C-0200000 - Management and Administration

Spec Item
Title
2
Management and Administration
2.1
Definitions and Acronyms
2.2
General Information
2.2.1
Government Regular Working Hours
2.2.1.1
Restriction to Contractor Working Hours
2.2.2
Requirements Hierarchy
2.3
General Administrative Requirements
2.3.1
Required Conferences and Meetings
2.3.2
Partnering
2.3.2.1
Contract Partnering Level C
2.3.2.2
Contract Partnering Administration
2.3.2.3
Contract Partnering Session Attendees
2.3.3
Permits and Licenses
2.3.4
Insurance
2.3.4.1
Certificate of Insurance
2.3.4.2
Minimum Insurance Amounts
2.3.5
Protection of Government Property
2.3.6
Instructions, Directives, and References
2.3.7
Invoicing Procedures
2.3.8
Forms
2.4
Government-Furnished Property, Materials and Services
2.4.1
Government-Furnished Utilities
2.4.1.1
Availability of Utilities
2.4.2
Government-Furnished Materials (GFM)
2.5
Contractor-Furnished Items
2.6
Management
2.6.1
Work Reception
2.6.2
Work Control
2.6.3
Work Schedule
2.6.4
Quality Management System (QMS)
2.6.4.1
Quality Control Plan (QCP)
2.6.4.2
Contractor Quality Control/Assessment Reports
2.6.5
Environmental Management System (EMS)
2.7
Personnel Requirements
2.7.1
Key Personnel
2.7.1.1
Project Manager (PM)
2.7.1.2
Quality Control Manager (QCM)
2.7.1.3
Site Safety and Health Officer (SSHO)
2.7.2
Employee Requirements
2.7.2.1
Employee Appearance
2.7.2.2
Employee Conduct
2.7.2.3
Removal of Employees
2.8
Security Requirements
2.8.1
Employee Listing
2.8.2
Vehicles
2.8.3
Passes and Badges
2.8.4
Access to Buildings
2.8.5
Access Arrangements
2.9
Contractor Safety Program
2.9.1
Accident Prevention Plan (APP)
2.9.2
Activity Hazard Analysis (AHA)
2.9.3
Hazard Specific Safety Plans
2.9.3.1
Hazard Communication Plan
2.9.3.2
Health Hazard Control Plan
2.9.4
Accident and Damage Reporting
2.9.4.1
Accident Reporting Notification
2.9.5
Fire Protection
2.9.6
Monthly On-Site Labor Report
2.9.7
Safety Inspections and Monitoring
2.9.8
Safety Certification
2.9.9
Safety Apparel on Jobsites
2.10
Environmental Protection
2.10.1
Disposal
2.10.1.1
Non-Hazardous Waste
2.10.1.2
Hazardous Waste
2.10.2
Spill Prevention, Containment, and Clean-up
2.10.3
Hazardous Material Management
2.11
Disaster Preparedness
2.12
IDIQ Work
2.12.1
Unit Priced Task Work (Non-Negotiated)
2.12.1.1
Acceptance and Performance
2.12.1.2
Invoicing and Receiving Payment
2.12.2
IDIQ ELINS

