B2603ADD2Attachment.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- Sperling Sports Complex Parking Improvements
- Solicitation number
- B-26-03
- Issued by
- Florida
About this file
This is a Pay Item List for the Sperling Sports Complex Parking Improvements project in Florida, detailing the scope of work and associated costs for parking lot renovations and enhancements. The project encompasses improvements to the existing asphalt parking lot and the addition of durable drive aisles. The pay items include mobilization, sediment and erosion control measures, clearing and grubbing, excavation and borrow materials totaling 1,500 cubic yards, concrete paving of 76 square yards, tree protection barriers over 294 linear feet, perimeter fencing of 880 linear feet, and installation of 174 concrete bumper guards. The project also includes performance turf installation of 6,635 square yards, placement of permeable turf stabilizer grid covering 27,939 square feet (with an alternate product option), pavement markings including 3,263 linear feet of standard white striping and thermoplastic crosswalk and stop bar markings, and signage installation and relocation for handicapped parking and directional purposes.
The pay item list does not include completed unit pricing or extended prices, as all cost fields are blank, indicating this is a preliminary bid document requiring contractor quotation. The mobilization cost includes contractor quality control testing for asphalt, concrete, and earthwork; capping and repair of existing irrigation systems; and temporary drainage construction. The clearing and grubbing allowance encompasses removal of all obstructions, vegetation, debris, and existing pavement, with the requirement that no trees be removed without city engineer approval. A five percent contingency is included in the bid structure, and an alternate pay item offers a substitution option for the permeable turf stabilizer grid product. The project involves two handicapped parking sign relocations and two new installations, along with two handicapped designation signs and four compact car parking only signs as part of the ground sign assemblies.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B2603SimpleTab.pdf | ||
| B2603ADD3.pdf | ||
| B2603ADD2.pdf | ||
| B2603ADD1.pdf | ||
| B2603Specs.pdf | ||
| B2603Plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pay Item List
| SPERLING SPORTS COMPLEX PARKING IMPROVEMENTS - SUMMARY OF PAY ITEMS | |||||
| PAY ITEM NO. | PAY ITEM DESCRIPTION | UNIT | QTY | UNIT PRICE | EXTENDED PRICE |
| 101-1 | MOBILIZATION | LS | 1 | ||
| 104-10-3 | SEDIMENT BARRIER | LF | 816 | ||
| 104-15 | SOIL TRACKING PREVENTION DEVICE | EA | 1 | ||
| 104-18 | INLET PROTECTION SYSTEM | EA | 2 | ||
| 110-1-1 | CLEARING & GRUBBING | LS | 1 | ||
| 110-21 | TREE PROTECTION BARRIER | LF | 294 | ||
| 120-1 | REGULAR EXCAVATION | CY | 750 | ||
| 120-2 | BORROW EXCAVATION | CY | 750 | ||
| 522-2 | CONCRETE PAVING 6" THICK | SY | 76 | ||
| 550-10-210 | FENCING, TYPE B, 0.0-5.0', STANDARD | LF | 880 | ||
| 542-70 | CONCRETE BUMPER GUARD FOR PARKING LOT | EA | 174 | ||
| 570-1-2 | PERFORMANCE TURF, SOD | SY | 6,635 | ||
| 700-1-111 | SINGLE COLUMN GROUND SIGN ASSEMBLY, F&I GROUND MOUNT, LESS THAN 12 SF | AS | 6 | ||
| 700-1-500 | SINGLE COLUMN GROUND SIGN ASSEMBLY, RELOCATE | AS | 1 | ||
| 710-90 | PAINTED PAVEMENT MARKING, STANDARD WHITE, SOLID, 6" | LF | 3,263 | ||
| 710-11-160 | PAINTED PAVEMENT MARKING, STANDARD WHITE, HANDICAPPED SYMBOL | EA | 7 | ||
| 710-11-170 | PAINTED PAVEMENT MARKING, STANDARD WHITE, SOLID, ARROW | EA | 7 | ||
| 711-11-123 | THERMOPLASTIC, STANDARD WHITE, SOLID, 12" FOR CROSSWALK | LF | 459 | ||
| 711-11-125 | THERMOPLASTIC, STANDARD WHITE, SOLID, 24" FOR STOP BAR | LF | 41 | ||
| 999-1 | PERMEABLE TURF STABILIZER GRID (ECORASTER E40) | SF | 27,939 | ||
| 999-2 | HANDICAPPED PARKING SIGN, FENCE MOUNT, RELOCATE | EA | 2 | ||
| 999-3 | HANDICAPPED PARKING SIGN, F&I FENCE MOUNT | EA | 2 | ||
| 999-4 | CONTINGENCY (5%) | LS | 5% | ||
| TOTAL PRICE | $0.00 |
| SUMMARY OF ALTERNATE PAY ITEMS | |||||
| PAY ITEM NO. | PAY ITEM DESCRIPTION | UNIT | QTY | UNIT PRICE | EXTENDED PRICE |
| 999-5 | PERMEABLE TURF STABILIZER GRID (TrueGrid ROOT) | SF | 27,939 |
| PAY ITEM NOTES | |
| 101-1 | INCLUDES THE COST FOR CONTRACTOR QUALITY CONTROL (CQC) TESTING |
| FOR ANY OF THE FOLLOWING THAT ARE NECESSARY TO COMPLETE THE | |
| CONSTRUCTION OF THIS PROJECT: ASPHALT, CONCRETE EARTHWORK. | |
| INCLUDES THE COST OF CAPPING AND REPAIR OF ANY EXISTING IRRIGATION | |
| SYSTEM LOCATED WITHIN THE R/W. INCLUDES THE COST OF TEMPORARY | |
| DRAINAGE DURING CONSTRUCTION TO ELIMINATE ANY FLOODING OF PRIVATE | |
| PROPERTY AND TO MAINTAIN EXISTING FLOWS WITHIN R/W. |
| 110-1-1 | INCLUDES, BUT NOT LIMITED TO, THE REMOVAL AND DISPOSAL OF ALL |
| OBSTRUCTIONS, VEGETATION, DEBRIS, TRIMMING OF TREES AND SHRUBS, | |
| ROOT REMOVAL, EXISTING ASPHALT PAVEMENT, BASE AND DRAINAGE | |
| STRUCTURES, SIDE DRAINS, AS REQUIRED, TO CONSTRUCT THE PROJECT. | |
| NO TREES ARE TO BE REMOVED WITHOUT APPROVAL FROM CITY ENGINEER. |
522-2 INCLUDES COST OF WATER VALVE ADJUSTMENTS AND OTHER UTILITY ADJUSTMENTS
570-1-2 VERTICAL ROOT SOD (BAHIA)
700-1-111 INCLUDES TWO (2) "HANDICAP" SIGNS, FOUR (4) "COMPACT CAR PARKING ONLY" SIGNS
File details come from the government source that posted it. Updated .