B09_Attachment_3_Price_schedule.xlsx

XLSX spreadsheet 48 KB Posted

Attached to
FY26 HOAL FACILITY & GROUNDS MAINTENANCE
Solicitation number
140P2126Q0057
Issued by

About this file

This is an Independent Government Cost Estimate (IGCE) pricing schedule template for the FY26 HOAL Facility & Grounds Maintenance Services contract, a Time and Materials (T&M) procurement with a base year period of performance from January 11, 2026 through September 30, 2026. The template is designed for the Department of the Interior National Park Service and includes sections for the base year plus four optional years, with formulas configured to automatically populate summary data across all performance periods.

The cost estimate structure encompasses five primary cost categories: Direct Labor (Burdened Rates), Equipment Purchases, Software Purchases, Other Direct Costs (including required travel, material/supplies, and other miscellaneous items), and Fringe benefits. The base year labor component identifies specific maintenance positions including two Full-Time Multi-Trade Maintenance Technicians (4,680 hours), a Supervisory Maintenance Technician (1,560 hours), Emergency/On-Call staff (160 hours), and Contract Administration (780 hours). Equipment purchases are limited to non-routine items, with examples provided for snow blowers and plows. Material and supplies are categorized as facility supplies (filters, bulbs, valves, sealants, caulk) and grounds supplies (ice melt, bags, tools). The template emphasizes that training is restricted to mission-specific requirements only, contractors should recover general and administrative expenses in their burdened rates, and vendors should not be contacted directly to preserve procurement integrity. Cost escalation of 3.5 to 4 percent is recommended for option years based on historical data.

View the file

Other files

File Type Posted
Sol_140P2126Q0057_Amd_0001.pdf PDF
B08_Attachment_2_15-5465.txt TXT text file
Sol_140P2126Q0057.pdf PDF
B09_Revised_SOW_v2.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

INDEPENDENT GOVERNMENT COST ESTIMATE
Just one of many options to use
START HERE: Enter Procurement Data below.
PROCUREMENT DATA
Procurement Name:FY26 HOAL Facility & Grounds Maintenance Services
Contract Type:T&M
Requisition Number:Requisition Number Goes Here
Period of Performance:01/11/2026 - 09/30/2026
Summary data, below, is autopulated from the yearly worksheets. Do not edit this section.
SUMMARY DATATOTAL
BASE YEAR SUBTOTAL:ERROR:#REF!
OPTION YEAR 1 SUBTOTAL:$0.00
OPTION YEAR 2 SUBTOTAL:$0.00
OPTION YEAR 3 SUBTOTAL:$0.00
OPTION YEAR 4 SUBTOTAL:$0.00
PROCUREMENT TOTAL:ERROR:#REF!
INSTRUCTIONS
Enter Procurement Data in the Procurement Data section above.
The Summary Data section is autopulated from the yearly worksheets. Do not edit this section.
There is one tab in this workbook for the base year and each option year.
If applicable, enter Basis for Estimate and Assumptions in the space below.

BASIS FOR ESTIMATE AND ASSUMPTIONS

Base Year

DIRECT LABOR (BURDENED RATES)
AmLabor CategoryHoursLabor RateAmount
1FT Multi-Trade Maintenace Tech (2)4680
2Supervisory Maintenace Tech1560
3Emergency / On-Call160
5Contract Administration780
6Fringe
SUBTOTAL
EQUIPMENT PURCHASES
Item DescriptionQuantityUnit PriceTotal
1Snow Blower1
2Plow1
30
SUBTOTAL
MATERIAL/SUPPLIES: (List Below)
Item DescriptionQuantityUnit PriceTotal
1Facility Supplies (filters, bulbs, valves, sealants, caulk, etc.)1
2Grounds Supplies (ice melt, bags, tools, etc.)1
30
SUBTOTAL