C-0200000 - Management and Administration

Spec Item
Title
2
Management and Administration
2.1
Definitions and Acronyms
2.2
General Information
2.2.1
Government Regular Working Hours
2.2.1.1
Restriction to Contractor Working Hours
2.2.2
Requirements Hierarchy
2.3
General Administrative Requirements
2.3.1
Required Conferences and Meetings
2.3.2
Partnering
2.3.2.1
Contract Partnering Level C
2.3.2.2
Contract Partnering Administration
2.3.2.3
Contract Partnering Session Attendees
2.3.3
Permits and Licenses
2.3.4
Insurance
2.3.4.1
Certificate of Insurance
2.3.4.2
Minimum Insurance Amounts
2.3.5
Protection of Government Property
2.3.6
Instructions, Directives, and References
2.3.7
Invoicing Procedures
2.3.8
Forms
2.4
Government-Furnished Property, Materials and Services
2.4.1
Government-Furnished Utilities
2.4.1.1
Availability of Utilities
2.4.2
Government-Furnished Materials (GFM)
2.5
Contractor-Furnished Items
2.6
Management
2.6.1
Work Reception
2.6.2
Work Control
2.6.3
Work Schedule
2.6.4
Quality Management System (QMS)
2.6.4.1
Quality Control Plan (QCP)
2.6.4.2
Contractor Quality Control/Assessment Reports
2.6.5
Environmental Management System (EMS)
2.7
Personnel Requirements
2.7.1
Key Personnel
2.7.1.1
Project Manager (PM)
2.7.1.2
Quality Control Manager (QCM)
2.7.1.3
Site Safety and Health Officer (SSHO)
2.7.2
Employee Requirements
2.7.2.1
Employee Appearance
2.7.2.2
Employee Conduct
2.7.2.3
Removal of Employees
2.8
Security Requirements
2.8.1
Employee Listing
2.8.2
Vehicles
2.8.3
Passes and Badges
2.8.4
Access to Buildings
2.8.5
Access Arrangements
2.9
Contractor Safety Program
2.9.1
Accident Prevention Plan (APP)
2.9.2
Activity Hazard Analysis (AHA)
2.9.3
Hazard Specific Safety Plans
2.9.3.1
Hazard Communication Plan
2.9.3.2
Health Hazard Control Plan
2.9.4
Accident and Damage Reporting
2.9.4.1
Accident Reporting Notification
2.9.5
Fire Protection
2.9.6
Monthly On-Site Labor Report
2.9.7
Safety Inspections and Monitoring
2.9.8
Safety Certification
2.9.9
Safety Apparel on Jobsites
2.10
Environmental Protection
2.10.1
Disposal
2.10.1.1
Non-Hazardous Waste
2.10.1.2
Hazardous Waste
2.10.2
Spill Prevention, Containment, and Clean-up
2.10.3
Hazardous Material Management
2.11
Disaster Preparedness
2.12
IDIQ Work
2.12.1
Unit Priced Task Work (Non-Negotiated)
2.12.1.1
Acceptance and Performance
2.12.1.2
Invoicing and Receiving Payment
2.12.2
IDIQ ELINS

C-0200000 - Management and Administration

Spec Item
Title
Description
2
Management and Administration
2.1
Definitions and Acronyms
Definitions and Acronyms are listed in J-1800000-01.
2.2
General Information
2.2.1
Government Regular Working Hours
The performance of other work requirements shall be accomplished within the Government’s regular working hours unless the requirements herein state otherwise, or the individual Task Orders indicate different hours. Work in certain annexes or sub-annexes may require or allow the Contractor to perform work outside normal working, including holidays, and may require Contractor availability at any hour during the day. All work outside Government regular working hours requires prior Contracting Officer’s (KO) approval. The Government's regular working hours are from 0700-1600, Sunday through Friday.
2.2.1.1
Restriction to Contractor Working Hours
If the Contractor wishes to work outside of the Government's regular working hours for the Contractor’s convenience, the Contractor shall submit a written Request to Work Outside Government’s Regular Working Hours to the KO for approval at least seven calendar days prior to requested day. Excludes work to be performed during specified hours.
2.2.2
Requirements Hierarchy
Requirements or definitions specified in each spec item of this contract apply to subordinate paragraphs. For example, requirements shown in spec item 3.1 would apply to spec items 3.1.1, 3.1.2, 3.1.2.1 and so on.
2.3
General Administrative Requirements
2.3.1
Required Conferences and Meetings
The Contractor may be required to attend administrative and coordination meetings. The Contractor shall attend meetings as shown in Section C 2.
2.3.2
Partnering
To increase the likelihood of successful performance of this contract, the Government requires cohesive partnerships with its Contractors and subcontractors. Key stakeholders, including the clients who will receive services, principal individuals from NAVFAC, the performance assessment team, and representative(s) of the installation(s) will be invited to participate in the partnering process. Key members of the prime and subcontractors teams, including senior management personnel must participate. The partnership will draw on the strength of each organization in an effort to achieve quality contract services done right the first time, within the contract price, as scheduled, and without any safety mishaps.

