B08-Section_J-Attachment_1-Specifications_Yellowstone_Grant_NPS_YELL_310402_8_27_2025.pdf

PDF 10 MB Posted

Attached to
YELL 310402 REPLACE GRANT WASTEWATER TREATMENT PLA
Solicitation number
140P2025R0102
Issued by

View the file

Other files

File Type Posted
Sol_140P2025R0102_Amd_0012.pdf PDF
B09-140P2025R0102-Amd_11_0011.pdf PDF
Sol_140P2025R0102_Amd_0011.pdf PDF
Sol_140P2025R0102_Amd_0010.pdf PDF
B09-140P2025R0102-Amd_10_0010.pdf PDF
Sol_140P2025R0102_Amd_0009.pdf PDF
Sol_140P2025R0102_Amd_0008.pdf PDF
B09_140P2025R0102_Amendment_08_Attachment_0008.pdf PDF
B09_140P2025R0102_Amendment_07_Attachment_0007.pdf PDF
Sol_140P2025R0102_Amd_0007.pdf PDF
Sol_140P2025R0102_Amd_0006.pdf PDF
Grant_Bid_Question_Tracker_0006.pdf PDF
Sol_140P2025R0102_Amd_0005.pdf PDF
B08_Project_Experience_Questionnaire_0004.docx DOCX document
B08_Small_Business_Subcontracting_Plan_0004.docx DOCX document
B08_Past_Performance_Questionnaire_0004.docx DOCX document
Grant_WWTP_and_Collections_11-19-25_0004.pdf PDF
B08_General_References_0004.docx DOCX document
Sol_140P2025R0102_Amd_0004.pdf PDF
310402-326133_Prebid_Meeting_Sign_In_Sheet_10-22-25_0003.pdf PDF
Sol_140P2025R0102_Amd_0003.pdf PDF
Sol_140P2025R0102_Amd_0002.pdf PDF
image_(1)_0002.png PNG image
image_0002.png PNG image
Sol_140P2025R0102_Amd_0001.pdf PDF
Sol_140P2025R0102.pdf PDF
B08_-Section_J_-_Attachment_10-Geotechnical_Data_Report_Part3.pdf PDF
B08_140P2025R0102.pdf PDF
B08_-Section_J_-_Attachment_12-Aquatic_Resources_Delineation_Report.pdf PDF
B08_-Section_J-Attachment_11-Regulated_Building_Materials_Survey_Grant_WWTP_Project.pdf PDF
B08-Section_J-Attachment_2-Drawings_1C_Grant_Village_WWTP.pdf PDF
B08_-Section_J_-_Attachment_10-Geotechnical_Data_Report_Part4.pdf PDF
B08-Section_J-Attachment_2-Drawings_3_Canyon_Collections_System.pdf PDF
B08-Section_J-Attachment_2-Drawings_1B_Grant_Village_WWTP.pdf PDF
B08_-Section_J_-_Attachment_10-Geotechnical_Data_Report_Part1.pdf PDF
B08-Section_J-Attachment_2-Drawings_1A_Grant_Village_WWTP.pdf PDF
B08-Section_J-Attachment_2-Drawings_2_Grant_Collections.pdf PDF
B08_-Section_J_-_Attachment_10-Geotechnical_Data_Report_Part2.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NATIONAL PARK SERVICE

YELLOWSTONE NATIONAL PARK, WYOMING

GRANT VILLAGE WASTEWATER TREATMENT PLANT & COLLECTION SYSTEM

& CANYON VILLAGE COLLECTION SYSTEM

CONTRACT DOCUMENTS

for the construction of the

YELL 310402 REPLACE GRANT VILLAGE WASTEWATER TREATMENT PLANT;

REHABILITATE CANYON AND GRANT WASTEWATER COLLECTION SYSTEMS

FINAL CONSTRUCTION DOCUMENTS

JACOBS

Loveland, Colorado

August 2025

Project No. D3167659 Copy No.

PW\JA\NPS\D3167659\4\42 SEALS PAGE

AUGUST 2025 00 01 07 - 1

YELL 310402

SECTION 00 01 07

SEALS PAGE

See Table of Contents for author of each specification section, identified by author’s initials as follows:

AUTHOR’S NAME = INITIALS

KILE SNIDER = KS

GEOFFREY B. KIRSTEN = GBK

STEPHEN M. SIGLER = SMS

LUKE A. SCOGGINS = LAS

JONATHAN JAMES = JJ

SPECIFICATIONS

Digitally Signed on

August 7, 2025

Kile Snider

SEALS PAGE PW\JA\NPS\D3167659\4\42

00 01 07 - 2 MAY 2025

YELL 310402

Digitally Signed on

May 6, 2025

Geoffrey B. Kirsten

AUGUST 2025 00 01 07 - 3

YELL 310402

Digitally Signed on

August 7, 2025

Jonathan James

08/07/2025

SEALS PAGE PW\JA\NPS\D3167659\4\42

00 01 07 - 4 MAY 2025

YELL 310402

Digitally Signed on

May 6, 2025

Stephen M. Sigler

MAY 2025 00 01 07 - 5

YELL 310402

Digitally Signed on

May 6, 2025

Luke A. Scoggins

END OF SECTION

PW\JA\NPS\D3167659\4\42 TABLE OF CONTENTS

AUGUST 2025 00 01 10 - 1

YELL 310402

TABLE OF CONTENTS

Person Section Responsible Title Pages

SPECIFICATIONS

DIVISION 01—GENERAL REQUIREMENTS

01 11 00 KS Summary of Work.............................................................. 1- 18 01 12 00 SMS Natural Features Protection ................................................ 1- 5 01 26 01 KS Contract Modification Procedures ..................................... 1- 6 01 27 00 KS Definition of Contract Line Items ...................................... 1- 2 01 31 00 KS Project Management and Coordination ............................. 1- 17 01 32 16 KS Construction Schedule ....................................................... 1- 10 01 32 33 KS Photo Documentation ......................................................... 1- 3 01 33 23 KS Submittal Procedures ......................................................... 1- 9

Supplement:

KS Submittal List ..................................................................... 1- 29