Option Year 1

INDEPENDENT GOVERNMENT COST ESTIMATEDIRECTIONS
OPTION YEAR 1: MM-DD-YY - MM-DD-YYEnter Option Year POP in cell B2
FY26 HOAL Facility & Grounds Maintenance ServicesAdd rows as needed
T&MAdjust formulas to ensure total Option Year cost appears in cell D5
Total$0.00
DIRECT LABOR (BURDENED RATES)
Labor CategoryHoursRateAmount
10$0.00$0.00
20$0.00$0.00Please note, in order to preserve the integrity of the procurement process, do not contact manufacturers or vendors directly to obtain quotes.
30$0.00$0.00
SUBTOTAL$0.00
EQUIPMENT PURCHASESYou can also use previous history to come up with your IGCE, just be sure to add an escalation (3.5% to 4%)
Item DescriptionQuantityUnit PriceTotal
10$0.00$0.00
20$0.00$0.00If this acquisition contains Direct Labor, then the purchase of Equipment and/or Software should only be for NON-routine purchases and/or items that are specifically required for this service acquisition.
30$0.00$0.00
SUBTOTAL$0.00
SOFTWARE PURCHASES
Item DescriptionQuantityUnit PriceTotal
10$0.00$0.00ODCs in FFP contracts can be hardware and/or software, in which they are primarily part of turnkey solutions. Turnkey solutions are a type of system that can be easily implemented into current business processes. A turnkey solution is immediately ready to use upon implementation and is designed to fulfill a certain process such as billing, website design, training or content management. With T&M contracts, ODCs are primarily supplies and spare parts.
20$0.00$0.00
30$0.00$0.00
SUBTOTAL$0.00
OTHER DIRECT COST
REQUIRED TRAVEL: (Not-to-Exceed Amount; Worse Case)
Travel (To/From)No. of TripsPrice Per TripTotal
10$0.00$0.00
20$0.00$0.00
30$0.00$0.00
SUBTOTAL$0.00For travel, use airline websites and the per diem shown under the GSA website, linked HERE
MATERIAL/SUPPLIES: (List Below)
Item DescriptionQuantityUnit PriceTotalTravel / Training / ODC information must be included in acquisition document and Independent Government Cost Estimate (IGCE). Training can only be included on T&M contracts, and only for mission-specific requirements (NOT professional development).

General and administrative (G&A) expenses should not be included. Contractors are expected to recover costs in their fully burdened rates.

10$0.00$0.00
20$0.00$0.00
30$0.00$0.00
SUBTOTAL$0.00
OTHER: (Anything not covered above)
Item DescriptionQuantityUnit PriceTotal
10$0.00$0.00
20$0.00$0.00
30$0.00$0.00
SUBTOTAL$0.00

FY TOTAL $0.00

http://www.gsa.gov/portal/content/104877?utm_source=OGP&utm_medium=print-radio&utm_term=perdiem&utm_campaign=shortcuts Option Year 2

INDEPENDENT GOVERNMENT COST ESTIMATEDIRECTIONS
OPTION YEAR 2: MM-DD-YY - MM-DD-YYEnter Option Year POP in cell B2
FY26 HOAL Facility & Grounds Maintenance ServicesAdd rows as needed
T&MAdjust formulas to ensure total Option Year cost appears in cell D5
Total$0.00
DIRECT LABOR (BURDENED RATES)
Labor CategoryHoursRateAmount
10$0.00
20$0.00Please note, in order to preserve the integrity of the procurement process, do not contact manufacturers or vendors directly to obtain quotes.
30$0.00
SUBTOTAL$0.00
EQUIPMENT PURCHASESYou can also use previous history to come up with your IGCE, just be sure to add an escalation (3.5% to 4%)
Item DescriptionQuantityUnit PriceTotal
10$0.00$0.00
20$0.00$0.00If this acquisition contains Direct Labor, then the purchase of Equipment and/or Software should only be for NON-routine purchases and/or items that are specifically required for this service acquisition.
30$0.00$0.00
SUBTOTAL$0.00
SOFTWARE PURCHASES
Item DescriptionQuantityUnit PriceTotal
10$0.00$0.00ODCs in FFP contracts can be hardware and/or software, in which they are primarily part of turnkey solutions. Turnkey solutions are a type of system that can be easily implemented into current business processes. A turnkey solution is immediately ready to use upon implementation and is designed to fulfill a certain process such as billing, website design, training or content management. With T&M contracts, ODCs are primarily supplies and spare parts.
20$0.00$0.00
30$0.00$0.00
SUBTOTAL$0.00
OTHER DIRECT COST
REQUIRED TRAVEL: (Not-to-Exceed Amount; Worse Case)
Travel (To/From)No. of TripsPrice Per TripTotal
10$0.00$0.00
20$0.00$0.00
30$0.00$0.00
SUBTOTAL$0.00For travel, use airline websites and the per diem shown under the GSA website, linked HERE
MATERIAL/SUPPLIES: (List Below)
Item DescriptionQuantityUnit PriceTotalTravel / Training / ODC information must be included in acquisition document and Independent Government Cost Estimate (IGCE). Training can only be included on T&M contracts, and only for mission-specific requirements (NOT professional development).

General and administrative (G&A) expenses should not be included. Contractors are expected to recover costs in their fully burdened rates.