A project’s characteristics determine the process level to be used. As such the following partnering level applies to this contract:

2.3.2.1
Contract Partnering Level C
This level of partnering discusses partnering concepts and benefits and should become a part of the pre-performance conference. The senior Government and Contractor stakeholders present will jointly host the partnering sessions. The partners will determine the frequency of the follow-on sessions. The partnering sessions should be held at locations agreed to by the partners.
2.3.2.2
Contract Partnering Administration
Upon award, the Administrative Contracting Officer (ACO) will contact the Contractor, client(s), Region, and Installation(s) stakeholders, and the performance assessment team to discuss implementation of partnering. The initial session must be scheduled as soon as possible after award of the contract. A partnership agreement, The Charter, should be in place as early as possible so issues arising, even before work begins, can be resolved using the issues resolution process. Replacement of Core Management Team members (stakeholders who attended the initial session and manage the contract work day-to-day) is discouraged since it will disrupt the synergy that has been developed. If replacement of a team member proves to be unavoidable, a follow-on partnering session must be held to officially turn the responsibilities of the position over to the new member.

The Core Management Team consisting of the attendees below must be present during the initial and all follow-on partnering sessions. These are the core mandatory attendees. Other stakeholders may attend if they desire or as recommended by the partners.

For more information concerning Partnering read NAVFACINST 11013.40A, which can be viewed in the Government’s Contracts Office.

2.3.2.3
Contract Partnering Session Attendees

The Contractor shall bring the necessary personnel to successfully partner on this contract. Asterisk indicates mandatory personnel.

President/Vice President

*Contract/Project Manager

*Supervisor/Superintendent

*Quality Control Manager

Safety Manager

2.3.3
Permits and Licenses
The Contractor shall obtain all required permits, licenses, and authorizations to perform work under this contract and comply with all the applicable Host Nation, regional and local laws and regulations, and U.S. DoD health, safety and environmental policies. Provide evidence of such Permits and Licenses to the KO within 15 calendar days after contract award, before any on-site work commences and at other times as requested by the KO. See Section F-0200000 / 2.3.3 for submittal requirement details. If regulatory approval is required to perform actions under this contract, the Contractor shall be responsible for the application for any approvals or documentation required to perform the activity. The Contractor must perform all work needed to obtain the required approvals prior to initiating the activity requiring that approval.
2.3.4
Insurance
Within 15 calendar days after award of this contract and before commencement of any on-site work, the Contractor shall furnish the KO a Certificate of Insurance as evidence of the existence of the following insurance coverage in amounts not less than the amounts specified below in accordance with the FAR Clause 52.228-05, INSURANCE – WORK ON A GOVERNMENT INSTALLATION. This insurance must be maintained during the performance period. See Section F-0200000 / 2.3.4 for submittal requirement details.
2.3.4.1
Certificate of Insurance
The Certificate of Insurance shall provide for at least 30 calendar days written notice to the KO by the insurance company prior to cancellation or material change in policy coverage. Other requirements and information are contained in the aforementioned insurance clause.
2.3.4.2
Minimum Insurance Amounts
The Contractor shall procure and maintain, during the entire period

of performance under this contract, the following minimum insurance coverage:

Comprehensive General Liability: $500,000 per occurrence

Automobile Liability: $200,000 per person, $500,000 per occurrence, $20,000 per occurrence for property damage

Workmen's Compensation: As required by federal and local worker's compensation and occupational disease statutes

Employer's Liability coverage: $100,000

War Hazard Insurance

Other, as required by local law

2.3.5
Protection of Government Property
During execution of the work, the Contractor shall protect Government property. The Contractor shall return areas damaged as a result of negligence under this contract to their original condition at no cost to the Government.
2.3.6
Instructions, Directives, and References
Applicable Department of Defense (DoD), Secretary of the Navy (SECNAV), Chief of Naval Operations (OPNAV), and other directives, instructions, and references are listed in

Section J-1800000-02.

