This document is a comprehensive set of technical specification sections for a roof restoration project for the Oregon Air National Guard at Building 145, located at 6801 NE Cornfoot Road in Portland, Oregon. The project, dated 02/13/2024, involves rehabilitating a 16,422 sq. ft. single-ply PVC roof membrane, including cleaning, coating, and repair work. The specification sections cover multiple aspects of the project, including summary requirements, maintenance cleaning, roof rehabilitation, joint sealants, and elastomeric wall coatings. The work is to be completed under a single prime contract, with specific requirements for installation, quality assurance, and warranty.

The project specifications detail technical requirements for roof and wall restoration, including specific performance standards for materials and application. The roof rehabilitation will use Tremco CPG Inc. products, with a two-coat polyurethane elastomeric fluid-applied system that includes a bio-based base coat and top coat. The manufacturer provides a 30-year warranty, with manufacturer inspections scheduled for years 2, 5, 10, 15, 20, and 25 following completion. The elastomeric coating system includes specific requirements for surface preparation, application techniques, and field quality control, with provisions for testing and verification of coating thickness and performance. The project emphasizes environmental considerations, including low-VOC materials, bio-based content, and compliance with EPA and local environmental regulations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Oregon Air National Guard Date of Issue (02/13/2024) Building 145 Air National Guard -Bldg 145 Roof Restoration

011000 - Page 1 of 4

SUMMARY

SECTION 011000 - SUMMARY

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Project information.

2. Work covered by Contract Documents.

3. Access to site.

4. Coordination with occupants.

5. Work restrictions.

6. Specification and drawing conventions.

1.2 PROJECT INFORMATION

A. Facility Owner Information:

1. Owner Name: Oregon Air National Guard.

B. Facility Information:

1. Building Name: Building 145.

2. Building Location: 6801 NE Cornfoot Road PORTLAND, OR 97218.

C. Project Information:

1. Project Name: Air National Guard -Bldg 145 Roof Restoration.

1.3 WORK COVERED BY CONTRACT DOCUMENTS

A. The Work of Project is defined by the Contract Documents and consists of the following:

1. Roof Area RA#1::

a. Area of Roof(s): 16,422 sq. ft.

b. Description of Work:

1) Existing roof rehabilitation specified in Division 07 Section 070150.74 Rehabilitation of Single Ply Roofing.

011000 - Page 2 of 4

c. Related Work:

2. Building Envelope Rehabilitation::

a. Description of Work: Replace control joints and apply a fibrated elastomeric coating.

b. Refer to Division 07 Section 079200.01 for Joint Sealants.

c. Division 09 Section 099653 Elastomeric Wall Coatings.

B. Type of Contract:

1. Project will be constructed under a single prime contract.

1.4 ACCESS TO SITE

A. Use of Site, Limited: Contractor shall have limited use of Project site for construction operations as indicated on Drawings by the Contract limits and as indicated by requirements of this Section.

1. Use of Site: Limit use of Project site to work in areas indicated and as directed by Owner.

Do not disturb portions of Project site beyond areas in which the Work is indicated, including designated lay-down areas.

2. Driveways, Walkways and Entrances: Keep driveways, facility loading areas, and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.

a. Schedule deliveries to minimize use of driveways and entrances by construction operations.

b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

B. Condition of Existing Building: Maintain portions of existing building affected by construction operations in a weathertight condition throughout construction period. Repair damage caused by construction operations.

1.5 COORDINATION WITH OCCUPANTS

A. Owner Occupancy: Owner will occupy site including existing and adjacent building(s) during entire construction period. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the Work so as not to interfere with Owner's day-to-day operations. Maintain existing exits unless otherwise indicated.

1. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Owner and approval of authorities having jurisdiction.

011000 - Page 3 of 4

2. Notify Owner not less than 72 hours in advance of activities that will affect Owner's operations.

1.6 WORK RESTRICTIONS

A. Work Restrictions, General: Comply with restrictions on construction operations.

1. Comply with limitations on use of public streets and with other requirements of authorities having jurisdiction.

B. On-Site Work Hours: Limit work in the existing building to normal business working hours of 7:00 a.m. to 4:00 p.m., Monday through Friday, unless otherwise indicated.

C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or others

D. Noise, Vibration, and Odors: Coordinate operations that may result in high levels of noise and vibration, odors, or other disruption to Owner occupancy with Owner.

1. Notify Owner not less than two days in advance of proposed disruptive operations.

2. Obtain Owner's written permission before proceeding with disruptive operations.

E. Nonsmoking Building: Smoking is not permitted within the building or within 25 feet of entrances, operable windows, or outdoor-air intakes.

F. Nonsmoking Project: Use of tobacco products on the Project site is not permitted.

G. Controlled Substances: Use of other controlled substances on the Project site is not permitted.

H. Employee Identification: Provide identification tags for Contractor personnel working on Project site. Require personnel to use identification tags at all times.

I. Employee Screening: Comply with Owner's requirements for drug and background screening of Contractor personnel working on Project site.

1. Maintain list of approved screened personnel with Owner's representative.

1.7 SPECIFICATION AND DRAWING CONVENTIONS

A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations.

These conventions are as follows:

1. Imperative mood and streamlined language are generally used in the Specifications. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.

2. Specification requirements are to be performed by Contractor unless specifically stated otherwise.

011000 - Page 4 of 4

B. Division 01 General Requirements: Requirements of Sections in Division 01 apply to the Work of all Sections in the Specifications.

C. Drawing Coordination: Requirements for materials and products identified on Drawings are described in detail in the Specifications. One or more of the following are used on Drawings to identify materials and products:

1. Terminology: Materials and products are identified by the typical generic terms used in the individual Specifications Sections.

