Table 1. Production Milestones

SOW

PARA TITLE FREQ SCHEDULE FORMAT PM SPE

POC

3.15.9 Production Milestone

Schedule

As Required

NLT 7 calendar days ACA; updated for each IPT

Contractor Format Acceptable

PM SPE

IPT

7.1.2 & 7.1.3

Quality Manual and Crosswalk Matrix Updates One Time NLT 14 calendar days ACA PM SPE Form 11 PM SPE

QA

7.3.1 Subcontractor and Supplier

Management Plan Updates One Time NLT 14 calendar days ACA Contractor Format

Acceptable

PM SPE

QA

3.13.1 Post Award Conference One Time 21 calendar days

ACA

At Contractor Facility

PM SPE

APM/COR

4.2 Design Package One Time 21 calendar days

ACA SOW PM SPE

ENG

3.13.3 IPT Meetings Weekly Every week from

contract start

Contractor Format Acceptable

PM SPE

APM/COR

3.12.4 Meeting Minutes As

required

NLT 2 business days after meetings

Contractor Format Acceptable

Product Team

3.18.1.1 Awareness Training

Certificate of Completion One Time 45 calendar days

ACA Email PM SPE

APM

3.18.3 iWATCH Training Results One Time 45 calendar days ACA Email PM SPE

APM

3.19.2 Background Checks One Time 45 calendar days

ACA Email PM SPE

APM

4.3 Design V & V One Time Prior to Pre-FAT

Audit Memo PM SPE

QA/ENG

4.4 Pre-FAT Audit One Time Prior to FAT build PM SPE Form QAR

5.1.4 First Article Test Delivery One Time

45 calendar days after award of Delivery Order

PD PM SPE

APM /ENG

4.4 Production Process

Package

One Time/ Updates

14 calendar days after FAT

Submission

SOW PM SPE

QA

3.19.4 Program Access Approval One Time 60 calendar days

ACA Email PM SPE

APM/ATO

3.19.3 OPSEC SOP/Plan One Time/

Annually

90 calendar days

ACA

Contractor Format Acceptable COR

5.3.1 Internal Audit Results One Time At PRR Contractor Format Acceptable

PM SPE

QA

5.3 Production Readiness

Review One Time

14 calendar days after FAT Approval

Email / Contractor Facility

PM SPE

QA

5.5.3 Corrective Action Request

Response

As required

15 calendar days after CAR receipt PM SPE Form 3 PM SPE

QA

4.5.4.1 Engineering Change

Request

As Required As required PM SPE Form 1 PM SPE

ENG