2.3.7
Invoicing Procedures
Invoicing procedures are identified in C-1800000 Spec Items 4.1.
2.3.8
Forms
Any government forms required for this Annex, e.g. accident reporting, and damage reporting will be provided by the government.
2.4
Government-Furnished Property, Materials and Services
In accordance with FAR 52.245-1, GOVERNMENT PROPERTY and NAVFAC Clause 5252.245-9300, GOVERNMENT-FURNISHED PROPERTY, MATERIALS AND SERVICES, and the following paragraphs, the Government will furnish or make available to the Contractor certain Government-owned facilities, utilities, materials, and equipment for use in connection with this contract.
2.4.1
Government-Furnished Utilities
Please refer to NAVFAC Clause 5252.245-9300 for requirements and to coordinate J-attachment numbering.
2.4.1.1
Availability of Utilities
The Government will furnish water and electricity at existing outlets required for the work to be performed under the contract at no cost to the Contractor. Information concerning the location of existing outlets may be secured from the KO. The Contractor shall provide and maintain, at its expense, the necessary service lines from the existing Government outlets to the work site. Provide and maintain backflow prevention devices on connections to domestic water lines and electrical transformer provisions on connections to electric lines. Meet all applicable DoD, DON, and U.S. base and site codes and regulations for backflow prevention devices and electrical transformer provisions. Services required by the Contractor, for which there are no available Government outlets, shall be provided by the Contractor at no cost to the Government.
2.4.2
Government-Furnished Materials (GFM)
A type of government property that is made available by the Government and accepted by the Contractor where this property is consumed or expended during the performance of the contract. Component parts or a higher assembly, or items that lose their individual identity through incorporation into an end-item are materials. Equipment, special tooling, and special test equipment are not considered materials.
2.5
Contractor-Furnished Items
Except for items identified as Government Furnished, the Contractor shall provide all equipment, materials, parts, supplies, components, and facilities to perform the requirements of this contract. The KO may inspect Contractor-furnished items for adequacy and compliance with contract requirements. Inadequate or unsafe items shall be removed and replaced by the Contractor at no cost to the Government. Materials containing asbestos, lead, and PCB’s shall not be brought on site. The KO may at any time require Samples, Material Safety Data Sheets (MSDS) or Manufacturer’s Data Cut Sheets of Materials used in this contract.
2.6
Management
The Contractor shall manage the total work effort associated with the services required herein to meet the performance objectives and standards. Such management includes but is not limited to planning, scheduling, cost accounting, report preparation, establishing and maintaining records, and quality control. The Contractor shall provide a staff with the necessary management expertise to assure performance objectives and standards are met.
2.6.1
Work Reception
The Contractor shall establish a work reception function with the capability to receive, classify, issue, correspond, and respond to task orders. Insert desired hours of operation for work reception function. Provide description of local requirement, corresponding response and completion times for each task order.
2.6.2
Work Control
The Contractor shall implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking and reporting of work in progress. The Contractor shall plan and schedule work to assure material, labor, and equipment are available to complete work requirements within the specified time limits and in conformance with the quality standards established herein. Verbal scheduling and Work Status Reports shall be provided when requested by the KO. A written status report of any item of work must be provided within 24 hours of the inquiry.
2.6.3
Work Schedule
The Contractor's work shall not interfere with normal Government business. In those cases where some interference is unavoidable, the Contractor shall minimize the impact and effects of the interference. The Contractor shall provide advance access of all of its work schedules to the Government. The Contractor shall notify the KO of any difficulty in scheduling work due to Government controls.
2.6.4
Quality Management System (QMS)
The Contractor shall establish and maintain a complete QMS program in accordance with the provisions specified herein. The Contractor’s QMS program shall provide an effective and efficient means of identifying and correcting problems throughout the entire scope of operations. The Contractor's QMS program shall address:

· Accurate documentation of work processes, procedures, and output measures.

· A systematic procedure for assessing compliance with performance objectives and standards.

· Accurate documentation of quality inspections conducted throughout the execution of work.

· Assessment-driven corrective actions and process adjustments as appropriate in a timely manner.

2.6.4.1
Quality Control Plan (QCP)
Within 15 calendar days after award of the contract and before commencement of any on-site work, the Contractor shall submit to the KO a QCP. The QCP shall describe the QMS methodology and approaches used under this contract. Within seven calendar days of any change during period of performance, submit to the KO a revised QCP for acceptance. See Section F-0200000 / 2.6.4.1 for submittal requirement details.
2.6.4.2
Contractor Quality Control/Assessment Reports
The Contractor shall submit a copy of the Contractor Quality Control/Assessment Report to the KO monthly for the quality control events performed and assessment-driven corrective actions and process adjustments during the previous week. The Government may adjust the frequency of the submittal based on the Contractor’s quality of performance. See Section F-0200000 / 2.6.4.2 for submittal requirement details
2.6.5
Environmental Management System (EMS)
The Contractor shall perform work under this contract consistent with the following EMS goals and policy.

