B08 W9123822R0009 Attachment 6 Contractors Project Experience Dated 28 January 2022.pdf

PDF 97 KB Posted

Attached to
DBB, Utah Test and Training Range (UTTR) Modular Storage Magazines (MSMs) Federal contract opportunity
Solicitation number
W9123822R0009
Issued by
Department of the Army Corps of Engineers Engineering District Sacramento

About this file

This document package includes a federal contract solicitation and supporting project experience attachment. The U.S. Army Corps of Engineers, Sacramento District is soliciting design-bid-build construction services to build nine earth-covered modular storage magazines at the Utah Test and Training Range in Utah for staging D5 missile motors. Each magazine requires a mechanical room, elevated concrete dock and floor, and air-pallet-bearing floor finish. Supporting facilities include special foundations, paving, antiterrorism/force protection features, electrical and mechanical utilities. Contractors must submit an attachment demonstrating relevant project experience, including details on schedule management, quality management, subcontractor management and site safety performance on past projects. The selected offeror will be responsible for special inspections, facility evaluation tests to verify structure compliance, and adhering to all applicable DoD standards for minimum antiterrorism and physical security.

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 06 CONTRACTOR’S PROJECT EXPERIENCE

<<Picture>>

Contractor’s Name (Who performed the work?):

Project Name: Project Location:

City, State

Project Owner: Point of contact information (owner name, POC name, address, and phone minimum) If

Government Contract, additionally provide the contract number and contracting office)

Detailed Description: General scope and relevance. Provide a description of the project. Be sure to include features of this project that make it comparable in type or nature to the proposed project described in this request for proposal.

Detailed Explanation of Relevancy:

Success/Challenges with schedule management, quality management, subcontractor management and site safety:

BGSF: XXX,XXX DART Rate:

Schedule:

Start Date:

MM-DD-YYYY

Original

Completion:

MM-DD-YYYY

Final Contract

Completion:

MM-DD-YYYY

Beneficial Occupancy

Date:

MM-DD-YYYY

Cost

Original Project Cost:

Final Project Cost:

Cost

Difference

% Subcontracted:

File details come from the government source that posted it. Updated .