B12_Bid_Schedule.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- OR-OREGON ISLANDS NWR - SOUTH STAIRS CON
- Solicitation number
- 140F0321R0007
About this file
This document contains a bid schedule for a federal construction contract opportunity with the Department of the Interior Fish and Wildlife Service. The bid schedule outlines base tasks and option tasks for repair and replacement work on the Coquille Point South Stairs at the Oregon Islands National Wildlife Refuge, including field verification, redesign services, mobilization, replacing existing concrete stair treads with stainless steel bar grating treads across eight stair runs, installing longitudinal cross bracing retrofits, demolishing and replacing an existing wood barricade structure, repairing a bowed post, and replacing roof shingles, balusters, and corroded beam hangers on a covered landing. Bidders are instructed to provide detailed pricing for each line item. The related federal contract opportunity posting includes the solicitation number 140F0321R0007 and identifies the opportunity as being for repairs to the South Stairs at the Oregon Islands National Wildlife Refuge.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Form Schedule
| OREGON ISLANDS NATIONAL WILDLIFE REFUGE |
| COQUILLE POINT SOUTH STAIRS - CONSTRUCTION REPAIRS |
| (ASSET NO. 10004568) |
| BID FORM |
| SCHEDULE OF PRICES |
| INSTRUCTIONS: |
| The Contract Bidder shall edit this Bid Schedule and provide a detailed breakdown of their |
| bid (including support documentation) and all associated line item pricing. It is the |
| responsibility of the bidder to ensure all requirements are met and all support documentation |
| is provided. The purpose of the Bid Schedule Document is to organize Base Bid Tasks |
| and Option Bid Tasks for U.S. Fish and Wildlife Service Price Evaluation. Contractor |
| shall show pricing for items. Failure to provide pricing for all items may result in bid not being |
| considered for award. |
Construction - Base and Option Bid:
| Task No. | Description | Quantity | Unit | Amount | |
| Base Task | |||||
| 1 | Field Verification Site Visit and Site Assessment. | 1 | Lump Sum | ||
| Base Task | |||||
| 2 | Limited Architect-Engineer Services for Re-Design. | 1 | Lump Sum | ||
| Base Task | |||||
| 3 | Mobilization / Demobilizaiton | 1 | Lump Sum | ||
| Option Task | |||||
| A | Replace (8) Existing Concrete Stair Treads with Stainless Steel Bar Grating Treads. |
[Location: Coquille Pt. South Stairs] [Stair Run No. 1] To include but not be limited to:
| All Fasteners and Components to result in a 100% Turnkey Installation. | 1 | Lump Sum |
| Option Task | ||
| B | Replace (8) Existing Concrete Stair Treads with Stainless Steel Bar Grating Treads. |
[Location: Coquille Pt. South Stairs] [Stair Run No. 2] To include but not be limited to:
| All Fasteners and Components to result in a 100% Turnkey Installation. | 1 | Lump Sum |
| Option Task | ||
| C | Replace (8) Existing Concrete Stair Treads with Stainless Steel Bar Grating Treads. |
[Location: Coquille Pt. South Stairs] [Stair Run No. 3] To include but not be limited to:
| All Fasteners and Components to result in a 100% Turnkey Installation. | 1 | Lump Sum |
| Option Task | ||
| D | Replace (8) Existing Concrete Stair Treads with Stainless Steel Bar Grating Treads. |
[Location: Coquille Pt. South Stairs] [Stair Run No. 4] To include but not be limited to:
| All Fasteners and Components to result in a 100% Turnkey Installation. | 1 | Lump Sum |
| Base Task | ||
| 4 | Replace (17) Existing Concrete Stair Treads with Stainless Steel Bar Grating Treads. |
[Location: Coquille Pt. South Stairs] [Stair Run No. 5] To include but not be limited to:
| All Fasteners and Components to result in a 100% Turnkey Installation. | 1 | Lump Sum |
| Option Task | ||
| E | Replace (17) Existing Concrete Stair Treads with Stainless Steel Bar Grating Treads. |
[Location: Coquille Pt. South Stairs] [Stair Run No. 6] To include but not be limited to:
| All Fasteners and Components to result in a 100% Turnkey Installation. | 1 | Lump Sum |
| Option Task | ||
| F | Replace (17) Existing Concrete Stair Treads with Stainless Steel Bar Grating Treads. |
[Location: Coquille Pt. South Stairs] [Stair Run No. 7] To include but not be limited to:
| All Fasteners and Components to result in a 100% Turnkey Installation. | 1 | Lump Sum |
| Base Task | ||
| 5 | Replace (17) Existing Concrete Stair Treads with Stainless Steel Bar Grating Treads. |
[Location: Coquille Pt. South Stairs] [Stair Run No. 8] To include but not be limited to:
| All Fasteners and Components to result in a 100% Turnkey Installation. | 1 | Lump Sum |
| Option Task | ||
| G | Install Longitudinal Cross Bracing Retrofits at locations along the length of the Stairway as shown in Sheets LB-1, LB-2, and LB-3. |
[Location: Coquille Pt. South Stairs] To include but not be limited to:
| All Fasteners and Components to result in a 100% Turnkey Installation. | 1 | Lump Sum | |
| Base Task | |||
| 6 | Demolish, Remove, Recycle, and Dispose of Existing Wood Barricade Structure. | 1 | Lump Sum |
| Base Task | |||
| 7 | Construct New Replacement Wood Barricade Structure. | 1 | Lump Sum |
| Option Task | |||
| H | Repair Bowed Post based on Repair Details shown on Sheet BP-1. |
[Location: Coquille Pt. South Stairs] To include but not be limited to:
| All Fasteners and Components to result in a 100% Contractor Turnkey Installation. | 1 | Lump Sum |
| Option Task | ||
| I | Replace Roof Shingles on Covered Landing. |
Replace Missing and/or Broken Balusters.
Replace (3) Corroded Beam Hangers as shown on Sheet LB-1.
[Location: Coquille Pt. South Stairs] To include but not be limited to:
Removal and Disposal of Existing Shingles and Installation of New Shingles to result in a 100% Contractor Turnkey Installation.
Removal and Disposal of Existing Broken Balusters and Installation of New Balusters to result in a 100% Contractor Turnkey Installation.
Removal and Disposal of Existing Corroded Beam Hangers and Installation of New Beam Hangers to result in a 100% Contractor Turnkey Installation. 1 Lump Sum
Total $0.00
| The Contract Bidder shall provide a detailed breakdown of their bid and all associated line item |
| pricing. The above Bid Schedule Description column is not intended to be comprehensive. |
| It is the responsiblilty of the bidder to ensure all requirements are met. |
Incomplete Bids Will Not Be Considered.
Name of Bidder and Company:
Address (Include Zip Code):