Goals:

· Reduce purchase and use of toxic and hazardous materials;

· Expand purchase of green products and services; increase recycling;

· Reduce energy and water use;

· Increase use of alternative fuels and renewable energy;

· Integrate green building concepts in major renovations and new construction;

· Prevent pollution at the source; and

· Continual improvement.

Policy:

· Protect public health and the environment by being an environmentally responsible member of the community;

· Preserve our natural, historic and cultural resources;

· Conserve natural resources by reducing what we discard, reusing items, and recycling materials, which includes purchasing products made from recycled materials;

· Integrate sound environmental practices into all our operations and business decisions; Integrate environmental protection requirements and pollution prevention initiatives into the early planning, design and procurement of facilities, equipment and material, as well as the planning and implementation of military training activities;

· Prevent or minimize pollution at its source as we seek out ways to eliminate or further minimize use of hazardous materials and generation of hazardous waste;

· Maintain a sound partnership with regulatory agencies to sustain our compliance with existing and new environmental laws and regulations;

· Enhance our program as we develop and implement an Environmental Management System; and

· Adhere to this policy, remind one another to do so, and ensure that our entire community knows this is our policy by our actions as well as our words.

The Contractor shall maintain monitoring and measurement information to address the EMS goals and policy and provide the EMS Goals and Policy Measurement Information to the KO when requested. In the event an EMS nonconformance or environmental noncompliance associated with the contracted services, tasks, or actions occurs, the Contractor shall take corrective and/or preventative actions. In the case of a noncompliance, the Contractor shall assume legal and financial liability for the noncompliance and take corrective action immediately to remedy the noncompliance. In the case of a nonconformance, the Contractor shall respond and take corrective action based on the time schedule established by the KO. The Contractor shall ensure that its employees are aware of their roles and responsibilities under the EMS and how these EMS roles and responsibilities affect work performed under the contract.

2.7
Personnel Requirements
The Contractor shall comply with the personnel requirements stated below.
2.7.1
Key Personnel
Within 15 calendar days after award of the contract, and before commencement of any on-site work, for other than qualification requirements required to be submitted with the offer, the Contractor shall submit to the KO a List of Key Personnel and Their Qualifications and any additional information requested by the KO to certify their qualifications.

The Contractor shall submit to the KO an Organizational Chart showing lines of authority of the key personnel and on-site supervisor(s) for this contract. The chart shall include names of personnel and their position title in this contract. As a minimum, include the PM, QCM, SSHO, Environmental Professional and on-site supervisor(s) and who they will report directly to for this contract. The key personnel shall be revised as applicable for the contract.

The PM, SSHO and QCM may be the same person.

See Section F-0200000 / 2.7.1 for submittal requirement details.