10$0.00$0.00
20$0.00$0.00
30$0.00$0.00
SUBTOTAL$0.00
OTHER: (Anything not covered above)
Item DescriptionQuantityUnit PriceTotal
10$0.00$0.00
20$0.00$0.00
30$0.00$0.00
SUBTOTAL$0.00

FY TOTAL $0.00

http://www.gsa.gov/portal/content/104877?utm_source=OGP&utm_medium=print-radio&utm_term=perdiem&utm_campaign=shortcuts Option Year 3

INDEPENDENT GOVERNMENT COST ESTIMATEDIRECTIONS
OPTION YEAR 3: MM-DD-YY - MM-DD-YYEnter Option Year POP in cell B2
FY26 HOAL Facility & Grounds Maintenance ServicesAdd rows as needed
T&MAdjust formulas to ensure total Option Year cost appears in cell D5
Total$0.00
DIRECT LABOR (BURDENED RATES)
Labor CategoryHoursRateAmount
10$0.00
20$0.00Please note, in order to preserve the integrity of the procurement process, do not contact manufacturers or vendors directly to obtain quotes.
30$0.00
SUBTOTAL$0.00
EQUIPMENT PURCHASESYou can also use previous history to come up with your IGCE, just be sure to add an escalation (3.5% to 4%)
Item DescriptionQuantityUnit PriceTotal
10$0.00$0.00
20$0.00$0.00If this acquisition contains Direct Labor, then the purchase of Equipment and/or Software should only be for NON-routine purchases and/or items that are specifically required for this service acquisition.
30$0.00$0.00
SUBTOTAL$0.00
SOFTWARE PURCHASES
Item DescriptionQuantityUnit PriceTotal
10$0.00$0.00ODCs in FFP contracts can be hardware and/or software, in which they are primarily part of turnkey solutions. Turnkey solutions are a type of system that can be easily implemented into current business processes. A turnkey solution is immediately ready to use upon implementation and is designed to fulfill a certain process such as billing, website design, training or content management. With T&M contracts, ODCs are primarily supplies and spare parts.
20$0.00$0.00
30$0.00$0.00
SUBTOTAL$0.00
OTHER DIRECT COST
REQUIRED TRAVEL: (Not-to-Exceed Amount; Worse Case)
Travel (To/From)No. of TripsPrice Per TripTotal
10$0.00$0.00
20$0.00$0.00
30$0.00$0.00
SUBTOTAL$0.00For travel, use airline websites and the per diem shown under the GSA website, linked HERE
MATERIAL/SUPPLIES: (List Below)
Item DescriptionQuantityUnit PriceTotalTravel / Training / ODC information must be included in acquisition document and Independent Government Cost Estimate (IGCE). Training can only be included on T&M contracts, and only for mission-specific requirements (NOT professional development).

General and administrative (G&A) expenses should not be included. Contractors are expected to recover costs in their fully burdened rates.

10$0.00$0.00
20$0.00$0.00
30$0.00$0.00
SUBTOTAL$0.00
OTHER: (Anything not covered above)
Item DescriptionQuantityUnit PriceTotal
10$0.00$0.00
20$0.00$0.00
30$0.00$0.00
SUBTOTAL$0.00

FY TOTAL $0.00

http://www.gsa.gov/portal/content/104877?utm_source=OGP&utm_medium=print-radio&utm_term=perdiem&utm_campaign=shortcuts Option Year 4

INDEPENDENT GOVERNMENT COST ESTIMATEDIRECTIONS
OPTION YEAR 4: MM-DD-YY - MM-DD-YYEnter Option Year POP in cell B2
FY26 HOAL Facility & Grounds Maintenance ServicesAdd rows as needed
T&MAdjust formulas to ensure total Option Year cost appears in cell D5
Total$0.00
DIRECT LABOR (BURDENED RATES)
Labor CategoryHoursRateAmount
10$0.00
20$0.00Please note, in order to preserve the integrity of the procurement process, do not contact manufacturers or vendors directly to obtain quotes.
30$0.00
SUBTOTAL$0.00
EQUIPMENT PURCHASESYou can also use previous history to come up with your IGCE, just be sure to add an escalation (3.5% to 4%)
Item DescriptionQuantityUnit PriceTotal
10$0.00$0.00
20$0.00$0.00If this acquisition contains Direct Labor, then the purchase of Equipment and/or Software should only be for NON-routine purchases and/or items that are specifically required for this service acquisition.
30$0.00$0.00
SUBTOTAL$0.00
SOFTWARE PURCHASES
Item DescriptionQuantityUnit PriceTotal
10$0.00$0.00ODCs in FFP contracts can be hardware and/or software, in which they are primarily part of turnkey solutions. Turnkey solutions are a type of system that can be easily implemented into current business processes. A turnkey solution is immediately ready to use upon implementation and is designed to fulfill a certain process such as billing, website design, training or content management. With T&M contracts, ODCs are primarily supplies and spare parts.
20$0.00$0.00
30$0.00$0.00
SUBTOTAL$0.00
OTHER DIRECT COST
REQUIRED TRAVEL: (Not-to-Exceed Amount; Worse Case)
Travel (To/From)No. of TripsPrice Per TripTotal
10$0.00$0.00
20$0.00$0.00
30$0.00$0.00
SUBTOTAL$0.00For travel, use airline websites and the per diem shown under the GSA website, linked HERE
MATERIAL/SUPPLIES: (List Below)
Item DescriptionQuantityUnit PriceTotalTravel / Training / ODC information must be included in acquisition document and Independent Government Cost Estimate (IGCE). Training can only be included on T&M contracts, and only for mission-specific requirements (NOT professional development).

General and administrative (G&A) expenses should not be included. Contractors are expected to recover costs in their fully burdened rates.

10$0.00$0.00
20$0.00$0.00
30$0.00$0.00
SUBTOTAL$0.00
OTHER: (Anything not covered above)
Item DescriptionQuantityUnit PriceTotal
10$0.00$0.00
20$0.00$0.00
30$0.00$0.00
SUBTOTAL$0.00

FY TOTAL $0.00

http://www.gsa.gov/portal/content/104877?utm_source=OGP&utm_medium=print-radio&utm_term=perdiem&utm_campaign=shortcuts Sample

INDEPENDENT GOVERNMENT COST ESTIMATEDIRECTIONS
BASE YEAR: 10-01-14 - 09-30-15Enter Option Year POP in cell B2
Sample ProcurementAdd rows as needed
T&MAdjust formulas to ensure total Option Year cost appears in cell D5
Total$307,468.53
DIRECT LABOR (BURDENED RATES)
Labor CategoryHoursRateAmount
1Project Manager III720$119.72$86,197.07
2Engineer III1440$99.72$143,601.91Please note, in order to preserve the integrity of the procurement process, do not contact manufacturers or vendors directly to obtain quotes.
3Technical Specialist II720$74.56$53,683.54
3Analyst II1440$68.59$98,775.00
SUBTOTAL$283,482.53
You can also use previous history to come up with your IGCE, just be sure to add an escalation (3.5% to 4%)
EQUIPMENT PURCHASES
Item DescriptionQuantityUnit PriceTotal
1Samophlange3$4,250.00$12,750.00If this acquisition contains Direct Labor, then the purchase of Equipment and/or Software should only be for NON-routine purchases and/or items that are specifically required for this service acquisition.
2Samophlange Inhibitor1$235.00$235.00
30$0.00$0.00
SUBTOTAL$12,985.00
SOFTWARE PURCHASES
Item DescriptionQuantityUnit PriceTotalODCs in FFP contracts can be hardware and/or software, in which they are primarily part of turnkey solutions. Turnkey solutions are a type of system that can be easily implemented into current business processes. A turnkey solution is immediately ready to use upon implementation and is designed to fulfill a certain process such as billing, website design, training or content management. With T&M contracts, ODCs are primarily supplies and spare parts.
1SamoManager v8.53$985.00$2,955.00
20$0.00$0.00
30$0.00$0.00
SUBTOTAL$2,955.00
OTHER DIRECT COST
REQUIRED TRAVEL: (Not-to-Exceed Amount; Worse Case)
Travel (To/From)No. of TripsPrice Per TripTotal
1Fairbanks, AK4$1,800.00$7,200.00
2Wallops, VA2$300.00$600.00
30$0.00$0.00For travel, use airline websites and the per diem shown under the GSA website, linked HERE
SUBTOTAL$7,800.00

MATERIAL/SUPPLIES: (List Below) Travel / Training / ODC information must be included in acquisition document and Independent Government Cost Estimate (IGCE). Training can only be included on T&M contracts, and only for mission-specific requirements (NOT professional development).

General and administrative (G&A) expenses should not be included. Contractors are expected to recover costs in their fully burdened rates.

Item DescriptionQuantityUnit PriceTotal
1Stapler1$10.00$10.00
2Binder32$4.00$128.00
30$0.00$0.00
SUBTOTAL$138.00
OTHER: (Anything not covered above)
Item DescriptionQuantityUnit PriceTotal
1Other Item #14$24.00$96.00
2Other Item #212$1.00$12.00
30$0.00$0.00
SUBTOTAL$108.00

FY TOTAL $307,468.53

http://www.gsa.gov/portal/content/104877?utm_source=OGP&utm_medium=print-radio&utm_term=perdiem&utm_campaign=shortcuts

File details come from the government source that posted it. Updated .