2. Abbreviations: Materials and products are identified by abbreviations scheduled on Drawings.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 011000

070150.16 - Page 1 of 3

MAINTENANCE CLEANING OF MEMBRANE ROOFING

SECTION 070150.16 - MAINTENANCE CLEANING OF MEMBRANE ROOFING

1.1 SUMMARY

A. Section Includes:

1. Pressure washing of roof membrane including membrane flashings, with full water reclamation.

B. Related Requirements:

1. Division 07 roofing rehabilitation section for repair and restoration coating of roofing membranes.

1.2 ACTION SUBMITTALS

A. Product Data: For cleaning compounds.

B.

1.3 INFORMATIONAL SUBMITTALS

A. Work Plan: For maintenance cleaning, including description of means and methods for water reclamation.

1.4 QUALITY ASSURANCE

A. Operator Qualifications: Trained and approved by manufacturer of cleaning equipment, with a record of successful roofing membrane cleaning.

B. Regulatory Requirements: Comply with governing EPA regulations. Comply with hauling and disposal regulations of authorities having jurisdiction.

1.5 PROJECT / FIELD CONDITIONS

A. Owner will occupy portions of building immediately below roof area to be maintained. Conduct operations so Owner's operations are not disrupted. Provide Owner with not less than 72 hours' notice of activities that may affect Owner's operations.

B. Protect building to be cleaned, adjacent buildings, walkways, site improvements, exterior plantings, and landscaping from damage or soiling from maintenance operations.

C. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities.

070150.16 - Page 2 of 3

PART 2 - PRODUCTS

2.1 CLEANING SYSTEM OPERATORS

A. Source Limitations: Engage a qualified roofing maintenance cleaning firm to perform cleaning of membrane roofing.

B. Approved Operators: RoofTec Cleaning Systems, Tremco CPG Inc., Beachwood OH, (800) 562- 2728.

2.2 PERFORMANCE REQUIREMENTS

A. Water Reclamation: Provide maintenance cleaning of membrane roofing that provides 100 percent reclamation of cleaning water and complies with applicable provisions of the US EPA National Pollutant Discharge Elimination System (NPDES) program and requirements of local authorities having jurisdiction.

2.3 MATERIALS

A. Pre-cleaning Treatment: Detergent-free.

1. Product: Tremco, RoofTec PREKLEEN.

B. Pressure Wash Cleaning Solution: VOC, detergent, phosphate, and surfactant free.

1. Product: Tremco, RoofTec RENEW Cleaner.

PART 3 - EXECUTION

3.1 PREPARATION

A. Comply with warranty requirements of existing roof membrane manufacturer.

B. Shut off rooftop utilities and service piping before beginning the Work.

C. Test existing roof drains to verify that they are not blocked or restricted. Immediately notify Owner of any blockages or restrictions.

D. Coordinate with Owner to shut down air-intake equipment in the vicinity of the Work. Cover air-intake louvers before proceeding with maintenance cleaning work that could affect indoor air quality or activate smoke detectors in the ductwork.

E. Maintain roof drains in functioning condition to ensure roof drainage at end of each workday.

Prevent debris from entering or blocking roof drains and conductors.

3.2 MAINTENANCE CLEANING OF ROOF MEMBRANE

A. Pretreat membrane and flashings when recommended by cleaning equipment manufacturer based upon site assessment of membrane condition.

070150.16 - Page 3 of 3

B. Apply pressure wash cleaning solution onto membrane and flashing surfaces.

C. Pressure wash membrane and flashings using equipment and methods recommended in writing by cleaning equipment manufacturer for specific application. Utilize rotating wash head equipment operated at not less than 2,000 psi (13,800 kPa). Use equipment utilizing vacuum removal of wash water and residues.

3.3

3.4 DISPOSAL

A. Collect cleaning water and associated cleaning compounds and residual material and process to meet US EPA and local environmental requirements for legal discharge.

END OF SECTION 070150.16

070150.74 - Page 1 of 14

REHABILITATION OF SINGLE PLY ROOFING

SECTION 070150.74 - REHABILITATION OF SINGLE PLY ROOFING

1.1 SUMMARY

A. This Section includes the following:

1. Roof membrane coating preparation.

2. Application of fully reinforced fluid-applied roof membrane and flashings over existing fully adhered PVC membrane roof.

B. Related Information:

1. Division 01 Section "Summary" for use of the premises and phasing requirements, and for restrictions on use of the premises due to Owner or tenant occupancy.

2. Division 07 Section "Maintenance Cleaning of Membrane Roofing" for reclaimed water cleaning system for preparation of existing roof substrate.

3. Division 07 Section 079200.01 - Joint Sealants.

4. Division 09 Section 099653 - Elastomeric Wall Coatings.

1.2 ROOFING CONFERENCES

A. Roofing Rehabilitation Preinstallation Conference: Conduct conference at Project site to review methods and procedures related to roofing system.

1. Meet with Owner; roofing coating materials manufacturer's representative; roofing rehabilitation Installer including project manager and foreman; and installers whose work interfaces with or affects rehabilitation including installers of roof accessories and roof-mounted equipment requiring removal and replacement as part of the Work.

2. Review temporary protection requirements for existing roofing system that is to remain uncoated, during and after installation.

3. Review methods and procedures related to re-coating preparation, including coating manufacturer's written instructions.

4. Review roof drainage during each stage of coating and review roof drain plugging and plug removal procedures.

5. Review and finalize construction schedule, and verify availability of materials, Installer's personnel, equipment, and facilities needed to make progress and avoid delays.

070150.74 - Page 2 of 14

6. Review base flashings, special roofing details, drainage, penetrations, equipment curbs, and condition of other construction that will affect coating.

7. Review HVAC shutdown and sealing of air intakes.

8. Review shutdown of fire-suppression, -protection, and -alarm and -detection systems.

9. Review procedures for asbestos removal or unexpected discovery of asbestos-containing materials.

10. Review governing regulations and requirements for insurance and certificates if applicable.

11. Review existing conditions that may require notification of Owner before proceeding.

1.3 MATERIALS OWNERSHIP

A. Demolished materials shall become Contractor's property and shall be removed from Project site.

1.4 DEFINITIONS

A. Roofing Terminology: Refer to ASTM D1079 "Standard Terminology Relating to Roofing and Waterproofing" and glossary in NRCA's "The NRCA Roofing Manual: Membrane Roof Systems" for definition of terms related to roofing work in this Section.

B. Roofing Coating Preparation: Existing roofing that is to remain and be prepared to accept restorative coating application.

C. Patching: Removal of a portion of existing membrane roofing system from deck or removal of selected components and accessories from existing membrane roofing system and replacement with similar materials.

D. Remove: Detach items from existing construction and legally dispose of them off-site unless indicated to be removed and reinstalled.

E. Existing to Remain: Existing items of construction that are not indicated to be removed.

1.5 ACTION SUBMITTALS

A. Product Data: For each type of product specified.

B. Sustainable Design Submittals:

1. Product Test Reports: For roof coating, indicating that coated roof will comply with solar reflectance index requirement.

2. Indicate Food, Conservation, and Energy Act of 2008 Bio-based material requirement compliance.

a. Indicate type of bio-based material in product.

070150.74 - Page 3 of 14

b. Indicate the percentage of bio-based content per unit of product.

c. Indicate relative dollar value of bio-based content product to total dollar value of product included in project.

1.6 INFORMATIONAL SUBMITTALS

A. Contractor's Product Certificate: Submit notarized certificate, indicating products intended for Work of this Section, including product names and numbers and manufacturers' names, with statement indicating that products to be provided meet the requirements of the Contract Documents.

1. Provide manufacturer's FM listing certificate for roofing system.

B. Product Test Reports: Based on evaluation of comprehensive tests performed by manufacturer and witnessed by a qualified testing agency, for components of roofing rehabilitation system.

C. Qualification Data: For Installer, Manufacturer, and Roofing Inspector.

1. Letter written for this Project indicating manufacturer approval of Installer to apply specified products and provide specified warranty.

2. Letter written by an officer (Director, VP or President) of the manufacturing company certifying the materials furnished for the project are the same as represented in this specification.

a. Letter must be notarized.

D. Warranties: Unexecuted sample copies of special warranties.

E. Photographs or Video Recordings: Show existing conditions of adjoining construction and site improvements, including exterior and interior finish surfaces, which might be misconstrued as having been damaged by rehabilitation operations. Submit before Work begins.

F. Proposed Protection Measures: Submit report, including Drawings, that indicates the measures proposed for protecting individuals and property, for environmental protection, and for dust control. Indicate proposed locations and construction of barriers.

G. Inspection Reports: Reports of Roofing Inspector. Include weather conditions, description of work performed, tests performed, defective work observed, and corrective actions required and carried out.

1. Submit report within 48 hours after inspection.

1.7 CLOSEOUT SUBMITTALS

A. Maintenance Data: To include in maintenance manuals.

B. Warranties: Executed copies of approved warranty forms.

070150.74 - Page 4 of 14

1.8 QUALITY ASSURANCE

A. Installer Qualifications: An employer of workers trained and certified by manufacturer, including a full-time on-site supervisor with a minimum of three years' experience installing products similar to those specified, able to communicate verbally with Contractor, Architect, and employees, and the following:

1. Qualified by the manufacturer to install manufacturer's product and furnish warranty of type specified.

B. Roofing Inspector Qualifications: A technical representative of manufacturer not engaged in the sale of products and experienced in the installation and maintenance of the specified roofing system, qualified to perform roofing observation and inspection specified in Field Quality Control Article, to determine Installer's compliance with the requirements of this Project, and approved by the manufacturer to issue warranty certification. The Roofing Inspector shall be:

1. An authorized full-time technical employee of the manufacturer.

1.9 FIELD CONDITIONS

A. Weather Limitations: Proceed with rehabilitation work only when existing and forecasted weather conditions permit Work to proceed without water entering into existing roofing system or building.

1. Store all materials prior to application at temperatures recommended by manufacturer.

2. Apply coatings within range of ambient and substrate temperatures recommended by manufacturer.

3. Do not apply roofing in snow, rain, fog, or mist.

B. Protect building to be rehabilitated, adjacent buildings, walkways, site improvements, exterior plantings, and landscaping from damage or soiling from rehabilitation operations.

C. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities.

D. Daily Protection: Coordinate installation of roofing so insulation and other components of roofing system not permanently exposed are not subjected to precipitation or left uncovered at the end of the workday or when rain is forecast.

E. Owner will occupy portions of building immediately below re-coating area. Conduct re-coating so Owner's operations will not be disrupted. Provide Owner with not less than 72 hours' notice of activities that may affect Owner's operations.

1.10 WARRANTY

A. Manufacturer's Warranty: Roof System Manufacturer's standard form in which Manufacturer agrees to repair or replace components of roofing system that fail in materials or workmanship within warranty period, as follows.

070150.74 - Page 5 of 14

1. Form of Warranty: Manufacturer's standard warranty form.

2. Scope of Warranty: Work of this Section and including sheet metal details and termination details installed by the roof system Installer and approved by the Roof System Manufacturer.

3. Warranty Period: 30 years from date of completion.

B. Manufacturer Inspection Services: By manufacturer's technical representative, to report maintenance responsibilities to Owner necessary for preservation of Owner's warranty rights. The cost of manufacturer's inspections is included in the Contract Sum.