2.7.1.1
Project Manager (PM)
The Contractor shall provide a PM who has relevant experience at a comparable level of responsibility in projects of similar size, scope and complexity. The PM or alternate shall have full authority to act for the Contractor on all contract matters relating to this contract. The PM or alternate shall be available on-site within one hour after the Government's request.
2.7.1.2
Quality Control Manager (QCM)
The Contractor shall provide a QCM who shall have full authority and responsibility for assuring performance objectives and standards identified in this contract are met. The QCM may be the same person as the project manager. The QCM or alternate shall be available on-site within one hour after the Government's request.
2.7.1.3
Site Safety and Health Officer (SSHO)
The Contractor shall provide a SSHO whose primary duty and responsibility is to have basic safety knowledge and a valid driving license to operate on-base.
2.7.2
Employee Requirements
The Contractor shall provide experienced, qualified, and capable personnel to perform the work in this contract. Personnel shall be fully knowledgeable of all safety and environmental requirements associated with the work they perform. Competent personnel shall be provided as required. Personnel shall speak, read, and comprehend English to the extent that they can perform the contract requirements and comply with installation emergency procedures.
2.7.2.1
Employee Appearance
The Contractor shall ensure that all employees present a professional appearance that is appropriate for their position. The KO reserves the right to determine the acceptability of any clothing worn. All Contractor/subcontractor employees working under this contract shall be identified by a distinctive nameplate, emblem, or patch attached in a prominent place on an outer garment. Employee identification shall not be substituted for station required passes or badges.
2.7.2.2
Employee Conduct
Contractor employees shall conduct themselves in a proper, efficient, courteous and businesslike manner.
2.7.2.3
Removal of Employees
The Contractor shall remove from the site any individual whose continued employment is deemed by the KO to be contrary to the public interest or inconsistent with the best interests of National Security.
2.8
Security Requirements
The Contractor shall become acquainted with and comply with all Government regulations as posted, or as requested by the KO when required to enter a Government site. The Contractor shall ensure that all security/entrance clearances are obtained.
2.8.1
Employee Listing
The Contractor shall maintain and provide upon request a current Employee List. The list shall include employee’s name, employee Passport number and Visa number (Passports and Visas must be valid for at least 6 months), valid Central Population Register (CPR) Card number for TCNs or Kingdom of Bahrain ID Card number for local nationals. This information, with the exception of CPR Cards and Kingdom of Bahrain ID Cards, will also be used for access to locations in the UAE.
2.8.2
Vehicles
The company name shall be displayed on each of the Contractor's vehicles in a manner and size that is clearly visible. All vehicles shall display a valid host nation state license plate that complies with Host Nation Vehicle Codes. Vehicles shall meet all other requirements of the Host Nation Vehicle Code, such as safety standards, and shall carry proof of insurance and host nation registration, if applicable.
2.8.3
Passes and Badges
All Contractor employees shall obtain the required employee and vehicle passes. The Government will issue badges without charge. Each employee shall wear the Government issued badge over the front of the outer clothing. When an employee leaves the Contractor's service, the employee's Passes and Badges shall be returned within 10 calendar days.
2.8.4
Access to Buildings
The Contractor shall monitor and control access into restricted areas under their responsibility, allowing only those individuals who have been properly cleared into restricted areas or other controlled access areas. The Contractor shall comply with security requirements, plus those imposed by the installation Commander at all times. Personnel with access to special areas will have the appropriate screening and/or security clearance, and personnel requiring routine access to restricted areas will wear special badges authorizing access for those areas. Contractor personnel shall not enter restricted or controlled areas or installation facilities unless specifically authorized in performance of their duties. The Contractor shall secure all buildings and facilities entered during non-duty hours and will secure all building and facilities under the Contractor’s cognizance at the end of each work day or shift period.
2.8.5
Access Arrangements
The Contractor shall make all arrangements through the appropriate office necessary to obtain access to buildings, facilities and other work areas, and when necessary, arrange for them to be opened and closed by the controlling authority. The Government may issue keys to the Contractor. The Contractor shall use due diligence and be responsible for compromised security systems to include replacement costs that result from its action or inaction.
2.9
Contractor Safety Program
The Contractor shall develop and implement a Safety Program detailing how the Contractor plans, staffs, performs, and controls all safety practices while delivering best value services to the Government without any accidents or mishaps. The Contractor’s safety program shall comply with all safety standards identified in the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM-385-1-1.
2.9.1
Accident Prevention Plan (APP)
To ensure that the Contractor has a well organized and thorough Safety Program, the Contractor shall prepare an Accident Prevention Plan (APP). The APP shall be prepared by the Contractor’s SSHO and shall be followed by all Contractor employees, subcontractors, and vendors at each service site. The APP shall follow the format and cover all topics as delineated in Appendix A of EM-385-1-1. The APP shall incorporate Activity Hazard Analyses (AHAs) and Situation Specific Safety Plans that are relevant to the site specific hazards and controls for each activity and type of work that may be encountered in the performance of this contract.

The Contractor shall submit an APP to the KO within 15 calendar days after contract award and before commencing any on-site work. The Contractor shall review, update, and submit the revised APP to the KO annually and within 15 calendar days whenever a change in work conditions, hazards, or activities occur. See Section F-0200000/2.9.1 for submittal requirement details.

2.9.2
Activity Hazard Analysis (AHA)
The Contractor shall prepare Activity Hazard Analyses (AHAs) for all common recurring work activities performed under this contract. AHAs shall be submitted with the APP and shall be updated as work activities or conditions change and additional AHAs prepared as new work activities are required. Specifically:

· For combination FFP/IDIQ contracts, the Contractor shall submit an AHA on task orders, with the associated proposal, whenever the service environment or required task is different from the firm-fixed-priced services.

