BAA-AFRL-RQKS-2015-0009-IndustryDay2.pdf

PDF 713 KB Posted

Attached to
Mission Systems Open Architecture Science and Technology (MOAST) Federal contract opportunity
Solicitation number
BAA-AFRL-RQKS-2015-0009
Issued by
Department of the Air Force Materiel Command Research Laboratory

About this file

Industry Day Briefing Charts

View the file

Other files for this federal contract opportunity

Other files attached to Mission Systems Open Architecture Science and Technology (MOAST), newest first.
File Type Posted
BAA-AFRL-RQKS-2015-0009-Amd1.pdf PDF
BAA-AFRL-RQKS-2015-0009-Q As.pdf PDF
BAA-AFRL-RQKS-2015-0009.pdf PDF
BAA-AFRL-RQKS-2015-0009-Atch6.pdf PDF
BAA-AFRL-RQKS-2015-0009-Atch4.pdf PDF
BAA-AFRL-RQKS-2015-0009-Atch3.pdf PDF
BAA-AFRL-RQKS-2015-0009-Atch7.pdf PDF
BAA-AFRL-RQKS-2015-0009-Atch2.pdf PDF
BAA-AFRL-RQKS-2015-0009-Atch8.pdf PDF
BAA-AFRL-RQKS-2015-0009-Atch5.pdf PDF
BAA-AFRL-RQKS-2015-0009-Atch1.pdf PDF
BAA-AFRL-RQKS-2015-0009-IndDay-Participants.pdf PDF
BAA-AFRL-RQKS-2015-0009-IndustryDay1.pdf PDF
BAA-AFRL-RQKS-2015-0009-IndustryDay-Q As.pdf PDF
BAA-AFRL-RQKS-2015-0009-IndustryDay.pdf PDF
BAA-AFRL-RQKS-2015-0009.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

18 August 2015

Air Force Research Laboratory

Integrity Service Excellence

DISTRIBUTION A - Approved for Public Release - 88ABW 2015-3574/3906

AFRL/RYWA

Avionics Vulnerability Mitigation Branch

Sensors Directorate

Air Force Research Laboratory

Mission Systems Open

Architecture Science &

Technology (MOAST)

BAA-AFRL-RQKS-2015-0009

12 Aug 2015

2 DISTRIBUTION A - Approved for Public Release - 88ABW 2015-3906

Program Objective

Conduct exploratory, applied, and advanced research and development to evolve and expand emerging open architecture standards and approaches for current and next-generation Air Force weapon systems

3 DISTRIBUTION A - Approved for Public Release - 88ABW 2015-3906

Anticipated Acquisition Strategy

• Anticipated Period of Performance

– 60 months ordering period

– 84 months total performance

• Value: $48M

• Anticipated Number of Awards: Two or more

– IDIQ

– C-type contracts

– Anticipated Award Date: February 2016

• Is this a follow-on?

– No

4 DISTRIBUTION A - Approved for Public Release - 88ABW 2015-3906

Intellectual Property

• Associate contractors agreements may be required

• AFRL expects unlimited rights with this effort

5 DISTRIBUTION A - Approved for Public Release - 88ABW 2015-3906

Security

• Work up to TS/SCI, SAP

• No classified proposals

• Export control restrictions apply

• No Foreign participation

6 DISTRIBUTION A - Approved for Public Release - 88ABW 2015-3906

Performance Location

• Research and development can occur either onsite at AFRL or at appropriately equipped contractor facilities

• RYWA will strive for a strong onsite R&D program, leveraging offsite R&D specialists as needed to maximize productivity

• Integration and test must be performed on-site

– Integration is expected to occur throughout the performance of the research, not just at the end of the effort

– Developed technology must be integrated with other products and technologies in the MOAST laboratory

– Incremental developments will be delivered and integrated for test, demonstration, experimentation purposes

– The goal is demonstration of the capabilities, test of developed technology, and experimentation with developed technology

DISTRIBUTION A - Approved for Public Release - 88ABW 2015-3574

Facilities and Resources MOAST Lab

8 DISTRIBUTION A - Approved for Public Release - 88ABW 2015-3906

Scope

• Advance the state-of-the-art in open architecture standards, approaches, technologies, and tools

• MOAST includes integration of mission-critical and flight-critical systems on manned and unmanned platforms, as well as ground systems

• Technical solutions at the component, system, and system of systems are of interest

• Initial focus is on OMS and UCI family of open architecture standards, but other standards are within scope

9 DISTRIBUTION A - Approved for Public Release - 88ABW 2015-3906

Goals

• Provide mature, robust open architecture solutions for current and next-generation Air Force weapon systems

– Enable affordable capability evolution

– Simplify integration

– Avoid vendor lock

– Promote innovation

– Provide options for legacy system migration

• Ensure open architecture solutions accommodate “built-in” cybersecurity features

• Promote interoperability with other open architecture standards

10 DISTRIBUTION A - Approved for Public Release - 88ABW 2015-3906

Objectives

• Evolve and expand OMS and UCI standards to accommodate additional platform challenges

• Develop innovative, affordable avionics cybersecurity technologies to augment OSA implementations

• Explore emerging concepts for future OSA implementations

• Conduct advanced technology demonstrations of mature open architecture capability

11 DISTRIBUTION A - Approved for Public Release - 88ABW 2015-3906

Technical Areas of Interest

• Evolution of Open System Architecture Standards

• Cyber Resiliency of Open System Architectures

• Open System Architecture Emerging Concepts and Technologies

• Open System Architecture Risk Reduction Studies and Experimentation

• Open System Architecture Advanced Technology Demonstrations

File details come from the government source that posted it. Updated .