1. Inspections to occur in following years: 2, 5, 10, 15, 20 and 25 following completion.

C. Installer Warranty: Installer's warranty signed by Installer, as follows.

1. Form of Warranty:.

2. Scope of Warranty: Work of this Section.

3. Warranty Period: 2 years from date of completion.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Basis of Design: The roof system specified in this Section is based upon products of Tremco CPG Inc, Beachwood, OH, (800) 562-2728, www.tremcoroofing.com that are named in other Part 2 articles. Provide specified products.

B. Source Limitations: Obtain components for roofing system from same manufacturer as membrane roofing or manufacturer approved by membrane roofing manufacturer.

2.2 PERFORMANCE REQUIREMENTS

A. General Performance: Rehabilitated roofing shall withstand exposure to weather without failure or leaks due to defective manufacture or installation.

1. Accelerated Weathering: Roofing system shall withstand 5000 hours of exposure when tested according to ASTM G152, ASTM G154, or ASTM G155.

B. Material Compatibility: Provide roofing materials that are compatible with one another under conditions of service and application required, as demonstrated by roofing manufacturer based on testing and field experience.

C. Exterior Fire-Test Exposure: Roofing system exterior fire-test exposure performance following application of rehabilitation coating shall be not be less than that of the prerehabilitated roof performance when tested in accordance with ASTM E108, based upon manufacturer's tests of identical applications.

070150.74 - Page 6 of 14

D. Energy Performance: Provide roof system meeting initial solar reflectance index of not less than 100 and an aged solar reflectance index of not less than 80 when calculated according to ASTM E1980.

E. Energy Performance: Roofing system shall have an initial solar reflectance index of not less than

0.70 and an emissivity of not less than 0.75 when tested according to CRRC-1.

1. Solar reflectance, initial: Not less than .80.

2. Solar reflectance, aged: Not less than .67.

3. Thermal emittance, initial: Not less than .88.

4. Thermal emittance, aged: Not less than .88.

F. FM Global Compliance: Roofing, base flashings, and component materials shall comply with requirements in FM Global 4470 as part of a roofing system and shall be listed in FM Global's "RoofNav" or shall receive written FM Global project approval for Class 1 or non-combustible construction, as applicable. Identify applicable materials with FM Global markings.

1. Fire/Windstorm Classification:

a. Internal Fire: Class 1

b. External Fire: Class A

c. Wind Uplift Rating: 750

2. Provide roofing membrane, base flashing, and component materials that comply with the requirements to comply with FM Global Roof Nav Assembly #511743-510317-0. IT IS

THE CONTRACTORS RESPONSIBILITY TO READ AND FOLLOW THE

PROVIDED TESTED ASSEMBLY.

3. Hail Resistance Rating: SH

G. SPRI Wind Design Standard: Manufacture and install copings and roof edge flashings tested according to ANSI/SPRI ES-1.

H. Flashings: Comply with requirements of Division 07 Sections "Sheet Metal Flashing and Trim" and "Manufactured Roof Specialties." Provide base flashings, perimeter flashings, detail flashings and component materials that comply with requirements and recommendations of the following:

1. FMG 1-49 Loss Prevention Data Sheet for Perimeter Flashings.

2. FMG 1-29 Loss Prevention Data Sheet for Above Deck Roof Components.

3. NRCA Roofing Manual (Sixth Edition) for construction details and recommendations.

4. SMACNA Architectural Sheet Metal Manual (Seventh Edition) for construction details.

070150.74 - Page 7 of 14

I. Exterior Fire-Test Exposure: ASTM E108, Class A and UL 790 for application and roof slopes indicated, as determined by testing identical membrane roofing materials by a qualified testing agency. Materials shall be identified with appropriate markings of applicable testing agency.

J. Bio-Based Content: Provide roofing rehabilitation coating materials meeting requirements of USDA Bio-based Affirmative Procurement Program, with not less than 20 percent bio-based content.

2.3 MATERIALS, GENERAL

A. General: Rehabilitation materials recommended by roofing system manufacturer for intended use and compatible with components of existing membrane roofing system.

B. Infill Materials: Where required to replace test cores and to patch existing roofing, use infill materials matching existing membrane roofing system materials, unless otherwise indicated.

C. Temporary Roof Drainage: Design and selection of materials for temporary roof drainage are responsibilities of the Contractor.

D. FM Global Standards: Roofing, base flashings, and component materials shall be identical to materials that comply with requirements in FM Global 4470 as part of a roofing system listed or approved by FM Global for Class 1 or non-combustible construction, as applicable. Identify applicable materials with FM Global markings.

2.4 FLUID-APPLIED ROOFING MEMBRANE COATING

A. Polyurethane Elastomeric Fluid-Applied System: Two-coat fluid-applied roofing membrane formulated for application over prepared existing roofing substrate.

1. Polyurethane Roof Coating System Base Coat: Bio-based, low-odor low-VOC two-part, for use with a compatible top coat.

a. Basis of design product: Tremco, AlphaGuard BIO Base Coat.

b. Combustion Characteristics, UL 790: Maintains combustion characteristics of existing roof system.

c. Volatile Organic Compounds (VOC), maximum, ASTM D3960: 1 g/L.

d. Accelerated Weathering, 5000 hours, ASTM G154: Pass.

e. Hardness, Shore A, minimum, ASTM D2240: 80.

f. Solids, by volume, ASTM D2697: 100 percent.

g. Bio-Based Content, Minimum: 70 percent.

h. Minimum Thickness, Base Coat reinforced over Smooth BUR, MB, Concrete, Single-Ply: 48 mils (1.22 mm) wet.

070150.74 - Page 8 of 14

2. Polyurethane roof coating system top coat, bio-based low-odor low-VOC two-part, for application over compatible base coat.

a. Basis of design product: Tremco, AlphaGuard BIO Top Coat.

b. Combustion Characteristics, UL790: Maintains combustion characteristics of existing roof system.

c. Volatile Organic Compounds (VOC), maximum, ASTM D3960: 6 g/L.

d. Solar Reflectance Index (SRI), ASTM E1980: For white, not less than 103.

e. Accelerated Weathering, 5000 hours, ASTM G 154: Pass.

f. Hardness, Shore A, minimum, ASTM D2240: 81.

g. Solids, by volume, ASTM D2697: 100 percent.

h. Bio-Based Content, Minimum: 60 percent.

i. Minimum Thickness, reinforced system: 48 mils (1.22 mm) wet.

j. Minimum Thickness, Slip-Resistant Coat: 24 mils (0.60 mm) wet.

k. Color: White.

B. Fluid-Applied Roofing Reinforcing Fabric:

1. Polyester Reinforcing Fabric: 100 percent stitch-bonded mildew-resistant polyester fabric intended for reinforcement of compatible fluid-applied membranes and flashings and as a protection layer under pavers or stone aggregates.

a. Basis of design product: Tremco, Permafab.

b. Tensile Strength, Minimum, ASTM D5034 (2-inch): MD - 110 lbs (49.8 kg); XMD

- 60 lbs (27.2 kg) avg.

c. Elongation, Minimum, ASTM D5034 (1-inch): MD - 25 percent; XMD - 100 percent.

d. Tear Strength, Minimum, ASTM D5587: MD - 20 lbs (9.0 kg) avg; XMD - 20 lbs (9.0 kg) avg.

e. Weight: 3 oz./sq. yd (102 g/sq. m).

2.5 AUXILIARY ROOFING REHABILITATION MATERIALS

A. General: Auxiliary materials recommended by roofing system manufacturer for intended use and compatible with existing roofing system and roofing coating system.

070150.74 - Page 9 of 14

B. Joint Sealant: Elastomeric joint sealant compatible with applied coating, with movement capability appropriate for application.

1. Joint Sealant, Polyurethane: ASTM C920, Type S, Grade NS, Class 50 single-component moisture curing sealant, formulated for compatibility and use in dynamic and static joints;

paintable.

a. Basis of design product: Tremco, TremSEAL Pro.

b. Volatile Organic Compounds (VOC), maximum, ASTM D3960: 40 g/L.

c. Hardness, Shore A, ASTM C661: 40.

d. Adhesion to Concrete, ASTM C794: 35 pli.

e. Tensile Strength, ASTM D412: 350 psi (2410 kPa).

f. Color: Closest match to substrate.

C. Miscellaneous Accessories: Provide miscellaneous accessories recommended by roofing system manufacturer.

2.6 WALKWAYS

A. Slip Resistant Product for Fluid-Applied Walkways:

1. Granular Roofing Surfacing: Ceramic-coated roofing granules, No. 11 screen size with 100 percent passing No. 8 (2.36-mm) sieve and 98 percent of mass retained on No. 40 (0.425-

mm) sieve.

a. Basis of design product: Granular Roofing Surfacing, Colored.

b. Aggregate application rate, average: 10 - 15 lb/100 sq ft (0.5 - 0.75 k/m2).

c. Color: As selected by Owner from manufacturer's standard colors from manufacturer's standard colors.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine existing roofing substrates, with Installer present, for compliance with requirements and for other conditions affecting application and performance of roof coatings

1. For the record, prepare written report, endorsed by Installer, listing conditions detrimental to performance.

2. Verify compatibility with and suitability of substrates.

3. Verify that substrates are visibly dry and free of moisture.

070150.74 - Page 10 of 14

4. Verify that roofing membrane surfaces have adequately aged to enable proper bond with base coat.

5. Verify that roofing membrane is free of blisters, splits, open laps, indications of shrinkage, and puncture damage or other indications of impending roof system failure.

6. Provide a site-specific safety plan prior to the start of construction.

7. Commencing application of coatings indicates acceptance of surfaces and conditions.

3.2 PREPARATION

A. Protect existing roofing system that is indicated not to be rehabilitated, and adjacent portions of building and building equipment.

1. Mask surfaces to be protected. Seal joints subject to infiltration by coating materials.

2. Limit traffic and material storage to areas of existing roofing membrane that have been protected.

3. Maintain temporary protection and leave in place until replacement roofing has been completed.

B. Shut down air intake equipment in the vicinity of the Work in coordination with the Owner. Cover air intake louvers before proceeding with coating work that could affect indoor air quality or activate smoke detectors in the ductwork.

1. Verify that rooftop utilities and service piping affected by the Work have been shut off before commencing Work.

C. Maintain roof drains in functioning condition to ensure roof drainage at end of each workday.

Prevent debris from entering or blocking roof drains and conductors. Use roof-drain plugs specifically designed for this purpose. Remove roof-drain plugs at end of each workday, when no work is taking place, or when rain is forecast.

1. Do not permit water to enter into or under existing membrane roofing system components that are to remain.

D. Prime all metal surfaces with a light priming of metal primer per Part 2-Products.

E. Install slip metal flashing at penetrations and perimeters to ensure all leading edges of the system are sufficiently covered.

F. Contractor responsible for daily water stop/tie ins per Tremco detail drawing.

G. All debris must be removed from the roof & ground on a daily basis.

070150.74 - Page 11 of 14

3.3 ROOFING COATING PREPARATION

A. Removal of Wet Insulation: Remove portions of roofing membrane with underlying wet insulation. Remove wet insulation, fill in tear-off areas to match existing insulation and membrane, and prepare patched membrane for application of roof coating as specified below.

B. Repair of Ponding Areas: Repair areas indicated as ponding areas or areas of inadequate drainage by removing roof membrane, adding additional insulation as required to provide minimum slopes to drain required by roofing rehabilitation coating manufacturer, and replace membrane with material matching existing. Submit photographic report indicating compliance.

