This is a State of Oregon Bid Security Form for the Oregon Military Department's Invitation to Bid (ITB S-24800-00017106) for the B115 HVAC Design Build project. The document establishes the bid bond requirements for contractors submitting proposals in response to the competitive bidding procurement. The project involves a complete HVAC system replacement for an 11,500 square-foot space structured in two components: a Design Element (CLIN 0001) with phased submittals at 35%, 65%, and 100% completion stages, and a Construction Element (CLIN 0002) as a not-to-exceed fixed-price contract. Design deliverables must comply with current ASHRAE standards and UFC 3-410-01, include stamped load calculations, and integrate with the existing Energy Management Control System. Construction cannot commence until Government approval of the 100% design submission. Bids are due July 14, 2026, with a mandatory pre-bid walkthrough scheduled to review building plans. The construction phase is fully turn-key, requiring the contractor to furnish all equipment, labor, materials, and supervision; execute ductwork and piping modifications; coordinate electrical work; handle architectural and structural repairs; perform roof penetrations with certified sealing; manage refrigerant evacuation and EPA-compliant disposal; and complete system commissioning with Testing, Adjusting, and Balancing.
Bid security in the amount of ten percent of the total bid amount is required pursuant to ORS 279C.365(4) and must be submitted with the proposal. The surety bond obligates the bidder to enter into the contract within the specified timeframe, execute required performance and payment bonds, and provide proof of insurance as mandated. Final acceptance requires submission of a zero-item punch list, completed commissioning tests, as-built drawings, operations and maintenance manuals, equipment inventory spreadsheets, warranty documentation, spare parts, and an executed DD Form 1354 for property transfer. Extensive preconstruction and construction submittals are required, including a Quality Control Plan, safety documentation, utility coordination requests, Buy American Act certifications, cybersecurity compliance for Direct Digital Control systems, and daily quality-control reporting.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B115 HVAC Design Build ITB.pdf | ||
| ATTACHMENT A SCOPE B115 FINAL.pdf | ||
| B115 RFI Answers v.1~1.pdf | ||
| B115 RFI Answers v.2~1.pdf | ||
| B115 HVAC Pre-bid sign-in001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DOJ Approved Version 8-5-25 ITB S-24800-00017106
State of Oregon – Oregon Military Department Invitation to Bid
EXHIBIT 3
State of Oregon Bid Security Form
We, , as “Principal,” (Name of Principal) and , an Corporation, (Name of Surety) authorized to transact Surety business in Oregon, as “Surety,” hereby jointly and severally bind ourselves, our respective heirs, executors, administrators, successors, and assigns to pay unto the State of Oregon (“Obligee”) the sum of ($ ) dollars.
WHEREAS, the condition of the obligation of this bond is that Principal has submitted its proposal or bid to an agency of the Obligee in response to Obligee’s procurement document (No. TQKD-26-2012) for the project identified as: B115 HVAC Design Build which proposal or bid is made a part of this bond by reference, and Principal is required to furnish bid security in an amount equal to ten (10%) percent of the total amount of the bid pursuant to the procurement document and ORS 279C.365 (4) for competitive bidding or 279C.400 (5) for competitive proposals.
NOW, THEREFORE, if the proposal or bid submitted by Principal is accepted, and if a contract pursuant to the proposal or bid is awarded to Principal, and if Principal enters into and executes such contract within the time specified in the procurement document and executes and delivers to Obligee its good and sufficient performance and payment bonds required by Obligee, as well as any required proof of insurance, within the time fixed by Obligee, then this obligation shall be void; otherwise shall remain in full force and effect.
IN WITNESS WHEREOF, we have caused this instrument to be executed and sealed by out duly authorized legal representatives this day of , 20___.
PRINCIPAL: SURETY:
By:
(signature)
BY ATTORNEY-IN-FACT:
(Official Capacity)
Name
Attest:
(Corporation Secretary)
Signature
Address
City State Zip
Phone Fax
File details come from the government source that posted it. Updated .