Regarding
Responsibility Matters
OCT 2018
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations
NOV 2015
52.211-5 Material Requirements AUG 2000 52.212-1 Instructions to Offerors--Commercial Items JUN 2020 52.212-3 Offeror Representations and Certifications--Commercial
Items
JUN 2020
52.212-4 Contract Terms and Conditions--Commercial Items OCT 2018 52.214-16 Minimum Bid Acceptance Period APR 1984 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017 52.215-2 Audit and Records--Negotiation JUN 2020 52.215-2 Alt II Audit and Records--Negotiation (JUN 2020) - Alternate II AUG 2016
52.215-8 Order of Precedence--Uniform Contract Format OCT 1997 52.215-10 Price Reduction for Defective Certified Cost or Pricing Data AUG 2011 52.215-11 Price Reduction for Defective Certified Cost or Pricing Data--
Modifications
JUN 2020
52.215-12 Subcontractor Certified Cost or Pricing Data JUN 2020 52.215-13 Subcontractor Certified Cost or Pricing Data--Modifications JUN 2020 52.215-15 Pension Adjustments and Asset Reversions OCT 2010 52.215-18 Reversion or Adjustment of Plans for Postretirement Benefits
(PRB) Other than Pensions
JUL 2005
52.215-19 Notification of Ownership Changes OCT 1997 52.215-21 Requirements for Certified Cost or Pricing Data and Data
Other Than Certified Cost or Pricing Data -- Modifications
JUN 2020
52.215-23 Limitations on Pass-Through Charges JUN 2020 52.216-1 Type Of Contract APR 1984 52.216-8 Fixed Fee JUN 2011 52.217-9 Option To Extend The Term Of The Contract MAR 2000 52.222-50 Combating Trafficking in Persons JAN 2019 52.222-56 Certification Regarding Trafficking in Persons Compliance
Plan.
MAR 2015
52.223-3 Hazardous Material Identification And Material Safety Data JAN 1997 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-6 Drug-Free Workplace MAY 2001 52.223-10 Waste Reduction Program MAY 2011 52.223-11 Ozone-Depleting Substances and High Global Warming
Potential Hydrofluorocarbons.
JUN 2016
52.223-15 Energy Efficiency in Energy-Consuming Products MAY 2020 52.223-16 Acquisition of EPEAT (R) - Registered Personal Computer
Products
OCT 2015
52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving
JUN 2020
52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.228-3 Worker's Compensation Insurance (Defense Base Act) JUL 2014 52.228-4 Workers' Compensation and War-Hazard Insurance Overseas APR 1984 52.228-5 Insurance - Work On A Government Installation JAN 1997 52.229-6 Taxes--Foreign Fixed-Price Contracts FEB 2013 52.230-3 Disclosure And Consistency Of Cost Accounting Practices JUN 2020 52.232-1 Payments APR 1984 52.232-8 Discounts For Prompt Payment FEB 2002 52.232-9 Limitation On Withholding Of Payments APR 1984 52.232-11 Extras APR 1984 52.232-17 Interest MAY 2014 52.232-18 Availability Of Funds APR 1984 52.232-20 Limitation Of Cost APR 1984 52.232-22 Limitation Of Funds APR 1984 52.232-23 Assignment Of Claims MAY 2014 52.232-25 Prompt Payment JAN 2017 52.232-25 Alt I Prompt Payment (Jan 2017) Alternate I FEB 2002 52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
OCT 2018
52.232-37 Multiple Payment Arrangements MAY 1999 52.233-1 Disputes MAY 2014 52.233-2 Service Of Protest SEP 2006 52.233-3 Protest After Award AUG 1996 52.233-3 Alt I Protest After Award (Aug 1996) - Alternate I JUN 1985 52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984
52.236-5 Material and Workmanship APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-19 Organization and Direction of the Work APR 1984 52.237-2 Protection Of Government Buildings, Equipment, And
Vegetation
APR 1984
52.237-3 Continuity Of Services JAN 1991 52.242-13 Bankruptcy JUL 1995 52.243-1 Alt I Changes--Fixed Price (Aug 1987) - Alternate I APR 1984 52.243-7 Notification Of Changes JAN 2017 52.244-2 Subcontracts JUN 2020 52.244-5 Competition In Subcontracting DEC 1996 52.244-6 Subcontracts for Commercial Items AUG 2020 52.245-1 Government Property JAN 2017 52.245-9 Use And Charges APR 2012 52.246-20 Warranty Of Services MAY 2001 52.246-25 Limitation Of Liability--Services FEB 1997 52.249-8 Default (Fixed-Price Supply & Service) APR 1984 52.249-14 Excusable Delays APR 1984 52.251-1 Government Supply Sources APR 2012 52.253-1 Computer Generated Forms JAN 1991 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense- Contract-Related Felonies