C. Membrane Surface Preparation:

1. Remove walkway pads and pavers from roofing membrane and dispose of legally. Recycle pavers.

2. Remove blisters, ridges, buckles, roofing membrane fastener buttons projecting above the membrane, and other substrate irregularities from existing roofing membrane that would inhibit application of uniform, waterproof coating.

3. Broom clean existing substrate.

4. Substrate Cleaning: Clean substrate of contaminants such as dirt, debris, oil, and grease that can affect adhesion of coating by power washing at maximum 2,000 psi (13,800 kPa).

a. Clean the roof free of all dirt and debris utilizing a scrubber head with water capturing system.

b. All water utilizing in the cleaning process must be captured and dispersed down a sanitary storm drain. No water runoff can be discharged to ground and/or storm drain.

5. Verify that existing substrate is dry before proceeding with application of coating. Spot check substrates with an electrical capacitance moisture-detection meter.

6. Verify adhesion of new products.

D. Existing Flashing and Detail Preparation: Repair flashings, gravel stops, copings, and other roof-related sheet metal and trim elements. Reseal joints, replace loose or missing fasteners, and replace components where required to leave in a watertight condition.

1. Install slip metal flashing at penetrations and perimeters to ensure all leading edges of the system are sufficiently covered.

2. Roof Drains: Remove drain strainer and clamping ring. Grind metal surfaces down to clean, bare, metal.

070150.74 - Page 12 of 14

3.4 FLUID-APPLIED FLASHING APPLICATION

A. Fluid-Applied Flashing and Detail Base Coat Application: Complete base coat and fabric reinforcement at parapets, curbs, penetrations, and drains prior to application of field of fluid-applied membrane. Apply base coat in accordance with manufacturer's written instructions.

1. Apply base coat on prepared and primed surfaces and spread coating evenly. Extend coating minimum of 8 inches (200 mm) up vertical surfaces and 4 inches (100 mm) onto horizontal surfaces.

2. Back roll to achieve minimum coating thickness indicated on Part 2 product listing, unless greater thickness is recommended by manufacturer; verify thickness of base coat as work progresses.

3. Reinforcing Fabric: Embed fabric reinforcement into wet base coat. Lap adjacent flashing pieces of fabric minimum 3 inches (75 mm) along edges and 6 inches (150 mm) at end laps.

a. Roll surface of fabric reinforcing to completely embed and saturate fabric. Leave finished base coat with fabric free of pin holes, voids, or openings.

4. Roof Drains: Install base coat onto surrounding membrane surface and metal drain bowl flange. Install target piece of fabric reinforcement immediately into wet base coat and roll to fully embed and saturate fabric. Reinstall clamping ring and strainer following application of top coat. Replace broken drain ring clamping bolts.

3.5 FLUID-APPLIED MEMBRANE APPLICATION

A. Fluid-Applied Membrane Base Coat: Apply base coat to field of membrane in accordance with manufacturer's written instructions.

1. Apply base coat on prepared and primed surfaces and spread coating evenly.

2. Back roll to achieve minimum coating thickness indicated on Part 2 product listing, unless greater thickness is recommended by manufacturer; verify thickness of base coat as work progresses.

3. Fabric Reinforcement: Embed fabric reinforcement into wet base coat. Lap adjacent pieces of fabric minimum 3 inches (75 mm) along edges and 6 inches (150 mm) at end laps.

a. Roll surface of fabric reinforcing to completely embed and saturate fabric. Leave finished base coat with fabric free of pin holes, voids, or openings.

B. Fluid-Applied Membrane Top Coat: Apply top coat to field of membrane and flashings uniformly in a complete, continuous installation.

1. Allow base coat to cure prior to application of top coat.

2. Repair any areas that have lifted, prior to top coat.

070150.74 - Page 13 of 14

3. Following curing of base coat and prior to application of top coat, sand raised or exposed edges of fabric reinforcement.

4. Prime base coat prior to application of top coat if top coat is not applied within 72 hours of the base coat application, using Geogard primer.

5. Apply top coat extending coating up vertical surfaces and out onto horizontal surfaces.

Install top coat over field base coat and spread coating evenly.

6. Back roll to achieve minimum coating thickness indicated on Part 2 product listing, unless greater thickness is recommended by manufacturer; verify thickness of base coat as work progresses.

7. Avoid foot traffic on new fluid-applied membrane for a minimum of 24 hours.

3.6 WALKWAY INSTALLATION

A. Install walkways following application of coating. Locate as indicated, or as directed by Owner.

1. Install 6’ back from all perimeter edges, a 6” striped out warning line applied in AG Bio Top coat with embedded color granule

2. Clean roof surface prior to application.

3. Utilize blue tape to ensure a uniform stripped out line.

B. Slip-Resistant Walkway Topcoat: Apply walkway second topcoat following application and curing of top coat. Locate as indicated on Drawings.

1. Mask walkway location with tape.

2. Prime first top coat prior to application of walkway top coat if walkway top coat is not applied within 72 hours of the first top coat application, using manufacturer's recommended primer.

3. Apply walkway topcoat and back roll to achieve minimum coating thickness indicated on Part 2 product listing, unless greater thickness is recommended by manufacturer; verify thickness of base coat as work progresses.

4. Broadcast Slip-Resistant Top Coat Aggregate in wet top coat at rate indicated in Part 2 product listing or as otherwise recommended by coating manufacturer.

a. Back roll aggregate and top coat creating even dispersal of aggregate. Remove masking immediately.

3.7 FIELD QUALITY CONTROL

A. Roofing Inspector: Owner will engage a qualified roofing inspector to perform roof tests and inspections and to prepare test reports.

070150.74 - Page 14 of 14

B. Roof Inspection: Contractor shall engage roofing system manufacturer's technical personnel to inspect roofing installation, and submit report. Notify Owner 48 hours in advance of dates and times of inspections. Inspect work as follows:

1. Upon completion of preparation of first component of work, prior to application of re-coating materials.

2. Following application of re-coating to flashings and application of base coat to field of roof.

3. Upon completion of re-coating but prior to re-installation of other roofing components.

C. Repair fluid-applied membrane where test inspections indicate that they do not comply with specified requirements.

D. Arrange for additional inspections, at Contractor's expense, to verify compliance of replaced or additional work with specified requirements.

3.8 PROTECTING AND CLEANING

A. Any damage done at/around setup area is the contactors responsibility to repair.

B. Protect roofing system from damage and wear during remainder of construction period.

C. Correct deficiencies in or remove coating that does not comply with requirements, repair substrates, and reapply coating.

D. Clean overspray and spillage from adjacent construction using cleaning agents and procedures recommended by manufacturer of affected construction.

END OF SECTION 070150.74

079200.01 - Page 1 of 9

JOINT SEALANTS

SECTION 079200.01 - JOINT SEALANTS

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Urethane joint sealants.

B. Related Sections:

1.3 PRECONSTRUCTION TESTING

A. Preconstruction Compatibility and Adhesion Testing: Submit to joint-sealant manufacturers, for testing indicated below, samples of materials that will contact or affect joint sealants.

1. Use ASTM C 1087 to determine whether priming and other specific joint preparation techniques are required to obtain rapid, optimum adhesion of joint sealants to joint substrates.

2. Submit not fewer than eight pieces of each kind of material, including joint substrates, shims, joint-sealant backings, secondary seals, and miscellaneous materials.

3. Schedule sufficient time for testing and analyzing results to prevent delaying the Work.

4. For materials failing tests, obtain joint-sealant manufacturer's written instructions for corrective measures including use of specially formulated primers.

5. Testing will not be required if joint-sealant manufacturers submit joint preparation data that are based on previous testing, not older than 24 months, of sealant products for adhesion to, and compatibility with, joint substrates and other materials matching those submitted.

B. Preconstruction Field-Adhesion Testing: Before installing sealants, field test their adhesion to Project joint substrates as follows:

1. Locate test joints where indicated on Project or, if not indicated, as directed by Architect.

2. Conduct field tests for each application indicated below:

a. Each kind of sealant and joint substrate indicated.

079200.01 - Page 2 of 9

3. Notify Architect seven days in advance of dates and times when test joints will be erected.

4. Arrange for tests to take place with joint-sealant manufacturer's technical representative present.

a. Test Method: Test joint sealants according to Method A, Field-Applied Sealant Joint Hand Pull Tab, in Appendix X1 in ASTM C 1193 or Method A, Tail Procedure, in

ASTM C 1521.

1) For joints with dissimilar substrates, verify adhesion to each substrate separately; extend cut along one side, verifying adhesion to opposite side.

Repeat procedure for opposite side.

5. Report whether sealant failed to adhere to joint substrates or tore cohesively. Include data on pull distance used to test each kind of product and joint substrate. For sealants that fail adhesively, retest until satisfactory adhesion is obtained.

6. Evaluation of Preconstruction Field-Adhesion-Test Results: Sealants not evidencing adhesive failure from testing, in absence of other indications of noncompliance with requirements, will be considered satisfactory. Do not use sealants that fail to adhere to joint substrates during testing.

1.4 ACTION SUBMITTALS

A. Product Data: For each joint-sealant product indicated.

B. Samples for Initial Selection: Manufacturer's color charts consisting of strips of cured sealants showing the full range of colors available for each product exposed to view.

C. Samples for Verification: For each kind and color of joint sealant required, provide Samples with joint sealants in 1/2-inch- (13-mm-) wide joints formed between two 6-inch- (150-mm-) long strips of material matching the appearance of exposed surfaces adjacent to joint sealants.

D. Joint-Sealant Schedule: Include the following information:

1. Joint-sealant application, joint location, and designation.

2. Joint-sealant manufacturer and product name.

3. Joint-sealant formulation.

4. Joint-sealant color.

1.5 INFORMATIONAL SUBMITTALS

A. Qualification Data: For qualified Installer.

B. Product Certificates: For each kind of joint sealant and accessory, from manufacturer.

079200.01 - Page 3 of 9

C. Sealant, Waterproofing, and Restoration Institute (SWRI) Validation Certificate: For each sealant specified to be validated by SWRI's Sealant Validation Program.

D. Product Test Reports: Based on evaluation of comprehensive tests performed by a qualified testing agency, indicating that sealants comply with requirements.

E. Preconstruction Compatibility and Adhesion Test Reports: From sealant manufacturer, indicating the following:

1. Materials forming joint substrates and joint-sealant backings have been tested for compatibility and adhesion with joint sealants.

2. Interpretation of test results and written recommendations for primers and substrate preparation needed for adhesion.

F. Preconstruction Field-Adhesion Test Reports: Indicate which sealants and joint preparation methods resulted in optimum adhesion to joint substrates based on testing specified in "Preconstruction Testing" Article.

G. Field-Adhesion Test Reports: For each sealant application tested.

H. Warranties: Sample of special warranties.

1.6 QUALITY ASSURANCE

A. Installer Qualifications: Manufacturer's approved installer who is trained for installation of units required for this Project.

B. Source Limitations: Obtain each kind of joint sealant from single source from single manufacturer.

C. Product Testing: Test joint sealants using a qualified testing agency.

1. Testing Agency Qualifications: An independent testing agency qualified according to ASTM C 1021 to conduct the testing indicated.

2. Test according to SWRI's Sealant Validation Program for compliance with requirements specified by reference to ASTM C 920 for adhesion and cohesion under cyclic movement, adhesion-in-peel, and indentation hardness.