01 35 13.22 KS Archeological Resources Protection .................................. 1- 3 01 35 23 KS Safety Requirements .......................................................... 1- 6 01 40 00 KS Quality Requirements ........................................................ 1- 8 01 42 00 KS Reference Standards ........................................................... 1- 14 01 45 33 LAS Special Inspection, Observation, and Testing .................... 1- 6

Supplement:

LAS Contractor’s Statement of Responsibility .......................... 1- 2

01 50 00 KS Temporary Facilities and Controls ..................................... 1- 14 01 57 19.11 KS Indoor Air Quality Management ........................................ 1- 7 01 57 19.12 KS Noise and Acoustics Management ..................................... 1- 3 01 57 23 KS Temporary Storm Water Pollution Prevention .................. 1- 9 01 57 28 KS Temporary Flow Control ................................................... 1- 8 01 67 00 KS Product Requirements ........................................................ 1- 10

Supplements:

KS Affirmative Procurement Reporting Form ......................... 1- 2 KS Manufacturer’s Certificate of Proper Installation .............. 1- 1 KS Manufacturer’s Certificate of Compliance ........................ 1- 1

01 73 29 KS Cutting and Patching .......................................................... 1- 4 01 73 40 KS Execution ........................................................................... 1- 8 01 74 19 KS Construction Waste Management and Disposal ................ 1- 9

Supplement:

KS Project Waste Management Plan Worksheet Sample ........ 1- 2

01 77 00 KS Closeout Procedures ........................................................... 1- 5

Person Section Responsible Title Pages

TABLE OF CONTENTS PW\JA\NPS\D3167659\4\42

00 01 10 - 2 AUGUST 2025

YELL 310402

01 78 23 KS Operation and Maintenance Data ....................................... 1- 9 Supplements:

KS Equipment Data Sheet ........................................................ 1- 1 KS Closeout and Operation & Maintenance (O&M)

Requirements Template .................................................. 1- 1 01 79 00 KS Demonstration and Training .............................................. 1- 4 01 81 13 KS Sustainable Design Requirements ...................................... 1- 4 01 88 15 LAS Anchorage and Bracing ...................................................... 1- 6 01 91 14 KS Total Building Commissioning .......................................... 1- 13 01 91 15 KS Process Equipment Testing and Facility Startup ............... 1- 10

Supplements:

KS Unit Process Startup Form ................................................. 1- 1 KS Facility Performance/Demonstration Certification Form .. 1- 1

DIVISION 02—EXISTING CONDITIONS

02 10 00 KS Natural Treatment System ................................................. 1- 6 02 41 00 KS Demolition ......................................................................... 1- 11 02 65 00 KS Underground Storage Tank Removal ................................ 1- 10 02 81 00 KS Transportation and Disposal of Hazardous Materials ........ 1- 11

Supplement:

KS Attachment A: Sample Offsite Policy

Certification Memo ......................................................... 1- 1 02 82 00 KS Asbestos Remediation ........................................................ 1- 31 02 83 00 KS Lead Remediation .............................................................. 1- 18 02 84 16 KS Handling of Lighting Ballasts and Lamps Containing

PCBs and Mercury .......................................................... 1- 7 02 84 33 KS Removal and Disposal of Polychlorinated Biphenyls

(PCBs) ............................................................................. 1- 11

DIVISION 03—CONCRETE

03 01 32 LAS Repair of Vertical and Overhead Concrete Surfaces ......... 1- 12 03 01 33 LAS Repair of Horizontal Concrete Surfaces ............................ 1- 12 03 10 00 LAS Concrete Forming and Accessories ................................... 1- 6 03 15 00 LAS Concrete Joints and Accessories ........................................ 1- 9 03 21 00 LAS Steel Reinforcement ........................................................... 1- 5 03 30 00 LAS Cast-in-Place Concrete ....................................................... 1- 27

Supplements:

LAS Concrete Mix Design, Class 4500F2S1W1C1 .................. 1- 2 LAS Concrete Mix Design, Class GM3500F1S1W1C1 ............ 1- 2 LAS Concrete Mix Design, Class 3500F1S1W1C1 .................. 1- 2

03 39 00 LAS Concrete Curing ................................................................. 1- 5

PW\JA\NPS\D3167659\4\42 TABLE OF CONTENTS

AUGUST 2025 00 01 10 - 3

YELL 310402

03 62 00 LAS Grouting ............................................................................. 1- 10 Supplement:

LAS 24-hour Evaluation of Nonshrink Grout Test Form and Grout Testing Procedures ......................................... 1- 3

03 63 00 LAS Concrete Doweling ............................................................ 1- 4 03 64 23 LAS Epoxy Resin Injection Grouting ........................................ 1- 11 03 64 24 LAS Polyurethane Injection Grouting ........................................ 1- 9

DIVISION 04—MASONRY

04 21 13.13 GBK Masonry Veneer ................................................................. 1- 13 04 22 00 LAS Concrete Unit Masonry ...................................................... 1- 14

DIVISION 05—METALS

05 05 19 LAS Post-Installed Anchors ....................................................... 1- 9 05 05 23 LAS Welding .............................................................................. 1- 6

Supplement:

LAS Welding and Nondestructive Testing Table ...................... 1- 1

05 12 00 LAS Structural Steel Framing .................................................... 1- 13 05 31 00 LAS Steel Decking ..................................................................... 1- 7 05 41 00 LAS Structural Metal Stud Framing ........................................... 1- 7 05 50 00 LAS Metal Fabrications ............................................................. 1- 17 05 52 16 LAS Aluminum Railings ............................................................ 1- 8 05 53 00 LAS Metal Gratings ................................................................... 1- 6

DIVISION 06—WOOD, PLASTICS, AND COMPOSITES

06 10 00 GBK Rough Carpentry ................................................................ 1- 8 06 41 00 GBK Architectural Wood Casework ........................................... 1- 10 06 82 00 LAS Glass-Fiber-Reinforced Plastic .......................................... 1- 12

DIVISION 07—THERMAL AND MOISTURE PROTECTION

07 14 00 GBK Fluid-Applied Waterproofing ............................................ 1- 5 07 15 00 GBK Air and Water Barriers ....................................................... 1- 14 07 19 00 GBK Water Repellents ................................................................ 1- 4 07 21 00 GBK Thermal Insulation ............................................................. 1- 7 07 41 13 GBK Metal Roof, Wall, and Soffit Panels .................................. 1- 20 07 62 00 GBK Sheet Metal Flashing and Trim .......................................... 1- 7 07 70 01 GBK Roof Specialties and Accessories ...................................... 1- 4 07 84 00 GBK Firestopping ....................................................................... 1- 6 07 92 00 GBK Joint Sealants ..................................................................... 1- 10

TABLE OF CONTENTS PW\JA\NPS\D3167659\4\42

00 01 10 - 4 AUGUST 2025

YELL 310402

DIVISION 08—OPENINGS

08 11 00 GBK Metal Doors and Frames .................................................... 1- 9 08 30 00 GBK Specialty Doors .................................................................. 1- 7 08 41 13 GBK Aluminum-Framed Windows ............................................ 1- 8 08 45 00 GBK Translucent Wall Assemblies ............................................ 1- 9 08 71 00 GBK Door Hardware ................................................................... 1- 17 08 80 00 GBK Glazing ............................................................................... 1- 12 08 90 00 GBK Louvers .............................................................................. 1- 5

DIVISION 09—FINISHES

09 22 16 GBK Nonstructural Metal Framing ............................................. 1- 4 09 29 00 GBK Gypsum Board ................................................................... 1- 12 09 30 00 GBK Tiling .................................................................................. 1- 10 09 51 13 GBK Acoustical Panel Ceilings .................................................. 1- 5 09 65 00 GBK Resilient Flooring ............................................................... 1- 8 09 90 00 KS Painting and Coating .......................................................... 1- 7

Supplements:

KS Paint System Data Sheet (PSDS) ....................................... 1- 1 KS Paint Product Data Sheet (PPDS) ...................................... 1- 1 KS Volatile Organic Compound (VOC) Limit List ................. 1- 2

09 96 35 KS Chemical-Resistant Coatings ............................................. 1- 13 Supplements:

KS Chemical-Resistant Coating System Data Sheet (CRCSDS). ..................................................................... 1- 1

KS Chemical-Resistant Coating Product Data Sheet (CRCPDS). ..................................................................... 1- 1

DIVISION 10—SPECIALTIES

10 14 00 GBK Signage ............................................................................... 1- 8 Supplement:

GBK Sign Schedule .................................................................... 1- 5 10 28 00 GBK Toilet and Bath Accessories ............................................... 1- 8 10 44 00 GBK Fire Protection Specialties and Safety Equipment ............. 1- 4 10 51 00 GBK Lockers and Benches ......................................................... 1- 4 10 80 00 GBK Miscellaneous Specialties .................................................. 1- 4

DIVISION 11—EQUIPMENT

11 31 00 GBK Appliances .......................................................................... 1- 2 11 53 00 GBK Laboratory Equipment ....................................................... 1- 13

PW\JA\NPS\D3167659\4\42 TABLE OF CONTENTS

AUGUST 2025 00 01 10 - 5

YELL 310402

DIVISION 12—FURNISHINGS

12 35 53 GBK Laboratory Casework ......................................................... 1- 22 12 49 00 GBK Roller Shades ..................................................................... 1- 6 12 50 00 GBK Furniture ............................................................................. 1- 3

Supplement:

GBK Furniture Data Sheets ......................................................... 1- 8

DIVISION 13—SPECIAL CONSTRUCTION

13 34 19 LAS Metal Building Systems ..................................................... 1- 15

DIVISION 14 THROUGH DIVISION 20 (NOT USED)

DIVISION 21—FIRE SUPPRESSION

21 13 13 KS Hybrid Fire-Extinguishing Systems ................................... 1- 15

DIVISION 22—PLUMBING

22 05 48 KS Vibration Isolation and Seismic Controls for Plumbing and Equipment ................................................ 1- 14

22 07 00 KS Plumbing Piping Insulation ............................................... 1- 7 22 10 01 KS Plumbing Piping and Accessories ...................................... 1- 24 22 10 01.02 KS Polyvinyl Chloride Drain Waste and Vent (PVC-DWV)

Pipe and Fittings Data Sheet ........................................... 1- 1 22 10 01.10 KS Carbon Steel Tubing and Fittings Data Sheet ................... 1- 1 22 10 01.13 KS High-Density Polyethylene (HDPE) Pipe and Fittings—

Propane and LPG Service Data Sheet ............................. 1- 3 22 30 00 KS Plumbing Equipment ......................................................... 1- 12

Supplements:

KS Gas Water Heater (Commercial) Data Sheet ..................... 1- 1 KS Domestic Hot Water Circulating Pump Data Sheet ........... 1- 1 KS Duplex, Submersible Sump Pump Data Sheet ................... 1- 1 KS Backflow Preventers Data Sheet ........................................ 1- 1 KS Hydropneumatic Tank Data Sheet KS Domestic Water Expansion Tank Data Sheet .................... 1- 1

22 40 00 KS Plumbing Fixtures .............................................................. 1- 16

DIVISION 23—HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 05 14 KS HVAC Adjustable Frequency Drives ................................ 1- 12 23 05 48 KS Vibration Isolation and Seismic Control for HVAC

Piping and Equipment ..................................................... 1- 13

TABLE OF CONTENTS PW\JA\NPS\D3167659\4\42

00 01 10 - 6 AUGUST 2025

YELL 310402

23 05 93 KS Testing, Adjusting, and Balancing for HVAC ................... 1- 7 23 07 00 KS HVAC Insulation ............................................................... 1- 12 23 09 00 KS Instrumentation and Control Devices for HVAC .............. 1- 16 23 09 13 KS HVAC Controls, Field Components, and Instruments ...... 1- 18 23 09 23 KS Direct-Digital Control System for HVAC ......................... 1- 11 23 23 00 KS Refrigerant Piping .............................................................. 1- 9 23 31 13 KS Metal Ducts and Accessories ............................................. 1- 33 23 34 00 KS HVAC Fans ........................................................................ 1- 21 23 37 00 KS Air Outlets and Inlets ......................................................... 1- 5 23 77 00 KS Air Handling Units ............................................................. 1- 28 23 81 00 KS Unitary Air-Conditioning Equipment ................................ 1- 22 23 82 00 KS Terminal Heating and Cooling Units ................................. 1- 10

DIVISION 24 AND DIVISION 25 (NOT USED)

DIVISION 26—ELECTRICAL

26 05 02 JJ Basic Electrical Requirements ........................................... 1- 7 26 05 04 JJ Basic Electrical Materials and Methods ............................ 1- 13 26 05 05 JJ Conductors ......................................................................... 1- 10 26 05 26 JJ Grounding and Bonding for Electrical Systems ................ 1- 7 26 05 33 JJ Raceway and Boxes ........................................................... 1- 31 26 05 70 JJ Electrical Systems Analysis ............................................... 1- 8

Supplement:

JJ Figure 1: Example Arc Flash Label ................................... 1- 1

26 08 00 JJ Commissioning of Electrical Systems ............................... 1- 20 26 09 13 JJ Power Measurement and Control ....................................... 1- 4 26 14 13 JJ Switchboards ...................................................................... 1- 9 26 20 00 JJ Low-Voltage AC Induction Motors ................................... 1- 9 26 22 00 JJ Low-Voltage Transformers ................................................ 1- 6 26 24 16 JJ Panelboards ........................................................................ 1- 7 26 24 19 JJ Low-Voltage Motor Control .............................................. 1- 12 26 27 26 JJ Wiring Devices .................................................................. 1- 12 26 29 23 JJ Low-Voltage Adjustable Frequency Drive System ........... 1- 9 26 32 13.13 JJ Diesel Engine Generator Set .............................................. 1- 14 26 33 53 JJ Static Uninterruptible Power Supply ................................. 1- 13 26 36 23 JJ Automatic Transfer Switches ............................................. 1- 6 26 42 01 KS Pipe Bonding and Test Stations ......................................... 1- 9 26 42 03 KS Under Tank Cathodic Protection System ........................... 1- 7 26 43 00 JJ Surge Protective Devices ................................................... 1- 6 26 50 00 JJ Lighting .............................................................................. 1- 11

PW\JA\NPS\D3167659\4\42 TABLE OF CONTENTS

AUGUST 2025 00 01 10 - 7

YELL 310402

DIVISION 27—COMMUNICATIONS

27 13 13 JJ Communications Copper Cabling Systems ....................... 1- 14

DIVISION 28—ELECTRONIC SAFETY AND SECURITY

28 31 00 JJ Fire Detection and Alarm ................................................... 1- 25 Supplement:

JJ Sequence of Operations Matrix ......................................... 1- 1

DIVISION 29 AND DIVISION 30 (NOT USED)

DIVISION 31—EARTHWORK

31 10 00 SMS Site Clearing....................................................................... 1- 10 31 23 13 KS Subgrade Preparation ......................................................... 1- 3 31 23 13.31 KS Ground Improvement ......................................................... 1- 15 31 23 16 KS Excavation .......................................................................... 1- 4 31 23 19.01 KS Dewatering ......................................................................... 1- 4 31 23 23 KS Fill and Backfill ................................................................. 1- 10 31 23 23.15 KS Trench Backfill .................................................................. 1- 12 31 32 19.16 KS Geotextile ........................................................................... 1- 9 31 37 00 KS Riprap ................................................................................. 1- 6 31 41 00 KS Shoring ............................................................................... 1- 2

DIVISION 32—EXTERIOR IMPROVEMENTS

32 11 23 KS Aggregate Base and Subbase Courses ............................... 1- 7 32 31 26 KS Woven Wire Fences and Gates .......................................... 1- 9 32 91 19.13 SS Restoration Topsoil Placement and Grading ..................... 1- 6 32 92 00 SS Restoration Turf and Grasses ............................................. 1- 4

DIVISION 33—UTILITIES

33 01 30.16 KS Television Inspection of Sewer Pipelines .......................... 1- 10 Supplements:

KS Inspection Summary Sheet ................................................ 1- 1 KS NASSCO PACP Quality Control Procedure ..................... 1- 3

33 01 30.51 KS Gravity Sewer Pipeline Cleaning ....................................... 1- 8 Supplement:

KS Sanitary Sewer Cleaning Form .......................................... 1- 2

TABLE OF CONTENTS PW\JA\NPS\D3167659\4\42

00 01 10 - 8 AUGUST 2025

YELL 310402

33 01 30.70 KS Cured-in-Place Pipe Liner (Gravity Pipe) .......................... 1- 22 33 01 30.80 KS Manhole Rehabilitation ...................................................... 1- 16 33 05 01.02 KS Ductile Iron Pipe and Fittings ............................................ 1- 12 33 05 01.10 KS High-Density Polyethylene (HDPE) Pressure Pipe and Fittings ..................................................................... 1- 12 33 05 01.12 KS Gravity Sewer Pipe and Fittings ........................................ 1- 14

Supplements:

KS WDEQ Policy 13.9.11 ....................................................... 1- 2 KS WDEQ Policy 13.9.13 ....................................................... 1- 2

33 05 01.12.01 KS Ductile Iron Pipe (DIP)—Gravity Sanitary Sewer Data Sheet ....................................................................... 1- 1

33 05 01.12.03 KS Polyvinyl Chloride (PVC) Pipe—Gravity Sanitary Sewer Data Sheet ............................................................ 1- 1

33 05 13 KS Manholes ............................................................................ 1- 14 33 05 16.13 KS Precast Concrete Utility Structure ..................................... 1- 6 33 12 16 KS Water Utility Distribution Valves ...................................... 1- 6 33 12 19 KS Water Utility Distribution Fire Hydrants ........................... 1- 4 33 13 00 KS Disinfection of Water Utility Distribution Facilities ......... 1- 4 33 41 01 KS Storm Drain, Sanitary Sewer, and Drainage Piping .......... 1- 5 33 41 01.03 KS Polyvinyl Chloride (PVC) Data Sheet ............................... 1- 2 33 41 01.05 KS Reinforced Concrete Data Sheet ........................................ 1- 3 33 41 01.08 KS Corrugated Polyethylene (CPE) Data Sheet ...................... 1- 1 33 44 13.13 KS Catch Basins....................................................................... 1- 4 33 46 00 KS Subsurface Drainage .......................................................... 1- 9 33 47 13.02 KS Pond and Reservoir Liners—Polypropylene ..................... 1- 17

Supplement:

KS Geomembrane Installer’s Certification of Subsurface

Acceptability ................................................................... 1- 1 33 52 00 KS Fuel System ........................................................................ 1- 16

Supplements:

KS Underground Fuel Oil Storage Tank Data Sheet ............... 1- 1 KS Day Tank Data Sheet ......................................................... 1- 1 KS Day Tank Fuel Oil Pump Data Sheet ................................. 1- 1

33 54 00 KS Propane Systems ................................................................ 1- 10 Supplement:

Propane Tank Schedule – Grant WWTP ........................... 1- 1

DIVISION 34 (NOT USED)

DIVISION 35—WATERWAY AND MARINE CONSTRUCTION

35 20 16.25 KS Fabricated Slide Gates ....................................................... 1- 11

PW\JA\NPS\D3167659\4\42 TABLE OF CONTENTS

AUGUST 2025 00 01 10 - 9

YELL 310402

DIVISION 36 THROUGH DIVISION 39 (NOT USED)

DIVISION 40—PROCESS INTERCONNECTIONS

40 05 15 KS Piping Support Systems ..................................................... 1- 15 Supplements:

KS Table 1: Nonchemical Areas .............................................. 1- 1 KS Table 2: Chemical Areas .................................................... 1- 1

40 05 33 KS Pipe Heat Tracing .............................................................. 1- 6 40 27 00 KS Process Piping—General ................................................... 1- 25 40 27 00.01 KS Cement-Mortar and Glass-Lined Ductile Iron Pipe and Fittings Data Sheet ................................................... 1- 4 40 27 00.03 KS Carbon Steel Pipe and Fittings—General Service

Data Sheet ....................................................................... 1- 6 40 27 00.08 KS Stainless Steel Pipe and Fittings—General Service

Data Sheet ....................................................................... 1- 4 40 27 00.10 KS Polyvinyl Chloride (PVC) Pipe and Fittings Data Sheet ... 1- 3 40 27 00.11 KS Chlorinated Polyvinyl Chloride (CPVC) Pipe and

Fittings Data Sheet .......................................................... 1- 3 40 27 00.13 KS Copper and Copper Alloy Pipe, Tubing, and Fittings

Data Sheet ....................................................................... 1- 2 40 27 00.15 KS Double Wall Containment Piping Data Sheet ................... 1- 2 40 27 01 KS Process Piping Specialties.................................................. 1- 17 40 27 02 KS Process Valves and Operators ............................................ 1- 28 40 42 13 KS Process Piping Insulation ................................................... 1- 7

Supplement:

KS Service and Insulation Thickness Table ............................ 1- 2

40 80 01 KS Process Piping Leakage Testing ........................................ 1- 6 40 90 00 JJ Instrumentation and Control for Process Systems ............. 1- 40

Supplements:

JJ Control Descriptions .......................................................... 1- 51 JJ Control Panel Schedule ...................................................... 1- 2 JJ Instrument List ................................................................... 1- 9 JJ PLC Input/Output List ....................................................... 1- 8 JJ Preparation for Testing and Functional Test Forms .......... 1- 1 JJ Performance Test Sheet ..................................................... 1- 1

TABLE OF CONTENTS PW\JA\NPS\D3167659\4\42

00 01 10 - 10 AUGUST 2025

YELL 310402

40 91 00 JJ Instrumentation and Control Components ......................... 1- 60 40 95 80 JJ Fiber Optic Communication System .................................. 1- 20

Supplements:

JJ On-Reel Fiber Optic Cable Test Summary Form .............. 1- 1 JJ Fiber Optic Attenuation Performance Test Form .............. 1- 1 JJ Post-Installation Fiber Optic Cable Test Summary

Form ................................................................................ 1- 2 40 96 00 JJ Applications Software ........................................................ 1- 20 40 99 90 JJ Package Control Systems ................................................... 1- 48

DIVISION 41—MATERIAL PROCESSING AND HANDLING EQUIPMENT

41 22 13.13 KS Overhead Cranes ................................................................ 1- 10 Supplement:

KS Crane Data Sheet ................................................................ 1- 1 KS Crane Dimension Sheet...................................................... 1- 1

41 22 23.19 KS Monorail Hoists, Davit Cranes, and Gantry Cranes .......... 1- 10 Supplements:

KS Screw Press and Polymer Totes Monorail Data Sheet ....... 1- 1 KS Screw Press and Polymer Totes Monorail

Dimension Sheet ............................................................. 1- 1 KS Screw Press and Polymer Totes Trolley Motor

Data Sheet ....................................................................... 1- 1 KS Headworks Monorail Data Sheet ....................................... 1- 1 KS Headworks Monorail Dimension Sheet ............................. 1- 1 KS Headworks Trolley Motor Data Sheet ............................... 1- 1

DIVISION 42 (NOT USED)

DIVISION 43—PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND

STORAGE EQUIPMENT

43 22 56.01 KS Submersible Propeller Pumps ............................................ 1- 9 Supplement:

KS Mixed Liquor Return Pumps 1 and 2 Data Sheet .............. 1- 3 43 32 55 KS Membrane Equipment System ........................................... 1- 23 43 40 01 KS Polyethylene Storage Tank and Containment for Totes .... 1- 16

Supplements:

KS Bulk Magnesium Hydroxide Storage Tank Data Sheet ..... 1- 1 KS Bulk Polyaluminum Chloride Storage Tank Data Sheet ... 1- 1 KS Screw Press Feed Tank Data Sheet .................................... 1- 1

PW\JA\NPS\D3167659\4\42 TABLE OF CONTENTS

AUGUST 2025 00 01 10 - 11

YELL 310402

DIVISION 44—POLLUTION AND WASTE CONTROL EQUIPMENT

44 42 19.04 KS Rotary Positive Displacement Blower ............................... 1- 13 Supplements:

KS Bioreactor Blowers 1 and 2 Induction Motor Data Sheet ....................................................................... 1- 1

KS Digester Blowers 1, 2, and 3 Induction Motor Data Sheet ....................................................................... 1- 1

KS Septage Blower Induction Motor Data Sheet .................... 1- 1 KS Air Scour Blowers 1, 2, 3, and 4 Induction Motor

Data Sheet ....................................................................... 1- 1 44 42 24.04 KS Rotating Scum Pipes .......................................................... 1- 7 44 42 30 KS Cylindrical Perforated Plate Fine Screens ......................... 1- 16

Supplement:

KS Fine Screen 1 and 2 Induction Motor Data Sheet .............. 1- 1

44 42 31 KS Septage Receiving System ................................................. 1- 16 44 42 35 KS Floating Decanters ............................................................. 1- 5 44 42 48.04 KS Automatic Composite Sampler ......................................... 1- 9 44 42 56.02 KS Vertical Centrifugal Pumps ................................................ 1- 6

Supplement:

KS Non-Potable Water Booster Pump Data Sheet .................. 1- 3

44 42 56.04 KS Submersible Pumps ............................................................ 1- 7 Supplements:

KS Influent Pumps 1 and 2 Data Sheet .................................... 1- 2 KS Intraplant Pumps 1 and 2 Data Sheet ................................. 1- 2 KS RAS Pumps 1, 2, and 3 Data Sheet .................................... 1- 2 KS WAS Pumps 1 and 2 Data Sheet........................................ 1- 2 KS Digested Sludge Transfer Pumps 1 and 2 Data Sheet ........ 1- 2 KS Dewatering Lift Station Data Sheet ................................... 1- 2 KS NPW Pumps 1and 2 Data Sheet......................................... 1- 2

44 42 56.10 KS In-Line Centrifugal Pumps ................................................ 1- 7 Supplement:

KS W2 Booster Pump Data Sheet ........................................... 1- 2 44 42 56.14 KS Lobe Pumps ....................................................................... 1- 10

Supplement:

KS Septage Metering Pumps 1 and 2 Data Sheet .................... 1- 2 KS Screw Press Feed Pump Plus Shelf Spare Data Sheet ....... 1- 2

TABLE OF CONTENTS PW\JA\NPS\D3167659\4\42

00 01 10 - 12 AUGUST 2025

YELL 310402

44 42 56.16 KS Peristaltic Pump ................................................................. 1- 13 Supplements:

KS Magnesium Hydroxide Feed Pumps 1, 2, and 3 Data Sheet ....................................................................... 1- 2

KS Polyaluminum Chloride Feed Pumps 1 and 2 Data Sheet ....................................................................... 1- 2

KS Glycerin Feed Pumps 1 and 2 Data Sheet .......................... 1- 2 44 44 63.01 KS Polymer Feed System, Liquid ............................................ 1- 9 44 45 16.01 KS Coarse Bubble Air Diffuser System .................................. 1- 12 44 45 16.02 KS Fine Bubble Air Diffuser System ...................................... 1- 18 44 45 16.10 KS Compressed Gas Mixing System ....................................... 1- 19 44 46 13.02 KS Screw Conveyor System .................................................... 1- 8

Supplement:

KS Shaftless Screw Conveyor Induction Motor Data Sheet .... 1- 1

44 46 22 KS Dewatering Screw Press .................................................... 1- 26 Supplements:

KS Screw Press Induction Motor Data Sheet .......................... 1- 1 KS Screw Press Washwater Booster Pump Data Sheet ........... 1- 1 KS Screw Press Air Compressor Induction Motor

Data Sheet ....................................................................... 1- 1

DIVISION 45 (NOT USED)

DIVISION 46—WATER AND WASTEWATER EQUIPMENT

46 24 33 KS Open-Channel Grinders ..................................................... 1- 12 46 66 20 KS Ultraviolet Disinfection Equipment ................................... 1- 20

DIVISION 47 THROUGH DIVISION 49 (NOT USED)

DRAWINGS

SPECIFICATIONS

PW\JA\NPS\D3167659\4\42 SUMMARY OF WORK

AUGUST 2025 01 11 00 - 1

YELL 310402

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.1 SUMMARY

A. Section includes the following:

1. Work Covered by Contract Documents.

2. Work Under Other Contracts.

3. Government Furnished Materials.

4. Materials and Work by Others.

5. Contractor Use of Sites.

6. Public Use of Sites.

7. Administrative Access During Construction.

8. Access During Construction.

9. Occupancy Requirements for Buildings.

10. Conduct of Operations.

11. Work Restrictions.

12. Special Construction Requirements.

13. Soils Investigation Report.

14. Unexpected Discovery of Archeological Resources.

15. Construction Materials.

16. Project Clean Up.

1.2 DEFINITIONS

A. Demolish: Means to remove and dispose.

B. Provide: Means to furnish and install.

1.3 WORK COVERED BY CONTRACT DOCUMENTS

A. Project Location:

1. Yellowstone National Park: Grant Village Wastewater Collection System and Treatment Plant, Teton County Wyoming. Canyon Village Wastewater Collection System, Park County Wyoming.

B. Contractor shall procure all items they are providing. “Provide” means to furnish and install and provide complete in place.

C. Project will be constructed under a single prime contract.

D. Project is designed to comply with requirements as specified in Section 01 81 13, Sustainable Design Requirements.

SUMMARY OF WORK PW\JA\NPS\D3167659\4\42

01 11 00 - 2 AUGUST 2025

YELL 310402

E. Completion of each item includes all materials, labor, transportation, material processing plants, equipment, royalties, warranties, O&M manuals, and incidentals necessary to complete the Work as described on the Construction Drawings and these specifications.

F. The Work required in the base scope as described in Section 01 27 00, Definition of Contract Line Items, includes the following work as described herein, but not limited to:

1. General Conditions: Include General Requirements, Mobilization/Demobilization, Permitting, Erosion Control, Maintenance of Traffic, and Surface Restoration required to complete the Work per Contract Specifications and Drawings.

2. The project includes the following work described herein, but not limited to:

a. Contract Line Item (CLIN) 001 - Grant Village Wastewater Treatment Plant.

1) Keep existing treatment capabilities functional throughout construction. The facility must continue treating wastewater throughout construction.

2) Construct new wastewater treatment plant buildings including, but not limited to:

a) Civil sitework, Headworks Facility, Process Facility, Bioreactor and Digester Facility, Generator Facility, and Bioreactor Splitter Facility. Additional bid options include:

O&M Storage Facility, and Dewatering Facility.

3) Procure and install a new maintenance vault for the grinder near the Grant Campground Loop A Lift Station as shown on the Drawings.

4) Provide interior and exterior piping, pipe supports, gates, gate operators, valves, valve operators, and valve supports.

5) Provide instrumentation and analyzers as shown including flow meters, pressure gages, pressure transmitters, level indicators and transmitters, sensors, and analyzers.

6) Provide a Process Control System (PCS) including and not limited to the main plant PLC, SCADA servers, operator workstations, network switches and firewalls. Provide the ability to connect to the fiber optic backbone that is being planned throughout Yellowstone National Park.

7) Provide laboratory furnishings and equipment including sink, cabinets, refrigerator, and desktop laboratory equipment.

8) Provide process equipment including but not limited to:

a) Aeration systems.

b) Blowers.

AUGUST 2025 01 11 00 - 3

YELL 310402

c) RAS/WAS pumps.

d) Mixing systems.

e) Instruments and controls.

f) Membrane system including blowers, permeate pumps, instruments and controls.

g) Chemical feed systems.

h) UV Disinfection systems.

i) Sludge dewatering screw press.

j) Screw conveyor.

k) Control panels and programming.

9) Provide two fine screens, a septage receiving system and two submersible pumps, appurtenances, and controls in headworks facility.

10) Provide liquid chemical fill, storage, feed and control systems for magnesium hydroxide (alkalinity), polyaluminum chloride (phosphorus removal), glycerin (nitrate removal), membrane cleaning chemicals (sodium hypochlorite and citric acid), and solids dewatering polymer.

11) Provide standby generator with AUTOMATIC transfer switch.

Provide underground diesel tank.

12) Provide transformer pad and ground sleeve in accordance with Northwestern Energy (NWE) standards. Provide meter enclosure and current transformer enclosure. Provide raceway between transformer pad and current transformer enclosure. Provide raceway and conductors between current enclosure and meter enclosure. Provide raceway and conductors on the load side of the current transformer enclosure.

13) Apply to and coordinate with the serving electric utility to provide service to the facility.

14) Coordinate with telecom company to maintain existing service and provide telephone service through a landline to the new Process Facility.

15) Generator Building includes the following work described herein, but not limited to:

a) Construct new generator building as shown.

b) Provide associated underground utilities:

1) Power and communications duct bank between the Process Facility and the Generator Building.

2) 480V power from panelboard in the Process Facility’s electrical room to a mini power center in the Generator Building.

c) 480V power from the generator to an automatic transfer switch in the Process Facility’s electrical room.

01 11 00 - 4 AUGUST 2025

YELL 310402

d) Control circuits from the automatic transfer switch in the Process Facility’s electrical room to the generator.

e) Propane gas line, routed from meter located at the Process Facility.

f) Underdrain piping as shown at the Generator Building.

g) Provide a new generator, HVAC equipment, and controls.

h) Provide an automatic bypass-isolation/automatic transfer switch in the Process Facility’s electrical room.

i) Restore all landscape disturbed by construction and temporary facilities: Preparing topsoil, fine grading, mulching, and weed control.

j) Conduct monthly spot treatment of weeds during the growing season (May through October) from time of seeding to substantial completion.

16) Provide unit heaters, direct expansion split air conditioning systems, supply and exhaust fans, sump pump, two water heaters, and emergency safety eye wash and shower units.

17) Demolish subsurface leach fields, headworks building, lab/blower building and dosing control building and associated piping as shown. Remove and dispose unsuitable soils (i.e., soils and contents from the leach fields) for preparation to construct the new facilities in those locations.

18) Demolish perimeter fences and entrance gates (at headworks and main sites).

19) Demolish buildings and structures 5 feet below grade as shown, except demolish the full structure of the existing septic tank.

20) Demolish yard piping within 5 feet of buildings and structures. Plug and abandon in place.

21) Demolish electrical conduits within 5 feet of buildings and structures. Plug and abandon in place.

22) Remove and dispose of liquids remaining in yard piping or basins.

Liquid in open basins can be conveyed to the existing Wastewater Treatment Plant.

23) Construct new leach fields as shown.

24) Add new groundwater monitoring wells as shown.

25) Provide underground propane storage tanks and associated valves and controls.

26) Provide a new steel drill stem wire mesh fence and gates around the main site and headworks site.

b. Empty and dewater Aeration Pond #1 and Secondary Pond #2.

Dewatered sludge will be placed in drying beds for further drying.

Dewatered sludge must have average solids content of at least 12 percent at time of placement in drying beds.

AUGUST 2025 01 11 00 - 5

YELL 310402

c. Reline Holding Ponds 1 and 2.

d. Contractor shall reblade both access roads from the headworks site to the nearest paved road after substantial completion.

e. Convert existing Lakeside Lift Station into a storage building as shown including:

1) Demolish influent pumps, piping, valves, valve operators, level instrument, and related appurtenances.

2) Patch concrete floor as needed.

3) Salvage existing generator.

4) Disconnect and remove existing NWE utility Meter, CT cabinet, and Service Entrance Disconnect Switch.

5) Convert existing lighting panel for continued use as described:

a) Install single-phase 208V feeders and a neutral from new Headworks building to existing Lakeside Lift Station lighting panel. Utilize existing wall penetrations for above-grade conduit entry into the building.

b) Abandon panelboard high-leg (B-phase) bus and support existing lighting and receptacle circuits on Phases A and C.

f. Demolish yard piping and utilities as shown.

g. Provide temporary utilities as shown including:

1) Demolish temporary utilities when new WWTP is complete.

h. Selective demolition of trees and other vegetation outside of construction impact area to create wildfire defensible zones as shown. White Bark Pine trees (also called five needle pines in these project documents) are an endangered species and shall not be removed in the 30-foot to 100-foot tree thinning zone unless approved by appropriate NPS personnel.

Several hundred of these trees have been surveyed and documented in the forest adjacent to the Project Site.

i. Restore all landscape disturbed by demolition, construction, or temporary facilities including preparing topsoil, fine grading, and mulching.

j. Provide new subsurface aeration system in Existing Aeration Pond #1.

k. Provide a fiber line as shown on the Drawings to connect to future fiber line.

l. Provide spare parts and equipment as indicated in the Specifications.

01 11 00 - 6 AUGUST 2025

YELL 310402

G. The optional bid items as described in Section 01 27 00, Contract Line Items, includes the following work as described herein, but not limited to:

1. CLIN 002 – Option 1, Grant Village Wastewater Collection System Rehab:

a. Grant Village Collection System:

1) Closed-Circuit Television (CCTV) inspection of collection system to verify location of repairs.

2) Perform point repairs on sewer mains of varying lengths identified on the Drawings.

3) Perform full pipe replacement of mains from manhole to manhole and installation of new pipe segments.

4) Removal and replacement of manholes and installation of new manholes.

5) Pipe cleaning and installation of Cured-in-Place Pipe (CIPP) liner.

6) Open cut lateral replacements originating from both mainlines and manholes.

7) Manhole rehabilitation including, but not limited to, cementitious lining and frame and over replacement.

2. CLIN 003 – Option 2, Canyon Village Wastewater Collection System Rehab:

a. Closed-Circuit Television (CCTV) inspection of collection system to verify location of repairs.

b. Perform point repairs on sewer mains of varying lengths identified on the plans.

c. Perform full pipe replacement of mains from manhole to manhole and installation of new pipe segments.

d. Removal and replacement of manholes and installation of new manholes.

e. Pipe cleaning and installation of Cured-in-Place Pipe (CIPP) liner.

f. Open cut lateral replacements originating from both mainlines and manholes.

g. Manhole rehabilitation including, but not limited to, cementitious lining and frame and over replacement.

3. CLIN 004 – Option 3, Construct new screw press dewatering facility with polymer system and cake conveyor system.

4. CLIN 005 – Option 4, Construct new O&M Storage facility at headworks site.

1.4 WORK UNDER OTHER CONTRACTS

A. General: Cooperate with separate contractors so work on those contracts may be carried out smoothly, without interfering with or delaying work under this Contract.

Coordinate Work of this Contract with work performed under separate contracts.

AUGUST 2025 01 11 00 - 7

YELL 310402

B. Work on main park roads under other contracts may cause delays for deliveries or contractors reaching the site. Alternative routing may be required.

C. Note that one of the main roads to the Site runs through a nearby Contractor RV site that may house contractors working on other projects in the area.

1.5 MATERIALS AND WORK BY OTHERS

A. Treatment Wetland: Wetland planting and maintenance to be performed by a separate contractor under a different contract.

B. Northwestern Energy (NWE):

1. NWE will provide a new primary feeder in a Contractor-provided ductbank that will run along the access road of the Wastewater Treatment Plant Site to the new transformer (provided by NWE) at the Wastewater Treatment Plant Site.

Primary feeder conduit and ductbank will be installed by Contractor to edge of contract limits. Coordinate with NWE for connection to primary feeder ductbank beyond contract limits.

2. NWE will provide conductors between the new transformer secondary and the Current Transformer (CT) enclosure line-side terminals.

3. NWE will provide and install a meter face and current transformers.

4. Contractor Coordination:

a. Contractor shall coordinate with NWE on the ductbank path prior to commencing work on ductbank trench. Contractor shall coordinate with NWE for inspection of trench and ductbank prior to backfilling primary feeder trench.

b. Contractor shall submit product information to the contracting officer for the CT enclosure and the meter socket enclosure for review by NWE prior to ordering equipment.

c. Contractor will coordinate with NWE for demolition and removal of existing transformer, meter enclosure, and CT’s, and decommissioning of existing primary feeder conductors.

5. NWE Contact: Dustin Workman (Dustin.Workman@northwestern.com).

C. Lumen:

1. Lumen will provide equipment and labor as needed to relocate telecom service pedestal to location determined by Lumen and approved by Contracting Officer.

2. Lumen to provide equipment and labor to provide required service between telecom service pedestal and Network Interface Box at Headworks Facility, Dewatering Facility, Process Facility, and Bioreactor and Digester Facility.

01 11 00 - 8 AUGUST 2025

YELL 310402

Coordinate with contractor as needed to utilize conduits installed by contractor and identified in construction documents for Lumen's use.

3. Lumen Contact: Kimberly Hessell (Kimberly.Hessell@Lumen.com).

1.6 CONTRACTOR USE OF SITES

A. General: Contractor shall have limited use of Site for construction operations. Limit use of premises to work in areas indicated on the Drawings. Do not disturb portions of Project Site beyond areas in which the Work is indicated.

1. Limits: Confine construction operations to limits of disturbance.

2. Limit site disturbance, including earthwork and clearing of vegetation, to limits shown on the Drawings.

B. Storage of Materials: Confine storage of materials to designated staging areas as shown on the Drawings or in coordination with the Contracting Officer.

C. Coordinate with Contracting Officer and Park Staff to minimize disruption of normal Park activities. Inform construction workers and supervisors about the special sensitivity of Park values, regulations, and appropriate housekeeping.

D. Maximize the use of previously disturbed areas for staging and stockpile areas to minimize ground disturbance.

E. Parking:

1. Contractor personnel should not block plant operators’ access to any areas they need to access and should coordinate with operators to determine allowable parking areas. Parking off of road or non-vegetated areas is not allowed unless approved by the Contracting Officer.

2. For collection system work additional parking areas are shown on the Drawings, including schedule constraints on times of day and/or times of the year that they can be used.

F. Preservation of Natural Features:

1. Prevent damage to natural surroundings as specified in Section 01 12 00, Natural Features Protection. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.

a. Trees and other vegetation within fire protection tree removal zones to be removed as specified in Section 31 10 00, Site Clearing.

b. Clearing for the collection system work is defined in Section 31 10 00, Site Clearing.

2. Provide temporary barriers to protect existing trees and plants and root zones.

AUGUST 2025 01 11 00 - 9

YELL 310402

3. Do not remove, injure, or destroy trees or other plants without prior approval.

Consult with Contracting Officer and remove agreed-on roots and branches that interfere with construction. Do not fasten ropes, cables, or guys to existing trees.

4. Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage.

G. Driveways and Entrances: Keep driveways and entrances serving premises clear and available to Government employees, and emergency vehicles at all times. Do not use for parking or storage of materials. Provide safe access during the performance of work for the public and concessionaires where shown on the Drawings to be required in locations of the Park that are accessible to the public and/or concessionaires.

1. Schedule deliveries to minimize use of driveways and entrances.

2. Schedule deliveries to minimize space and time requirements for storage of materials and equipment onsite.

H.…