AHAs shall follow format of Figure 1-1 of EM-385-1-1 and shall explain the following as detailed in the EM-385-1-1:

· The steps of the service process;

· Identify potential hazards that exist as a result of the Contractor’s service process within the environment;

· Measures or plans of actions to safely remove potential hazards away from people in and around the service process and environment;

· Specific materials and equipment necessary to safely remove potential hazards away from people in and around the service process and environment;

· Inspection requirements to assure service activity is safe; and

· Training of service personnel to be aware of potential hazards and measures or plans of actions to be used to remove hazards from service environment.

During performance of services, the SSHO shall periodically review the AHA at each service site and for each sub-annex to assess the effectiveness of the Contractor’s overall APP. If changes to the AHAs are required, such changes shall be submitted to the KO for review and acceptance.

2.9.3
Hazard Specific Safety Plans
The Contractor shall develop and implement hazard specific safety plans, as listed below, as necessary for the situation or types of work to be performed under this contract. These Hazard Specific Safety Plans shall be submitted with the APP and shall be updated as situations change. Additional hazard specific safety plans developed as applicable when new types of work are required under this contract.
2.9.3.4
Hazard Communication Plan
The Contractor shall develop a plan to explain how it will identify hazardous substances at the service site. This plan shall address: (1) training (to include potential safety and health effects from exposure); (2) labeling of hazardous substances; (3) maintaining an inventory listing of hazardous chemicals at the service site; and (4) location of a library of Material Safety Data Sheets (MSDSs) in the

office to satisfy 29 Code of Federal Regulations (CFR) 1910.1200 or 1926.59 requirements.

2.9.3.5
Health Hazard Control Plan
The Contractor shall develop a plan to explain how it will determine the presence of hazardous or toxic agents at the service environment and explain what safety measures are to be taken. This plan shall satisfy relevant topics of Section 6 of EM385-1-1.
2.9.4
Accident and Damage Reporting
The Contractor shall notify the KO of all damages, accidents, mishaps, and near misses that occur on or related to Government property as soon as practical, but not later than four hours.

For recordable injuries and illnesses, property damage accidents resulting in at least $2,000 in damages, the Prime Contractor shall conduct an accident investigation to establish the root cause(s) of the accident.

(a) For recordable injuries and illnesses and property damage accidents resulting in at least $2,000 in damages complete the Navy Contractor Significant Incident Report (CSIR) form and provide the report to the KO within 1 calendar day of the accident. The KO will provide a blank copy of any required or special forms.

(1) Recordable Injuries or Illnesses. Any work-related injury or illness that results in:

(i) Death, regardless of the time between the injury and death, or the length of the illness;

(ii) Days away from work (any time lost after day of injury/illness onset);

(iii) Restricted work;

(iv) Transfer to another job;

(v) Medical treatment beyond first aid;

(vi) Loss of consciousness; or

(vii) A significant injury or illness diagnosed by a physician or other licensed health care professional, even if it did not result in (1) through (6) above.

See Section F-0200000 / 2.9.4 for submittal requirement details.

2.9.4.1
Accident Reporting Notification
The Contractor shall report all accidents, mishaps, and near misses to the KO in a timely manner as described below:

· An Initial Accident Reporting Notification Report shall be developed by the Contractor and provided to the KO immediately after that an accident, or near miss, has occurred. The Contractor may not have all the facts and information regarding the actual incident or near miss at the time of the initial report. However, it is the Government’s desire to receive notification of all mishap situations as early as possible.

· The Contractor shall develop a Follow-on Accident Reporting Notification Report and shall and provide a copy to the KO by close of business the day of the accident, or if the accident occurs after hours, at start of business the following morning. Follow-on reports shall be required daily until the Contractor can send a final, conclusive report of the nature, cause, and outcome of the accident.

· The Contractor shall provide a Final Accident Reporting Notification Report of the accident to the KO within 24 hours after completing the investigation of the accident.

2.9.5
Fire Protection
The Contractor shall know where fire alarms are located and how to activate them. The Contractor shall handle and store all combustible supplies, materials, waste and trash in a manner that prevents fire or hazards to persons, facilities, and materials.
2.9.6
Monthly On-Site Labor Report
N/A
2.9.7
Safety Inspections and Monitoring
N/A
2.9.8
Safety Certification
N/A
2.9.9
Safety Apparel on Jobsites
The Contractor personnel shall wear appropriate high-visibility safety apparel (garment, vest, or harness of retro-reflective and fluorescent material) meeting ANSI/ISEA 107-2004 requirements. Appropriate garment shall be based on the worker hazards and tasks, complexity of the work environment or background, and vehicular traffic and speed. As a minimum, the Contractor personnel shall wear ANSI/ISEA 107-2004 Class I compliant apparel.
2.10
Environmental Protection
The Contractor shall comply with all applicable Host Nation, regional and local laws and regulations, and standards listed in U.S. DoD Final Governing Standards for Bahrain and UAE and the OEBGD which covers the country of Djibouti. All environmental protection matters shall be coordinated with the KO. Inspection of any of the government facilities or areas operated or used by the Contractor may be accomplished by the NSA Bahrain Installation Environmental Program Director, or authorized officials on a no-notice basis during Government regular working hours. In the event that a regulatory agency assesses a monetary fine against the Government for violations caused by Contractor negligence, the Contractor shall reimburse the Government for the amount of that fine, costs of defending against administrative or other legal action, remedial action, and other costs. The Contractor shall comply with the instructions of the cognizant Navy Medical Department with respect to avoidance of conditions which create a nuisance or which may be hazardous to the health of military or civilian personnel. The Contractor is responsible for ensuring that its employees receive applicable environmental and occupational health and safety training, and are kept up to date on regulatory required specific training for the type of work to be conducted onsite. All on-site Contractor personnel, and their subcontractor personnel, performing tasks that have the potential to cause a significant environmental impact shall be competent on the basis of appropriate education, training or experience.
2.10.1
Disposal
2.10.1.1
Non-Hazardous Waste
The Contractor shall dispose of debris and rubbish resulting from the work under this contract after determined to be non-usable and non-recyclable, on-installation and off-installation.
2.10.1.2
Hazardous Waste
The Contractor shall dispose of all hazardous waste in accordance with applicable Host Nation (including the country of Djibouti), regional and local laws and regulations, and U.S. DoD Final Governing Standards for Bahrain and UAE.
2.10.2
Spill Prevention, Containment, and Clean-up
The Contractor shall prevent, contain, clean up, and report all spills on Government property, caused by the Contractor, in a manner that complies with applicable Host Nation, regional and local laws and regulations, and U.S. DoD Final Governing Standards for Bahrain and UAE or otherwise stated herein, and the U.S. Navy spill control plans at no cost to the Government.
2.10.3
Hazardous Material Management
The Contractor shall support the Consolidated Hazardous Material Reutilization and Inventory Management Program (CHRIMP). The Contractor shall ensure that procedures are in place to deal with hazardous materials, pursuant to the FAR Clause 52.223-3, HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA. The CHRIMP is available upon request to the KO.
2.11
Disaster Preparedness
The Contractor shall comply with the NSA Bahrain Contingency Instruction / Contingency Response Plan. The Contractor shall support the installation contingency response plan as directed by the KO. The NSA Bahrain Contingency Instruction / Contingency Response Plan is available upon request to the KO.
2.12
IDIQ Work
IDIQ work is identified in each applicable annex or sub-annex. IDIQ work may consist of Unit Priced Tasks (UPT) Work (non-negotiated). The Contractor shall perform all IDIQ task work as ordered by the KO per Section G. IDIQ work will consist of UPT which may be ordered by the Government as separate items or in combinations of items from the Schedule of Indefinite Delivery Indefinite Quantity Work (Bid Schedule) in Section B on an as needed basis.
2.12.1
Unit Priced Task Work (Non-Negotiated)
UPT work is defined as an IDIQ work item that includes all direct and indirect costs plus profit associated with the particular unit of work. All materials and equipment (rented or owned) required for the accomplishment of a UPT shall be included within the respective exhibit line item prices. The FFP for the task order is determined by multiplying the exhibit line item unit prices by the quantities ordered. The Contractor is not required to submit cost estimates for UPTs.
2.12.1.1
Acceptance and Performance
The Contractor shall possess the capability to accept and perform IDIQ work via an electronic medium. The Contractor is required to report all IDIQ quantities ordered monthly to the KO.
2.12.1.2
Invoicing and Receiving Payment
The Contractor shall submit one Consolidated IDIQ Invoice for IDIQ work completed during the preceding month. The Contractor shall possess the capability to invoice and receive payment for IDIQ work via an electronic medium. No partial or advance payments are provided.
2.12.3
IDIQ ELINS
IDIQ ELINs are provided in J-1800000-03.