D. Mockups: Install sealant in mockups of assemblies specified in other Sections that are indicated to receive joint sealants specified in this Section. Use materials and installation methods specified in this Section.

E. Preinstallation Conference: Conduct conference at Project site.

1.7 PROJECT CONDITIONS

A. Do not proceed with installation of joint sealants under the following conditions:

079200.01 - Page 4 of 9

1. When ambient and substrate temperature conditions are outside limits permitted by joint-sealant manufacturer.

2. When joint substrates are wet.

3. Where joint widths are less than those allowed by joint-sealant manufacturer for applications indicated.

4. Where contaminants capable of interfering with adhesion have not yet been removed from joint substrates.

1.8 WARRANTY

A. Special Installer's Warranty: Manufacturer's standard form in which Installer agrees to repair or replace joint sealants that do not comply with performance and other requirements specified in this Section within specified warranty period.

1. Warranty Period: Two years from date of Substantial Completion.

B. Special Manufacturer's Warranty: Manufacturer's standard form in which joint-sealant manufacturer agrees to furnish joint sealants to repair or replace those that do not comply with performance and other requirements specified in this Section within specified warranty period.

1. Warranty Period for Urethane Sealants: Five years from date of Substantial Completion.

C. Special warranties specified in this article exclude deterioration or failure of joint sealants from the following:

1. Movement of the structure caused by structural settlement or errors attributable to design or construction resulting in stresses on the sealant exceeding sealant manufacturer's written specifications for sealant elongation and compression.

2. Disintegration of joint substrates from natural causes exceeding design specifications.

3. Mechanical damage caused by individuals, tools, or other outside agents.

4. Changes in sealant appearance caused by accumulation of dirt or other atmospheric contaminants.

PART 2 - PRODUCTS

2.1 MATERIALS, GENERAL

A. Compatibility: Provide joint sealants, backings, and other related materials that are compatible with one another and with joint substrates under conditions of service and application, as demonstrated by joint-sealant manufacturer, based on testing and field experience.

B. Liquid-Applied Joint Sealants: Comply with ASTM C 920 and other requirements indicated for each liquid-applied joint sealant specified, including those referencing ASTM C 920 classifications for type, grade, class, and uses related to exposure and joint substrates.

079200.01 - Page 5 of 9

1. Suitability for Immersion in Liquids. Where sealants are indicated for Use I for joints that will be continuously immersed in liquids, provide products that have undergone testing according to ASTM C 1247. Liquid used for testing sealants is deionized water, unless otherwise indicated.

C. Stain-Test-Response Characteristics: Where sealants are specified to be nonstaining to porous substrates, provide products that have undergone testing according to ASTM C 1248 and have not stained porous joint substrates indicated for Project.

D. Colors of Exposed Joint Sealants: As selected by Architect from manufacturer's full range.

2.2 SILICONE GLAZING SEALANTS

A. General: Refer to Division 08 Section "Glazing" for general requirements for application of glazing sealants.

B. Glazing Sealant: Neutral-curing silicone glazing sealant complying with ASTM C 920, Type S, Grade NS, Class 100/50, Use NT.

1. Products: Subject to compliance with requirements, provide the following:

a. Tremco Incorporated; Spectrem 1.

2.3 URETHANE JOINT SEALANTS

A. Single-Component, Nonsag, Urethane Joint Sealant: ASTM C 920, Type S, Grade NS, Class 25, for Use NT.

1. Products: Subject to compliance with requirements, provide the following:

a. Tremco Incorporated; Dymonic or Vulkem 116.

2.4 JOINT SEALANT BACKING

A. General: Provide sealant backings of material that are nonstaining; are compatible with joint substrates, sealants, primers, and other joint fillers; and are approved for applications indicated by sealant manufacturer based on field experience and laboratory testing.

B. Cylindrical Sealant Backings: ASTM C 1330, Type C (closed-cell material with a surface skin) Type B (bicellular material with a surface skin) or any of the preceding types, as approved in writing by joint-sealant manufacturer for joint application indicated, and of size and density to control sealant depth and otherwise contribute to producing optimum sealant performance.

C. Bond-Breaker Tape: Polyethylene tape or other plastic tape recommended by sealant manufacturer for preventing sealant from adhering to rigid, inflexible joint-filler materials or joint surfaces at back of joint. Provide self-adhesive tape where applicable.

079200.01 - Page 6 of 9

2.5 MISCELLANEOUS MATERIALS

A. Primer: Material recommended by joint-sealant manufacturer where required for adhesion of sealant to joint substrates indicated, as determined from preconstruction joint-sealant-substrate tests and field tests.

B. Cleaners for Nonporous Surfaces: Chemical cleaners acceptable to manufacturers of sealants and sealant backing materials, free of oily residues or other substances capable of staining or harming joint substrates and adjacent nonporous surfaces in any way, and formulated to promote optimum adhesion of sealants to joint substrates.

C. Masking Tape: Nonstaining, nonabsorbent material compatible with joint sealants and surfaces adjacent to joints.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine joints indicated to receive joint sealants, with Installer present, for compliance with requirements for joint configuration, installation tolerances, and other conditions affecting joint-sealant performance.

B. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. Surface Cleaning of Joints: Clean out joints immediately before installing joint sealants to comply with joint-sealant manufacturer's written instructions and the following requirements:

1. Remove all foreign material from joint substrates that could interfere with adhesion of joint sealant, including dust, paints (except for permanent, protective coatings tested and approved for sealant adhesion and compatibility by sealant manufacturer), old joint sealants, oil, grease, waterproofing, water repellents, water, surface dirt, frost and dispose of legally.

2. Clean porous joint substrate surfaces by brushing, grinding, mechanical abrading, or a…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .