This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for the YELL 310402 project involving Grant Wastewater Treatment Plant and Collections and Canyon Collections. The amendment, issued by NPS DSC Contracting Services Division in Denver, CO, provides responses to questions and updates several construction specifications and construction drawings, including specifications for Summary of Work, Project Management and Coordination, Ductile Iron Pipe and Fittings, Manholes, Septage Receiving System, Dewatering Screw Press, and Ultraviolet Disinfection Equipment. The amendment also includes updates to multiple drawing sheets with page references ranging from pages 20 to 483 of 589, and maintains that all other terms and conditions of the original solicitation remain unchanged and in full force and effect. The effective date of this amendment is 12/01/2025, with an original solicitation date of 09/26/2025.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P2025R0102 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PDS
Denver CO 80225-0287 P.O. Box 25287 1 Denver Federal Center, Building 50 NPS, DSC Contracting Services Div
12/01/20250006
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
09/26/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
YELL 310402 - Grant Wastewater Treatment Plant and Collections and Canyon Collections
The purpose of this amendment is to provide the responses to questions and to provide for the following updated Construction Specifications and Construction Drawings as follows:
1. Construction Specification 01 11 00 - Summary of Work
2. Construction Specification 01 31 00 - Project Management and Coordination
3. Construction Specification 33 05 01.02 - Ductile Iron Pipe and Fittings
4. Construction Specification 33 05 13 - Manholes
5. Construction Specification 44 42 31 - Septage Receiving System
6. Construction Specification 44 46 22 - Dewatering Screw Press
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Vicki Freese-supler
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P2025R0102/0006
7. Construction Specification 46 66 20 -
Ultraviolet Disinfection Equipment
8. Drawing Sheet 356C8312, Page 67 of 94
9. Drawing Sheet 356C8313, Page 68 of 94
10. Drawing Sheet 356C8314, Page 69 of 94
11. Drawing Sheet 356C8315, Page 70 of 94
12. Drawing Sheet 450G044, Page 20 of 589
13. Drawing Sheet 450G045, Page 21 of 589
14. Drawing Sheet 450G046, Page 22 of 589
15. Drawing Sheet 480D301, Page 480 of 589
16. Drawing Sheet 480D304, Page 483 of 589
All other terms and conditions of the solicitation remain unchanged and in full force and effect.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .