A06_Repair_Drawings__Bowed_Post.pdf

PDF 2 MB Posted

Attached to
OR-OREGON ISLANDS NWR - SOUTH STAIRS CON
Solicitation number
140F0321R0007
Issued by

About this file

This document contains construction drawings and notes for repairing bowed stair posts at the Oregon Islands National Wildlife Refuge in Bandon, Oregon. The drawings specify removing and replacing two bowed posts on each side of the stairway with pressure-treated Douglas Fir posts, reattaching existing cross-bracing, and bracing the stairway as necessary.

The related federal contract opportunity is solicitation number 140F0321R0007 from the U.S. Fish and Wildlife Service for repair work on the south stairs at the Oregon Islands National Wildlife Refuge. The solicitation seeks contractors to perform the stair post repair work depicted in the construction drawings. The response deadline and award date are not provided.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCTION NOTES:

1. SHORE STAIR STRINGER ABOVE AND BELOW BOWED POSTS, BOTH SIDES OF STAIR AND LATERALLY BRACE STAIR

AS NECESSARY.

2. UNBOLT CROSS BRACING AND SAVE FOR REUSE.

3. REMOVE BOWED POSTS AND REPLACE IN KIND, REUSING EXISTING BOLTS. POST TO BE PT 4x6 DOUG-FIR #2.

4. RE-FASTEN EXISTING CROSS BRACING TO NEW POSTS USING EXISTING BOLTS.

BOWED POST,

TYP EA SIDE

OF STAIRWAY

SHEET NO:

PROJ. NO.

DRAWN

CHECKED

DATE

200288

PROJECT:

TITLE: REPAIR BOWED STAIR POSTS

CLIENT: US FISH AND WILDLIFE SERVICE

COQUILLE POINT STAIRWAY EVALUATION CONTRACT ORDER:

10/07/2020

SWH

DFP

BP1

140F0719D0007/140F120F0068OREGON ISLANDS NATIONAL WILDLIFE REFUGE, BANDON, OREGON www.coffman.com ph 503.552.3800

329 NE Couch Street, Suite 203 Portland, OR 97232

File details come from the government source that posted it. Updated .