DEC 2008
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7003 Agency Office of the Inspector General AUG 2019 252.203-7005 Representation Relating to Compensation of Former DoD
Officials
NOV 2011
252.204-7000 Disclosure Of Information OCT 2016 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Antiterrorism Awareness Training for Contractors. FEB 2019 252.204-7008 Compliance With Safeguarding Covered Defense Information
Controls
OCT 2016
252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991 252.209-7004 Subcontracting With Firms That Are Owned or Controlled By
The Government of a Country that is a State Sponsor of Terrorism
MAY 2019
252.211-7007 Reporting of Government-Furnished Property AUG 2012 252.215-7008 Only One Offer JUL 2019 252.216-7006 Ordering SEP 2019 252.222-7002 Compliance With Local Labor Laws (Overseas) JUN 1997 252.223-7004 Drug Free Work Force SEP 1988 252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or
Hazardous Materials
SEP 2014
252.225-7001 Buy American And Balance Of Payments Program-- Basic DEC 2017 252.225-7002 Qualifying Country Sources As Subcontractors DEC 2017 252.225-7018 Photovoltaic Devices--Certificate JAN 2020 252.225-7049 Prohibition on Acquisition of Certain Foreign Commercial
Satellite Services - Representations.
DEC 2018
252.225-7050 Disclosure of Ownership or Control by the Government of a Country that is a State Sponsor of Terrorism
DEC 2018
252.246-7003 Notification of Potential Safety Issues JUN 2013
52.216-18 ORDERING. (AUG 2020)
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from through [insert dates].
(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.
(c) A delivery order or task order is considered "issued" when--
(1) If sent by mail (includes transmittal by U.S. mail or private delivery service), the Government deposits the order in the mail;
(2) If sent by fax, the Government transmits the order to the Contractor's fax number; or
(3) If sent electronically, the Government either--
(i) Posts a copy of the delivery order or task order to a Government document access system, and notice is sent to the Contractor; or
(ii) Distributes the delivery order or task order via email to the Contractor's email address.
(d) Orders may be issued by methods other than those enumerated in this clause only if authorized in the contract.
52.216-19 ORDER LIMITATIONS (OCT 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than (insert dollar figure or quantity), the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor -
(1) Any order for a single item in excess of (insert dollar figure or quantity);
(2) Any order for a combination of items in excess of (insert dollar figure or quantity); or
(3) A series of orders from the same ordering office within days that together call for quantities exceeding the limitation in paragraph (b) (1) or (2) of this section.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the
Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.
(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
52.216-22 INDEFINITE QUANTITY. (OCT 1995)
(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the "maximum". The Government shall order at least the quantity of supplies or services designated in the Schedule as the "minimum".
(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor's and Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after [insert date].
52.216-27 SINGLE OR MULTIPLE AWARDS. (OCT 1995)
The Government may elect to award a single delivery order contract or task order contract or to award multiple delivery order contracts or task order contracts for the same or similar supplies or services to two or more sources under this solicitation.
(End of provision)
52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor within 30 days provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 66 Months from date of Award.
Section L - Instructions, Conditions and Notices to Bidders
INSTRUCTIONS TO OFFERORS
Section L - Instructions, Conditions and Notices to Bidders
INSTRUCTIONS TO OFFERORS
L.1 SITE VISIT
There is no pre-proposal conference and site visit scheduled for this requirement.
L.2 FORMAT TO SUBMIT PRE-PROPOSAL INQUIRIES (PPI)
All prospective offerors submitting PPIs must use the attached PPI form. All PPIs shall be submitted to Mr. Steven Guzman at e-mail address steven.guzman@eu.navy.mil with a copy to Mr. Oscar Becerril at e-mail address oscar.becerril@eu.navy.mil.
PPIs shall be submitted in Mircosoft word and only have one question per sheet.
In order to allow time for the Government to respond to the PPI, the cutoff date for PPIs is twelve days prior to the proposal due date.
PRE-PROPOSAL INQUIRY
RFP: N33191-21-R-4003 PPI No.
SOLICITATION: Italy Wide Environmental Testing
NOTE: ALL PRE-PROPOSAL INQUIRIES SHALL BE SUBMITTED BY E-MAIL, ON THIS FORM TO
THE FOLLOWING E-MAIL ADDRESSES. SUBMIT ONLY ONE INQUIRY ON EACH FORM.
steven.guzman@eu.navy.mil and Oscar.becerril@eu.navy.mil
DATE OF PROPOSAL INQUIRY:
FROM FIRM: POC:
ADDRESS
PHONE NO.:
E-MAIL ADDRESS:
PROPOSAL INQUIRY: (Please type or print clearly)
(Include RFP Section, page number, and paragraph if applicable)
GOVERNMENT RESPONSE:
Responder’s signature/date:
L.3 PERIOD OF ACCEPTANCE OFFERORS:
Due to the evaluation and review requirements for this procurement, the offeror agrees to hold its offer firm for at least 90 calendars days from the date specified for receipt of offers.
L.4 REQUEST FOR PROPOSAL (RFP) FILES:
Solicitation files are posted to the Contract Opportunities, beta SAM.gov website (https://beta.sam.gov/), as mandated by our agency. It is the sole responsibility of the offeror to obtain the RFP files, along with any amendments, from this website.
L.5 JOINT VENTURE (JV) AGREEMENTS
For the purposes of this solicitation, a Joint Venture (JV) refers to a U.S.-Styled formal legal entity in the nature of a partnership comprised of two or more persons or companies. Each JV must provide one (1) CAGE/NCAGE code, one (1) DUNS number for the JV and one (1) DUNS number for each member comprising the JV. Each JV must be registered in SAM using the name of the JV.
Joint Venture Offerors (JV) offerors, shall provide with their proposal a notarized legal document that establishes the JV. The JV Agreement shall take effect upon the submission of the proposal and remain irrevocable until one
(1) year after the work has been finally inspected and accepted by the Government. Submission of the notarized legal document that establishes the JV shall be furnished with the proposal in its original language version along with a certified English translation of the notarized JV document. The Joint Venture must be formed and valid at the time of submission of the proposal. The validated notarized legal document must include language that each member of the JV will be jointly and severably liable for the performance of the whole contract and will be incorporated into the contract award if award is made to the JV.
Only offers from Prime Contractors and Joint Ventures (JV) will be accepted.
1. The Joint Venture Agreement shall include, at a minimum, the following:
(b) Name of firms that form the JV and the name of the JV.
(c) Name and title of the corporate officials signing on behalf of each party.
(d) Solicitation number.
(e) Description of the responsibilities in terms of work category for each member (for example:
Firm A performing 100% of C-2-d.)
(f) The statement "The composition and structure of the JV will remain unchanged from award to one
(1) year after the work has been finally inspected and accepted by the Government.”
(g) Date of issuance of the agreement and notarized signature of the corporate officials signing in behalf of each party.
(h) Statement under oath stating that the Joint Venture(JV) is in compliance at the time of proposal submission with all applicable laws, rules, and regulations. This statement must be signed under oath by all members comprising the Joint Venture.
The U.S. Government reserves the right to review the actual JV Agreement to determine its basis and compliance with the applicable laws. Any internal agreements affecting the internal composition of the existing JV and its potential liabilities in relation to the contract (performance guarantee, insurance, etc) will be sent to the Contracting Officer to provide notice of the same. Any change in the composition of the JV will require the JV to formally request a Novation Agreement in accordance with FAR 42.12, which will be approved/disapproved at the discretion of the Contracting Officer.
L.6 CONTENT OF PROPOSALS
PROPOSAL REQUIREMENTS. The non-price proposal and price/cost proposal shall be submitted in separate volumes. The non-price proposal shall not contain any cost/pricing information. The non-price proposal presented by the offeror to whom the award is made will be incorporated into the contract at time of award.
Proposals shall be submitted via e-mail with the subject line as one of the following, as appropriate:
“SOLICITATION N33191-21-R-4003 Bahrain, UAE, & CLDJ ENVIRONMENTAL TESTING Multiple e-mails may need to be sent for any of the submissions, if your e-mail exceeds 5MB. The U.S. Navy computer server will only accept e-mails with attachments up to 5MB. If you need to submit more than one e-mail for any of the above submission, then number them at the end of the e-mail subject title as 1 of ?, 2 of ?, etc.
Proposals not received at the above address on or before the hour and date set for the receipt of proposals shall be subject to the provisions of FAR Clause 52.215-1 Instructions to Offerors -- Competitive Acquisition (JAN 2017).
Offers are solicited on an “all or none” basis and FAR 52.215-1, INSTRUCTIONS TO OFFERORS COMPETITIVE ACQUISITION in Section L, is hereby modified. Failure to submit offers for all line items listed shall be cause for rejection of the offer.
b) The offeror shall submit the following information:
(2) Price Proposal Submission: Submit the following:
(i) Cover letter in accordance with FAR 52.215-1(c)(2), including Solicitation Number; name, address, telephone and email address of the Offeror; in case the Offeror is a JOINT VENTURE (JV), the name of the JV MUST BE CLEARLY IDENTIFIED; Name, title, and signature of the person authorized to sign the proposal; DUNS Number and CAGE or NCAGE Code of the Offeror, in case the Offeror is a JOINT VENTURE (JV), provide a DUNS Number for each member of the JV.
(ii) Submit completed and signed Standard Form 33 with the applicable DUNS Number and
CAGE code of the offeror provided on the face of the SF-33. Acknowledge amendments on this form. If applicable, ensure the SF-33 includes the appropriate name and address of any newly formed joint venture arrangement.
(iv) A completed Price Schedule for base Contract Line Item Number (CLIN) 0001 and Option
CLINS 0002, 0003, 0004, 0005, and 0006.
(v) A completed J-1800000-03 for IDIQ ELINS. The submitted J-1800000-03 must have proposed prices for each ELIN.
(vi) A statement that the offeror agrees to hold prices for 90 days from the date specified for receipt of offers.
(vii) Acknowledgement of all amendments.
(viii) Registration in the System for Award Management (SAM) at https://www.sam.gov is required at time of proposal submission. Offerors are required to submit an electronic (.pdf) screen view of the firm’s Entity Overview screen from SAM as part of their proposal.
(ix) The Government intends to pay invoices in accordance with the clause for Wide Area Work
Flow. To do this, your firm must have a U.S. bank or a U.S. bank affiliate associated with your local bank. With your proposal, identify the name of your U.S. bank or affiliate for purposes of paying invoices.
(x) Submit evidence of availability of working/operating capital from an independent financial institution, which will be used for the performance of the resultant contract.
(xi) Documentation of the laboratory's accreditation by CNIC.
(xii) N/A
(xiii) N/A
(xiii) Joint Venture (JV) Agreement (if applicable).
(1) Solicitation Submittal Requirements:
(a) STANDARD FORM 33, SOLICITATION, OFFER, AND AWARD
The offeror MUST complete Blocks 12 through 18.
In Block 14, the offeror MUST acknowledge all amendments.
In Block 15, provide a Point of Contact with a valid phone number and email address.
In Block 15, provide a NATO Commercial and Government Entity (NCAGE) Code.
In Block 15, provide a Duns and Bradstreet (DUNS) Number- the offeror MUST have an active DUNS Number.
(b) SECTION B– Supplies or Services and Prices
The offeror MUST fill in the dollar amount for Contract Line Item Numbers (CLINs) 0001 through 0006 on Section B of the SF 33 and on J-1800000-03 IDIQ Line Items (ELINS) Price Schedule to include the total amount to complete the testing and analysis for each CLIN.
Offerors shall provide their Price Proposal in U.S. Dollars. Award will be made in U.S. Dollars.
Therefore, the offeror’s bank must be able to accept U.S. Dollars as payment.
(c) SECTION 00060 – REPRESENTATIONS AND CERTIFICATIONS
The offeror MUST sign and acknowledge the Representations and Certifications form provided in Section 00600 of this solicitation and submit it with their proposal.
The offeror MUST have an active registration with System for Award Management (SAM) at the time of contract award.
If proposing as a Joint Venture (JV), the offeror MUST provide the documents requested below under “Joint Venture Requirements.”
(d) SECTION 00700 – CONTRACT CLAUSES
(e) Pricing
Any unrequested information will not be considered as part of the offer and will not be reviewed.
(3) Non-price Proposal Submission: Submit the following:
i. Submit all Non-price factor requirements divided by factor. Each factor must have an individual tab divider;
ii. Offerors shall put offeror’s name on every page.
iii. Page format shall be 8.5 by 11 inches and have margins of 1 inch on all four sides. Text shall be black, using Times New Roman or Courier, and no smaller than 11 point and single line spacing.
L.7 SUBMIT PROPOSALS TO:
Proposals shall be submitted via e-mail to Mr. Steven Guzman at e-mail address steven.guzman@eu.navy.mil with a copy to Mr. Oscar Becerril at e-mail address oscar.becerril@eu.navy.mil by 07 January 2021, 11:00 a.m. Central European Time (CET).
52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017 52.233-3 Protest After Award AUG 1996
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a firm fixed price indefinite-delivery indefinite-quantity contract resulting from this solicitation.
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from My-Angela.buescher@eu.navy.mil.
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
5252.242-9305 PRE-PERFORMANCE CONFERENCE (JUL 1995)
Within ten days of contract award, prior to commencement of the work, the Contractor will meet in conference with representatives of the Contracting Officer, at a time to be determined by the Contracting Officer, to discuss and develop mutual understanding relative to scheduling and administering work.
Section M - Evaluation Factors for Award
EVALUATION FACTORS
A. BASIS FOR AWARD
1. The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract; to negotiate with offerors in the competitive range; and to award the contract to the offeror submitting the proposal determined to represent the best value—the proposal most advantageous to the Government, price and other factors considered.
2. As stated in the solicitation, the Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
3. The tradeoff process is selected as appropriate for this acquisition. The Government considers it to be in its best interest to allow consideration of award to other than the lowest priced offeror or other than the highest technically rated offeror.
4. As stated in the solicitation, all technical factors when combined are of equal importance to the performance confidence assessment (past performance) rating; and all technical factors and the performance confidence assessment (past performance) rating, when combined are approximately equal to price.
5. Any proposal found to have a deficiency in meeting the stated solicitation requirements or performance objectives will be considered ineligible for award, unless the deficiency is corrected through discussions. Proposals may be found to have either a significant weakness or multiple weaknesses that impact either the individual factor rating or the overall rating for the proposal. The evaluation report must document the evaluation board’s assessment of the identified weakness(es) and the associated risk to successful contract performance resulting from the weakness(es). This assessment must provide the rationale for proceeding to award without discussions.
B. ADJECTIVAL RATINGS/DESCRIPTIONS
1. The technical rating reflects the degree to which the proposed approach meets or does not meet the minimum performance or capability requirements through an assessment of the strengths, weaknesses, significant weaknesses, deficiencies, and risks of a proposal.
a. A combined technical/risk evaluation considering risk in conjunction with the strengths, weaknesses, significant weaknesses, and deficiencies in determining technical ratings shall be used. The technical risk evaluation shall utilize the combined technical/risk ratings listed in the following table. Adjectival ratings and rating descriptions will be used to assign an overall rating to each technical proposal and to assign a rating for each technical factor. Use upper case letter ratings for major technical factors as well as the overall rating. The addition of plus (+) or minus (-) to an adjective rating is not allowed.
b. The distinction between experience and past performance is that experience pertains to the volume of work completed by a contractor that are comparable to the types of work described under the definition of recent, relevant projects, in terms of size, scope, and complexity. Past performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts.
Table 1. Combined Technical/Risk Rating Method
Adjectival Rating Description
Outstanding (O)
Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Good (G)
Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Acceptable (A)
Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Marginal (M)
Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Unacceptable (U)
Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.
2. Definitions: The following definitions are provided to assist evaluators in the evaluation of each non-cost/price factor.
a. Strength: An aspect of an offeror’s proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.
b. Weakness: A flaw in the proposal that increases the risk of unsuccessful contract performance.
c. Significant Weakness: A flaw that appreciably increases the risk of unsuccessful contract performance.
d. Deficiency: A material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level.
e. A project is defined as an environmental services project performed under a single task order or contract
C. PAST PERFORMANCE EVALUATION
1. The past performance evaluation results in an assessment of the offeror’s probability of meeting the solicitation requirements. The past performance evaluation considers each offeror’s demonstrated recent and relevant record of performance in supplying products and services that meet the contract’s requirements. The currency and relevance of the information, source of the information, context of the data, and general trends in contractor’s performance shall be considered. These are combined to establish one performance confidence assessment rating for each offeror.
2. There are three aspects to the past performance evaluation: recency, relevancy (including context of data), and quality (including general trends in contractor performance and source of information).
The first is to evaluate the recency of the offeror’s past performance. A Recent Project qualifying for the Recency requirement is defined as a project completed within the past five (5) years or at least 80% complete from the date of issuance of this RFP.
The second is to determine how relevant a recent contract is having been accomplished by the offeror the source selection. Relevant is defined as having the same scope and complexity as that required of this solicitation.
3. The third is to establish the overall quality of the offeror’s past performance. Recency is generally expressed as a time period during which past performance references are considered relevant, and is critical to establishing the re in terms of Recency and Relevancy of past performance information provided.
Common aspects of relevancy for the scope of complexity of this procurement include, but are not limited to, the following: similarity of Laboratory Analytical & Monitoring service/support, complexity, dollar value, contract type, use of key personnel (for services) and extent of subcontract/teaming. The past performance evaluation conducted in support of a current source selection does not establish, create, or change the existing record and history of the offeror’s past performance on past contracts; rather, the past performance evaluation process gathers information from customers on how well the offeror performed those past contracts.
4. The SSEB will review all past performance, general trends, and usefulness of the information and incorporate these into the performance confidence assessment. A separate quality assessment rating is not required; rather, the past performance confidence assessment rating is based on the offeror’s overall record of recency, relevancy and quality of performance.
In the case of offerors for which there is no information on past contract performance or where past contract performance is not available, the offeror may not be evaluated favorably or unfavorably on the factor of past contract performance. In this case, the offeror’s past performance is unknown and assigned a confidence rating of “neutral.” Although the SSEB may not rate an offeror that lacks recent, relevant past performance favorably or unfavorably with regard to past performance, the SSA may determine, that a “Substantial Confidence” or “Satisfactory Confidence” past performance rating is worth more than a “Neutral Confidence” past performance rating in a best value tradeoff as long as the determination is consistent with stated selection criteria.
5. Performance Confidence Assessment. This source selection requires less discrimination within the past performance evaluation, therefore, the SSEB may use the confidence ratings identified in Table 3 below.
Table 3. Performance Confidence Assessments Adjectival Rating Description Satisfactory Confidence Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.
Neutral Confidence No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The offeror may not be evaluated favorably or unfavorably on the factor of past performance.
Limited Confidence Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.
No Confidence Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.
D. EVALUATION FACTORS FOR AWARD
1. The solicitation requires the evaluation of price and the following non-price factors:
Factor 1 –Corporate Experience (Technical Factor) Factor 2 –Management Approach (Technical Factor) Factor 3 –Past Performance
2. The relative order of importance of the non-cost/price evaluation is the technical factors (Factors 1 and 2) are of equal importance to each other and, when combined are equal in importance to the past performance evaluation/performance confidence…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .